Solicitation FA4479-10-R-0002
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This solicitation is for an Indefinite Delivery Indefinite Quantity Contract for Simplif ied Acquisition of Base Engineering Requirements (SABER) at Joint Base Lew is-McChord.
This procurement is limited to qualif ied Small Business Administration certif ied 8(a) f irms located in Region X.
TERRY P SEAVERNS 253-982-3894
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
03-May-2010
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________03 Jun 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______150 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
62 CONS/LGC
P.O. BOX 4178
100 COL JOE JACKSON BLVD, STE 2001
JOINT BASE LEWIS-MCCHORD WA 98438-0178
FA4479
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(253) 982-5207FAX:TEL: SEE SCHEDULE TEL: FAX:
FA4479-10-R-0002 76
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA4479-10-R-0002
Section B - Supplies or Services and Prices
SECTION B CONTRACT INFORMATION
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum contract value for all orders issued against this contract shall not be less than the minimum amount stated below. The maximum contract value for all orders issued against this contract shall not exceed the maximum contract value stated below. These amounts are for all orders issued against this contract over the entire life of the contract and any options exercised.
MINIMUM MAXIMUM
AMOUNT AMOUNT
$200,000.00 $47,500,000.00
NO CONTRACTOR ENTRIES ARE REQUIRED FOR LINE ITEMS 0001 THROUGH 0005 IN THE
PROPOSAL SCHEDULE, SECTION B. COEFFICIENTS SHALL BE ENTERED IN THE SUPPLEMENT TO
SECTION B FOLLOWING THE LINE ITEM DESCRIPTIONS.
MAKE NO ENTRIES IN THIS LINE ITEM.
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
MAKE NO
ENTRY
MAKE
NO
ENTRY MAKE NO ENTRY MAKE NO ENTRY
Base Year - SABER
FFP
Contractor shall provide all labor, material, equipment and sundry items to provide maintenance, repair, design and construction services as described in each task order issued in accordance with the terms of this contract. These services may be during standard and non-standard working hours and in controlled areas or areas otherwise requiring escorts, in accordance with the Coefficient Schedule Section B Supplement at Joint Base Lewis-McChord, WA.
The current R.S. Means database will be used as the unit price guide and the appropriate coefficient multiplier will be used to determine individual task order pricing for task orders issued under this contract.
FOB: Destination
NSN: Z199-10-IDC-SABR
SIGNAL CODE: A
MAKE NO ENTRY
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
MAKE NO
ENTRY
MAKE
NO
ENTRY. MAKE NO ENTRY MAKE NO ENTRY
OPTION Option Year 1 - SABER
FFP
Contractor shall provide all labor, material, equipment and sundry items to provide maintenance, repair, design and construction services as described in each task order issued in accordance with the terms of this contract. These services may be during standard and non-standard working hours and in controlled areas or areas otherwise requiring escorts, in accordance with the Coefficient Schedule Section B Supplement at Joint Base Lewis-McChord, WA.
The current R.S. Means database will be used as the unit price guide and the appropriate coefficient multiplier will be used to determine individual task order pricing for task orders issued under this contract.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
MAKE NO
ENTRY
MAKE
NO
ENTRY MAKE NO ENTRY MAKE NO ENTRY
OPTION Option Year 2 - SABER
FFP
Contractor shall provide all labor, material, equipment and sundry items to provide maintenance, repair, design and construction services as described in each task order issued in accordance with the terms of this contract. These services may be during standard and non-standard working hours and in controlled areas or areas otherwise requiring escorts, in accordance with the Coefficient Schedule Section B Supplement at Joint Base Lewis-McChord, WA.
The current R.S. Means database will be used as the unit price guide and the appropriate coefficient multiplier will be used to determine individual task order pricing for task orders issued under this contract.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
MAKE NO
ENTRY
MAKE
NO
ENTRY MAKE NO ENTRY MAKE NO ENTRY
OPTION Option Year 3 - SABER
FFP
Contractor shall provide all labor, material, equipment and sundry items to provide maintenance, repair, design and construction services as described in each task order issued in accordance with the terms of this contract. These services may be during standard and non-standard working hours and in controlled areas or areas otherwise requiring escorts, in accordance with the Coefficient Schedule Section B Supplement at Joint Base Lewis-McChord, WA.
The current R.S. Means database will be used as the unit price guide and the appropriate coefficient multiplier will be used to determine individual task order pricing for task orders issued under this contract.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
MAKE NO
ENTRY
MAKE
NO
ENTRY MAKE NO ENTRY MAKE NO ENTRY
OPTION Option Year 4 - SABER
FFP
Contractor shall provide all labor, material, equipment and sundry items to provide maintenance, repair, design and construction services as described in each task order issued in accordance with the terms of this contract. These services may be during standard and non-standard working hours and in controlled areas or areas otherwise requiring escorts, in accordance with the Coefficient Schedule Section B Supplement at Joint Base Lewis-McChord, WA.
