Attachment__2_-_Drawings_dated_30_October_2013_-_Part_9.pdf

PDF 6 MB Posted

Attached to
Add/Repair Passenger Terminal, Bldg. 164
Solicitation number
FA4418-15-R-0009
Issued by

About this file

Attachment 2 - Drawings dated 30 October 2013 - Part 9 for Solicitation FA4418-16-R-0002 Add/Repair Passenger Terminal Bldg 164.

View the file

Other files

File Type Posted
Attachment__15_-_Spec_Section_01_32_16_00_20_dated_30_October_2013.pdf PDF
Attachment__14_-_Addendum__3_dated_9_February_2016.pdf PDF
FA4418-16-R-0002-0003_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__3.pdf PDF
FA4418-16-R-0002_-_Add_Repair_Passenger_Terminal _Bldg_164_-_Questions_and_Answers.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__2.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Site_Visit_Minutes_-_Passenger_Terminal.pdf PDF
Attachment__1_-_Pre-proposal_Site_Visit_Record_of_Attendance.pdf PDF
Attachment__2_-_Pre-proposal_Site_Visit_Presentation.pdf PDF
Attachment__11_-_Asbestos_ _Lead_Report_dated_10_October_2012.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_2.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_1.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_3.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_5.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__1.pdf PDF
Attachment__12_-_Passenger_Terminal_OS-SWPPP_dated_2_October_2013.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_4.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Conference_Transportation_Instructions.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_13.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_7.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__4_-_SID_Schedule_dated_30_October_2013.pdf PDF
Attachment__6_-_Green_Procurement_Form_dated_15_July_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__3_-_FF E_Schedule_dated_30_October_2013.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_10.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_8.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_14.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_11.pdf PDF
Attachment__10_-_Addendum__2_dated_10_November_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_6.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_12.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_4.pdf PDF
Attachment__5_-_Wage_Determination_dated_22_May_2015.pdf PDF
FA4418-16-R-0002_Add_Repair_Passenger_Terminal _Bldg_164.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_5.pdf PDF
Attachment__7_-_Submittal_Register_dated_14_March_2014.pdf PDF
Attachment__9_-_Spec_Section_01_32_17_00_20_NAS_dated_30_October_2013.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_15.pdf PDF
Attachment__8_-_Addendum__1_dated_17_September_2014.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TV

REFLECTED CEILING

LEGEND & SYMBOLS

2' X 2' ACT CEILING GRID SYSTEM; REFER TO FINISH

AND COLOR SCHEDULE; A600 FOR TYPES

GYPSUM BOARD CEILING SYSTEM

2' x 4' LIGHT, REFER TO ELECTRICAL DRAWINGS

2' x 2' LIGHT, REFER TO ELECTRICAL DRAWINGS

RECESSED CAN LIGHT, REFER TO ELECTRICAL

DRAWINGS

LINEAR LIGHT FIXTURE, REFER TO ELECTRICAL

DRAWINGS

ROOM NAME & NUMBER TAG:

REFER TO SHEET A600 FOR FINISHES

WORKING POINT

COLUMN GRID TAG

CENTERLINE

REVISION MARK1

Room Name A0000

EGGCRATE PARABOLIC LIGHT LENS

LINEAR METAL, REFER TO KEYNOTES

SUPPLY DIFFUSER, REFER TO MECHANICAL DRAWINGS

RETURN DIFFUSER, REFER TO MECHANICAL DRAWINGS

6 8 9 10 11

A

B

D

E

F

J

K

L

H

N

G

7 7.1 7.9 9.3 9.7

L.8

M

A301

A301

A301

A301

A301

A301

A301

A301

A511

A511

A311

A302

A302

A302

A302

A312

A511

A313

A.F.F.

GWB SYSTEM

9' - 6"

A.F.F.

2' x 2' ACT SYSTEM

8' - 4"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

9' - 6"

VESTIBULE

CARTS

CENTRAL

LOBBY

PSC

SECURITY

SCREENING

SECURE

GATE

CORRIDOR

DEPARTURE

GATE 2

ENHANCED

VENDING

AREA

FAMILY

LOUNGE

CRIB ROOM

ELEC.

BAGGAGE

CLAIM

DEPARTURE/ARRIVAL

GATE 3

CUSTOMS

MECHANICAL

LOST &

FOUND

MEN

WOMEN

WOMEN

MEN

ARRIVAL

WAITING

CAR

RENTAL

COVERED

CANOPY

AREA

BAGGAGE

BREAKDOWN

PLAY

ROOM

RESTROOM

SPRINKLER

RISER

ROOM

VESTIBULE

SHOWER/

CHANGING

ROOM

SHOWER/

CHANGING

ROOM

COMM.

CORRIDOR

CARTS

MEN

WOMEN

BAGGAGE

ACCESS

CONTROLLER

A.F.F.

GWB SYSTEM

10' - 0"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

2' x 2' ACT SYSTEM

9' - 0"

A.F.F.

GWB SYSTEM

9' - 6"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

8' - 0" A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

9' - 6"

A.F.F.

GWB SYSTEM

9' - 6"

A.

F.

F.

2' x

' A C

T

SY

ST

EM

8'

4"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

METAL SOFFIT

9' - 6 1/2"

A.F.F.

METAL SOFFIT

9' - 6 1/2"

A.F.F.

METAL SOFFIT

9' - 6 1/2"

A.F.F.

GWB SYSTEM

9' - 6"

A312

A.F.F.

GWB SYSTEM

9' - 6"

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

8' - 0"

A572

SIM

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

1'- 2"

1'-2"

1'- 2"

1'-2" 1'-2"

1'- 2"

1'- 2"

1'- 2"

4"

4"

4 1/2"

4" 4"

4"

4"

4"

2'-6"

2'-6"

2'- 6"

A552

A.F.F.

GWB SYSTEM

9' - 6"

NAA

N9.59.1

N8.5N7.7N7.1

NN.1

NQ

NP

N8.4 N8.6 N9.2 N9.8

NJ.4

NE.8

N7.8N7.05

NL.1

NK.9

NE.4

NA.9

C.4

NC.8

NC.5

N7.4

A122

A.F.F.

2' x 2' ACT SYSTEM

9' - 0"

A.F.F.

2' x 2' ACT SYSTEM

9' - 8"

A.F.F.

2' x 2' ACT SYSTEM

9' - 8"

A.F.F.

2' x 2' ACT SYSTEM

9' - 8"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

GWB SYSTEM

10' - 0 1/2"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A572

A572

A572

A.F.F.

2' x 2' ACT SYSTEM

8' - 4"

A.F.F.

GWB SYSTEM

8' - 0"A.F.F.

GWB SYSTEM

8' - 0"A.F.F.

2' x 2' ACT SYSTEM

8' - 4"

2'- 6"

A572

A572

A573

SIM

A572

A572

EXISTING CONCRETE SURFACE

TO BE PAINTED, PT1

8'-0" CASED

OPENING

8'-0" CASED

OPENING

8'-0" CASED

OPENING

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

SCOPE OF WORK LEGEND

THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:

DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)

AND

DKFX: 11-1122 B FOR REPAIR

INDICATES WORK AS REQUIRED FOR - -

MINOR CONSTRUCTION (MC)

ALL OTHER WORK IS REPAIR

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A121

RE

FL

EC

TE

D C

EI

LI

NG

P

LA

N

S

OU

TH

S

ID

E

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

NKEYLAN NOT TO SCALE

SOUTH

SIDE

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"A040 A121

FIRST FLOOR REFLECTED

CEILING PLAN - SOUTH SIDE

NEW CONSTRUCTION

KEYNOTES

1 METAL LADDER AND ATTIC ACCESS HATCH, ANCHOR LADDER

SECURELY TO MASONRY WALL. REFER TO SPECIFICATION SECTION

05 51 33 - METAL LADDERS; COORDINATE WITH STRUCTURAL

DRAWINGS AND FRAMING PLANS.

13 SUSPENDED 3-DIMENSIONAL CURVED SYSTEM IS PART OF

FF&E-ANCILLARY ITEM #1; REFER TO ANCILLARY ITEM #1 NOTES ON

A410 & A411 - REFER TO SPECIFICATION SECTION 09 54 00. BASIS OF

DESIGN IS TWO-DIRECTIONAL USG CURVATURA SYSTEM WITH 2'x 2'

PANELS WITH 9/16" SUSPENSION SYSTEM WITH 5/32" REVEAL.

17 REPAIR ANY HOLES IN EXISTING CEILING. CLEAN SURFACE OF ALL

FOREIGN MATERIAL. DULL EXISTING SURFACE BY LIGHTLY ABRADING.

APPLY PAINT TO A TEST AREA, ALLOW TO DRY ONE WEEK BEFORE

TESTING ADHESION. IF ADHESION IS POOR, OR IF NEW PAINT

ATTACKS THE PREVIOUS FINISH, REMOVAL OF PREVIOUS FINISH MAY

BE NECESSARY IF EXISTING PAINT IS PEELING BADLY, CLEAN

SURFACE TO SOUND SUBSTRATE, PRIME AND PAINT. REFER TO 09 90

00 PAINT.

22 2" INSULATED METAL PANEL.

23 LINEAR METAL CEILING EXTERIOR.

24 LINEAR METAL CEILING INTERIOR.

TV

6 8

E

A301

A301

A301

A301

A301

A301

A301

A301

NJ.4

NE.8

N7.8N7.05

A.F.F.

