Attachment__8_-_Addendum__1_dated_17_September_2014.pdf

PDF 53 KB Posted

Attached to
Add/Repair Passenger Terminal, Bldg. 164
Solicitation number
FA4418-15-R-0009
Issued by

About this file

Attachment 8 - Addendum 1 dated 17 September 2014 for Solicitation FA4418-16-R-0002 Add/Repair Passenger Terminal Bldg 164.

View the file

Other files

File Type Posted
Attachment__15_-_Spec_Section_01_32_16_00_20_dated_30_October_2013.pdf PDF
Attachment__14_-_Addendum__3_dated_9_February_2016.pdf PDF
FA4418-16-R-0002-0003_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__3.pdf PDF
FA4418-16-R-0002_-_Add_Repair_Passenger_Terminal _Bldg_164_-_Questions_and_Answers.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__2.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Site_Visit_Minutes_-_Passenger_Terminal.pdf PDF
Attachment__1_-_Pre-proposal_Site_Visit_Record_of_Attendance.pdf PDF
Attachment__2_-_Pre-proposal_Site_Visit_Presentation.pdf PDF
Attachment__11_-_Asbestos_ _Lead_Report_dated_10_October_2012.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_2.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_1.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_3.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_5.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__1.pdf PDF
Attachment__12_-_Passenger_Terminal_OS-SWPPP_dated_2_October_2013.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_4.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Conference_Transportation_Instructions.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_13.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_7.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__4_-_SID_Schedule_dated_30_October_2013.pdf PDF
Attachment__6_-_Green_Procurement_Form_dated_15_July_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__3_-_FF E_Schedule_dated_30_October_2013.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_10.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_8.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_14.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_11.pdf PDF
Attachment__10_-_Addendum__2_dated_10_November_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_6.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_12.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_9.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_4.pdf PDF
Attachment__5_-_Wage_Determination_dated_22_May_2015.pdf PDF
FA4418-16-R-0002_Add_Repair_Passenger_Terminal _Bldg_164.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_5.pdf PDF
Attachment__7_-_Submittal_Register_dated_14_March_2014.pdf PDF
Attachment__9_-_Spec_Section_01_32_17_00_20_NAS_dated_30_October_2013.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_15.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1 To

Project: DKFX 11-1122 A/B Add/Repair Passenger Terminal, Building 164

Joint Base Charleston (Air Base) South Carolina

17 September 2014

1. Specifications, Division 01 – General Requirements: Incorporate Specifications Section 01 32 17.00 20 Network Analysis Schedule dated 30 October 2013.

2. Specifications, Division 32, 32 18 16.13, 1.3 System Description: Change this paragraph to read “Measure the perimeters of the play event use zone in accordance with the requirements of FF&E.”

3. Specifications, Division 32, 32 18 16.13, 3.1 Site Preparation: Replace “Section 11 68 13 PLAYGROUND EQUIPMENT and Section 12 93 00 SITE FURNISHINGS.” with “FF&E.”

4. Drawings, Roll-Up Door, 10’ wide x 9’-4” high, Sheet S111, Door Location - Column Line C, Between C1 and C2,: As referenced by Keyed Note #8, the opening of this existing roll-up door in Garage 124 is required to be structurally infilled. However, Architectural sheets do not show door demolition nor brick veneer infill of this door opening. Add the requirements to demolish this roll-up door and to provide brick infill per the following specific notes. This work shall also apply to all other sheets as applicable.

a. Drawings, A003, Demolition Keynotes: Apply Demolition Keynote “D2” to require demolition of roll-up door.

b. Drawings, A040, 1/A003/A040, Demolition Keynotes: Apply Demolition Keynote “D2” to require demolition of roll-up door.

c. Drawings, A201, 2/A102/A201: Apply Note “BRICK INFILL TYP. STAGGER JOINTS” to require brick infill to demolished roll-up door opening.

5. Drawings, A201, Exterior Material & Color Legend, Material Brick: Change Material Brick, Basis of Design Product & Manufacturer from “Hanson – Richtex Southern 355 w/Flash” to “Match Existing.” Also change Color “Charleston Brick” to “Match existing brick as closely as possible. Final brick selection shall be by the Government from samples provided by the contractor.”

6. Clarification, Ancillary Items: Drawings for Ancillary Items are included in the back of the drawings package as:

Ancillary Item #1 – Furniture Fixtures and Equipment (FF&E), Sheets I101, I102, I201 Ancillary Item #2 - Baggage Handling Equipment (BHE), Sheet BHE01 Ancillary Item #3 – Intrusion Detection System (IDS), Sheets IDS01, IDS02, IDS03 Ancillary Item #4 – Audio Visual Systems (AVS), Sheet AVS01 Ancillary Item #5 – WiFi System (WFS), Sheet WF01

These Ancillary Items are referenced from various sheets as “BY OTHERS” “UNDER SEPARATE CONTRACT” etc. One example of this is Sheet A415, New Construction Keynotes #3. These notes refer

FA4418-16-R-0002 Attachment #8Add/Repair Passenger Terminal, Bldg 164 to the various Ancillary Items that are to be priced separately per Bid Schedule and may be awarded with the construction contract.

7. Drawings, C310, Post Development Conditions: Drainage requirements for the Bid Alternate #3 Play Area are shown on this sheet. See Sheet A502 for fencing requirements. Contractor shall provide block-outs (or scuppers) at the base of in all masonry walls to allow water flow in direction shown. Block-outs shall be one brick wide minimum and spaced approximately of 16” on center.

B164 Add #1 20140917
01 32 17.00 20
Revised FF&E Schedule 9-17-14

File details come from the government source that posted it. Updated .