The current R.S. Means database will be used as the unit price guide and the appropriate coefficient multiplier will be used to determine individual task order pricing for task orders issued under this contract.
FOB: Destination
SUPPLEMENTAL SECTION B DATA
SUPPLEMENTAL INFORMATION
SECTION B SUPPLEMENT
A minimum guarantee of $200,000 is applicable for the initial contract period only. The estimated total and maximum aggregate amount of the proposed contract is $47,500,000 over the life of the contract with an estimated value of $9,500,000 for the base year and each of the four option years.
The contractor will perform any and all functions called out in the contract per scope specified in individual Task Orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the RS MEANS® current as of the date of the estimate, multiplied by the applicable coefficient entered below.
Coefficients 06 applies to contractor provided estimates for year-end or emergency requirements when a Hold Harmless agreement is not executed by the contractor.
COEFFICIENT #
DESCRIPTION
COEFFICIENT
% FACTOR
COEFFICIENT 01 TASK ORDER COEFFICIENT FOR ALL WORK ON JOINT BASE
LEWIS-MCCHORD (JBLM) DURING STANDARD WORK HOURS
EXCEPT FOR TASK ORDERS ISSUED FOR WORK IN A
CONTROLLED AREA OR OTHERWISE REQUIRING
GOVERNMENT ESCORTS. THIS COEFFICIENT REMAINS VALID
FOR THE ENTIRE CONTRACT PERIOD INCLUDING ANY
OPTIONS EXERCISED.
COEFFICIENT 02 TASK ORDER COEFFICIENT FOR ALL WORK ON JOINT BASE
LEWIS-MCCHORD (JBLM) DURING STANDARD WORK HOURS
TO BE PERFORMED IN CONTROLLED AREAS OR OTHERWISE
REQUIRING GOVERNMENT ESCORTS. THIS COEFFICIENT
REMAINS VALID FOR THE ENTIRE CONTRACT PERIOD
INCLUDING ANY OPTIONS EXERCISED.
COEFFICIENT 03 TASK ORDER COEFFICIENT FOR ALL WORK ON JOINT BASE
LEWIS-MCCHORD (JBLM) DURING NON-STANDARD WORK
HOURS EXCEPT FOR TASK ORDERS ISSUED FOR WORK IN A
CONTROLLED AREA OR OTHERWISE REQUIRING
GOVERNMENT ESCORTS. THIS COEFFICIENT REMAINS VALID
FOR THE ENTIRE CONTRACT PERIOD INCLUDING ANY
OPTIONS EXERCISED.
COEFFICIENT 04 TASK ORDER COEFFICIENT FOR ALL WORK ON JOINT BASE
LEWIS-MCCHORD (JBLM) DURING NON-STANDARD WORK
HOURS TO BE PERFORMED IN CONTROLLED AREAS OR
OTHERWISE REQUIRING GOVERNMENT ESCORTS. THIS
COEFFICIENT REMAINS VALID FOR THE ENTIRE CONTRACT
PERIOD INCLUDING ANY OPTIONS EXERCISED.
COEFFICIENT 05 TASK ORDER COEFFICIENT APPLIED TO ITEMS NOT COVERED
BY THE UNIT PRICE GUIDE CONTRACTUALLY REFERRED TO
AS NON PRE-PRICED ITEMS. THIS COEFFICIENT SHALL TAKE
INTO ACCOUNT ANY EFFICIENCY FACTOR THE CONTRACTOR
APPLIED TO COEFFICIENTS 01, 02, 03 AND 04. THIS
COEFFICIENT 06 THAT PORTION OF COEFFICIENTS 01, 02, 03 AND 04
ATTRIBUTED TO PROJECT ESTIMATING. ESTIMATES
PROVIDED AND PAID FOR USING THIS COEFFICIENT WILL
REMAIN VALID FOR 120 CALENDAR DAYS FROM THE DATE
THE NEGOTIATED ESTIMATE IS ACCEPTED BY THE
GOVERNMENT WITHOUT CONSIDERATION GIVEN TO THE
QUARTERLY PRICING UPDATES OF THE UNIT PRICE GUIDE
PROVIDED FOR ELSEWHERE IN THIS CONTRACT. THIS
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 17-AUG-2010 TO
16-AUG-2011
N/A 62 CES/CONSTRUCTION - F2Y3FQ
555 BARNES BLVD, STE 301
JOINT BASE LEWIS-MCCHORD WA 98438
FOB: Destination
F2Y3FQ
0002 POP 17-AUG-2011 TO
16-AUG-2012
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 17-AUG-2012 TO
16-AUG-2013
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 17-AUG-2013 TO
16-AUG-2014
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 17-AUG-2014 TO
16-AUG-2015
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within the number of days specified in each task order calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .the number of calendar days specified in each task order The time stated for completion shall include final cleanup of the premises and all task order close out documentation submittal and approval.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
Section G - Contract Administration Data
CONTRACT ADMINISTRATION
ADMINISTRATIVE MATTERS
1.1 CONTRACTOR’S CONTRACT ADMINISTRATION
To Be Completed By The Contractor:
Name and Title:
Responsible Office:
Address:
Telephone Number:
Email:
Cage Code:
Duns Number:
Tax Identification Number:
1.2 INDIVIDUAL(S) AUTHORIZED TO NEGOTIATE OR DISCUSS PROPOSAL
Name of Primary: Name of Alternate:
Address: Address:
Telephone #: Telephone #:
Alternate #: Alternate #:
Fax No: Fax No:
Email: Email:
1.3 INVOICES
Individual delivery orders issued against this contract will establish specific invoicing procedures. Wide Area Work Flow (electronic invoicing/payment system) is required for payment under this contract unless specified otherwise in individual task orders. A Wide Area Work Flow worksheet with the invoice routing addresses will be issued for each task order issued under this contract and will be applicable only for the task for which it is issued.