GWB SYSTEM

9' - 6" A.F.F.

GWB SYSTEM

9' - 6"

A.F.F.

GWB SYSTEM

9' - 6" A.F.F.

GWB SYSTEM

9' - 6"

A.F.F.

GWB SYSTEM

8' - 0" A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

8' - 0"

A.

F.

F.

G

W B

SY

ST

EM

8'

0"

A.F.F.

GWB SYSTEM

8' - 0" A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

8' - 0"

A.F.F.

GWB SYSTEM

9' - 6"

A.F.F.

GWB SYSTEM

9' - 6"

6'-9 1/2" 3'-4" 4'-11" 2'-0" 30'-10 1/2" 2'-0" 4'-11" 3'-4" 6'-9 1/2" 1'-4"

2'-6"

1'-4" 1'-4"

3'- 4"

9'-

1/ 4"

2'- 0"

'-1

1/

2" 2'-

0" 9'-

1/

4" 3'-

4" 6'-

1/

4" 4'-

3/

4"

1'- 4"

1'- 4"

1'-4" 1'-4"

1'- 4"

1'- 4"

4'-7 3/4" 1'-4"

2'-6"

4'-7 3/4"

2'-6

1'-4

4'-7 3/4

A.

F.

F.

G

W B

SY

ST

EM

9'

6"

A.

F.

F.

G

W B

SY

ST

EM

9'

6"

135.00° 135.00°

135.00° 135.00°

135.00°

5.

° 135.00°

'-7

7'-11" 32'-2 1/2" 7'-11"

48'-0 1/2"

1'-4" 8"1'-8" 1'-8" 8" 1'-4" 1'-8" 1'-8"

8" 8"

8" 8"

3'- 6"

'-5

/4

'-2

/2

'-5

/4

4'-6 1/4" 23'-2 1/4" 4'-6 1/4"

1'- 8"

1'- 8"

1'- 8"

1'- 8"

1'-4

4'-7 3/4

8" 8"

8"

8" 8"8" 8"

8" 8"

8" 8"

8" 8" 13 5.

A.

F.

F.

2' x

' A C

T

SY

ST

EM

" A.

F.

F.

2' x

' A

C T

SY

ST

EM

" A.

F.

F.

2' x

' A C

T

SY

ST

EM

" A.

F.

F.

2' x

' A

C T

SY

ST

EM

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

2'- 0"

A572

A572

A572

A572

A573

A573

A573

A573

A573

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

A572

8" 1'-

4" 8"

1'- 4"

A572

A572

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A572

A572

A572

4'-0 " 4'-0"

7'-4 1/2"7'-4 1/2

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A.F.F.

2' x 2' ACT SYSTEM

10' - 0"

A572

A572

A572

REFLECTED CEILING

LEGEND & SYMBOLS

2' X 2' ACT CEILING GRID SYSTEM; REFER TO FINISH

AND COLOR SCHEDULE; A600 FOR TYPES

GYPSUM BOARD CEILING SYSTEM

2' x 4' LIGHT, REFER TO ELECTRICAL DRAWINGS

2' x 2' LIGHT, REFER TO ELECTRICAL DRAWINGS

RECESSED CAN LIGHT, REFER TO ELECTRICAL

DRAWINGS

LINEAR LIGHT FIXTURE, REFER TO ELECTRICAL

DRAWINGS

ROOM NAME & NUMBER TAG:

REFER TO SHEET A600 FOR FINISHES

WORKING POINT

COLUMN GRID TAG

CENTERLINE

REVISION MARK1

Room Name A0000

EGGCRATE PARABOLIC LIGHT LENS

LINEAR METAL, REFER TO KEYNOTES

SUPPLY DIFFUSER, REFER TO MECHANICAL DRAWINGS

RETURN DIFFUSER, REFER TO MECHANICAL DRAWINGS

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A122

EN

LA

RG

ED

R

EF

LE

C

TE

D C

EI

LI

NG

P

LA

N

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

SCALE: 1/4" = 1'-0"A120 A122

1 ELARGED CEILING PLAN - CENTRAL LOBBY

NEW CONSTRUCTION

KEYNOTES

13 SUSPENDED 3-DIMENSIONAL CURVED SYSTEM IS PART OF

FF&E-ANCILLARY ITEM #1; REFER TO ANCILLARY ITEM #1 NOTES ON

A410 & A411 - REFER TO SPECIFICATION SECTION 09 54 00. BASIS OF

DESIGN IS TWO-DIRECTIONAL USG CURVATURA SYSTEM WITH 2'x 2'

PANELS WITH 9/16" SUSPENSION SYSTEM WITH 5/32" REVEAL.

0' 2' 4' 8'

VTR

ROOF PLAN LEGEND

DOWN SPOUT (DS) CONNECTED TO STORM SYSTEM;

REFER CIVIL DRAWINGS.

STANDING SEAM METAL ROOF PANEL; REFER TO

EXTERIOR MATERIAL SCHEDULE A201

PLUMBING VENT THRU ROOF; REFER TO

1/A513 FOR DETAIL

DS

RAIN CHAIN CONNECTED TO STORM SYSTEM;

REFER TO CIVIL DRAWINGS.

RC

EDGE OF WALL BELOW

EXHAUST FAN THRU ROOF; REFER TO A513

FOR CURB DETAIL & MECHANICAL

ROOF TOP VENTILATOR THRU ROOF; REFER

TO A513 FOR CURB DETAIL & MECHANICAL

1 2

3 4 5 6 8

A

B

C

D

E

H

N

75.2 7.1 7.9

L.8

M

A301

A301

A301

A301

A301

A301

A301

A301

A310

NEW ROOF

EDGE OF

WALL BELOW

A511

A311

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK1

A310

A302

A302

A302

A302

SLOPE: 1 1/2" / 12"

SL

O

PE

: 1

/2

/ 1

2"

DS

DS

DS

DS

DS DS

DS

RC

RC

SL

O

PE

: 1

/2

/ 1

2"

SL

O

PE

: 1

/2

/ 1

2"

SLOPE: 1 1/2" / 12"

SLOPE: 1 1/2" / 12"

RC

RC

GUTTER GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

TROUGH

GUTTER

A512

A512

NAA

N7.7N7.1

NM.2

NN.1

NQ

N3.1 N4.1 N5.1 N5.6

NJ.4

NE.8

N7.8N7.05

NL.1

NK.9

NE.4

NA.9

NC.8

N7.4

EDGE OF WALL BELOW

VTR

VTR

VTR

VTR

SLOPE: 1 1/2" / 12"

SL

O

PE

: 1

/2

/ 1

2"

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

SCOPE OF WORK LEGEND

THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:

DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)

AND

DKFX: 11-1122 B FOR REPAIR

INDICATES WORK AS REQUIRED FOR - -

MINOR CONSTRUCTION (MC)

ALL OTHER WORK IS REPAIR

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A130

RO

OF

P

LA

N

N

OR

TH

S

ID

E

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

NN

KEYLAN NOT TO SCALE

NORTH

SIDE

SCALE: 1/8" = 1'-0"A130

1 ROOF PLAN - NORTH SIDE

0' 4' 8' 16'

ROOF PLAN NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES.

2 REFER TO A513 FOR ROOF DETAILS

3 VENT THROUGH ROOFS AND OTHER ROOF PENESTRATIONS ARE

INDICATED FOR DETAIL COORDINATION. THE CONTRACTOR IS

RESPONSIBLE FOR LOCATING ANY AND ALL ROOF PENETRATIONS.

PENETRATIONS INCLUDE BUT AREN'T LIMITED TO VENTS THROUGH

ROOF, BOILER FLUES, EXHAUSTS AND OTHER MECHANICAL

EQUIPMENT. REFER TO MECHANICAL DRAWINGS.

4 IN THE ABSENCE OF DETAIL FOR ANY CONDITION ON THE ROOF, THE

MOST STRINGENT CONDITION OF THE CURRENT NRCA/SMACNA

SHALL APPLY.

NEW CONSTRUCTION

KEYNOTES

26 EXHAUST FAN - REFER TO MECHANICAL.

27 ROOF TOP VENTILATOR - REFER TO MECHANICAL

28 VENT PIPE - REFER TO MECHANICAL

33 EXPOSED STRUCTURAL STEEL TRUSSES, BEAMS, PURLINS, BRACING

AND COLUMNS TO BE FINISHED WITH COATING 2 (C2); REFER TO

EXTERIOR MATERIAL COLOR SCHEDULE, A201 FOR ADDITIONAL

INFORMATION.

GENERAL ROOF NOTES

1 IN THE ABSENCE OF DETAIL FOR ANY CONDITION ON THE ROOF, THE

MOST STRINGENT CONDITION OF THE CURRENT NRCA/SMACNA SHALL

APPLY.

2 ALL CLARIFICATIONS OR ADDITIONAL INFORMATION NEEDED SHALL BE

IN ACCORDANCE WITH THE CRITERIA AND DETAILS OF THE NRCA

ROOFING AND WATERPROOFING MANUAL AND SMACNA

ARCHITECTURAL SHEET METAL MANUAL. ANY DEVIATIONS FOR THE

SPECIFIED OR INDICATED REQUIREMENTS SHALL BE SUBMITTED FOR

APPROVAL BY THE ARCHITECT PRIOR TO INSTALLATION.

3 FOLLOW RECOMMENDAITONS AND GUIDELINES OF THE SMACNA

MANUAL, 6TH ED., FOR DETAIL CLARIFICATIONS IN REFERENCE TO

SHEET METAL WORK.

