Attachment__2_-_Drawings_dated_30_October_2013_-_Part_8.pdf
PDF 6 MB Posted
- Attached to
- Add/Repair Passenger Terminal, Bldg. 164
- Solicitation number
- FA4418-15-R-0009
About this file
Attachment 2 - Drawings dated 30 October 2013 - Part 8 for Solicitation FA4418-16-R-0002 Add/Repair Passenger Terminal Bldg 164.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ACT ACOUSTICAL CEILING TILE
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BRG BEARING
CI CONTINUOUS INSULATION
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CS CLEAR SPACE
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
DET DETAIL
DIAM DIAMETER
DIM DIMENSION
DN DOWN
DWG DRAWING
EA EACH
EJ EXPANSION JOINT
EL OR ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EXIST EXISTING
EXP EXPOSED
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FIN FINISH (ED)
FL OR FLR FLOOR
FOB FACE OF BRICK
FOF FACE OF FINISH
FOS FACE OF STUD
FT FOOT/FEET
GA GAGE, GAUGE
GALV GALVANIZED
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFRC GLASS FIBER REINFORCED
CONCRETE
GL GLASS, GLAZING
GWB GYPSUM WALLBOARD
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HT HEIGHT
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
JT JOINT
LAV LAVATORY
LP LOW POINT
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MT METAL THRESHOLD
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
NIC NOT IN CONTRACT
NO OR # NUMBER
N NORTH
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPG OPENING
OPP OPPOSITE
PL PLASTIC LAMINATE
PNT PAINT
PT PRESSURE TREATED
RAD RADIUS
RCP REFLECTED CEILING PLAN
REQ'D REQUIRED
R RISER
RD ROOF DRAIN
REINF REINFORCED
REV REVERSED
RO ROUGH OPENING
SC SOLID CORE
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SV SHEET VINYL FLOORING
STL STEEL
SUSP SUSPENDED
T/ TOP OF
T TREAD
TEMP TEMPORARY
THK THICK
TYP TYPICAL
UFUI USER FURNISHED
USER INSTALLED
U.N.O. UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VPAB VAPOR PERMEABLE
AIR BARRIER
VWC VINYL WALL COVERING
WD WOOD
W/ WITH
W/O WITHOUT
ABBREVIATIONS
55 View Name
SCALE: 1/8" = 1'-0"
1 View Name
SCALE: 1/8" = 1'-0"A101
55 View Name
SCALE: 1/8" = 1'-0"A101 A101
View Name
SCALE: 1/8" = 1'-0"
TYPICAL SYMBOLS USED ON ALL
ARCHITECTURAL SHEETS
DETAIL TITLE WITHOUT DETAIL NUMBER: USED
ONLY FOR TYPICAL DETAILS THAT DO NOT
HAVE TO BE REFERENCED OR FOR "FLOOR"
TYPE PLANS.
1-PART DETAIL TITLE WITH DETAIL NUMBER:
USED TO IDENTIFY DETAILS THAT DO NOT HAVE
TO BE REFERENCED BACK TO DETAIL CUT.
2-PART DETAIL TITLE WITH DETAIL NUMBER &
REFERENCED SHEET NO.: USED TO IDENTIFY
DETAILS THAT NEED TO BE REFERENCED
BACK TO DETAIL CUT.
3-PART DETAIL TITLE WITH DETAIL NUMBER,
REFERENCE SHEET NO & ORIGINATION SHEET
NO.: USED TO IDENTIFY DETAILS THAT NEED TO
BE REFERENCED BOTH TO THE DETAIL CUT AS
WELL AS WHERE IT IS DRAWN.
A101
2-PART WALL SECTION CALLOUT KEY WITH
DETAIL NUMBER & SHEET REFERENCE WHERE
DETAIL IS DRAWN.
A101
3-PART WALL SECTION CALLOUT KEY WITH
DETAIL NUMBER, REFERENCE SHEET WHERE
DETAIL IS KEYED & SHEET REFERENCE WHERE
DETAIL IS DRAWN.
A101
A101
2-PART BUILDING SECTION CALLOUT KEY WITH
DETAIL NUMBER & SHEET REFERENCE WHERE
DETAIL IS DRAWN.
A101
3-PART BUILDING SECTION CALLOUT KEY WITH
DETAIL NUMBER, REFERENCE SHEET WHERE
DETAIL IS KEYED & SHEET REFERENCE WHERE
DETAIL IS DRAWN.
A101
A101
A101 A101
ELEVATION CALLOUT KEY WITH DETAIL NUMBER
& SHEET REFERENCE WHERE DETAIL IS DRAWN.
A101 A101
A101
2-PART ELEVATION CALLOUT KEY WITH DETAIL
NUMBER & SHEET REFERENCE WHERE DETAIL
IS DRAWN.
3-PART ELEVATION CALLOUT KEY WITH DETAIL
NUMBER, REFERENCE SHEET WHERE DETAIL IS
KEYED & SHEET REFERENCE WHERE DETAIL IS
DRAWN.
A101
GRAPHIC SCALE OF A SHEET OR DETAIL
0' 4' 8' 16'
ANCILLARY ITEM (AI)
GENERAL NOTES
ANCILLARY ITEM # 1 - FIXTURES, FURNITURE & EQUIPMENT (FF&E):
REFER TO FF&E SCHEDULE FOR FF&E SCOPE OF WORK. LOCATION(S),
SIZES AND ELECTRICAL REQUIREMENTS FOR SEATING POWER ARE
APPROXIMATE. GENERAL CONTRACTOR (GC) TO VERIFY AND
COORDINATE ALL REQUIREMENTS WITH THE SEATING MANUFACTURER.
NOTE: SHOULD BID ALTERNATE # 3 - OUTDOOR PLAY AREA NOT BE
AWARDED BY THE GOVERNMENT THEN THE PLAY AREA STRUCTURE,
PLAY STRUCTURE SURFACING AND PLAY AREA FURNITURE LISTED IN THE
FF&E SCHEDULE WILL NOT BE A PART OF THE FF&E SCOPE OF WORK.
ANCILLARY ITEM # 2 - BAGGAGE HANDLING EQUIPMENT (BHE): REFER TO
DRAWING BHE01 AND SPECIFICATION SECTIONS 34 77 39.00 10 INBOUND
BAGGAGE CONVEYOR, 34 77 39.00 20 OUTBOUND BAGGAGE CONVEYOR
AND 34 77 39 BAGGAGE CONVEYING EQUIPMENT FOR SCOPE OF BHE
WORK. LOCATION(S), SIZES AND ELECTRICAL REQUIREMENTS FOR BHE
ARE APPROXIMATE. GENERAL CONTRACTOR (GC) TO VERIFY AND
COORDINATE ALL REQUIREMENTS WITH SELECTED BHE MANUFACTURER
ONCE THE SYSTEM HAS BEEN SELECTED.
ANCILLARY ITEM # 3 - INTRUSION DETECTION SYSTEM (IDS): REFER TO
DRAWINGS IDS01 AND IDS02 AND SPECIFICATION SECTION 28 20 00.00 20
ELECTRONIC SECURITY SYSTEMS (ESS), COMMERCIAL FOR SCOPE OF
IDS WORK. GENERAL CONTRACTOR (GC) TO VERIFY AND COORDINATE
ALL REQUIREMENTS WITH IDS MANUFACTURER.
ANCILLARY ITEM # 4 - AUDIO VISUAL SYSTEM (AVS): REFER TO DRAWING
AVS01 AND AVS02 FOR SCOPE OF AVS WORK. GENERAL CONTRACTOR
(GC) TO VERIFY AND COORDINATE ALL REQUIREMENTD WITH AVS
MANUFACTURER(S).
ANCILLARY ITEM # 5 - WI-FI: REFER TO DRAWING WF01 FOR SCOPE OF
WORK. GENERAL CONTRACTOR (GC) TO VERIFY AND COORDINATE ALL
REQUIREMENTS WITH MANUFACTURER(S).
1. SUPPORT INFRASTRUCTURE: SUPPORT FOR ALL ANCILLARY ITEMS
IS INCLUDED IN THE CONSTRUCTION PROJECT INFRASTRUCTURE
INCLUDES BUILT IN STRUCTURAL REQUIREMENTS, CONDUIT, BOXES, PULL
STRINGS, POWER TO SUPPORT EQUIPMENT.
2. BREAKDOWN: THE INDIVIDUAL ANCILLARY ITEMS INCLUDE THE
ACTUAL EQUIPMENT, FURNITURE, WIRING, INSTALLATION, AND SETUP.
ALL RELATIVE GENERAL AND SUB-CONTRACTOR MARKUPS AND COSTS
SHALL BE INCLUDED IN EACH OF THE APPROPRIATE ANCILLARY ITEMS.