1.5 WIDE AREA WORK FLOW INSTRUCTIONS
Wide Area Work Flow Receipt and Acceptance (WAWF-RA) Vendor Instructions Installation and Registration Checklist
Completion of all instructions contained in this checklist must be accomplished prior to activation of the firm and user accounts
1. Check Central Contractor Registration System (CCR) (www.ccr.gov) to see if your company is registered.
If you are registered in CCR, please go to Step 3 below.
For help with registration in CCR, contact the CCR Help desk, 888-227-2423 or e-mail CCR@dlis.dla.mil or see the CCR Handbook at http://www.ccr.gov/handbook.cfm.
2. Register with Central Contractor Registry (CCR).
All vendors desiring to quote on goods or services in support of the Department of Defense (DoD) must be registered in the CCR at http://www.ccr.gov/.
Ensure that all mandatory fields are completed in your new CCR account (i.e., Telephone/Fax number, Data Universal Numbering System (DUNS) and/or Commercial and Government Entity (CAGE) codes, North American Industry Code Systems (NAICS) codes, etc).
Note: All contractors are required to update their CCR registration annually. Failure to do so will result in suspension of the account, which will prevent or delay awarding DoD contracts and payments to your firm.
3. Establish an Electronic Business Point of Contact (EB POC).
The next step is to ensure that you have identified an EB POC for your company. You are required to establish both a primary and alternate EB POC for each CAGE/DUNS code assigned to the firm.
To see if an EB POC is listed for your company, go to http://www.ccr.gov/ and click on “Search CCR.”
Where prompted, enter the DUNS or CAGE or Company Name and click “Submit Query.” If you are presented with a list of DUNS numbers, you will need to pick the specific location and click on the DUNS.
Scroll to the bottom of the Inquiry Results page. There you can see if anyone is listed as the EB POC. If no one is listed, your company has not identified an EB POC yet. If you see that there is no one listed as your company’s EB POC, you need to click on “Update or Renew Registrations Using TPIN” to add it.
Each vendor organization may establish up to two EB POC’s (primary and alternate) for each CAGE/DUNS combination.
The EB POC will be responsible for authorizing access to employee(s) of the vendor’s organization to view and/or modify data submitted on behalf of the vendor.
Update NAICS codes developed by the Census Bureau, which replaced the Standard Industrial Classification (SIC) codes. Until NAICS codes are updated, update will not be complete. For more info on NAICS codes, visit: http://www.census.gov/epcd/www/naics.html
4. Establish a group in WAWF-RA associated with your cage code(s).
This can be done by calling DISA-Ogden Customer Support at 1-800-392-1798 or by e-mailing cscassig@ogden.disa.mil
5. Determine if your organization will designate a Group Administrator (GAM). (Proceed to paragraph 6 if you are not going to designate a GAM).
In medium to large sized companies, there may be need to establish more than one GAM.
A GAM determines who has access to the WAWF-RA vendor account.
The initial GAM shall be the person designated as the EB POC. To appoint additional GAM’s, each vendor must submit an official appointment letter signed by the EB POC.
The appointment letter should be faxaed to the WAWF-RA Customer Support Center.
The Group Administrator’s Manual is available for reviewing to all WAWF-RA registered users.
The GAM Manual can be found in the Software Users Manual link within the WAWF-RA application.