4 FOLLOW RECOMMENDAITONS AND GUIDELINES OF THE NRCA MANUAL,

5TH ED., FOR DETAIL CLARIFICATIONS IN REFERENCE TO MEMBRANE

ROOF.

5 NO ROOFING KETTLE SHALL COME WITHIN 250 FEET OF OCCUPIED

AREAS.

6 NO CURB SHALL COME WITHIN 8 INCHES OF VALLEY OR CRICKET LINE.

ADJUST THE TAPERED INSULTION ACCORDING T THE ACTUAL CURB

PLACEMENTS.

7 PROVIDE CRICKETS AT ALL ROOFTOP EQUIPMENT LOCATIONS

RUNNING PERPENDICULAR TO THE ROOF SLOPE THAT EXCEED 24

INCHES WIDE.

8 PREFABRICATE FLASHING CORNERS AND ENDS WITH MINIMUM 18 INCH

RETURNS.

9 PROVIDE CONCEALED JOINT COVER PLATE IN FLASHING WITH 12 INCH

WIDE SPLICE SHEET CENTERED ON SEAM. APPLY TWO ROWS OF

BUTYL TAPE EACH SIDE OF JOINT AND PROVIDE SEALANT AT SEAM.

10 ALL SHEET METAL TERMINATIONS TO HAVE HEMMED EDGES. NO

EXPOSED CUT EDGES.

11 ADD ADDITIONAL LAYER OF ROOFING MEMBRANE BELOW LOW SLOPE

ROOF WHERE WATER SHEET DRAINS FROM HIGH TO LOW.

12 PROVIDE STAINLESS STEEL FLASHING MATERIAL AT LOCATIONS

WHERE WATER SHEET DRAINS FROM HIGH TO LOW.

VTR

ROOF PLAN LEGEND

DOWN SPOUT (DS) CONNECTED TO STORM SYSTEM;

REFER CIVIL DRAWINGS.

STANDING SEAM METAL ROOF PANEL; REFER TO

EXTERIOR MATERIAL SCHEDULE A201

PLUMBING VENT THRU ROOF; REFER TO

1/A513 FOR DETAIL

DS

RAIN CHAIN CONNECTED TO STORM SYSTEM;

REFER TO CIVIL DRAWINGS.

RC

EDGE OF WALL BELOW

EXHAUST FAN THRU ROOF; REFER TO A513

FOR CURB DETAIL & MECHANICAL

ROOF TOP VENTILATOR THRU ROOF; REFER

TO A513 FOR CURB DETAIL & MECHANICAL

6 8 9 10 11

A

D

E

F

J

K

L

H

N

G

7 7.1 7.9 9.3 9.7

L.8

M

A301

A301

A301

A301

A301

A301

A301

A301

EDGE OF WALL BELOW

A511

A511

A511

A311

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

DKFX 11-1122 A

"MC" WORK

A302

A302

A302

A302

A511

A313

SL

O

PE

: 1

/2

/ 1

2"

SLOPE: 1 1/2" / 12"

DS

DS

DS

DS

DS

DS

DSDS

DS

RC

RC

RC

RC

GUTTERGUTTERGUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER

GUTTER GUTTER

GUTTER

GUTTER

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

A513

SIM

RC

TROUGH

GUTTER

NAA NAA

N9.59.1

N8.5N7.7N7.1

NN.1

NQ

NP

N8.4 N8.6 N9.2 N9.8

NJ.4

NE.8

N7.8N7.05

NL.1

NE.4

NA.9 NA.9

C.4

NC.8 NC.8

NC.5

N7.4

EDGE OF WALL BELOW

VTR

VTR

VTR

VTR

SL

O

PE

: 1

/2

/ 1

2"

SLOPE: 1 1/2" / 12"

SL

O

PE

: 1

/2

/ 1

2"

SL

O

PE

: 1

/2

/ 1

2"

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

SCOPE OF WORK LEGEND

THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:

DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)

AND

DKFX: 11-1122 B FOR REPAIR

INDICATES WORK AS REQUIRED FOR - -

MINOR CONSTRUCTION (MC)

ALL OTHER WORK IS REPAIR

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A131

RO

OF

P

LA

N

S

OU

TH

S

ID

E

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

NN

KEYLAN NOT TO SCALE

SOUTH

SIDE

SCALE: 1/8" = 1'-0"A131

1 ROOF PLAN - SOUTH SIDE

0' 4' 8' 16'

ROOF PLAN NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES.

2 REFER TO A513 FOR ROOF DETAILS

3 VENT THROUGH ROOFS AND OTHER ROOF PENESTRATIONS ARE

INDICATED FOR DETAIL COORDINATION. THE CONTRACTOR IS

RESPONSIBLE FOR LOCATING ANY AND ALL ROOF PENETRATIONS.

PENETRATIONS INCLUDE BUT AREN'T LIMITED TO VENTS THROUGH

ROOF, BOILER FLUES, EXHAUSTS AND OTHER MECHANICAL

EQUIPMENT. REFER TO MECHANICAL DRAWINGS.

4 IN THE ABSENCE OF DETAIL FOR ANY CONDITION ON THE ROOF, THE

MOST STRINGENT CONDITION OF THE CURRENT NRCA/SMACNA

SHALL APPLY.

NEW CONSTRUCTION

KEYNOTES

26 EXHAUST FAN - REFER TO MECHANICAL.

27 ROOF TOP VENTILATOR - REFER TO MECHANICAL

28 VENT PIPE - REFER TO MECHANICAL

33 EXPOSED STRUCTURAL STEEL TRUSSES, BEAMS, PURLINS, BRACING

AND COLUMNS TO BE FINISHED WITH COATING 2 (C2); REFER TO

EXTERIOR MATERIAL COLOR SCHEDULE, A201 FOR ADDITIONAL

INFORMATION.

FIRST FLOOR

EL.0' - 0"

3 4 5 6 11

A301

A301

A301

A301

AA

A A

172A101A DD

A

A

INSULATED METAL

PANELS

BRICK INFILL, TYP;

STAGGER JOINTS

INSULATED

METAL PANELS INSULATED

METAL PANELS

A302

A302

A302

A302

A313

A502

A

GUTTER

METAL FASCIA

INSULATED

METAL PANELS

STANDING SEAM

METAL ROOF PANELS

AUTOMATIC SLIDING

ENTRANCE DOOR

(IMPACT); REFER TO

DOOR SCHEDULE

ALUM.

STOREFRONT, TYP.

DOWNSPOUT

STANDING SEAM

METAL ROOF PANELS

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

BREAK METAL

TRIM

BRICK INFILL,

TYP; STAGGER

JOINTS

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

GUTTER

STANDING SEAM

METAL ROOF PANELS

METAL FASCIA

METAL TRUSS, COATING 2 (C2);

REFER TO STRUCTURAL DWGS.

GUTTER

STANDING SEAM

METAL ROOF PANELS

AUTOMATIC SLIDING

ENTRANCE DOOR (IMPACT)

CAST STONE, TYP.

GUTTER

DS DS RC RC

BREAK METAL

TRIM

BRICKMETAL FENCE DSBUILDING NUMBER

SIGN, TYPE B5.

REFER TO 4/A514

Z

N9.59.1N8.5N7.7N7.1 N10.9N10.6N9.9N7.8N7.05

2727 26 26

LIMITS OF BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT IRON ENCLOSURE

INCLUDING GATE AND FOOTINGS; PLAY AREA AND PLAY STRUCTURE SURFACE

MATERIALS, SITE LIGHTING, DRINKING FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT

FOR THE FF&E PLAY STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA

FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE, PLUMBING AND

ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT AWARDED THE PLAY STRUCTURE,

PLAY AREA SURFACING AND PLAY AREA FURNITURE WILL NOT BE AWARDED EITHER.

BRICK, TYP.

BREAK METAL

TRIM

33 3333

NEW BRICK

ROWLOCK

NEW BRICK

ROWLOCK

NEW BRICK

ROWLOCK

BUILDING NUMBER

SIGN, TYPE B5.

REFER TO 4/A514

16433

29 29

FIRST FLOOR

EL.0' - 0"

1 2 3

A310

A

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

BRICK

INSULATED METAL

PANELS, TYP.

ALUM.

STOREFRONT, TYP.

BREAK METAL

TRIM

DS

N3.1

NEW BRICK

ROWLOCK

FIRST FLOOR

EL.0' - 0"

346891011 79.39.7

A301

A301

A301

A301

A502

BREAK METAL

TRIM, TYP.

GUTTER

ALUM. STOREFRONT

ENTRANCES, TYP.

BRICK

PIER, TYP.

METAL TRUSS, COATING 2 (C2);

REFER TO STRUCTURAL DWGS.

METAL FASCIA

INSULATED

METAL PANELS

METAL FASCIA

INSULATED METAL PANELS 1

A311

A311

144B156A

CAST STONE

CAP, TYP.

A302

A302

A302

A302

STANDING SEAM

METAL ROOF PANELS

ALUM.

STOREFRONT

BRICK INFILL,

TYP; STAGGER

JOINTS

BRICK

PIER, TYP.

BRICK INFILL,

TYP; STAGGER

JOINTS

BREAK METAL TRIM

RC

STANDING SEAM

METAL ROOF PANELS

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

ALUM. STOREFRONT, TYP.