SEE DESCRIPTIONS FOR EACH INDIVIDUAL ANCILLARY ITEM SCOPE OF
WORK.
3. GENERAL CONTRACTOR REQUIREMENTS: THE GENERAL
CONTRACTOR (GC) IS RESPONSIBLE FOR VERIFYING AND COORDINATING
ALL AI REQUIREMENTS FOR THIS PROJECT, INCLUDING BUT NOT LIMITED
TO SCHEDULING, COORDINATING, ORDERING, SHIPPING, DELIVERY,
HANDLING, INSTALLATION, AND SETUP. GC TO NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY OF ANY CONFLICTS OR DISCREPANCIES IN ANY
OF THE AI'S. REFER TO MEP FOR REQUIREMENTS WHICH ARE PART OF
THE GC'S SCOPE OF WORK.
4. REFER TO G002 FOR SHEETS LISTED AS CONTAINING ANCILLARY
ITEMS.
ANCILLARY ITEMS (AI)
BID ALTERNATES
BID ALTERNATE #1 - DROP OFF LOOP (MINOR CONSTRUCTION)
THIS BID ALTERNATE INCLUDES THE DROP-OFF LOOP, DROP ARM GATES
AND ALL ASSOCIATED WORK. REFER TO C002, OTHER CIVIL, LANDSCAPE
AND ELECTRICAL DRAWINGS.
BID ALTERNATE #2 - BRICK CROSSWALK (MINOR CONSTRUCTION)
THIS BID ALTERNATE INCLUDES THE BRICK CROSSWALK ACROSS BATES
STREET AND ALL ASSOCIATED WORK. WORK INCLUDES SAW CUTTING
AND REMOVING EXISTING PAVEMENTS AND INSTALLATION OF NEW
BRICK PAVEMENTS. REFER TO C002, OTHER CIVIL AND LANDSCAPE
DRAWINGS.
BID ALTERNATE #3 - PLAY AREA (MINOR CONSTRUCTION)
THIS BID ALTERNATE INCLUDES THE PLAY AREA, BRICK AND WROUGHT
IRON ENCLOSURE INCLUDING GATE AND FOOTINGS; PLAY AREA AND
PLAY STRUCTURE SURFACE MATERIALS, SITE LIGHTING, DRINKING
FOUNTAIN AND ALL ASSOCIATED WORK EXCEPT FOR THE FF&E PLAY
STRUCTURE INCLUDING THE SHADE STRUCTURE AND PLAY AREA
FURNITURE. REFER TO C002, OTHER CIVIL, LANDSCAPE ARCHITECTURE,
PLUMBING AND ELECTRICAL DRAWINGS. IF BID ALTERNATE #3 IS NOT
AWARDED THE PLAY STRUCTURE, PLAY AREA SURFACING AND PLAY
AREA FURNITURE WILL NOT BE AWARDED EITHER.
SCOPE OF WORK LEGEND
THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:
DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)
AND
DKFX: 11-1122 B FOR REPAIR
INDICATES WORK AS REQUIRED FOR
MINOR CONSTRUCTION (MC)
ALL OTHER WORK IS REPAIR
MINOR CONSTRUCTION INCLUDES THE ADDITION PORTION OF THE
BUILDING AND ALL ASSOCIATED WORK. ADDITIONAL ROOF CANOPIES
(OTHER THAN REPAIR TO EXISTING ROOF CANOPIES) AND ALL
ASSOCIATED WORK ARE ALSO INCLUDED. BASE BID MC SITE WORK
INCLUDES NEW PAVEMENTS (OTHER THAN REPAIR TO EXISTING
PAVEMENTS), CURB & GUTTER, SIDEWALKS (OTHER THAN REPAIR TO
EXISTING SIDEWALKS), TRENCH DRAIN, GRADING, ETC. AND ALL WORK
ASSOCIATED WITH THESE ITEMS; EXCLUDING BID ALTERNATES #1, #2 &
#3.
GLICK/BOEHM
CHARLESTON
NO. B-80006 T
CE
TIHCRADER
ET
SI
G E
R
TH CARO
LIN
A
S
TA
TE
OF
SOU
& ASSOCIATES, INC.
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
OFSHEET
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T
HE
A
IR
F
OR
C E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
A000
GE
NE
RA
L
NO
TE
S, S
YM
B
OL
S, A B B
RE
VI
AT
IO
NS
GB
KR
S
SM
/30
/20
AD
D/
RE
PA
IR
P
AS
SE
NG
ER
T
ER
M
IN
AL
B
UI
LD
IN
G
DKFX:11-1122 A / B
NEW CONSTRUCTION KEYNOTES
MASTER LIST
1 METAL LADDER AND ATTIC ACCESS HATCH, ANCHOR LADDER SECURELY TO MASONRY
WALL. REFER TO SPECIFICATION SECTION 05 51 33 - METAL LADDERS; COORDINATE
WITH STRUCTURAL DRAWINGS AND FRAMING PLANS.
2 VENDING MACHINES PROVIDED AND INSTALLED BY OTHERS. REFER TO ELECTRICAL
AND PLUMBING DRAWINGS FOR ADDITIONAL REQUIREMENTS.
3 BAGGAGE HANDLING EQUIPMENT (BHE) TO BE PROVIDED AND INSTALLED UNDER
SEPERATE CONTRACT, SHALL BE COORDINATED BY CONTRACTOR. REFER TO MEP
DRAWINGS FOR REQUIREMENTS WHICH ARE PART OF THE BASE BID AND IN THE
GENERAL CONTRACTORS SCOPE OF WORK.
4 SECURITY SCANNING EQUIPMENT (SSE) TO BE PROVIDED AND INSTALLED UNDER
SEPERATE CONTRACT AND SHALL BE COORDINATED BY GENERAL CONTRACTOR.
REFER TO MEP DRAWINGS FOR REQUIREMENTS, INCLUDING ALTERNATE LOCATION,
WHICH ARE PART OF THE BASE BID AND IN THE GENERAL CONTRACTORS SCOPE OF
WORK.
5 EXISTING STEEL SILL(S) TO BE PREPPED AND RE-FINISHED IN ACCORDANCE WITH
SPECIFICATION SECTION - STEEL COATINGS 09 97 13.00 40 FOR MORE PREPARATION
AND COATING INFORMATION. REFER TO BB/BHE01 FOR ADDITIONAL ITEMS REQUIRING
FIELD VERIFICATION. FINISH TO BE COATING 1 (C1)
6 SOFFITS ABOVE - REFER TO A120 AND A121 - REFLECTED CEILING PLANS.
7 PLAY AREA EQUIPMENT, PLAY AREA SURFACING AND FURNITURE WHICH ARE PART OF
BID ALTERNATE #3 AND INCLUDED IN ANCILLARY ITEM #1 SHALL BE COORDINATED BY
THE GENERAL CONTRACTOR. REFER TO CIVIL AND INTERIOR DESIGN DRAWINGS FOR
MORE INFORMATION. IF BID ALTERNATE #3 IS NOT AWARDED THE PLAY STRUCTURE,
PLAY AREA SURFACING AND PLAY AREA FURNITURE WILL NOT BE AWARDED EITHER.
8 FLOOR DRAIN - REFER TO PLUMBING.
9 PAY PHONE(S) (PROVIDED AND INSTALLED BY OTHERS) LOCATIONS INDICATED FOR
COORDINATION - REFER TO ELECTRICAL FOR REQUIREMENTS WHICH ARE PART OF
THE BASE BID AND IN THE GENERAL CONTRACTORS SCOPE OF WORK.
10 PHONE CARD MACHINE (PROVIDED AND INSTALLED BY OTHERS) LOCATIONS INDICATED
FOR COORDINATION - REFER TO ELECTRICAL FOR REQUIREMENTS WHICH ARE PART
OF THE BASE BID AND IN THE GENERAL CONTRACTORS SCOPE OF WORK.
11 ATM (PROVIDED AND INSTALLED BY OTHERS) LOCATIONS INDICATED FOR
COORDINATION - REFER TO ELECTRICAL FOR REQUIREMENTS WHICH ARE PART OF
THE BASE BID AND IN THE GENERAL CONTRACTORS SCOPE OF WORK.
12 FOLDING PANEL PARTITION SHALL BE PROVIDED AND INSTALLED BY CONTRACTOR -
REFER TO STRUCTURAL, ELECTRICAL AND SPECIFICATION SECTION 10 22 39 FOLDING
PANEL PARTITION.