6. Establish an organizational e-mail address
All records created in WAWF-RA are stored in a virtual file folder and as status is updated or changes, the system generates an e-mail notification to applicable individuals identified in the firm’s organizational e-mail account.
The GAM or EB POC shall provide the organizational e-mail to the WAWF-RA Customer Support Center.
Ensure that your firm’s organizational e-mail address is operational and can receive e-mail from WAWF-
RA prior to registering your e-mail address with the WAWF-RA Customer Support Center.
Note: If you do not set up an organizational e-mail address, the personal e-mail address of the first person who self-registers from your firm (CAGE/DUNS code), will be designated as the organizational e-mail address for your firm.
7. Set up PCs to access WAWF-RA
Set up the PCs of your organization’s users to access WAWF-RA.
Select the “Setting Up Your Machine” link on the WAWF-RA home page. For more information:
https://wawf.eb.mil/Instr.html.
8. Have all users self-register on the WAWF-RA website
Every user for your firm must self-register on the WAWF-RA website by completing the on-line registration form.
Select the “Self Register” link on the WAWF-RA home page and follow the instructions.
Users may access WAWF-RA with either a User ID/Password combination or a PKI certificate. Users who want to use a PKI certificate must obtain it before self-registering.
PKI Certificates may be obtained from one of the approved Interim External Certificate Authorities:
Operation Research Consultants Inc. http://eca.orc.com, Digital Signature Trust Co.
http://www.digsigtrust.com/home.html, or Verisign: http://www.verisign.com. The web sites provide the instructions needed to acquire a PKI Certificate.
If further assistance is needed, contact the WAWF-RA Customer Service Center.
Note: Registrations will not be activated until the WAWF-RA Customer Support Center receives an e-mail from the EB POC/GAM as registered in the CCR database.
9. Follow-Up (If necessary).
If your (GAM or user) account hasn’t been activated within two business days of self-registering contact the WAWF-RA Customer Service Center: 1-800-392-1798, FAX Commercial: 801-605-7453, DSN: 388- 7543, E-Mail: cscassig@ogden.disa.mil Note: Reference “WAWF” in e-mail Subject line.
Section H - Special Contract Requirements
LOCAL PROCEDURES
1.0 PLACE OF PERFORMANCE:
1.1 Locations of work will be at Joint Base Lewis-McChord (JBLM). The specific place of performance will be designated on each individual Task Order.
1.2 Any place the terms "engineer", "civil engineer", "62 CES" or similar designations for the engineering function are used in the solicitation and subsequent contract the terms "Department of Public Works" or DPW are considered freely interchangeable.
1.3 Any place "McChord AFB" may appear "Joint Base Lewis-McChord" or JBLM are interchangeable. Joint Base Lewis-McChord encompasses the entire facilities formerly known individually as Fort Lewis and McChord
AFB.
1.4 References to the 62d Contracting Squadron or 62 CONS are interchangeable with the terms Directorate of Contracting or DOC.
2.0 GENERAL CONTRACT DESCRIPTION
2.1 This is an indefinite delivery, indefinite quantity (IDIQ) contract for construction efforts at Joint Base Lewis- McChord (JBLM), Washington. The government will award construction projects by individual Task Orders on an as needed basis. The contractor shall furnish all personnel, equipment, tools, materials, supervision, and other items and services necessary to design, manage, and accomplish a broad range of maintenance, repair, alteration, and/or new construction work on various real property facilities. During the contract period construction, repair or renovation projects will be identified to the Contracting Officer who will issue individual Task Orders to the contractor to complete the work. The contractor shall maintain an office on JBLM in order to receive work requests and other related requirements to accomplish each individual Task Order. The work shall include tasks in various trades such as carpentry, pavement repairs, roofing, asbestos abatement/removal, demolition, concrete masonry, welding, etc.
2.1.1 Unit Price Guides (UPG): UPGs include commercial pricing tools such as computer cost databases and libraries of hard copy books. The R.S. Means © cost data books are the designated UPGs for this solicitation and contract. UPGs consist of detailed task specifications along with a standard unit of measure and a unit price for each. Because the task specifications and prices apply to a general area or industry, it is necessary to tailor the UPG to the costs and practices of a specific location. This step, which is called “localization,” is critical to the success of a SABER Program. Commercial software alternatives are available for the localization process and for compiling the basic task listings and standard unit prices. Examples of commercially available estimating software compatible with the R.S. Means database are those published by WinEstimator Inc., 4Clicks, Sage North America, R.S.
MEANS, Inc., et al.
2.1.2 COEFFICIENTS (REFERENCE SECTION B LINE ITEM 0001) Coefficients are factors that are multiplied against the standard unit prices in the UPG to calculate task order (TO) prices. Proposed coefficients should cover cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipts taxes etc.
