Attachment 2 Wage Determination WA100053 03-19-2010.doc

DOC document 47 KB Posted

Attached to
IDIQ SABER Contract Federal contract opportunity
Solicitation number
FA4479-10-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

Davis Bacon Wage Determination WA100053

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ SABER Contract, newest first.
File Type Posted
Questions and Answers for FA4479-10-R-0002 as of 05-26-10 Posted.doc DOC document
Attachment 10 Addendum 1 SOW 7664.pdf PDF
Attachment 8-6 Addendum 2 to Scope of Work for DEQ000878J .pdf PDF
FA4479-10-R-0001-0004.doc DOC document
FA4479-10-R-0002-0003.doc DOC document
Questions and Answers for FA4479-10-R-0002 as of 05-20-10 Posted.doc DOC document
Meeting Memorandum of the Pre-Proposal Site Visits and Meetings.pdf PDF
Questions and Answers for FA4479-10-R-0002 as of 05-10-10.doc DOC document
Attachment 9 DEQ000878J Addendum 1 Rev.pdf PDF
FA4479-10-R-0002-0002.doc DOC document
Attachment 8-5 DEQ000878J Recycle Ctr Mod As Builts.pdf PDF
FA4479-10-R-0002-0001.pdf PDF
Attachment 1 SABER SOW 7664 2010 19 Apr 10.pdf PDF
FA4479-10-R-0002.pdf PDF
Attachment 8-4 Earthworks Acceptance Criteria.pdf PDF
Attachment 8-3 FtlewisOperPlan0207.pdf PDF
Attachment 7 Subcontactor-Teaming Partner Consent Sample Format.doc DOC document
Attachment 8-2 Solid Waste Permit10.pdf PDF
Attachment 8-0 DEQ000878J Scope of Work.pdf PDF
Attachment 5 Base Access List Format.xls XLS spreadsheet
Attachment 3 Hold Harmless Agreement.doc DOC document
Attachment 4 Insurance Compliance Certificate.doc DOC document
Attachment 8-1 DEQ000878J Location Map.pdf PDF
Attachment 6 Past Performance Survey.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: WA100053 03/19/2010 WA53

Superseded General Decision Number: WA20080053

State: Washington

Construction Type: Building

County: Pierce County in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

* ASBE0007-002 01/01/2010

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 36.53 13.75

BRWA0001-011 06/01/2009

Rates Fringes

Bricklayers, Caulkers............$ 34.31 12.04

CARP0770-020 06/01/2009

Rates Fringes

CARPENTER (Acoustical

Installation)....................$ 35.55 13.08

CARPENTER (Including

Formwork, Drywall Hanging, Cabinet Installation;

Insulator-Batt and Metal Stud

Installation)....................$ 35.39 13.08

MILLWRIGHT.......................$ 36.39 13.08

PILEDRIVERMAN....................$ 35.59 13.08

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham

Auburn Bremerton Anacortes

Renton Shelton Yakima

Aberdeen-Hoquiam Tacoma Wenatchee

Ellensburg Everett Port Angeles

Centralia Mount Vernon Sunnyside

Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free

26-35 radius miles $1.00/hour

36-45 radius miles $1.15/hour

46-55 radius miles $1.35/hour

Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free

26-45 radius miles $ .70/hour

Over 45 radius miles $1.50/hour

* ELEC0076-005 09/01/2009

Rates Fringes

ELECTRICIAN......................$ 34.84 3%+16.40

ELEC0076-006 06/01/2001

Rates Fringes

ELECTRICIAN (Alarm

Installation Only)...............$ 18.77 5.97

ELECTRICIAN (Low Voltage

Wiring Only).....................$ 18.77 5.97

ELEV0019-005 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 44.14 20.035+A+B

FOOTNOTE:

a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit.

b. Eight paid holidays: New Year's Day; Memorial Day;

Independence Day; Labor Day; Veteran's Day; Thanksgiving

Day; Friday after Thanksgiving and Christmas Day

ENGI0612-004 06/01/2009

Rates Fringes

Power equipment operators:

GROUP 1A...................$ 35.79 15.15

GROUP 1AA..................$ 36.36 15.15

GROUP 1AAA.................$ 36.92 15.15

GROUP 1.....................$ 35.24 15.15

GROUP 2.....................$ 34.75 15.15

GROUP 3.....................$ 34.33 15.15

GROUP 4.....................$ 31.97 15.15

Zone Differential (Add to Zone 1 rates):

Zone 2 (26-45 radius miles) = $ .70

Zone 3 (Over 45 radius miles) - $1.00

BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom

(including jib with attachments)

GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom

(including jib with attachments); Excavator/Trackhoe: Over

90 metric tons

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom

(including jib with attachments); Excavator/Trackhoe: over

50 metric tons to 90 metric tons

GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom

(including jib with attachments); Excavator/Trackhoe: over

30 metric tons to 50 metric tons; Screedman; Scrapers: 45 yards and over; Grader/Blade

GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;

Drilling machine; Excavator/Trackhoe: 15 to 30 metric tons;

Horizontal/directional drill operator; Compactor; Scraper:

under 45 tons

GROUP 3 - Cranes-thru 19 tons with attachments; Motor patrol grader-nonfinishing; Roller-Plant Mix; Excavator/Trackhoe:

under 15 metric tons; Forklift: 3000 lbs and over with attachments; Service Oiler; Concrete Pump; Outside Hoist

(Elevators and Manlifts); Pump Grout

GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments; Bobcat/Skid Loader

HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan.