STANDING SEAM

METAL ROOF PANELS

METAL FASCIA

GUTTER

A512

153B153C 150B 150C 149B 149C

RCRCDSDS DS

ALUM. STOREFRONT

ENTRANCES, TYP.

ALUM. STOREFRONT, TYP.

ALUM. STOREFRONT

ENTRANCES, TYP.

DS

BREAK METAL TRIM

N3.1N4.1N5.1N5.6N8.4N8.6N9.2N9.8 N7.8 N7.05N7.4

27 2726

BRICK

BRICK INFILL, TYP;

STAGGER JOINTS

J JGG G

ALUM. STOREFRONT,

TYP.

33 33 33

BUILDING NUMBER SIGN;

TYPE B5. REFER TO 4/A514

FIRST FLOOR

EL.0' - 0"

124B 125 124C

BOLLARDS

OVERHEAD DOOR

GUTTER

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

HOLLOW MTL DOOR &

FRAME; REFER TO DOOR

SCHEDULE

BREAK METAL TRIM

DOWNSPOUT

INSULATED METAL

PANELS, TYP.

ALUM. STOREFRONT, TYP.

ALUM. STOREFRONT

ENTRANCES, TYP.20

DS

N3.1

BRICK

BRICK INFILL, TYP;

STAGGER JOINTS

MATERIALS LEGEND

BRICK (NEW)

BRICK (EXISTING)

STANDING SEAM METAL ROOF

INSULATED METAL PANELS

WINDOW/STOREFRONT TAG: REFER TO SHEET

A620 FOR TYPES

DOOR TAG: REFER TO SHEET A610 FOR SCHEDULE

COLUMN GRID TAG1

101A

W8

BREAK METAL TRIM

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

BID ALTERNATES

BID ALTERNATE #1 - DROP OFF LOOP (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE DROP-OFF LOOP, DROP ARM GATES

AND ALL ASSOCIATED WORK. REFER TO C002, OTHER CIVIL, LANDSCAPE

AND ELECTRICAL DRAWINGS.

BID ALTERNATE #2 - BRICK CROSSWALK (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE BRICK CROSSWALK ACROSS BATES

STREET AND ALL ASSOCIATED WORK. WORK INCLUDES SAW CUTTING

AND REMOVING EXISTING PAVEMENTS AND INSTALLATION OF NEW

BRICK PAVEMENTS. REFER TO C002, OTHER CIVIL AND LANDSCAPE

DRAWINGS.

BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT

IRON ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND

PLAY STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING

FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY

STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA

FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE,

PLUMBING AND ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT

AWARDED THE PLAY STRUCTURE, PLAY AREA SURFACING AND PLAY

AREA FURNITURE WILL NOT BE AWARDED EITHER.

EXTERIOR MATERIAL & COLOR LEGEND

MATERIAL

BRICK

BASIS OF DESIGN PRODUCT & MANUFACTURER COLOR

HANSON - RICHTEX SOUTHERN 355 W/ FLASH CHARLESTON BRICK

MORTAR -- NATURAL COLORED PORTLAND CEMENT

MORTAR AND MATCHES EXISTING MORTAR AS

SELECTED BY GOVERNMENT FROM SAMPLES

CAST STONE -- BEIGE # 37769, FROM FED STD 595B

ALUMINUM STOREFRONT

(IMPACT & BLAST RESISTANT)

EFCO 526 (T) COLOR: DARK BRONZE

FINISH: AA-M10C22 A44

ALUMINUM STOREFRONT

ENTANCES (IMPACT & BLAST

RESISTANT)

EFCO D300 COLOR: DARK BRONZE

FINISH: AA-M10C22 A44

AUTOMATIC SLIDING ENTRANCE

DOORS (BLAST)

STANLEY DURA-SHIELD COLOR: DARK BRONZE

FINISH: AA-M10C22 A44

AUTOMATIC SLIDING ENTRANCE

DOORS (IMPACT)

STANLEY DURA-STORM 2000 COLOR: DARK BRONZE

FINISH: AA-M10C22 A44

ROOF PANEL ULTRA SEAM US-200 PANELS: 18" WIDE

WITH 2" DOUBLE LOCK SEAMS & STIFFNER RIBS

DARK BRONZE

ROOF RE-ROOF PANEL ULTRA SEAM US-200 PANELS: 18" WIDE

WITH 2" DOUBLE LOCK SEAMS & STIFFNER RIBS WITH ROOF

HUGGER. REFER TO SPEC. SECTION

DARK BRONZE

GUTTERS & DOWNSPOUTS TBD DARK BRONZE (MATCH ROOF)

2" INSULATED METAL PANEL CENTRIA, 20" WIDE FORMAWALL DIMENSION SERIES

TEXTURE: SMOOTH

PROFILE: FLAT

REVEAL: 1/8"

ALIGN REVEALS WITH SOFFIT PANEL REVEALS

# 154, DARK BRONZE DURAGUARD PLUS COATING

2" INSULATED METAL PANEL

(FOR SOFFIT)

CENTRIA, 20" WIDE FORMAWALL DIMENSION SERIES

TEXTURE: SMOOTH

PROFILE: FLAT

REVEAL: 1/8"

ALIGN REVEALS OF VERTICAL PANEL WITH REVEALS OF

SOFFIT PANEL

# 154, DARK BRONZE DURAGUARD PLUS COATING

EXTERIOR HOLLOW METAL

DOORS & FRAMES (BLAST &

IMPACT)

-- PT 12; REFER TO A600

EXTERIOR HOLLOW METAL

DOORS & FRAMES

-- PT 12; REFER TO A600

OVERHEAD DOORS (NEW) OVERHEAD DOOR COMPANY

MODEL: STORMTIGHT 625 SERIES, 20 GUAGE

POWDERGUARD WEATHERED FINISH,

DARK BRONZE

CANOPY CEILINGS USG, PARALINE II

MOUNTED ON FLAT CHANNELS

1691 METALLIC GOLD

NON-PERFORATED

GLAZING -- GUARDIAN, BRONZE; REFER TO A620 FOR

GLAZING SCHEDULE

COATING 1 (C1) SHERWIN WILLIAMS

POLYSILOXANE XLE-80 EPOXY SILOXANE

UMBRA: SW 4008

REFER TO SPEC. SECTION 09 97 13.00 40

COATING 2 (C2) SHERWIN WILLIAMS

POLYSILOXANE XLE-80 EPOXY SILOXANE

SILVER BRITE: SW 4091

REFER TO SPEC. SECTION 09 97 13.00 40

METAL FASCIA TBD; 22 GAUGE MINIMUM DARK BRONZE PRE-FINISH TO MATCH ROOF

BREAK METAL TRIM TBD; 22 GAUGE MINIMUM DARK BRONZE PRE-FINISH TO MATCH

STOREFRONT

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A201

EX

TE

RI

OR

B

UI

LD

IN

G

EL

EV

AT

IO

NS

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

SCALE: 1/8" = 1'-0"A102 A201

1 BUILDING ELEVATION - WEST 1

SCALE: 1/8" = 1'-0"A102 A201

2 BUILDING ELEVATION - WEST 2

SCALE: 1/8" = 1'-0"A102 A201

3 BUILDING ELEVATION - EAST 1

SCALE: 1/8" = 1'-0"A102 A201

4 BUILDING ELEVATION - EAST 2

EXTERIOR COLOR SCHEDULE

NOTES

1 MANUFACTURERS NAMES ARE PROVIDED AS THE BASIS OF DESIGN

OR APPROVED EQUAL

2 REFER TO SHEET A620 FOR STOREFRONT ELEVATIONS

3 REFER TO A641 & A642 FOR SIGNAGE

ELEVATION NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES

2 REFER TO A201 FOR EXTERIOR MATERIAL & COLOR SCHEDULE

3 REFER TO A000 FOR ANCILLARY ITEMS (AI) AND BID ALTERNATE

INFORMATION

4 STAGGER MORTAR JOINTS WITH EXISTING BRICK AND HALF BRICK TO

CAMOFLAGE INFILL

NEW CONSTRUCTION

KEYNOTES

16 NEW CONCRETE STAIR AND LANDING, COORDINATE WITH CIVIL.

18 NEW CHILLER - REFER TO MECHANICAL.

20 SPLIT SYSTEM UNITS - REFER TO MECHANICAL.

26 EXHAUST FAN - REFER TO MECHANICAL.

27 ROOF TOP VENTILATOR - REFER TO MECHANICAL

29 EXISTING IMC FENCE TO REMAIN. COORDINATE WITH DEMOLITION

NOTE 38. REPAIR ANY DAMAGE AS A RESULT OF CONSTRUCTION

30 PROVIDE 24" HIGH; REVERSE LIT; CUT METAL LETTERS

CONSTRUCTED OF ALUMINUM; FONT = HELVETICA; TOTAL DEPTH = 5";

LED ILLUMINATION - WHITE. REFER TO 4/A503 FOR DETAILS.

33 EXPOSED STRUCTURAL STEEL TRUSSES, BEAMS, PURLINS, BRACING

AND COLUMNS TO BE FINISHED WITH COATING 2 (C2); REFER TO

EXTERIOR MATERIAL COLOR SCHEDULE, A201 FOR ADDITIONAL

ABCDEHN M

A301

A301

A301

A301

A310

138A 138B

A511

127C

A302

A302

GUTTER

ALUM. STOREFRONT,

TYP.

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

BRICK, TYP.

BRICK PIER, TYP.

CAST STONE, TYP.