2.1.2.1 Coefficient 01 applies to all work on Joint Base Lewis-McChord (JBLM) during standard work hours except for task orders issued for work in a controlled area or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.2 Coefficient 02 applies to all work on Joint Base Lewis-McChord (JBLM) during standard work hours to be performed in controlled areas or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.3 Coefficient 03 applies to all work on Joint Base Lewis-McChord (JBLM) during non-standard work hours except for task orders issued for work in a controlled area or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.4 Coefficient 04 applies all work on Joint Base Lewis-McChord (JBLM) during non-standard work hours to be performed in controlled areas or otherwise requiring Government escorts. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.5 Coefficient 05 applies to items not covered by the Unit Price Guide contractually referred to as Non Pre- Priced Items. This coefficient shall take into account any efficiency factor the contractor applied to Coefficients 01, 02, 03 and 04. This coefficient remains valid for the entire contract period including any options exercised.
2.1.2.6 Coefficient 06 is for that portion of coefficients 01, 02, 03 and 04 attributed to project estimating. Estimates provided and paid for using this coefficient will remain valid for 120 calendar days from the date the negotiated estimate is accepted by the Government without consideration given to the quarterly pricing updates of the Unit Price Guide provided for elsewhere in this contract. This coefficient remains valid for the entire contract period including any options exercised. This coefficient applies for Task Order Requests for Proposal (TORFP) where the contractor does not execute a Hold Harmless Agreement in lieu of receipt of this estimating fee. Coefficient 06 is intended for use to expedite year-end or emergency requirements; the contracting officer may process SABER projects up to the point of award in advance of full project funding. Coefficient 06 is designated to compensate the contractor for the level of effort expended in estimating, designing, and negotiating the project task order in advance of full funding. Any payment the contractor receives under this line item will be offset by a reduction from the negotiated price of the TO if the project results in a later award. While it is not the government’s intent to have the contractor provide an estimating service for projects with no serious SABER construction consideration, the Government is not obligated to issue a Task Order for the construction work described in the Task Order issued for project estimating. The Contracting Officer will work closely with Civil Engineering to insure that projects priced in advance of funding are not excessive and that there is a high probability of funding. This coefficient may be used for anticipated construction projects at the discretion of the Contracting Officer. However, the Hold Harmless Agreement included as an attachment to this solicitation and contract will normally be included in individual TORFP for yearend requirements issued under the authority of a Special Advanced Authority or emergency requirements which the contractor may accept and sign in lieu of payment under this coefficient.
2.1.3 Task Order Pricing
2.1.3.1 The "bare costs" are defined as the UPG price from the column that includes the total costs before the application of any overhead and profit.
2.1.3.2 The prices established in the RS MEANS® database Bare Costs (which means no markup for overhead and profit) column, will be multiplied by the City Cost Index Weighted Average Total for Tacoma, Washington and totaled, then Washington State Use Tax at the rate specified for Zip Code 98438 shall be added for the material costs to arrive as the total to which the coefficient shall be applied; then this subtotal shall be multiplied by the applicable coefficient to arrive at the actual price for a unit of work.
2.1.3.3 In order to be considered for contract award, offerors must submit all coefficients included as part of Line Item 0001. These six coefficients shall remain valid for the entire contract period including any options exercised.
The Government uses these multipliers to determine the price of work for each task on individual task orders. The coefficient will be represented as “net”, a “decrease from” or an “increase to”, the prices listed in RS MEANS®.
An offer of “net” would be represented as “1.0.” An example of a decrease from the prices in RS MEANS® would be “0.98.” An example of an increase above the prices in RS MEANS® would be “1.10”.
2.1.3.4 Offered coefficients must contain all allowable contractor costs, including contingencies and profit.
Examples of such costs are State gross receipts taxes and payroll taxes, such as FICA, workmen’s compensation (when not included in the wage determination), state and federal unemployment taxes for direct payroll employees, superintendents’ salaries, builders’ risk insurance, mobilization and demobilization expenses, and bond premiums;
and various overhead expenses, such as project estimating, site office overhead, field office building, furniture, equipment, on-site office staff salaries, vehicle and construction equipment maintenance, office administrative expenses and a proportional share of home office overhead. The coefficient should also include all insurance, special clothing for workers, traffic barricades, flag persons, additional supervision, paperwork fees associated with a particular task order, consultant fees, all on and off site storage, etc.
2.1.4 Non-Pre-priced Items (NPIs):
2.1.4.1 Items of work not covered by the Unit Price Guide (UPG) but within its scope and general intent and necessary to complete the requirements of a specific task order may be negotiated and incorporated into the task order by the Contracting Officer. Non-pre-priced work shall be so noted on each task order and will not exceed 10% of the final negotiated amount. Proposed costs for non-pre-priced items will be supported by three verifiable price quotes where possible.