H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing

H-2 Class "C" Suit - Base wage rate plus $ .25 per hour.

H-3 Class "B" Suit - Base wage rate plus $ .50 per hour.

H-4 Class "A" Suit - Base wage rate plus $ .75 per hour.

IRON0086-010 07/01/2009

Rates Fringes

IRONWORKER (Reinforcing, Structural and Ornamental).......$ 36.62 17.40

LABO0001-016 06/01/2009

ZONE 1:

Rates Fringes

Laborers:

GROUP 2.....................$ 24.86 9.07

GROUP 3.....................$ 30.96 9.07

GROUP 4.....................$ 31.70 9.07

GROUP 5.....................$ 32.21 9.07

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $1.00

ZONE 3 - $1.30

BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,

TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.

TOWNSEND, PT. ANGELES, AND BREMERTON

ZONE 1 - Projects within 25 radius miles of the respective city hall

ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall

ZONE 3 - More than 45 radius miles from the respective city hall

LABORERS CLASSIFICATIONS

GROUP 2: Flagman

GROUP 3: General Laborer; Mason Tender-Cement/Concrete;

Chipping Gun (under 30 lbs.); Form Stripping; Roof Tearoff

GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;

Grade Checker; Gunite; Pipe Layer; Vibrating Plate

GROUP 5: Mason Tender-Brick

* PAIN0005-029 07/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 34.31 14.18

PAIN0005-030 06/01/2008

Rates Fringes

Painters:

Parking Lot and Highway

Striping Only...............$ 26.50 11.40

PAIN0005-031 03/01/2009

Rates Fringes

PAINTER (Including Brush, Roller, Spray and Prep Work).....$ 20.82 7.44

PAIN0005-034 07/01/2009

Rates Fringes

Soft Floor Layers (Including

Vinyl and Carpet)................$ 26.23 11.88

PAIN0188-005 09/01/2009

Rates Fringes

GLAZIER..........................$ 36.00 12.50

PLAS0077-001 07/01/2008

Rates Fringes

PLASTERER........................$ 32.50 12.33

PLAS0528-004 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 35.75 13.40

PLUM0082-007 06/01/2007

Rates Fringes

PLUMBER (Excluding HVAC Pipe

Installation)....................$ 35.55 15.32

REFRIGERATION MECHANIC...........$ 35.55 15.32

PLUM0082-008 06/01/2007

Rates Fringes

PIPEFITTER (HVAC Pipe

Installation Only)...............$ 35.55 15.32

PIPEFITTER.......................$ 35.55 15.32

ROOF0153-004 01/01/2010

Rates Fringes

ROOFER (Excluding Metal Roofs)...$ 28.00 10.54

SFWA0699-006 01/01/2010

Rates Fringes

SPRINKLER FITTER (Fire

Sprinklers)......................$ 44.19 19.60

* SHEE0066-024 06/01/2009

Rates Fringes

Sheet Metal Worker (Including

HVAC Duct Work and

Installation of HVAC Systems)....$ 38.19 19.79

SUWA2009-026 05/22/2009

Rates Fringes

LABORER: Handheld Drill.........$ 17.17 5.36

LABORER: Irrigation.............$ 11.58 0.00

LABORER: Landscape..............$ 9.90 0.00

LABORER: Overhead Door

Installation.....................$ 22.31 3.44

OPERATOR: Backhoe...............$ 26.34 8.38

OPERATOR: Bulldozer.............$ 26.63 8.38

OPERATOR: Loader................$ 30.40 8.38

OPERATOR: Mechanic..............$ 24.33 4.33

ROOFER (Metal Roofs Only)........$ 24.30 4.05

TILE SETTER......................$ 18.72 3.35

TRUCK DRIVER: Dump Truck........$ 27.04 0.00

* TEAM0174-005 06/01/2009

Rates Fringes

Truck drivers:

ZONE A:

GROUP 2:...................$ 31.03 14.60

ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.

ZONE C (over 45 miles from centr of listed cities*): Add

$1.00 per hour to Zone A rates.

*Zone pay will be calculated from the city center of the following listed cities:

BELLINGHAM CENTRALIA RAYMOND OLYMPIA

EVERETT SHELTON ANACORTES BELLEVUE

SEATTLE PORT ANGELES MT. VERNON KENT

TACOMA PORT TOWNSEND ABERDEEN BREMERTON

TRUCK DRIVERS CLASSIFICATIONS

GROUP 2 - Semi-Trailer Truck

HAZMAT PROJECTS

Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B: +$.50 per hour - Uses same respirator protection as

Level A. Supplied air line is provided in conjunction with a chemical "splash suit."

LEVEL A: +$.75 per hour - This level utilizes a fully-encapsulated suit with a self-contained breathing apparatus or a supplied air line.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction

Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR

Part 7).

Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board

(formerly the

Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Attachment 2

Page 9 of 9 Solicitation FA4479-10-R-0002

File details come from the government source that posted it. Updated .