ALUM. STOREFRONT

ENTRANCES, TYP.;

REFER TO DOOR

SCHEDULE

OVERHEAD DOOR

BOLLARD

METAL FASCIAINSULATED

METAL PANELS

GUTTER

STANDING SEAM

METAL ROOF PANELS

DS

INSULATED

METAL PANELS

INSULATED

METAL PANELS

NEW MASONRY WALL;

REFER TO PLANS

BRICK INFILL,

TYP; STAGGER

JOINTS

EXT. HOLLOW MTL

DOOR & FRAME

BRICK INFILL, TYP;

STAGGER JOINTS

GUTTER

STANDING SEAM

METAL ROOF PANELS

STANDING SEAM

METAL ROOF PANELS GUTTER

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

BRICK PIER, TYP.

CAST STONE CAP, TYP.

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

METAL FASCIA

STANDING SEAM METAL

ROOF PANELS

BREAK METAL TRIM

20 20 20

RCRC DS DSBOLLARD

Y

NAANM.2NN.1NQ NP NJ.4 NE.8

26 26

33 33

FIRST FLOOR

EL.0' - 0"

A D K L N

A301

A301

A301

A301

165BG

B

B

METAL FASCIA

EXT. HOLLOW METAL

DOOR & FRAME; REFER

TO DOOR SCHEDULE

INSULATED

METAL PANELS

A302

A302

A511

ALUM.

STOREFRONT, TYP.

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

BRICK PIER, TYP.

CAST STONE

CAP, TYP.

OVERHEAD

DOOR

STANDING SEAM METAL

ROOF PANELS

DS

GUTTER

METAL FASCIA

STANDING SEAM

METAL ROOF PANELS

CAST STONE

CAP, TYP.

STANDING SEAM METAL

ROOF PANELS

STANDING SEAM METAL

ROOF PANELS

EXT. HOLLOW METAL

DOOR & FRAME; REFER

TO DOOR SCHEDULE

INSULATED

METAL PANELSGUTTER GUTTER

BRICK PIER, TYP.

METAL FASCIABREAK METAL TRIM

18 20

DSDS DSDSDS RCBRICK

METAL FENCE

NAA NA.4 NA.2 NB.4 NN.1 NQNPNJ.4NE.8NA.9 C.4 NC.8

LIMITS OF BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT IRON

ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND PLAY

STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING FOUNTAIN AND

ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY STRUCTURE INCLUDING

THE SHADE STRUCTURE AND PLAY AREA FURNITURE. REFER TO C002, OTHER

CIVIL, LANDSCAPE ARCHITECTURE, PLUMBING AND ELECTRICAL DRAWINGS. IF

BID ALTERNATE #3 IS NOT AWARDED THE PLAY STRUCTURE, PLAY AREA

SURFACING AND PLAY AREA FURNITURE WILL NOT BE AWARDED EITHER.

158C 158B 158A

EXISTING BRICK

COLUMN

MATERIALS LEGEND

BRICK (NEW)

BRICK (EXISTING)

STANDING SEAM METAL ROOF

INSULATED METAL PANELS

WINDOW/STOREFRONT TAG: REFER TO SHEET

A620 FOR TYPES

DOOR TAG: REFER TO SHEET A610 FOR SCHEDULE

COLUMN GRID TAG1

101A

W8

BREAK METAL TRIM

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

BID ALTERNATES

BID ALTERNATE #1 - DROP OFF LOOP (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE DROP-OFF LOOP, DROP ARM GATES

AND ALL ASSOCIATED WORK. REFER TO C002, OTHER CIVIL, LANDSCAPE

AND ELECTRICAL DRAWINGS.

BID ALTERNATE #2 - BRICK CROSSWALK (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE BRICK CROSSWALK ACROSS BATES

STREET AND ALL ASSOCIATED WORK. WORK INCLUDES SAW CUTTING

AND REMOVING EXISTING PAVEMENTS AND INSTALLATION OF NEW

BRICK PAVEMENTS. REFER TO C002, OTHER CIVIL AND LANDSCAPE

DRAWINGS.

BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT

IRON ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND

PLAY STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING

FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY

STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA

FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE,

PLUMBING AND ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT

AWARDED THE PLAY STRUCTURE, PLAY AREA SURFACING AND PLAY

AREA FURNITURE WILL NOT BE AWARDED EITHER.

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A202

EX

TE

RI

OR

B

UI

LD

IN

G

EL

EV

AT

IO

NS

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

SCALE: 1/8" = 1'-0"A102 A202

1 BUILDING ELEVATION - NORTH

SCALE: 1/8" = 1'-0"A103 A202

2 BUILDING ELEVATION - SOUTH

ELEVATION NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES

2 REFER TO A201 FOR EXTERIOR MATERIAL & COLOR SCHEDULE

3 REFER TO A000 FOR ANCILLARY ITEMS (AI) AND BID ALTERNATE

INFORMATION

4 STAGGER MORTAR JOINTS WITH EXISTING BRICK AND HALF BRICK TO

CAMOFLAGE INFILL

NEW CONSTRUCTION

KEYNOTES

5 EXISTING STEEL SILL(S) TO BE PREPPED AND RE-FINISHED IN

ACCORDANCE WITH SPECIFICATION SECTION - STEEL COATINGS 09

97 13.00 40 FOR MORE PREPARATION AND COATING INFORMATION.

REFER TO BB/BHE01 FOR ADDITIONAL ITEMS REQUIRING FIELD

VERIFICATION. FINISH TO BE COATING 1 (C1)

18 NEW CHILLER - REFER TO MECHANICAL.

19 CHAIN LINK FENCE ENCLOSURE - REFER TO CIVIL FOR SIZES AND

DETAILS.

20 SPLIT SYSTEM UNITS - REFER TO MECHANICAL.

26 EXHAUST FAN - REFER TO MECHANICAL.

27 ROOF TOP VENTILATOR - REFER TO MECHANICAL

33 EXPOSED STRUCTURAL STEEL TRUSSES, BEAMS, PURLINS, BRACING

AND COLUMNS TO BE FINISHED WITH COATING 2 (C2); REFER TO

EXTERIOR MATERIAL COLOR SCHEDULE, A201 FOR ADDITIONAL

EXISTING ROOF DECK

EL.12' - 3"

A D NL.8 M

A301

A301

A301

A301

COVERED

CANOPY

AREA

VESTIBULE

CENTRAL

LOBBY

DEPARTURE

GATE 2

A A

A313

A302

A302

A311

A312

A 149AC C C

A551

TYP.

123 33 3

1 1/2" 12"

1 1/2" 12"

NAA NM.2 NN.1 NQNJ.4NE.8 NL.1NK.9NE.4NA.9 NC.8

CLERESTORY

27 2626

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

3 4 5 6 8 9 10 117 7.9 9.3 9.7

A301

A301

A301

A301

176 165A 159A 159B

BAGGAGE

BUILD UP

DISPATCH

CENTRAL

LOBBY

WOMEN

MEN

MECHANICAL

LOST &

FOUND

CORRIDOR

A302

A302

A302

A302

A312

T

A551

TYP.

1 1/2" 12"

N7.8N7.05

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

DEKLN L.8M

A301

A301

A301

A301

CENTRAL

LOBBY

DEPARTURE

GATE 2

VESTIBULE

COVERED

CANOPY

AREA

A511

A302

A302

153A G

13 13

A551

TYP.

NAANA.4NN.1NQ NP NJ.4 NE.8NL.1 NK.9 NE.4 NA.9C.4NC.8 NC.5

CLERESTORY

LIMITS OF BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT IRON ENCLOSURE

INCLUDING GATE AND FOOTINGS; PLAY AREA AND PLAY STRUCTURE SURFACE

MATERIALS, SITE LIGHTING, DRINKING FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT

FOR THE FF&E PLAY STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA

FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE, PLUMBING AND

ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT AWARDED THE PLAY STRUCTURE,

PLAY AREA SURFACING AND PLAY AREA FURNITURE WILL NOT BE AWARDED EITHER.

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

123456891011 5.2

A301

A301

A301

A301

CORRIDOR

CENTRAL

LOBBY

FLIGHT

CHECK-IN

COUNTER

DISPATCH

BAGGAGE

BUILD UP

134 127D 124B 125

124C

A310

A511

A302

A302

A302

A302

101B172B

C

11 10 A551

TYP.

1 1/2" 12" 1 1/2"

12"

N7.1N7.8 N7.05

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

BID ALTERNATES

BID ALTERNATE #1 - DROP OFF LOOP (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE DROP-OFF LOOP, DROP ARM GATES

AND ALL ASSOCIATED WORK. REFER TO C002, OTHER CIVIL, LANDSCAPE

AND ELECTRICAL DRAWINGS.

BID ALTERNATE #2 - BRICK CROSSWALK (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE BRICK CROSSWALK ACROSS BATES

STREET AND ALL ASSOCIATED WORK. WORK INCLUDES SAW CUTTING

AND REMOVING EXISTING PAVEMENTS AND INSTALLATION OF NEW

BRICK PAVEMENTS. REFER TO C002, OTHER CIVIL AND LANDSCAPE

DRAWINGS.

BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT

IRON ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND

PLAY STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING

FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY

STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA

FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE,

PLUMBING AND ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT

AWARDED THE PLAY STRUCTURE, PLAY AREA SURFACING AND PLAY

AREA FURNITURE WILL NOT BE AWARDED EITHER.