2.1.4.2 Coefficient 05 shall be applied to the quoted, verified and negotiated NPI costs to arrive at the total cost for any NPIs before inclusion in the total task order price.
2.1.4.3 To permit recurrent use, a non-pre-priced line item must be incorporated by supplemental agreement into a locally developed non-pre-priced UPB. This may be done at any time during the contract period.
2.1.5 Construction projects under this contract will generally range from $2,000 to $750,000. However, where the Contracting Officer has determined in writing that an emergency exists or that the project is of such pressing need the maximum task order amount may be increased to $1,000,000 for an individual project. There is no pertinent historical information from previous SABER contracts due to the recent consolidation of Fort Lewis and McChord AFB into the Joint Base Lewis-McChord (JBLM). The estimated value of task orders is $9, 500,000 per year with a maximum contract program value of $47,500,000 over the life of the contract.
2.1.6 Ordering Procedures.
2.1.6.1 Work under this contract will be ordered by written Task Orders issued on DD Form 1155 (Order for Supplies or Services) to the contractor by the Contracting Officer.
2.1.6.2 Each award as a result of this solicitation will cite an individual Task Order number. Individual Task Order will be placed in a sequential numbering system, which relate back to the basic contract and their assigned Task Order Number.
2.1.6.3 The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders. Requests for proposals will indicate funds availability. Occasionally, the government will request a proposal for projects for which funds are not certified or readily available. Air Mobility Command (AMC) refers to these acquisitions as “Normal Straddle Bid” or “Special Advance Authority” (SAA) projects. Information specifically identifying these projects and the funding restriction will be included in the request for proposal.
2.1.6.4 Task Orders will be firm fixed price and clearly define the specific services to be performed or the performance desired. Each Task Order may contain additional, site or project specific, provisions. Any such additional provisions shall be a part of the Task Order Request for Proposal.
2.1.6.5 Task Order projects shall be for non-complex performance oriented tasks requiring design up to 35%. Some projects may be already designed or require very little design effort. The ordering procedures are defined in the basic SABER specifications, Attachment 1.
2.1.6.6 Task Orders may be modified by the Contracting Officer. Modifications to Task Orders will be issued on Standard Form (SF) 30 and cite the Task Order Number.
2.1.6.7 Contractors are required to contact the Contracting Officer within two days after receipt of Task Order Request for Proposal (TORFP) if they plan not to participate in the walk through or submit a proposal on a Task Order.
2.1.6.8 Contractors are required to comply with the provisions identified at FAR 52.223-4 and 52.223-9, Alt 1.
2.1.6.9 The unit price data provided by the RS MEANS® UPG in the estimating database and the contractor supplied estimating software shall serve as the basis for establishing the value of the work performed on a unit price basis.
2.1.6.10 The contractor must include justification for any non-pre-priced work included for an individual requirement. The contractor shall first attempt to price all unit prices using the computerized database provided by RS MEANS®. If an item is not included in this database or if the contractor’s computer system is not available, the contractor shall use the hard copy of the MEANS Facility Construction Cost Data to price the items. If the contractor cannot locate a particular item in either of these sources, the contractor shall then extend the search to the following MEANS pricing guides before considering it a non-priced item.
Mechanical Cost Data Plumbing Cost Data Electrical Cost Data Assemblies Cost Data Repair and Remodeling Cost Data
2.1.6.11 The contractor’s proposal shall be supported by necessary documentation to indicate that adequate engineering and planning to accomplish the requirement have been done. Examples of documentation that might reasonably be expected would include drawings, calculations, catalog cuts, specifications, architectural renderings, etc.
2.1.6.12 Time for submittal of the contractor’s proposal for individual requirements will be as agreed upon by the government and the contractor or as specified in the TORFP.
2.1.6.13 Upon receipt of the contractor’s proposal, the Government will review the proposal for completeness. The Government will negotiate with the contractor all non-pre-priced items, quantities for pre-priced items, and performance times.
2.1.6.14 Each task order will include the following information.
Item number, description, material submittal requirements, quantity and unit prices for pre-priced and non-pre-priced items and total. This is accomplished by incorporating the entire negotiated agreement into the task order.
Task order price and delivery or performance date.
Liquidated damages, if any.
Any statement of work, drawings, or other pertinent data.
Any other task order unique Federal Acquisition Regulation (FAR) or departmental FAR supplement clauses required for a particular project. These additional provisions shall also be stated in the TORFP.
