Attachment 9 DEQ000878J Addendum 1 Rev.pdf

PDF 27 KB Posted

Attached to
IDIQ SABER Contract Federal contract opportunity
Solicitation number
FA4479-10-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

Addendum 1 to the Scope of Work for Project DEQ000878J

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ SABER Contract, newest first.
File Type Posted
Questions and Answers for FA4479-10-R-0002 as of 05-26-10 Posted.doc DOC document
Attachment 10 Addendum 1 SOW 7664.pdf PDF
Attachment 8-6 Addendum 2 to Scope of Work for DEQ000878J .pdf PDF
FA4479-10-R-0001-0004.doc DOC document
FA4479-10-R-0002-0003.doc DOC document
Questions and Answers for FA4479-10-R-0002 as of 05-20-10 Posted.doc DOC document
Meeting Memorandum of the Pre-Proposal Site Visits and Meetings.pdf PDF
Questions and Answers for FA4479-10-R-0002 as of 05-10-10.doc DOC document
FA4479-10-R-0002-0002.doc DOC document
Attachment 8-5 DEQ000878J Recycle Ctr Mod As Builts.pdf PDF
FA4479-10-R-0002-0001.pdf PDF
Attachment 1 SABER SOW 7664 2010 19 Apr 10.pdf PDF
FA4479-10-R-0002.pdf PDF
Attachment 2 Wage Determination WA100053 03-19-2010.doc DOC document
Attachment 8-2 Solid Waste Permit10.pdf PDF
Attachment 8-0 DEQ000878J Scope of Work.pdf PDF
Attachment 5 Base Access List Format.xls XLS spreadsheet
Attachment 3 Hold Harmless Agreement.doc DOC document
Attachment 8-4 Earthworks Acceptance Criteria.pdf PDF
Attachment 8-3 FtlewisOperPlan0207.pdf PDF
Attachment 7 Subcontactor-Teaming Partner Consent Sample Format.doc DOC document
Attachment 4 Insurance Compliance Certificate.doc DOC document
Attachment 8-1 DEQ000878J Location Map.pdf PDF
Attachment 6 Past Performance Survey.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 May 2010

ADDENDUM 1

TO

SCOPE

FOR

Project DEQ000878J Extend Compost Awning, Sequalitchew Training

Area, Landfill No. 5 Building PO7601

The technical provisions of the Scope and attachments are hereby changed in part as follows:

1. Paragraph 1, at end of paragraph add “For the purpose of this project, there is a maximum statutory cost limitation of $750,000 for minor construction.”

2. Add new paragraph as follows:

“1.10 Contractor shall remove communication line and utility pole located at the center west end of new awning location. Communication line shall be removed back to next utility pole and left looped and tied at the top of pole for possible future use. Fill and pave location to match new awning floor construction.”

3. Attachments. Add “5. Recycling Center Modifications As-Builts”.

1 Attachment Recycling Center Modifications As-Builts.

File details come from the government source that posted it. Updated .