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A301

B

UI

LD

IN

G

SE

C

TI

ON

S

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

SCALE: 1/8" = 1'-0"A102 A301

1 BUILDING SECTION

SCALE: 1/8" = 1'-0"A102 A301

2 BUILDING SECTION

SCALE: 1/8" = 1'-0"A102 A301

3 BUILDING SECTION

SCALE: 1/8" = 1'-0"A102 A301

4 BUILDING SECTION

NEW CONSTRUCTION

KEYNOTES

3 BAGGAGE HANDLING EQUIPMENT (BHE) TO BE PROVIDED AND

INSTALLED UNDER SEPERATE CONTRACT, SHALL BE COORDINATED

BY CONTRACTOR. REFER TO MEP DRAWINGS FOR REQUIREMENTS

WHICH ARE PART OF THE BASE BID AND IN THE GENERAL

CONTRACTORS SCOPE OF WORK.

10 PHONE CARD MACHINE (PROVIDED AND INSTALLED BY OTHERS)

LOCATIONS INDICATED FOR COORDINATION - REFER TO ELECTRICAL

FOR REQUIREMENTS WHICH ARE PART OF THE BASE BID AND IN THE

GENERAL CONTRACTORS SCOPE OF WORK.

11 ATM (PROVIDED AND INSTALLED BY OTHERS) LOCATIONS INDICATED

FOR COORDINATION - REFER TO ELECTRICAL FOR REQUIREMENTS

WHICH ARE PART OF THE BASE BID AND IN THE GENERAL

CONTRACTORS SCOPE OF WORK.

12 FOLDING PANEL PARTITION SHALL BE PROVIDED AND INSTALLED BY

CONTRACTOR - REFER TO STRUCTURAL, ELECTRICAL AND

SPECIFICATION SECTION 10 22 39 FOLDING PANEL PARTITION.

13 SUSPENDED 3-DIMENSIONAL CURVED SYSTEM IS PART OF

FF&E-ANCILLARY ITEM #1; REFER TO ANCILLARY ITEM #1 NOTES ON

A410 & A411 - REFER TO SPECIFICATION SECTION 09 54 00. BASIS OF

DESIGN IS TWO-DIRECTIONAL USG CURVATURA SYSTEM WITH 2'x 2'

PANELS WITH 9/16" SUSPENSION SYSTEM WITH 5/32" REVEAL.

20 SPLIT SYSTEM UNITS - REFER TO MECHANICAL.

23 LINEAR METAL CEILING EXTERIOR.

24 LINEAR METAL CEILING INTERIOR.

26 EXHAUST FAN - REFER TO MECHANICAL.

27 ROOF TOP VENTILATOR - REFER TO MECHANICAL

SECTION NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES

2 REFER TO A201 FOR EXTERIOR MATERIAL & COLOR SCHEDULE

3 REFER TO A000 FOR ANCILLARY ITEMS (AI) AND BID ALTERNATE

INFORMATION

EXISTING ROOF DECK

EL.12' - 3"

3 4 5 6 8 9 10 117 9.3 9.7

A301

A301

A301

A301

A311

A311

A302

A302

A302

A302

149BG 150A 153B 153C 156A

FE-1FE-1

BAGGAGE

BREAKDOWN

BAGGAGE

CLAIM

DEPARTURE/ARRIVAL

GATE 3

SECURE

GATE

CORRIDOR

DEPARTURE

GATE 1

SPEC. CAT

LOUNGE

SHOWER/

CHANGING

ROOM

1 1/2" 12"

1 1/2" 12"

N7.8N7.05

A514

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

A B D E F K L NG L.8 M

A301

A301

A301

A301

A302

A302

A511 A314

A312

156C 156B162163170

ARRIVAL

WAITING

CORRIDOR

PLAY

ROOM

BAGGAGE

CLAIM

1 1/2" 12"

NAA NA.4 NN.1 NQNPNJ.4NE.8 NL.1NA.9 C.4 NC.8NC.5

LIMITS OF BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT

IRON ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND PLAY

STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING FOUNTAIN

AND ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY STRUCTURE

INCLUDING THE SHADE STRUCTURE AND PLAY AREA FURNITURE. REFER

TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE, PLUMBING AND

ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT AWARDED THE PLAY

STRUCTURE, PLAY AREA SURFACING AND PLAY AREA FURNITURE WILL

NOT BE AWARDED EITHER.

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

ABDEK HN L.8M

A301

A301

A301

A301

A302

A302

SPEC. CAT

LOUNGE

UNISEX

BUSINESS

CENTER

BAGGAGE

BUILD UP

BREAK

ROOM

TRAINING

OIC OFFICE

READING

ROOM

GAME

ROOM

146 145 127A

1 1/2" 12"

NAANM.2NN.1NQ NP NJ.4 NE.8NL.1

Y

NOTE:

NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE

WORK REMAINS. REFER TO A000 FOR MASTER LIST.

BID ALTERNATES

BID ALTERNATE #1 - DROP OFF LOOP (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE DROP-OFF LOOP, DROP ARM GATES

AND ALL ASSOCIATED WORK. REFER TO C002, OTHER CIVIL, LANDSCAPE

AND ELECTRICAL DRAWINGS.

BID ALTERNATE #2 - BRICK CROSSWALK (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE BRICK CROSSWALK ACROSS BATES

STREET AND ALL ASSOCIATED WORK. WORK INCLUDES SAW CUTTING

AND REMOVING EXISTING PAVEMENTS AND INSTALLATION OF NEW

BRICK PAVEMENTS. REFER TO C002, OTHER CIVIL AND LANDSCAPE

DRAWINGS.

BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)

THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT

IRON ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND

PLAY STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING

FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY

STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA

FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE,

PLUMBING AND ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT

AWARDED THE PLAY STRUCTURE, PLAY AREA SURFACING AND PLAY

AREA FURNITURE WILL NOT BE AWARDED EITHER.

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A302

B

UI

LD

IN

G

SE

C

TI

ON

S

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

SCALE: 1/8" = 1'-0"A102 A302

1 BUILDING SECTION

SCALE: 1/8" = 1'-0"A103 A302

2 BUILDING SECTION

SCALE: 1/8" = 1'-0"A102 A302

3 BUILDING SECTION

NEW CONSTRUCTION

KEYNOTES

2 VENDING MACHINES PROVIDED AND INSTALLED BY OTHERS. REFER

TO ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL

REQUIREMENTS.

3 BAGGAGE HANDLING EQUIPMENT (BHE) TO BE PROVIDED AND

INSTALLED UNDER SEPERATE CONTRACT, SHALL BE COORDINATED

BY CONTRACTOR. REFER TO MEP DRAWINGS FOR REQUIREMENTS

WHICH ARE PART OF THE BASE BID AND IN THE GENERAL

CONTRACTORS SCOPE OF WORK.

4 SECURITY SCANNING EQUIPMENT (SSE) TO BE PROVIDED AND

INSTALLED UNDER SEPERATE CONTRACT AND SHALL BE

COORDINATED BY GENERAL CONTRACTOR. REFER TO MEP

DRAWINGS FOR REQUIREMENTS, INCLUDING ALTERNATE LOCATION,

WHICH ARE PART OF THE BASE BID AND IN THE GENERAL

CONTRACTORS SCOPE OF WORK.

23 LINEAR METAL CEILING EXTERIOR.

26 EXHAUST FAN - REFER TO MECHANICAL.

27 ROOF TOP VENTILATOR - REFER TO MECHANICAL

33 EXPOSED STRUCTURAL STEEL TRUSSES, BEAMS, PURLINS, BRACING

AND COLUMNS TO BE FINISHED WITH COATING 2 (C2); REFER TO

EXTERIOR MATERIAL COLOR SCHEDULE, A201 FOR ADDITIONAL

INFORMATION.

SECTION NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES

2 REFER TO A201 FOR EXTERIOR MATERIAL & COLOR SCHEDULE

EXISTING ROOF DECK

EL.12' - 3"

STEEL BEAM; REFER

TO STRUCTURAL

CEILING REFER TO

FINISH SCHEDULE

AIR SPACE (MATCH EXISTING)

NEW BRICK VENEER TO MATCH EXISTING, REFER TO

STRUCTURAL FOR REINFORCING AND LINTEL INFORMATION.

INSULATED, VERTICAL METAL WALL

PANELS; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

RETRO FIT ZEE PURLINS

RIGID INSULATION;

STAGGER SEAMS BREAK METAL; (PRE-

FINISHED TO MATCH ROOF

PANELS) WRAPPED FASCIA

P.T. WD BLOCKING

CONCRETE SLAB; REFER TO

STRUCTURAL

CONCRETE FOOTING;

REFER TO STRUCTURAL.