2.1.7 SEPARATE REQUIREMENT FOR PROJECT ESTIMATING:
2.1.7.1 In order to expedite year-end Normal Straddle Bid, Special Advance Authority, or emergency requirements, the government may request the contractor to prepare a design and cost proposal and participate in negotiations for a specific project prior to the Government's receipt of full project funding. This effort will be referred to as Project
Estimating. Compensation for Project Estimating will be determined by multiplying each task negotiated for the work described in the request for proposal (individual Task Order) times the figure entered on the Price Schedule for Project Estimating. It is paramount that the figure entered on the Schedule for Project Estimating represent only that portion of CLIN 0009 (option year CLIN as appropriate), attributed to Project Estimating. The figure shall remain constant for the duration of the contract, to include any options that may be exercised and shall not be construed as an additional cost under the contract. Only the CLIN for Project Estimating shall be computed on Task Orders issued for that purpose.
2.1.7.2 Once funds become available for the actual construction of a project previously negotiated under a project estimating Task Order, the amount previously paid under that Task Order shall be deducted from the total price of the Task Order issued for the actual construction.
2.1.7.3 While it is not the government's intent to have the contractor provide an estimating service for projects with no serious SABER construction consideration, the Government is not obligated to issue a Task Order for the construction work described in the Task Order issued for project estimating.
2.1.7.4 If the Government and the contractor cannot come to an agreement on a particular project to be priced under the project estimating process, negotiations shall be terminated without cost to the government.
2.2 PROPOSAL PREPARATION COSTS
2.2.1 The costs for preparation of Task Order proposals shall be the responsibility of the contractor and not reimbursable. Each Task Order awarded will include, at a minimum, all labor wages, management, supervision, mobilization, material and equipment costs, and any costs associated with any required design effort. The contractor shall furnish all project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design if applicable, and all other associated costs necessary to fulfill the requirements of the Task Order.
3.0 SABER TECHNICAL SPECIFICATIONS: The SABER Technical Specifications are numbered and organized by the Construction Specification Institute’s (CSI) Master Format. Some specifications are broad scoped in nature and contain a variety of items; therefore, they will have several RS MEANS© Computerized Pricing Guide (MCPG) designators. Other specifications will not have MCPG pricing information; these items are those which are special ordered from the manufacturer or the items involved would be proprietary to each manufacturer’s own equipment. The intent of these specifications is to furnish concise industrial and/or commercial standards for maintenance and repair of Government facilities.
4.0 CONSTRUCTION CODES: The contractor shall comply with the latest edition of the Uniform Building Code, Uniform Mechanical Code, National Electric Code, Standard Plumbing Code, National Fire Protection Association (NFPA) Code, and Building Office Construction Authority (BOCA) Codes for any construction under this contract. The contractor shall have a copy of each of these documents for use during the term of the contract, and furnish one (1) complete set to the government at the beginning of the contract. The contractor shall maintain these code books current throughout the life of the contract by obtaining copies of any and all revisions or updates as they become available, not to exceed 60 days of the release of the revision. If there is a conflict between these codes, regulations, and specifications, the most stringent requirement shall apply at all times.
5.0 PERFORMANCE EVALUATIONS: At the conclusion of each task order, the Contracting Office will complete a contractor’s performance evaluation when applicable. The evaluation will take into account all aspects of the contractor’s performance. Evaluations will be accomplished electronically using the Construction Contractor Appraisal Support System (CCASS).
6.0 EXCLUSION PERIODS: Exclusion Periods may be incorporated into individual Task Orders as determined by the Contracting Officer. Some exterior work may not be able to be performed during the period between November 15th through April 15th inclusive, and such period will not be considered in computing the time allowed for completion. However, the contractor may request and be allowed to work during this period at the contractor’s own risk if permitted by the Contracting Officer.
7.0 CONTRACT ADMINISTRATION: Administration of the Task Orders under this contract will be performed by 62 CONS/LGCA (SABER), Joint Base Lewis-McChord (JBLM), Washington. No changes, deviations, or waivers shall be effected without a modification of the contract, executed by the Contracting Officer authorizing such changes, deviations, or waivers.
8.0 IDENTIFICATION OF CORRESPONDENCE: All correspondence and data submitted by the Contractor under this contract shall reference the contract number, Task Order number, project title, and project number.
9.0 NOTICE OF CONSTRUCTIVE CHANGES: No order, statement or direction of the Contracting Officer, an authorized representative of the Contracting Officer whether or not acting within the limits of his authority, or any other representatives of the Government, shall constitute a change order under the “Changes” clause of this contract or entitle the contractor(s) to an equitable adjustment of the price or delivery schedule, unless such a change is issued in writing and signed by the Contracting Officer.