13 SUSPENDED 3-DIMENSIONAL CURVED SYSTEM IS PART OF FF&E-ANCILLARY ITEM #1;
REFER TO ANCILLARY ITEM #1 NOTES ON A410 & A411 - REFER TO SPECIFICATION
SECTION 09 54 00. BASIS OF DESIGN IS TWO-DIRECTIONAL USG CURVATURA SYSTEM
WITH 2'x 2' PANELS WITH 9/16" SUSPENSION SYSTEM WITH 5/32" REVEAL.
14 EQUIPMENT SLAB(S) COORDINATE WITH CIVIL AND STRUCTURAL.
15 NEW SIDEWALK, COORDINATE WITH CIVIL.
16 NEW CONCRETE STAIR AND LANDING, COORDINATE WITH CIVIL.
17 REPAIR ANY HOLES IN EXISTING CEILING. CLEAN SURFACE OF ALL FOREIGN MATERIAL.
DULL EXISTING SURFACE BY LIGHTLY ABRADING. APPLY PAINT TO A TEST AREA, ALLOW
TO DRY ONE WEEK BEFORE TESTING ADHESION. IF ADHESION IS POOR, OR IF NEW
PAINT ATTACKS THE PREVIOUS FINISH, REMOVAL OF PREVIOUS FINISH MAY BE
NECESSARY IF EXISTING PAINT IS PEELING BADLY, CLEAN SURFACE TO SOUND
SUBSTRATE, PRIME AND PAINT. REFER TO 09 90 00 PAINT.
18 NEW CHILLER - REFER TO MECHANICAL.
19 CHAIN LINK FENCE ENCLOSURE - REFER TO CIVIL FOR SIZES AND DETAILS.
20 SPLIT SYSTEM UNITS - REFER TO MECHANICAL.
21 EYEWASH - REFER TO PLUMBING.
22 2" INSULATED METAL PANEL.
23 LINEAR METAL CEILING EXTERIOR.
24 LINEAR METAL CEILING INTERIOR.
25 NOT USED.
26 EXHAUST FAN - REFER TO MECHANICAL.
27 ROOF TOP VENTILATOR - REFER TO MECHANICAL
28 VENT PIPE - REFER TO MECHANICAL
29 EXISTING IMC FENCE TO REMAIN. COORDINATE WITH DEMOLITION NOTE 38. REPAIR
ANY DAMAGE AS A RESULT OF CONSTRUCTION
30 PROVIDE 24" HIGH; REVERSE LIT; CUT METAL LETTERS CONSTRUCTED OF ALUMINUM;
FONT = HELVETICA; TOTAL DEPTH = 5"; LED ILLUMINATION - WHITE. REFER TO 4/A503
FOR DETAILS.
31 COORDINATION DRAWINGS REQUIRED FOR DEVICES TO BE INSTALLED IN THIS AREA,
INCLUDING ANCILLARY ITEMS. THE GC IS RESPONSIBLE FOR COORDINATING WITH
MANUFACTURERS, INSTALLERS OF THE WORK IN THIS AREA AND SUBS. ALL WIRING
AND CONDUIT IS TO BE CONCEALED. FINISHED SIZES OF ALL DEVICES AND LOCATIONS
ARE TO BE INCLUDED ON THE COORDINATION DRAWINGS. COORDINATION DRAWINGS
ARE TO BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO THE BEGINNING OF
ANY ROUGH-IN INSTALLATION. ROUGH-IN'S ARE TO BE APPROVED BY THE
CONTRACTING OFFICER PRIOR TO BEING COVERED WITH GYPSUM WALLBOARD.
32 NOT USED.
33 EXPOSED STRUCTURAL STEEL TRUSSES, BEAMS, PURLINS, BRACING AND COLUMNS TO
BE FINISHED WITH COATING 2 (C2); REFER TO EXTERIOR MATERIAL COLOR SCHEDULE,
A201 FOR ADDITIONAL INFORMATION.
DEMOLITION KEYNOTES MASTER LIST
D1 DEMOLISH PORTION OF CONCRETE SLAB, PREPARE FOR NEW WORK. REFER TO STRUCTURAL
FOR EXTENTS AND DETAILS. COORDINATE WITH NEW WORK.
D2 DEMOLISH EXISTING OVERHEAD DOOR, HOOD, TRACKS, OPERATOR AND ASSOCIATED
WIRING. COMPLETE. REFER TO ELECTRICAL FOR ADDITIONAL DEMOLITION INFORMATION.
D3 DEMOLISH EXISTING CONCRETE CANOPY AND STRUCTURAL SUPPORTS. COORDINATE LIMITS
WITH STRUCTURAL AND RELFECTED CEILING PLAN.
D4 DEMOLISH EXISTING CANOPY, CANOPY FRAMING, CEILINGS, GUTTERS, DOWNSPOUTS AND
LIGHTS, INCLUDING ASSOCIATED WIRING. COORDINATE WITH NEW WORK. REFER TO
STRUCTURAL AND ELECTRICAL FOR ADDITIONAL INFORMATION.
D5 DEMOLISH AUTOMATIC ENTRANCE DOOR SYSTEM INCLUDING ACTIVATION MONITOR,
JUNCTION BOXES AND WIRING. REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION.
D6 SALVAGE ITEM(S) REFER TO SPECIFICATION SECTION 01 11 00 - SUMMARY OF WORK. ALL
LISTED ITEMS SHALL BE DELIVERED TO THE AREA AS DIRECTED BY THE CONTRACTING
OFFICER.
D7 DEMOLISH EXISTING GUTTERS, INCLUDING HANGERS. COMPLETE.
D8 DEMOLISH EXISTING UTILITY CONNECTIONS. CAP SUPPLY AND DRAIN LINES BELOW EXISTING
SLAB OR IN EXISTING WALLS TO REMAIN. REFER TO CIVIL, MECHANICAL, ELECTRICAL AND
PLUMBING DEMOLITION PLANS FOR ADDITIONAL UTILITY CONNECTION LOCATIONS. REFER TO
STRUCTURAL FOR SLAB INFILL DETAIL(S).
D9 DEMOLISH EXISTING DOWNSPOUTS, INCLUDING HANGERS COMPLETE. REFER TO CIVIL FOR
DEMOLITION OR TIE-IN OF EXISTING UNDERGROUND PIPING. DEMOLISH EXISTING SPLASH
BLOCKS IF APPLICABLE.
D10 DEMOLISH EXISTING DIVERTER STRIP/GUTTER. COMPLETE.
D11 DEMOLISH EXISTING EXTERIOR LIGHT FIXTURES INCLUDING JUNCTION BOXES AND
ASSOCIATED WIRING. COMPLETE. REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION.
D12 DEMOLISH EXISTING ENTRANCE ROOF, ROOF FRAMING, GUTTERS, DOWNSPOUTS, CEILING
AND LIGHTS, INCLUDING ASSOCIATED WIRING. COORDINATE WITH NEW WORK. REFER TO
STRUCTURAL AND ELECTRICAL FOR ADDITIONAL INFORMATION.
D13 DEMOLISH EXISTING GIRTS, ROOF EDGE AND VERTICAL STANDING SEAM PANELS AS
REQUIRED FOR NEW WORK. COORDINATE DEMOLITION WITH NEW WORK.
D14 DEMOLISH EXISTING VERTICAL METAL ROOF PANELS (FASCIA) AS REQUIRED TO ACCOMDATE
NEW ROOF PANELS. COORDINATE WITH NEW WORK.
D15 DEMOLISH EXISTING CONCRETE STAIR, LANDING AND FOOTING. REFER TO STRUCTURAL.
D16 DEMOLISH ACCOUSTICAL CEILING SYSTEM INCLUDING WALL TRIM, TRACKS AND CLIPPING
FASTENERS AND HANGER WIRES BACK TO STRUCTURE. COMPLETE.
D17 DEMOLISH ALL OR PORTION OF EXISTING MASONRY EXTERIOR WALL AS REQUIRED FOR NEW
WORK. COORDINATE DEMOLITION WITH NEW WORK. DIMENSIONS INDICATED ARE
APPROXIMATE. ALL DIMENSIONS SHALL BE FIELD VERIFIED. DEMOLISH EXISTING BRICK AT
TRANSITION TO NEW TO ALLOW FOR STAGGERED MORTAR JOINTS. BRICK VENEER ABOVE
NEW WALL OPENINGS FOR STOREFRONT SYSTEM TO BE DEMOLISHED FULL HEIGHT OF
BRICK. DEMOLISH ADDITIONAL COURSE OF BRICK BELOW SILL OF NEW WINDOW TO ALLOW
FOR INSTALLATION OF NEW ROWLOCK. REFER TO 2/A051.