METAL STUD WITH BATT

INSULATION

GYP BD (MOLD AND

MOISTURE RESISTANT)

METAL DECK; REFER

TO STRUCTURAL

METAL DECK; REFER

TO STRUCTURAL

INSULATED METAL SOFFIT PANELS; REFER TO

EXTERIOR MATERIAL & COLOR SCHEDULE

SOFFIT EXTRUSION TRIM BY METAL

WALL PANEL MANUFACTURER (FINISH

TO MATCH INSULATED METAL PANELS)

CMU; REFER TO STRUCTURAL

FOR REINFORCING AND LINTEL

INFORMATION

STANDING SEAM METAL ROOF PANELS

A512

SIM

A512

SIM

DRIP EDGE; PRE-FINISHED

TO MATCH ROOF PANELS

GUTTER

METAL FLASHING DRIP EDGE;

PRE-FINISHED TO MATCH STANDING

SEAM METAL ROOF PANELS

METAL PURLIN; REFER

TO STRUCTURAL

METAL STUD FRAMING;

REFER TO DETAILS ON A512

STEEL TUBE; REFER

TO STRUCTURAL

FLUID APPLIED, VAPOR PERMEABLE,

WATER RESISTANT/AIR BARRIER

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

CMU; REFER TO STRUCTURAL

FOR REINFORCING AND

LINTEL INFORMATION

AIR SPACE (MATCH EXISTING)

BRICK VENEER, MASONRY. REFER TO STRUCTURAL

FOR REINFORCING AND LINTEL INFORMATION

CONCRETE SLAB; REFER

TO STRUCTURAL

CONCRETE FOOTING;

REFER TO STRUCTURAL

INSULATED, VERTICAL METAL WALL

PANELS; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

INSULATED METAL SOFFIT PANELS; REFER TO

EXTERIOR MATERIAL & COLOR SCHEDULE

SOFFIT EXTRUSION TRIM BY METAL

WALL PANEL MANUFACTURER (FINISH

TO MATCH INSULATED METAL PANELS)

METAL STUD WITH BATT

INSULATION

GYP BD (MOLD AND

MOISTURE RESISTANT)

STEEL BEAM; REFER

TO STRUCTURAL

ZEE PURLIN

RIGID INSULATION;

STAGGER SEAMS

BREAK METAL; (PRE-FINISHED

TO MATCH ROOF PANELS)

WRAPPED FASCIA

METAL DECK; REFER

TO STRUCTURAL P.T. WD BLOCKING

STANDING SEAM

METAL ROOF PANELS

DOWNSPOUT, TYP; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

DOWNSPOUT - REFER TO CIVIL

FOR CONTINUATION

A512

SIM

A512

SIM

DRIP EDGE; PRE-FINISHED

TO MATCH ROOF PANELS

GUTTER

METAL FLASHING DRIP EDGE;

PRE-FINISHED TO MATCH STANDING

SEAM METAL ROOF PANELS

METAL DECK; REFER

TO STRUCTURAL

METAL PURLIN; REFER

TO STRUCTURAL

STEEL TUBE; REFER

TO STRUCTURAL

METAL STUD FRAMING;

REFER TO DETAILS ON A512

FLUID APPLIED, VAPOR PERMEABLE,

WATER RESISTANT/AIR BARRIER

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

A

EXISTING FRAMING @ 13'-6"

O.C. (FIELD VERIFY SPACING)

RETRO FIT ZEE PURLIN

BREAK METAL; (PRE-

FINISHED TO MATCH ROOF

PANELS) WRAPPED FASCIA

P.T. WD BLOCKING

SHOTCRETE WALL; REFER

TO STRUCTURAL.

EXISTING CONCRETE SLAB;

REFER TO STRUCTURAL.

METAL STUD WITH BATT

INSULATION

GYP BD (MOLD AND

MOISTURE RESISTANT)

EXISTING METAL DECK

EXISTING STANDING SEAM

METAL ROOF SYSTEM

EXISTING STRUCTURE;

REFER TO STRUCTURAL

CEILING REFER TO

FINISH SCHEDULE

EXISTING BAR JOIST

EL. 10' - 0"

INSULATED METAL SOFFIT PANELS; REFER

TO EXTERIOR MATERIAL & COLOR SCHEDULE

EXISTING CMU; REFER

TO STRUCTURAL.

EXISTING BRICK VENEER

A512

A512

INSULATED VERTICAL METAL WALL

PANELS; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

STANDING SEAM METAL

ROOF PANELS

RIGID INSULATION;

STAGGER SEAMS

DRIP EDGE; PRE-FINISHED

TO MATCH ROOF PANELS

GUTTER

EXISTING

METAL STUD FRAMING;

REFER TO DETAILS ON A512

METAL FLASHING DRIP

EDGE; PRE-FINISHED TO

MATCH STANDING SEAM

METAL ROOF PANELS

EL. 9' - 6 1/2"

EL. 9' - 4"

TOP OF GLAZING

SOFFIT EXTRUSION TRIM BY METAL

WALL PANEL MANUFACTURER (FINISH

TO MATCH INSULATED METAL PANELS)

2'-4"

METAL STUD FRAMING;

REFER TO DETAILS ON A512

WALL SECTION LEGEND

& SYMBOLS

BRICK

CMU

COLUMN GRID TAG

SPOT ELEVATION

CENTERLINE

REVISION TAG

BATT INSULATION

METAL STUD

ROOF SLOPE

SCOPE OF WORK LEGEND

THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:

DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)

AND

DKFX: 11-1122 B FOR REPAIR

INDICATES WORK AS REQUIRED FOR - -

MINOR CONSTRUCTION (MC)

ALL OTHER WORK IS REPAIR

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A310

W

AL

L

SE

C

TI

ON

S

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

99SCALE: 1" = 1'-0"A102 A310

2 WALL SECTION @ NEW 8" BLOCK/BRICK WALL

SCALE: 1" = 1'-0"A301 A310

3 WALL SECTION @ NEW 12" BLOCK/BRICK WALL

SCALE: 1" = 1'-0"A102 A310

1 WALL SECTION @ EXIST. BLOCK/BRICK

SECTION NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES

2 REFER TO A201 FOR EXTERIOR MATERIAL & COLOR SCHEDULE

EXISTING ROOF DECK

EL.12' - 3"

M

INSULATED VERTICAL METAL WALL

PANEL; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

INSULATED METAL SOFFIT PANEL; REFER TO

EXTERIOR MATERIAL & COLOR SCHEDULE

SOFFIT EXTRUSION TRIM BY METAL

WALL PANEL MANUFACTURER (FINISH

TO MATCH INSULATED METAL PANELS)

EXISTING METAL DECK

STEEL BEAM; REFER

TO STRUCTURAL

RETRO FIT ZEE PURLIN

BREAK METAL; (PRE-FINISH TO

MATCH ROOF PANELS)

WRAPPED FASCIA

EXISTING STANDING SEAM

METAL ROOF SYSTEM

EXISTING STRUCTURE;

REFER TO STRUCTURAL P.T. WD BLOCKING

STEEL ANGLE; REFER

TO STRUCTURAL

GYPSUM BOARD SOFFIT

METAL STUD FRAMING

STOREFRONT; REFER TO

A620 FOR ELEVATION BREAK METAL TRIM

ACOUSTIC CEILING TILE

STEEL TUBE; REFER TO

STRUCTURAL. FINISHED TO BE C2;

REFER TO EXTERIOR MATERIAL &

COLOR SCHEDULE

STANDING SEAM ROOF

PANELS ON CANOPY

SLOPE AWAY

FROM BLDG

FINISH FLOOR; REFER TO

FINISH AND COLOR SCHEDULE

EXISTING CONCRETE SLAB

SIDEWALK; REFER TO CIVIL

EXISTING FOUNDATION WALL;

REFER TO STRUCTURAL

EXISTING CONCRETE FOOTING;

REFER TO STRUCTURAL

A621

A621

GUTTER

9'- 4"

A512

SIM

A512

SIM

STANDING SEAM METAL

ROOF PANELS

RIGID INSULATION;

STAGGER SEAMS

EXISTING

DRIP EDGE; PRE-FINISHED

TO MATCH ROOF PANELS

METAL FLASHING DRIP EDGE; PRE-

FINISHED TO MATCH STANDING

SEAM METAL ROOF PANELS

NM.2

EXISTING FRAMING @ 13'-6"

O.C. (FIELD VERIFY SPACING)

METAL STUD FRAMING;

REFER TO DETAILS ON A512

LINEAR METAL PAN CANOPY

CEILING; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

DEPARTURE

GATE 1

EXISTING ROOF DECK

EL.12' - 3"

N

INSULATED VERTICAL METAL WALL PANEL; REFER

TO EXTERIOR MATERIAL & COLOR SCHEDULE

INSULATED METAL SOFFIT PANEL;

REFER TO EXTERIOR MATERIAL &

COLOR SCHEDULE

SOFFIT EXTRUSION TRIM BY METAL

WALL PANEL MANUFACTURER (FINISH

TO MATCH INSULATED METAL PANELS)

EXISTING METAL DECK

STEEL BEAM; REFER TO STRUCTURAL

RETRO FIT ZEE PURLIN

BREAK METAL WRAPPED FASCIA;

PRE-FINISH TO MATCH ROOF PANELS

EXISTING STANDING SEAM

METAL ROOF SYSTEM

EXISTING STRUCTURE;

REFER TO STRUCTURAL

P.T. WD BLOCKING

GYPSUM BOARD SOFFIT

METAL STUD FRAMING

STOREFRONT, REFER TO

A620 FOR ELEVATION

BREAK METAL TRIM; FINISH TO

MATCH STOREFRONT SYSTEM

CEILING; REFER TO

FINISH SCHEDULE

STEEL TUBE BEAM; REFER TO

STRUCTURAL. FINISH TO BE C2; REFER TO

EXTERIOR MATERIAL & COLOR SCHEDLUE

SLOPE AWAY

FROM BLDG

FINISH FLOOR; REFER TO

FINISH & COLOR SCHEDULE

EXISTING CONCRETE SLAB

SIDEWALK; REFER TO CIVIL

EXISTING FOUNDATION WALL;

REFER TO STRUCTURAL

EXISTING CONCRETE FOOTING;

REFER TO STRUCTURAL

MASONRY COLUMN;

REFER TO A502

STEEL BEAM; REFER

TO STRUCTURAL

LINEAR METAL PAN CANOPY

CEILING; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

A512

SIM

STANDING SEAM METAL

ROOF PANELS

RIGID INSULATION;

STAGGER SEAMS

EXISTING

DRIP EDGE; PRE-FINISH

TO MATCH ROOF PANELS

METAL FLASHING DRIP EDGE; PRE-

FINISHED TO MATCH STANDING

SEAM METAL ROOF PANELS

GUTTER

NN.1

EXISTING FRAMING @ 13'-6" O.C.