10.0 NOTIFICATION REQUIREMENTS WHEN CHANGING KEY PERSONNEL: Personnel in key positions are considered essential to the performance of any resultant Task Orders under this contract. Examples of key positions include project manager, superintendents, and quality control inspectors. Prior to diverting any key personnel to other programs/projects, the contractor shall notify the Contracting Officer at least ten (10) working days in advance of the proposed diversion and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the SABER program. Contractor shall provide a listing of key personnel. This listing of key personnel may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
11.0 CONTRACT PHASE-IN/PHASE-OUT:
11.1 The contractor shall commence any mobilization and familiarization activities prior to actual work on individual Task Orders as soon after contract award as practicable. However, within 14 calendar days after contract award, the contractor shall mobilize the necessary personnel and equipment to estimate and negotiate requirements.
The contractor shall have a fully operational field office with all required facilities, staff and automated data processing (ADP) capabilities within 30 calendar days after award.
11.2 The Contractor shall be provided a site on base to operate (notification of location will be prior to award).
Contractor shall be provided full utilities for a project trailer. These utilities shall include power, water, and sewer.
Contractor shall be required to provide temporary fencing at his own expense if required. The color of the building or trailer must match the existing base color scheme. The contractor is responsible for mobilization, set-up, and utility connections. The contractor shall anchor the building securely and install appropriate skirting, provide safe and proper entrances and exits. In the event of a fire or any damage to the building, the contractor shall notify the Base Civil Engineer Squadron immediately. The contractor is responsible for insuring his/her own contents. The government shall not be liable for any loss or damage to the contractor’s property, including stock, or for expenses incidental to such loss or damage.
11.3 Contractor must vacate government-furnished office and storage areas on the last day of the contract period.
Premises must be returned in the same condition in which they were received or as agreed to by the CO. All ongoing Task Orders must be completed from an approved field office or off-base location.
12.0 DAVIS-BACON WAGE DETERMINATION: Reference FAR 22.404-12(c)(1). The current wage determinations will be incorporated into the contract at the time of option exercise, and the contractor will be required to comply with the revised wages; however, the coefficients will not be adjusted since the updated Unit Prices Book reflecting changed labor costs will also be updated along with the option exercise.
13.0 REQUIRED INSURANCE:
13.1 Reference clause FAR 52.228-5, Insurance - Work on a Government Installation and FAR 28.306(b). The Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
13.1.1 Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen’s Compensation insurance shall extend to cover employer’s liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
13.1.2 General Liability Insurance: Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
13.1.3 Automobile Liability Insurance: This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
13.2 The contractor agrees to execute the insurance certificate included as an attachment to this solicitation/contract with the Contracting Officer within 10 days of contract award. This certificate shall be executed on the form entitled Contract Insurance Requirements Compliance Certificate included as an attachment to this solicitation/contract.
14.0 BONDING:
14.1 A proposal/bid bond is not required with the proposal. The offeror shall however, provide a letter or other verifiable evidence from the surety asserting offeror’s ability to obtain adequate bonding at the time of contract award with the contractor’s proposal.
14.2 Reference clause FAR 52.228-15, Performance and Payment Bonds - Construction. The initial bond amount required is based upon the amount of the seed project task order amount which will be issued simultaneously with contract award. Payment and performance bonds will be required for all task orders within 10 calendar days after task order award. Although the amount of the initial bond is based on the seed project task order amount the bond premium costs should be included in the coefficients based on the contract estimated annual amount.
15.0 PREPARATION OF MATERIAL APPROVAL SUBMITTALS:
15.1 Reference clause FAR 52.236-5, Material and Workmanship. The submittals shall be accomplished in accordance with instructions that will be provided with Material Approval Submittal Form which will be provided at the time of contract award.
15.2 Material submittal requirements are normally established in the individual project Scopes of Work but may be found in other contract documents. Within 15 calendar days of receipt of a task order or Notice to Proceed the Contractor shall submit all required material submittals, whether or not listed in the project Scope of Work or submit to the Contracting Officer a Schedule of Material Submittals indicating when the Contractor intends to submit each submittal item not otherwise provided within that 15 day period. If the Contractor identifies any material submittal requirements not reflected on the Scope of Work, the Contractor should add them to the end of the Schedule of Material Submittals prior to its submittal. All proposed schedules for material submittals will be subject to review and approval
16.0 ACCIDENT PREVENTION: Reference clause FAR 52.236-13 Alternate I, Accident Prevention. Prior to commencing work, the contractor shall: (1) submit a written proposed plan for implementing referenced clause.
The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance, and a plan for controlling these hazards; and (2) meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
17.0 UTILITY SERVICES: Reference clause FAR 52.236-14, Availability and Use of Utility Services and FAR
36.514. Utility Services furnished to the Contractor by the Government from the Government’s existing system outlets and supplies will be at no cost to the Contractor.
18.0 PREPARATION OF SCHEDULES FOR CONSTRUCTION CONTRACTS: Reference clause FAR 52.236-15.