D18 DEMOLISH EXISTING MASONRY COLUMN AND/OR PIER. REFER TO STRUCTURAL TO
COORDINATE EXISTING STEEL COLUMN(S) AND/OR CONCRETE FOOTINGS TO BE DEMOLISHED
OR TO REMAIN. PROTECT EXISTING STEEL TO REMAIN FROM DEMOLITION ACTIVITIES.
D19 DEMOLISH COLUMN DECORATIVE WRAP. REFER TO STRUCTURAL TO COORDINATE EXISTING
STEEL COLUMNS TO BE DEMOLISHED OR REMAIN. PROTECT EXISTING STEEL TO REMAIN
FROM DEMOLITION ACTIVITIES.
D20 DEMOLISH EXISTING INTERIOR PARTITION WALL, INCLUDING FLOOR AND CEILING TRACKS
AND ANCHORS.
D21 DEMOLISH ALL OR PORTION OF INTERIOR CMU WALL, INCLUDING FURRING AND GYPSUM
WALL BOARD AS REQUIRED FOR NEW WORK. COORDINATE DEMOLITION WITH NEW WORK.
DIMENSIONS INDICATED ARE APPROXIMATE. ALL DIMENSIONS SHALL BE FIELD VERIFIED.
D22 DEMOLISH GLASS BLOCK AND ATTACHED INTERIOR PARTITION WALLS INCLUDING FLOOR AND
CEILING TRACKS AND ANCHORS.
D23 DEMOLISH EXISTING CASEWORK AND COUNTERTOPS. COMPLETE.
D24 DEMOLISH EXISTING HANDRAIL, INCLUDING WALL ATTACHMENTS. COMPLETE.
D25 DEMOLISH EXISTING GYPSUM BOARD CEILING INCLUDING FRAMING SYSTEM AND ANCHORS.
COMPLETE.
D26 DEMOLISH EXISTING DOOR, FRAME, HARDWARE INCLUDING THRESHOLD IF APPLICABLE AND
FLASHING. COMPLETE.
D27 DEMOLISH EXISTING WINDOW, SILL PAN, FLASHING AND HARDWARE. COMPLETE.
D28 DEMOLISH EXISTING STOREFRONT SYSTEM INCLUDING ATTACHMENTS AND ASSOCIATED
WIRING. COMPLETE.
D29 DEMOLISH ANY AND ALL CEILING MOUNTED ITEMS. ITEMS INCLUDE BUT ARE NOT LIMITED TO
THE FOLLOWING: LIGHTS, SPEAKERS, HVAC SUPPLY AND RETURN DIFFUSERS, EXIT SIGNS,
SMOKE DETECTORS AND SPRINKLER HEADS. REFER TO MECHANICAL, ELECTRICAL AND FIRE
PROTECTION DRAWINGS FOR ADDITIONAL INFORMATION
D30 PROTECT EXTERIOR GYPSUM SHEATHING CEILING. DEMOLISH SURFACE MOUNTED LIGHT
FIXTURES. REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION. COORDINATE WITH NEW
WORK.
D31 DEMOLISH EXISTING ROOF, ROOF FRAMING, EXISTING CONCRETE DECK AND CONCRETE
DECK FRAMING AS REQUIRED FOR NEW CLERESTORY WORK. COORDINATE DEMOLITION WITH
NEW WORK. PLACEMENT AND DIMENSION WITH NEW CLERESTORY FRAMING ARE BASED ON
STRUCTURAL. FIELD VERIFY ALL DIMENSIONS BEFORE BEGINNING DEMOLTION WORK.
D32 DEMOLISH METAL WALL SOFFIT PANELS AND ASSOCIATED BLOCKING TO ALLOW FOR
INSTALLATION OF NEW SOFFIT PANELS. EXISTING TUBE STEEL TRUSS TO REMAIN. REFER TO
2/A050 AND 2/A051 FOR ADDITIONAL INFORMATION.
D33 DEMOLISH EXISTING GYPSUM WALL BOARD AND FURRING STRIPS OR STUDS FROM INTERIOR
FACE OF EXTERIOR MASONRY WALL, INCLUDING FLOOR AND CEILING TRACKS AND ANCHORS.
D34 SALVAGE EXISTING CHILLER. REFER TO MECHANICAL AND CIVIL DRAWINGS.
D35 DEMOLISH EXISTING CONCRETE EQUIPMENT SLAB, REFER TO CIVIL DRAWINGS.
D36 PROTECT EXISTING TRANSFORMER AND CONCRETE EQUIPMENT SLAB DURING DEMOLITION
AND NEW WORK. REFER TO CIVIL DRAWINGS.
D37 DEMOLISH EXISTING FLOOR TILE, TOPPINGS, MUD BEDS AND/OR ADDITIONAL FLOOR
MATERIALS. (DEPTH OF 1-1/2" IS INDICATED ON EXISTING DRAWINGS, DETAIL #11 ON SHEET 1, DATED APRIL 8, 1959). REFER TO STRUCTURAL FOR INFILL. COORDINATE TOLERANCES OF
TOP OF EXISTING STRUCTURAL SLAB WITH NEW FLOOR FINISH MANUFACTURERS WRITTEN
INSTRUCTIONS. SELF LEVELING COMPOUNDS MAY BE REQUIRED.
D38 REMOVE PORTION OF WOODEN (IMC) FENCE AS REQUIRED ONCE CONSTRUCTION FENCE IS
CONSTRUSTED TO ALLOW CONSTRUCTION ACTIVITIES TO BE PERFORMED. ONCE
CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED RE-CONSTRUCT PORTION OF REMOVED
FENCE PRIOR TO REMOVAL OF CONSTRUCTION FENCE.
D39 DEMOLISH EXISTING FLOOR FINISHES INCLUDING ADHESIVES, MASTIC AND/OR MORTAR BEDS
TO STRUCTURAL SLAB TO ACHIEVE A LEVEL FINISH PREPPED TO RECEIVE NEW FINISHES.
COORDINATE TOLERANCES OF TOP OF EXISTING STRUCTURAL SLAB WITH NEW FLOOR FINISH
MANUFACTURERS WRITTEN INSTRUCTIONS. SELF LEVELING COMPOUNDS MAY BE REQUIRED.
D40 DEMOLISH EXISTING GYPSUM WALL BOARD, FURRING STRIPS AND/OR STUDS INCLUDING
ANCHORS FROM INTERIOR FACE OF CMU WALLS.
D41 EXISTING BAGGAGE HANDLING EQUIPMENT (BHE) INDICATED FOR COORDINTATION OF
SALVAGEABLE ITEMS. EXISTING EQUIPMENT SHALL BE REMOVED BY GOVERNMENT PRIOR TO
START OF DEMOLITION. REMAINING DEVICES ARE LISTED AS SALVAGEABLE. REFER TO
SPECIFICATION SECTION 01 11 00 - SUMMARY OF WORK.
D42 EXISTING SECURITY SCANNING (SSE) INDICATED FOR COORDINTATION OF SALVAGEABLE
ITEMS. EXISTING EQUIPMENT SHALL BE REMOVED BY GOVERNMENT PRIOR TO START OF
DEMOLITION. REMAINING DEVICES ARE LISTED AS SALVAGEABLE. REFER TO SPECIFICATION
SECTION 01 11 00 - SUMMARY OR WORK.
D43 DEMOLISH RAISED PLANTER(S) - REFER TO CIVIL.
D44 DEMOLISH EXISTING PLUMBING FIXTURES, TRIM AND ASSOCIATED PIPING. REFER TO
PLUMBING DRAWINGS.
D45 DEMOLISH EXISTING TOILET PARTITIONS, TRIM AND ANCHORS. COMPLETE.
D46 DEMOLISH EXISTING SIDEWALK, RAMPS, CURB AND GUTTER AND/OR ASPHALT PAVING. REFER
TO CIVIL FOR LIMITS.
D47 NOT USED.
D48 DEMOLITION OF PORTION OF SLAB TO ALLOW FOR INSTALLATION OF AUTOMATIC SLIDING
ENTRANCES DOOR TRACKS. REFER TO MANUFACTURER'S WRITTEN INSTALLATION
INSTRUCTIONS.
D49 EXISTING FIBER LINES TO REMAIN. LOCATE AND PROTECT LINES DURING DEMOLITION AND
CONSTRUCTION ACTIVITIES. REFER TO STRUCTURAL.
D50 DEMOLISH EXISTING EDGE OF STANDING SEAM ROOF PANEL AND EXISTING FASCIA PANELS
AND TRIM TO ALLOW FOR INSTALLATION OF NEW INSULATED VERTICAL METAL PANELS AND
FASCIA. COORDINATE DEMOLITION WITH NEW WORK.