(FIELD VERIFY SPACING)

METAL STUD FRAMING;

REFER TO DETAILS ON A512

DEPARTURE/ARRIVAL

GATE 3

A512

SIM

EXISTING ROOF DECK

EL.12' - 3"

N

INSULATED, VERTICAL METAL WALL

PANELS; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

INSULATED METAL SOFFIT PANELS; REFER TO

EXTERIOR MATERIAL & COLOR SCHEDULE

SOFFIT EXTRUSION TRIM BY METAL WALL

PANEL MANUFACTURER (FINISH TO MATCH

INSULATED METAL PANELS)

ZEE PURLIN (INSULATION BACKSTOP)

EXISTING STANDING SEAM

METAL ROOF SYSTEM

EXISTING STRUCTURE,

REFER TO STRUCTURAL.

STEEL ANGLE, REFER

TO STRUCTURAL.

GYPSUM BOARD SOFFIT

METAL STUD FRAMING

STOREFRONT, REFER TO

A620 FOR ELEVATION

CEILING; REFER TO

FINISH SCHEDULE

FINISH FLOOR; REFER TO

FINISH AND COLOR SCHEDULE

EXISTING CONCRETE SLAB

SIDEWALK; REFER TO CIVIL

EXISTING FOUNDATION WALL;

REFER TO STRUCTURAL

EXISTING CONCRETE FOOTING;

REFER TO STRUCTURAL

A622

INSULATION BETWEEN CANOPY

RAFTERS; REFER TO STRUCTURAL

FOR RAFTER SIZES AND SPACING

STANDING SEAM METAL ROOF PANELS

MASONRY COLUMN;

REFER TO A502

TUBE STEEL COLUMN; REFER TO

STRUCTURAL. FINISH TO BE C2; REFER TO

EXTERIOR MATERIAL & COLOR SCHEDULE

LINEAR METAL PAN CANOPY

CEILING; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

3 5/8" METAL STUD FRAMING

ATTACH TO EXISTING FRAMING

BRACE AS REQUIRED

BREAK METAL TRIM; FINISH TO

MATCH STOREFRONT SYSTEM

BATT INSULATION A512

SIM

STEEL TUBE TRUSS; REFER TO

STRUCTURAL. FINISH TO BE C2;

REFER TO EXTERIOR MATERIAL &

COLOR SCHEDULE

NN.1

EXISTING FRAMING @ 13'-6"

O.C. (FIELD VERIFY SPACING)

METAL STUD FRAMING;

REFER TO DETAILS ON A512

BACK-LIT SIGNAGE; REFER TO

BUILDING ELEVATION 3/A201

DEPARTURE

GATE 2

WALL SECTION LEGEND

& SYMBOLS

BRICK

CMU

COLUMN GRID TAG

SPOT ELEVATION

CENTERLINE

REVISION TAG

BATT INSULATION

METAL STUD

ROOF SLOPE

SCOPE OF WORK LEGEND

THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:

DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)

AND

DKFX: 11-1122 B FOR REPAIR

INDICATES WORK AS REQUIRED FOR - -

MINOR CONSTRUCTION (MC)

ALL OTHER WORK IS REPAIR

GLICK/BOEHM

CHARLESTON

NO. B-80006 T

CE

TIHCRADER

ET

SI

G E

R

TH CARO

LIN

A

S

TA

TE

OF

SOU

& ASSOCIATES, INC.

G

E W

BAIR AS

I N62 8T H

IR

A D

MAN

COM

MO

IT Y

B I L

SEAL AREA

OFSHEET

DA

TE

P R E P

B Y

A P P R 'D

RECORD DRAWING DATE

DRAWING SIZE:

PROJECT NO.

DE

PA

RT

M

EN

T

OF

T

HE

A

IR

F

OR

C E

AI

R M

OB

IL

IT

Y C

OM

M

AN

D

R E V

D A

TE

D E S C R

IP

TI

O N

D R A W

IN

G

R E V

IS

IO

N S

CH

K B

Y:

DR

AW

N

BY

DS

GN

BY

SU

PV

CH

EN

GR

GL

IC

K/

BO

EH

M

AS

SO

CI

AT

ES

, IN

C

3 K

IN

G

ST

RE

ET

, S

UI

TE

CH

AR

LE

ST

ON

, S

C

JO

IN

T B A S E

C H A R

LE

S

TO

N

A B

C H A R

LE

S

TO

N S C

ARCH30 E(30X42)

A311

W

AL

L

SE

C

TI

ON

S

GB

KR

S

SM

/30

/20

AD

D/

RE

PA

IR

P

AS

SE

NG

ER

T

ER

M

IN

AL

B

UI

LD

IN

G

DKFX:11-1122 A / B

100SCALE: 1" = 1'-0"A102 A311

1 WALL SECTION @ DEPARTURE GATE 1

SCALE: 1" = 1'-0"A103 A311

3 WALL SECTION @ DEPARTURE/ARRIVAL GATE 3

SCALE: 1" = 1'-0"A301 A311

2 WALL SECTION @ DEPARTURE GATE 2

SECTION NOTES

1 REFER TO G111 FOR GENERAL PROJECT NOTES

2 REFER TO A201 FOR EXTERIOR MATERIAL & COLOR SCHEDULE

EXISTING ROOF DECK

EL.12' - 3"

CMU, REFER TO STRUCTURAL FOR

REINFORCING AND LINTEL INFORMATION

BOLLARD, BEYOND

CONCRETE SLAB;

REFER TO STRUCTURAL

CONCRETE FOOTING;

REFER TO STRUCTURAL

3 5/8" METAL STUD

INSULATED, VERTICAL METAL WALL

PANELS; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

INSULATED METAL SOFFIT PANELS;

REFER TO EXTERIOR MATERIAL &

COLOR SCHEDULE

SOFFIT EXTRUSION TRIM BY METAL

WALL PANEL MANUFACTURER (FINISH

TO MATCH INSULATED METAL PANELS)

STEEL BEAM; REFER

TO STRUCTURAL

STANDING SEAM METAL ROOF

PANELS; REFER TO EXTERIOR

MATERIAL & COLOR SCHEDULE

ZEE PURLIN

BREAK METAL; (PRE-FINISHED

TO MATCH ROOF PANELS)

WRAPPED FASCIA

METAL DECK; REFER

TO STRUCTURAL

P.T. WD BLOCKING

STEEL BEAM; REFER TO STRUCTURAL

A612

RIGID INSULATION; STAGGER SEAMS

GUTTER

A512

SIM

A512

SIM

DRIP EDGE; PRE-FINISHED

TO MATCH ROOF PANELS

METAL FLASHING DRIP EDGE; PRE-

FINISHED TO MATCH STANDING

SEAM METAL ROOF PANELS

ROLL-UP DOOR MOTOR

ROLL-UP OVERHEAD DOOR;

REFER TO DOOR SCHEDULE

ROLL-UP DOOR HOOD

STEEL PLATE; REFER TO STRUCTURAL

STEEL TUBE; REFER

TO STRUCTURAL

BREAK METAL TRIM; FINISH TO MATCH

STOREFRONT SYSTEM

METAL PURLINS; REFER

TO STRUCTURAL

METAL STUD FRAMING; REFER

TO DETAILS ON A512

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

SHOTCRETE; REFER TO

STRUCTURAL

METAL STUD/SHOTCRETE/CMU

WALL; REFER TO PLAN(S) AND

WALL TYPES

STEEL CHANNEL; REFER

TO STRUCTURAL

EXISTING CMU WALL

EXISTING BAR JOIST

EXISTING FILLER BLOCK

EXISTING METAL DECK

DIRECTION SWITCH

EXISTING BAR JOIST

GYP BD SOFFIT, TYP.

ACT CEILING; REFER TO

REFLECTED CEILING

PLAN FOR HEIGHT

STOREFRONT HEAD

STOREFRONT SILL

EXISTING CONCRETE SLAB

GLAZING

STOREFRONT MULLION

EXISTING FOOTING

A623

A623

A624

Sim

FIRST FLOOR

EL.0' - 0"

EXISTING ROOF DECK

EL.12' - 3"

9'- 6"

SUPPORT BEAM; REFER TO 8/S611

ELECTRICALLY POWERED

FOLDING PARTITION. BASIS OF

DESIGN: MODERNFOLD FOLDING

PARTITION 933E

GYPSUM WALL BOARD

METAL STUD FRAMING

MOUNT HEAD OF DOOR FLUSH

WITH GYP BD SOFFIT

FLOATING SEAL PROVIDE 3"

OPERATING CLEARANCE

CARPET; REFER TO FINISH AND

COLOR SCHEDULE(S), A600

3" PIPE; REFER TO STRUCTURAL

EXISTING METAL DECK

STEEL PLATE; REFER TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .