About this file
Seed Project SOW Attachment 4
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Lewis, WA Earthworks
DEQ000878J Attch 8-4
EARTHWORKS ENTRANCE
SCALE HOUSE
CHECK-IN AND
PARKING AREA
SOLO POINT ROAD
WHARF ROAD
STEILACOOM-DUPONT ROAD
NORTH
NORTH FORT
Earthworks facility hours of operation…
Monday – Thursday 7:00 – 4:00 P.M.
Friday
7:00 – 3:00 P.M.
For scheduling information call:
253-967-3803
All projects must be listed separately if they have a different IJO#, Service Order #, Contract# drivers will have to know what project they are working on as well as the location.
SCHEDULE LOADS IN AND OUT OF
THE FACILITY AT LEAST ONE DAY
PRIOR TO ENSURE WE HAVE
PROPER STAFFING
Driver:
Date: Time:
Truck #:
Company Name:
Building #:
Material:
Inbound: Outbound:
Comments:
Tracking #:
Initial:
FORT LEWIS EARTHWORKS
Vehicle weight in:
Vehicle weight out:
Capturing which project you are working on is very vital, we would like an IJO# or Bldg number at the least for the project you are taking material for or bringing material in from
If attendant is unavailable please fill out weigh ticket manually
Capturing your weight in & out
Is very important
Material: the product in which you will be taking or bringing into the Earthworks facility (i.e.. Concrete)
The following demolition materials accepted here at the Earthworks are:
Asphalt - Brick - Concrete
All concrete and asphalt is to be broken down to a size of 2 x 2 or less, concrete that has rebar must be cut to within 6 inches from the edge of the concrete.
No fence posts with concrete will be accepted.
No contaminated loads will be accepted (trash or other debris will not be accepted).
Attendant will turn your load away and notify the project COR of discrepancies if these parameters are not met.
Segregation of Materials
ASHPALT PILE
(Inbound)
CONCRETE
(inbound)
CRUSHED CONCRETE
(outbound)
CRUSHED ASPHALT
(outbound)
SCALE HOUSE
All drivers must weigh in & out at the scale house. Follow the same route into as well as out of the concrete area
PIT RUN
Segregation of Materials (Keep all waste streams segregated)
The following types of landscaping materials are accepted here:
•Grass
•Leaves
•Limbs
•SOD
•Stumps
•Soil
•Wood Chips
PRE CONSUMER FOOD WASTE IS ACCEPTED AND
TURNED INTO PREMIUM COMPOST AMENDED TOPOSOIL
MANURE
FOOD WASTE
TOPSOIL
(inbound/ outbound)
PCS
COURSE
MULCH
(outbound)
FINE
MULCH
(outbound)
LEAVES / GRASS
For Everyone’s safety Please remember:
SPEED LIMIT IS 15 MPH
Please yield to troops crossing
| Fort Lewis, WA� Earthworks |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
File details come from the government source that posted it. Updated .