UP
FACP
CHAPLAIN
STO
TMO
APS GYM
TOILET
SHOWER
MECH
CONFERENCE
STO
OFFICE
OFFICE
OFFICE
FOYER
ELEC./STOR.
STO
WOMEN
MEN
STO
PASSENGER
TV ROOM
ADMIN
CORRIDOR
CORRIDOR
OFFICE
CLOSET
BAGGAGE
PALLET
BUILDUP
EMPLOYEE
BREAK
ROOM
DISPATCH
ROOM
SERVER
OFFICE
OFFICE
FOYER
ENTRY
OFFICE
BAGGAGE
SERVICE
CENTER
OFFICE
WOMEN
CHANGE
CHANGE
MEN
OFFICE
VAULT
TRAINING
ROOM
LOST
BAGGAGE
STO
OFFICE
C O
R R
ID
O
R
MECH./ELEC.
PASSENGER
SNACK BAR
FAMILY
WAITING
OFFICE
OFFICE
REST
ROOM
KITCHENETTE
PRE-SCREENING
VIP
LOUNGE
PRE-SCREENING
VIP
LOUNGE
ATRIUM
CUSTOMS &
IMMIGRATION
ARRIV
INBOUND
BAGGAGE
CLAIM
GATE 1
PASSENGER
WAITING
FOYER
GATE 2
PASSENGER
WAITING
BAGGAGE
CHECKIN
CENTER
PASSENGER
LOBBY
PASSENGER
SERVICE
CENTER
PASSENGER
SCREENING
CORRIDOR
LINE OF ROOF/CANOPY ABOVE
1 2
3 4 5 6 8 9 10 11
A
B
C
E
F
J
K
L
H
N
G
75.2 7.9 9.3 9.7
M
OFFICE
OFFICE
WOMEN
MEN
JAN
COVERED
BAGGAGE
RECEIVING
C.4
MECH/ELEC
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
FINISH ABBREVIATIONS
ACT -
CMU -
CONC -
CPT -
CT -
CWT -
EXP -
GWB -
PT -
RB -
TT -
VCT -
VWC -
WT -
ACOUSTICAL CEILING TILE
CONCRETE MASONRY UNIT
CONCRETE
CARPET
CERAMIC TILE
CERAMIC WALL TILE
EXPOSED STRUCTURE
GYPSUM BOARD
PAINT
RUBBER BASE
TERRAZZO TILE
VINYL COMPOSITE TILE
VINYL WALL COVERING
WALL TILE
SCOPE OF WORK LEGEND
THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:
DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)
AND
DKFX: 11-1122 B FOR REPAIR
INDICATES WORK AS REQUIRED FOR - -
MINOR CONSTRUCTION (MC)
ALL OTHER WORK IS REPAIR
GLICK/BOEHM
CHARLESTON
NO. B-80006 T
CE
TIHCRADER
ET
SI
G E
R
TH CARO
LIN
A
S
TA
TE
OF
SOU
& ASSOCIATES, INC.
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
OFSHEET
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T
HE
A
IR
F
OR
C E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
A001
EX
IS
TI
NG
F
LO
OR
P
LA
N
GB
KR
S
SM
/30
/20
AD
D/
RE
PA
IR
P
AS
SE
NG
ER
T
ER
M
IN
AL
B
UI
LD
IN
G
DKFX:11-1122 A / B
SCALE: 3/32" = 1'-0"A040 A001
1 FIRST FLOOR - EXISTING (FOR INFORMATION ONLY)
NKEYLAN NOT TO SCALE
NORTH
SIDE
SOUTH
SIDE
EXISTING FINISH SCHEDULE (FOR INFORMATION ONLY)
ROOM
NO. ROOM NAME
FLOOR BASE WALLS CEILING
REMARKS
ROOM
NO.MATERIAL FINISH MATERIAL MATERIAL FINISH MATERIAL
101 STO CONC. VCT RB CMU PT ACT 101
102 CHAPLAIN CONC. - - - - - 102
103 TMO CONC. TT RB GWB VWC / WC ACT 103
104 APS GYM CONC. VCT - GWB - EXP 104
105 TOILET CONC. CT CT GWB - ACT 105
106 SHOWER CONC. CT CT GWB - ACT 106
107 MECH CONC. - - CMU PT EXP 107
108 CONFERENCE CONC. CPT RB GWB - ACT CHAIR RAIL 108
109 STO CONC. VCT RB CMU / GWB PT ACT 109
110 OFFICE CONC. CPT RB GWB VWC ACT 110
111 OFFICE CONC. CPT RB GWB VWC ACT 111
112 OFFICE CONC. CPT RB GWB VWC ACT 112
113 FOYER CONC. - - - - - 113
114 ELEC./STOR. CONC. VCT RB GWB - ACT 114
115 STO CONC. EXIST CT RB CMU PT ACT 115
116 WOMEN CONC. CT CT GWB / CWT VWC ACT / GWB 116
117 MEN CONC. CT CT GWB / CWT VWC ACT / GWB 117
118 STO CONC. CT CT CMU PT ACT 118
119 PASSENGER TV ROOM CONC. CPT RB GWB VWC ACT / GWB 119
120 ADMIN CONC. CPT RB GWB VWC ACT 120
121 CORRIDOR CONC. CPT RB GWB VWC ACT 121
122 CORRIDOR CONC. CPT RB GWB VWC ACT 122
123 OFFICE CONC. CPT RB GWB VWC ACT 123
124 CLOSET CONC. TT - GWB VWC ACT 124
125 BAGGAGE PALLET BUILDUP CONC. VCT RB CMU PT EXP 125
126 EMPLOYEE BREAK ROOM CONC. CPT RB GWB VWC ACT 126
127 DISPATCH ROOM CONC. CPT RB GWB PT ACT 127
128 SERVER CONC. CPT RB GWB PT ACT 128
129 OFFICE CONC. CPT RB GWB PT ACT 129
130 OFFICE CONC. CPT RB GWB PT ACT 130
131 PASSAGE CONC. VCT RB CMU PT EXP 131
132 FOYER CONC. TT RB GWB PT ACT 132
133 ENTRY CONC. TT RB GWB VWC ACT 133
134 OFFICE CONC. CPT CT VB VWC ACT 134
135 BAGGAGE SERVICE CENTER CONC. CPT RB GWB VWC ACT 135
136 OFFICE CONC. CPT RB GWB VWC ACT 136
137 WOMEN CONC. CT CT GWB / CWT VWC ACT / GWB 137
138 CHANGE CONC. CT CT GWB VWC ACT 138
139 CHANGE CONC. CT CT GWB VWC ACT 139
140 MEN CONC. CT CT GWB / CWT VWC ACT / GWB 140
141 OFFICE CONC. CPT RB GWB VWC ACT 141
142 VAULT CONC. VCT RB GWB PT ACT 142
143 TRAINING ROOM CONC. CPT RB GWB VWC ACT 143
144 LOST BAGGAGE STO CONC. CPT RB GWB VWC ACT 144
145 OFFICE CONC. CPT RB GWB VWC ACT 145
146 CORRIDOR CONC. CPT RB GWB VWC ACT 146
147 MECH./ELEC. CONC. - - CMU PT EXP 147
148 PASSENGER SNACK BAR CONC. VCT RB GWB PT ACT 148
149 FAMILY WAITING CONC. TT RB GWB VWC ACT / GWB 149
150 OFFICE CONC. CPT RB GWB VWC ACT 150
151 OFFICE CONC. CPT RB GWB VWC ACT 151
152 MEN CONC. CT CT GWB / CWT VWC ACT / GWB 152
153 JAN CONC. CT CT CMU PT ACT 153
154 WOMEN CONC. CT CT GWB / CWT VWC ACT / GWB 154
155 OFFICE CONC. CPT RB GWB VWC ACT 155
156 OFFICE CONC. CPT RB GWB VWC ACT 156
157 REST ROOM CONC. - - - - - 157
158 KITCHENETTE CONC. - - - - - 158
159 PRE-SCREENING VIP LOUNGE CONC. BY OTHER BY OTHER BY OTHER BY OTHER BY OTHER 159 160 PRE-SCREENING VIP LOUNGE CONC. BY OTHER BY OTHER BY OTHER BY OTHER BY OTHER 160
161 ATRIUM CONC. TT RB GWB VWC ACT 161
162 CUSTOMS & IMMIGRATION ARRIV CONC. CPT RB GWB VWC ACT / GWB 162
163 INBOUND BAGGAGE CLAIM CONC. TT RB GWB VWC ACT / GWB 163
164 GATE 1 PASSENGER WAITING CONC. TT RB GWB VWC ACT / GWB ACCOUSTICAL WALL
COVER
165 FOYER CONC. - - - - - 165
166 GATE 2 PASSENGER WAITING CONC. TT RB GWB VWC ACT / GWB 166
167 BAGGAGE CHECKIN CENTER CONC. TT RB GWB VWC ACT / GWB 167
168 PASSENGER LOBBY CONC. TT RB GWB VWC ACT / GWB 168
169 PASSENGER SERVICE CENTER CONC. TT RB GWB - GWB 169
170 PASSENGER SCREENING CONC. TT RB GWB VWC ACT / GWB 170
171 CORRIDOR CONC. TT RB GWB VWC ACT / GWB 171
176 MECH/ELEC CONC. 176
177 COVERED BAGGAGE RECEIVING CONC. - - - - - 177
178 MEN CONC. CT CT CWT - ACT 178
179 JAN CONC. CT CT CMU PT ACT 179
180 WOMEN CONC. CT CT CWT - ACT 180
181 OFFICE CONC. CPT RB GWB VWC ACT 181
182 OFFICE CONC. CPT RB GWB VWC ACT 182
1 2
3 4 5 6 8 9 10 11
A
B
C
D
E
F
J
K
L
H
N
G
75.2 7.1 7.9 9.3 9.7
L.8
M
SL
O
PE
: 1
/2
/ 1
2"
SLOPE: 1 1/2" / 12"
SLOPE: 1 1/2" / 12"
SLOPE: 1 1/2" / 12"
SL
O
PE
: 1
/2
/ 1
2"
SL
O
PE
: 1
/2
/ 1
2"
SL
O
PE
: 1
/2
/ 1
2"
SL
O
PE
: 1
/2
/ 1
2"
SL
O
PE
: 1
/2
/ 1
2"
SLOPE: 1 1/2" / 12"
SLOPE: 1 1/2" / 12"
SLOPE: 1 1/2" / 12" SLOPE: 1 1/2" / 12"
SL
O
PE
: 1
/2
/ 1 2"
EXISTING STANDING
SEAM METAL ROOF
PANELS
NE.4
C.4
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
SCOPE OF WORK LEGEND
THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:
DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)
AND
DKFX: 11-1122 B FOR REPAIR
INDICATES WORK AS REQUIRED FOR - -
MINOR CONSTRUCTION (MC)
ALL OTHER WORK IS REPAIR
GLICK/BOEHM
CHARLESTON
NO. B-80006 T
CE
TIHCRADER
ET
SI
G E
R
TH CARO
LIN
A
S
TA
TE
OF
SOU
& ASSOCIATES, INC.
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
OFSHEET
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T
HE
A
IR
F
OR
C E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
A002
EX
IS
TI
NG
R
OO
F
PL
AN
GB
KR
S
SM
/30
/20
AD
D/
RE
PA
IR
P
AS
SE
NG
ER
T
ER
M
IN
AL
B
UI
LD
IN
G
DKFX:11-1122 A / B
SCALE: 3/32" = 1'-0"A002
1 EXISTING ROOF PLAN (FOR INFORMATION ONLY)
N
KEYLAN NOT TO SCALE
NORTH
SIDE
SOUTH
SIDE
UP
FACP
LEGEND & SYMBOLS
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE DEMOLISHED
EXISTING WINDOW TO REMAIN
EXISTING WINDOW TO BE DEMOLISHED
ROOM NAME & NUMBER
WORKING POINT
COLUMN GRID MARK
CENTERLINE
REVISION MARK1
Room Name A0000
EXISTING ITEM / AREA TO BE DEMOLISHED
1 2
3 4 5 6 8
A
B
C
D
E
H
N
75.2 7.1 7.9
L.8
M
D26
D26D26D26
D26
D26
D26
D26
D26
D26
D26
D26
D26
D15
D24
D26
D26
D26
D23
D23
D23
D26 D26 D26
D26
D26 D26 D26 D26
D26D26D26
D26 D26
D26
D26D26
D26
D26
D26
D26
D5 D26
D26 D26 D26 D28
D28
D28
D27 D27
D26 D26
D6
D27
D27
D27
D22
D45
D44
D44
D44
D44
D44
D44
D44
D44
D45
D22
D21D21
D18D18 D18
D22D22
D22
D22 D22
D22
D20
D21
D19
D19
D20
D20
D21
D20D20
D20
D21
D21
D21
D20
D20
D21
D20
D21
D20 D20
D21 D20D20 D20D20
D28
D21
D21
D22
D22
D20
D20 D20
D20 D20
D20
D20
D20
D20
D26
D20 D20
D19
D19
D20
D20
D20
D21
D21
D21
D20
D21 D21
D20
D21
D17
D17
D17
D17
D17
D17
D23
D26
D17 D27 D27D17
A050
A051
A040
A040
A040
D18
D44
D44
D18
D18
D17 D18
D44
D20
D21 D21
D23
D23
D21
D21D21 D21
D27 D27 D27
D2
D18 D18
D18
D18
D17
D17
D17
D27 D27
D20
D20
D20
D20
D6
D21 D2
D21
D20
D9
D9
D9
D9
D9
D9
3'-
1/ 2"
'-1
0"
25'-0"+/-
4'-
D26
D26
CHAPLAIN
STO
TMO
APS GYM
TOILET
SHOWER
MECH
CONFERENCE
STO
OFFICE
OFFICE
OFFICE
FOYER
STO
STO
WOMEN
MEN
STO
PASSENGER
TV ROOM
ADMIN
CORRIDOR
CORRIDOR
OFFICE
OFFICE
BAGGAGE
PALLET
BUILDUP
EMPLOYEE
BREAK
ROOM
CONSOLE
ROOM
SERVER
OFFICE
OFFICE
FOYER
ENTRY
GATE 1
PASSENGER
WAITING
FOYER
GATE 2
PASSENGER
WAITING
BAGGAGE
CHECKIN
CENTER
PASSENGER
LOBBY
PASSENGER
SERVICE
CENTER
PASSENGER
SCREENING
D33
D33
D33
D33
D17
D17D33
D17 D17
D33
D40
D40 D40 D17
D38
D40
D40 D40
D46
D40 D40
D19
D40 D40
D21
D40
D17
D33
D40
D40
D1
D46
D9
D21
D40
D40
D9
D6
D1
D39
D39 D39
D39
D39
D39
D39D39
D39 D46
D39 D39
D39
D39D39
D39
D39
D39 D39
D42
D42
D42
D41
D41
D41
D41
D41
D41
D39
D42
D39
D39
D43
D43D43
D43 D43D43 D46
D31
D17
D19
D27
D21 D21
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
A051
D8
D8
D8
D8
D8
D49
D49
LIMITS OF DEMO
40'-2" +/-
D48
D19
D19
D19
D19
NOTE:
NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE
WORK REMAINS. REFER TO A000 FOR MASTER LIST.
SCOPE OF WORK LEGEND
THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:
DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)
AND
DKFX: 11-1122 B FOR REPAIR
INDICATES WORK AS REQUIRED FOR - -
MINOR CONSTRUCTION (MC)
ALL OTHER WORK IS REPAIR
GLICK/BOEHM
CHARLESTON
NO. B-80006 T
CE
TIHCRADER
ET
SI
G E
R
TH CARO
LIN
A
S
TA
TE
OF
SOU
& ASSOCIATES, INC.
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
OFSHEET
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T
HE
A
IR
F
OR
C E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
A003
DE
M
OL
IT
IO
N
PL
AN
N
OR
TH
S
ID
E
GB
KR
S
SM
/30
/20
AD
D/
RE
PA
IR
P
AS
SE
NG
ER
T
ER
M
IN
AL
B
UI
LD
IN
G
DKFX:11-1122 A / B
DEMOLITION GENERAL NOTES
1 LOOSE FURNITURE AND EQUIPMENT WILL BE REMOVED BY THE
GOVERNMENT PRIOR TO BEGINNING OF CONSTRUCTION. REMAINING
EQUIPMENT NOT LISTED AS SALVAGEABLE TO BE DISPOSED OF BY
THE CONTRACTOR. REMAINING FURNITURE TO BE DISPOSED OF BY
THE CONTRACTOR.
2 REFER TO H001 FOR HAZARDOUS MATERIAL ABATEMENT.
3 BEFORE BEGINNING CONSTRUCTION OR DEMOLITION ACTIVITIES THE
CONTRACTOR SHALL TAKE FIELD MEASUREMENTS, VERIFY EXISTING
CONDITIONS, COMPARE RESULTS WITH INFORMATION PROVIDED AND
NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR TO
ORDERING MATERIALS AND/OR COMMENCEMENT OF WORK.
4 CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY OF BUILDING
CONTENTS AS WELL AS BUILDING MATERIALS STORED ON SITE
DURING CONSTRUCTION.
5 REFER TO CIVIL, STRUCTURAL, MECANICAL, ELECTRICAL, AND
PLUMBING FOR OTHER DEMOLITION. CONTRACTOR TO COORDINATE
DEMOLITION REQUIRED BY OTHER DISCIPLINES AND COMPLETE
PREPARATION FOR NEW WORK.
6 EXISTING CONSTRUCTION TO REMAIN SHALL BE PROTECTED DURING
DEMOLITION AND NEW WORK CONSTRUCTION ACTIVITIES.
7 THE EXTENT OF DEMOLITION INDICATED IS BASED ON AS BUILT
DRAWING PROVIDED BY THE OWNER AND FIELD OBSERVATIONS. ANY
DISCPEPANCIES BETWEEN ACTUAL CONDITIONS AND THOSE
INDICATED ARE TO BE BROUGHT TO THE ATTENTION OF THE OF THE
CONTRACTING OFFICER AS SOON AS DISCPEPANCIES ARE
DISCOVERED.
8 IF THE CONTRACTOR ENCOUNTERS MATERIALS BELIEVED TO BE
ASBESTOS OR LEAD, HE SHALL IMMEDIATELY STOP WORK IN THE
AFFECTED AREA AND REPORT THE CONDITION TO THE CONTRACTING
OFFICER IN WRITING. WORK IN THE AFFECTED AREA SHALL NOT BE
RESUMED EXCEPT BY WRITTEN NOTIFICATION OF THE MATERIAL IN
QUESTION - IS NOT ASBESTOS OR LEAD AND HAS BEEN DECLARED
HARMLESS
9 DEMOLITION PLANS AND ELEVATIONS SHOW THE INTENT OF
DEMOLITION TO BE PERFORMED. ALL DASHED ITEMS ARE TO BE
DEMOLISHED COMPLETE. CONTRACTOR SHALL INCLUDE ALL
DEMOLITION, CUTTING AND PATCHING REQUIRED FOR NEW
CONSTRUCTION. REFER TO OTHER DISCIPLINES (CIVIL STRUCTURAL,
MECHANICAL ELECTRICAL, MECHANICAL AND FIRE PROTECTION)
DEMOLITION DRAWINGS FOR ADDITIONAL ITEMS TO BE DEMOLISHED.
THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES BETWEEN
DISCIPLINES DEMOLITION AND NEW WORK TO THE CONTRACTING
OFFICER. IT IS THE RESPONSIBILITY OF THE CONTRACT TO SHORE,
BRACE AND/OR SECURE MATERIALS AND STRUCTURE TO REMAIN.
10 WHERE EXISTING WALL, CEILING, ROOF OR FLOOR SYSTEMS ARE TO
REMAIN AND ARE DISTURBED BY DEMOLITION, THEY SHALL BE
REPAIRED AS REQUIRED TO MATCH ORIGINAL INTEGRITY AND
ADJACENT CONSTRUCTION.
11 CONTRACTOR TO REMOVE ALL ABANDONDED OR UNNECESSARY
PIPING, DUCT, WIRING CONDIUT AND/OR ANCHORS COMPLETE.
12 REFER TO SPECIFICATION SECTION 01 11 00 SUMMARY OF WORK FOR
SALVAGEABLE ITEMS TO BE TURNED OVER TO THE GOVERNMENT.
13 REFER TO STRUCTURAL & PLUMBING FOR LOCATIONS OF NEW
FIXTURES AND ADDITIONAL SLAB DEMOLITION.
14 BRICK VENEER ABOVE NEW WALL OPENINGS FOR STOREFRONT
SYSTEM TO BE DEMOLISHED FULL HEIGHT OF BRICK. DEMOLISH
ADDITIONAL COURSE OF BRICK BELOW SILL OF NEW WINDOW TO
ALLOW FOR INSTALLATION OF NEW ROWLOCK. REFER TO 2/A051.
N
KEYLAN NOT TO SCALE
NORTH
SIDE
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"A040 A003
1 DEMOLITION FLOOR PLAN - NORTH SIDE
DEMOLITION PLAN NOTES
1 REFER TO G111 FOR GENERAL PROJECT NOTES
2 REFER TO A003 FOR GENERAL DEMOLITION NOTES.
3 REFER TO DEMOLITION ELEVATIONS FOR ADDITIONAL DEMOLITION
INFORMATION.
4 DEMOLITION PLANS WERE CREATED USING EXISTING PLANS
PROVIDED BY THE USERS THUS ALL DIMENSIONS ARE +/- AND
SHOULD BE FIELD VERIFIED.
DEMOLITION KEYNOTES
D1 DEMOLISH PORTION OF CONCRETE SLAB, PREPARE FOR NEW WORK.
REFER TO STRUCTURAL FOR EXTENTS AND DETAILS. COORDINATE
WITH NEW WORK.
D2 DEMOLISH EXISTING OVERHEAD DOOR, HOOD, TRACKS, OPERATOR
AND ASSOCIATED WIRING. COMPLETE. REFER TO ELECTRICAL FOR
ADDITIONAL DEMOLITION INFORMATION.
D5 DEMOLISH AUTOMATIC ENTRANCE DOOR SYSTEM INCLUDING
ACTIVATION MONITOR, JUNCTION BOXES AND WIRING. REFER TO
ELECTRICAL FOR ADDITIONAL INFORMATION.
D6 SALVAGE ITEM(S) REFER TO SPECIFICATION SECTION 01 11 00 -
SUMMARY OF WORK. ALL LISTED ITEMS SHALL BE DELIVERED TO THE
AREA AS DIRECTED BY THE CONTRACTING OFFICER.
D8 DEMOLISH EXISTING UTILITY CONNECTIONS. CAP SUPPLY AND DRAIN
LINES BELOW EXISTING SLAB OR IN EXISTING WALLS TO REMAIN.
REFER TO CIVIL, MECHANICAL, ELECTRICAL AND PLUMBING
DEMOLITION PLANS FOR ADDITIONAL UTILITY CONNECTION
LOCATIONS. REFER TO STRUCTURAL FOR SLAB INFILL DETAIL(S).
D9 DEMOLISH EXISTING DOWNSPOUTS, INCLUDING HANGERS
COMPLETE. REFER TO CIVIL FOR DEMOLITION OR TIE-IN OF EXISTING
UNDERGROUND PIPING. DEMOLISH EXISTING SPLASH BLOCKS IF
APPLICABLE.
D15 DEMOLISH EXISTING CONCRETE STAIR, LANDING AND FOOTING.
REFER TO STRUCTURAL.
D17 DEMOLISH ALL OR PORTION OF EXISTING MASONRY EXTERIOR WALL
AS REQUIRED FOR NEW WORK. COORDINATE DEMOLITION WITH NEW
WORK. DIMENSIONS INDICATED ARE APPROXIMATE. ALL DIMENSIONS
SHALL BE FIELD VERIFIED. DEMOLISH EXISTING BRICK AT TRANSITION
TO NEW TO ALLOW FOR STAGGERED MORTAR JOINTS. BRICK VENEER
ABOVE NEW WALL OPENINGS FOR STOREFRONT SYSTEM TO BE
DEMOLISHED FULL HEIGHT OF BRICK. DEMOLISH ADDITIONAL
COURSE OF BRICK BELOW SILL OF NEW WINDOW TO ALLOW FOR
INSTALLATION OF NEW ROWLOCK. REFER TO 2/A051.
D18 DEMOLISH EXISTING MASONRY COLUMN AND/OR PIER. REFER TO
STRUCTURAL TO COORDINATE EXISTING STEEL COLUMN(S) AND/OR
CONCRETE FOOTINGS TO BE DEMOLISHED OR TO REMAIN. PROTECT
EXISTING STEEL TO REMAIN FROM DEMOLITION ACTIVITIES.
D19 DEMOLISH COLUMN DECORATIVE WRAP. REFER TO STRUCTURAL TO
COORDINATE EXISTING STEEL COLUMNS TO BE DEMOLISHED OR
REMAIN. PROTECT EXISTING STEEL TO REMAIN FROM DEMOLITION
ACTIVITIES.
D20 DEMOLISH EXISTING INTERIOR PARTITION WALL, INCLUDING FLOOR
AND CEILING TRACKS AND ANCHORS.
D21 DEMOLISH ALL OR PORTION OF INTERIOR CMU WALL, INCLUDING
FURRING AND GYPSUM WALL BOARD AS REQUIRED FOR NEW WORK.
COORDINATE DEMOLITION WITH NEW WORK. DIMENSIONS INDICATED
ARE APPROXIMATE. ALL DIMENSIONS SHALL BE FIELD VERIFIED.
D22 DEMOLISH GLASS BLOCK AND ATTACHED INTERIOR PARTITION WALLS
INCLUDING FLOOR AND CEILING TRACKS AND ANCHORS.
D23 DEMOLISH EXISTING CASEWORK AND COUNTERTOPS. COMPLETE.
D24 DEMOLISH EXISTING HANDRAIL, INCLUDING WALL ATTACHMENTS.
COMPLETE.
D26 DEMOLISH EXISTING DOOR, FRAME, HARDWARE INCLUDING
THRESHOLD IF APPLICABLE AND FLASHING. COMPLETE.
D27 DEMOLISH EXISTING WINDOW, SILL PAN, FLASHING AND HARDWARE.
COMPLETE.
D28 DEMOLISH EXISTING STOREFRONT SYSTEM INCLUDING
ATTACHMENTS AND ASSOCIATED WIRING. COMPLETE.
D31 DEMOLISH EXISTING ROOF, ROOF FRAMING, EXISTING CONCRETE
DECK AND CONCRETE DECK FRAMING AS REQUIRED FOR NEW
CLERESTORY WORK. COORDINATE DEMOLITION WITH NEW WORK.
PLACEMENT AND DIMENSION WITH NEW CLERESTORY FRAMING ARE
BASED ON STRUCTURAL. FIELD VERIFY ALL DIMENSIONS BEFORE
BEGINNING DEMOLTION WORK.
D33 DEMOLISH EXISTING GYPSUM WALL BOARD AND FURRING STRIPS OR
STUDS FROM INTERIOR FACE OF EXTERIOR MASONRY WALL,
INCLUDING FLOOR AND CEILING TRACKS AND ANCHORS.
D38 REMOVE PORTION OF WOODEN (IMC) FENCE AS REQUIRED ONCE
CONSTRUCTION FENCE IS CONSTRUSTED TO ALLOW CONSTRUCTION
ACTIVITIES TO BE PERFORMED. ONCE CONSTRUCTION ACTIVITIES
HAVE BEEN COMPLETED RE-CONSTRUCT PORTION OF REMOVED
FENCE PRIOR TO REMOVAL OF CONSTRUCTION FENCE.
D39 DEMOLISH EXISTING FLOOR FINISHES INCLUDING ADHESIVES, MASTIC
AND/OR MORTAR BEDS TO STRUCTURAL SLAB TO ACHIEVE A LEVEL
FINISH PREPPED TO RECEIVE NEW FINISHES. COORDINATE
TOLERANCES OF TOP OF EXISTING STRUCTURAL SLAB WITH NEW
FLOOR FINISH MANUFACTURERS WRITTEN INSTRUCTIONS. SELF
LEVELING COMPOUNDS MAY BE REQUIRED.
D40 DEMOLISH EXISTING GYPSUM WALL BOARD, FURRING STRIPS AND/OR
STUDS INCLUDING ANCHORS FROM INTERIOR FACE OF CMU WALLS.
D41 EXISTING BAGGAGE HANDLING EQUIPMENT (BHE) INDICATED FOR
COORDINTATION OF SALVAGEABLE ITEMS. EXISTING EQUIPMENT
SHALL BE REMOVED BY GOVERNMENT PRIOR TO START OF
DEMOLITION. REMAINING DEVICES ARE LISTED AS SALVAGEABLE.
REFER TO SPECIFICATION SECTION 01 11 00 - SUMMARY OF WORK.
D42 EXISTING SECURITY SCANNING (SSE) INDICATED FOR
COORDINTATION OF SALVAGEABLE ITEMS. EXISTING EQUIPMENT
SHALL BE REMOVED BY GOVERNMENT PRIOR TO START OF
DEMOLITION. REMAINING DEVICES ARE LISTED AS SALVAGEABLE.
REFER TO SPECIFICATION SECTION 01 11 00 - SUMMARY OR WORK.
D43 DEMOLISH RAISED PLANTER(S) - REFER TO CIVIL.
D44 DEMOLISH EXISTING PLUMBING FIXTURES, TRIM AND ASSOCIATED
PIPING. REFER TO PLUMBING DRAWINGS.
D45 DEMOLISH EXISTING TOILET PARTITIONS, TRIM AND ANCHORS.
COMPLETE.
D46 DEMOLISH EXISTING SIDEWALK, RAMPS, CURB AND GUTTER AND/OR
ASPHALT PAVING. REFER TO CIVIL FOR LIMITS.
D48 DEMOLITION OF PORTION OF SLAB TO ALLOW FOR INSTALLATION OF
AUTOMATIC SLIDING ENTRANCES DOOR TRACKS. REFER TO
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.
D49 EXISTING FIBER LINES TO REMAIN. LOCATE AND PROTECT LINES
DURING DEMOLITION AND CONSTRUCTION ACTIVITIES. REFER TO
STRUCTURAL.
LEGEND & SYMBOLS
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE DEMOLISHED
EXISTING WINDOW TO REMAIN
EXISTING WINDOW TO BE DEMOLISHED
ROOM NAME & NUMBER
WORKING POINT
COLUMN GRID MARK
CENTERLINE
REVISION MARK1
Room Name A0000
EXISTING ITEM / AREA TO BE DEMOLISHED
6 8 9 10 11
A
B
D
E
F
J
K
L
H
N
G
7 7.1 7.9 9.3 9.7
L.8
M
D26
D23 D23
D27 D27 D26 D26
D27
D26
D26
D26
D26
D26 D26
D26 D26
D26
D26
D26
D27D26D26D26
D23D23
D26D26
D26
D26
D26
D26
D26
D23
D26
D27 D27
D26
D26
D26
D26
D26
D26 D26
D26
D26
D26
D5 D26
D26
D26 D26 D26 D26D28
D28
D28 D27 D27 D26
D27 D27
D45D45
D23
D8
D41
D27
D27
D27
D22
D22
D44 D44
D44
D22
D18 D18 D18 D18D18 D18
D21
D21
D21
D21
D21
D21 D21
D17
D21
D21
D21
D20
D20
D22D22
D22
D22 D22
D22
D20
D21
D19
D19
D20
D21
D21
D17
D17
D21 D21
D20D20
D20
D20 D21 D26 D21D20
D20
D20
D20
D20
D21
D20
D21
D20
D21
D20 D20
D21 D20D20 D20D20
D28
D21
D44
D44
D44
D44D44
D44
D44
D44
D44
D20
D21
D21
D21
D21
D21
D44
D44
D44
D45
D45
D20
D21
D44
D44
D20
D20
D20
D20
D20
D20 D20
D20
D20
D19
D19
D17
A050
A051
A040
A040
A040
D18D18 D18
D18
D18
D17 D18D18 D18
D21 D21
D23
D23
D20
D20
D20
D20
D20
D26
D20
D20
D26 D28
D18 D18 D18
D18
D27D27
D17
D17
D20
D20
D20
D20
D17
D37D37
D37
D37
D17
D21
D21
D21
D20
D21
D20D20
D9 D9 D9
D9 D9
D9D9
D9
D9
3'-
1/ 2"
'-1
0"
'-8
/2
'-0
7'- 6"
'-0
10'-3"+/-
7'- 0"
EQ
D26
FOYER
ENTRY
OFFICE
BAGGAGE
SERVICE
CENTER
OFFICE
WOMEN
CHANGE
CHANGE
MEN
OFFICE
VAULT
CUSTOMS
OFFICE
LOST
BAGGAGE
STO
OFFICE
C O
R R
ID
O
R
MECH./ELEC.
PASSENGER
SNACK BAR
FAMILY
WAITING
OFFICE
OFFICE
REST
ROOM
KITCHENETTE
158PRE-SCREENING
VIP
LOUNGE
PRE-SCREENING
VIP
LOUNGE
ATRIUM
CUSTOMS &
IMMIGRATION
ARRIV
INBOUND
BAGGAGE
CLAIM
GATE 1
PASSENGER
WAITING
FOYER
PASSENGER
LOBBY
PASSENGER
SERVICE
CENTER
PASSENGER
SCREENING
CORRIDOR
OFFICE
OFFICE
WOMEN
MEN
JAN
COVERED
BAGGAGE
RECEIVING
D17
D19
D21
D40
D40
D1
D46 D46
D17
D46 D46
D33
D40
D44
D40D33
D40
D40 D40
D40
D40
D40
D17 D17
D20D40
D40
D40
D40
D21
D40
D40
D33
D2
D2
D2
D40
D40
D9
D40
D40
D40
D40
D40
D40D40
D40
D40
D21
D17 D17
D33
D20
D33
D12
D9 D9
D17
D38
D38
D46
D46
D39 D39
D39
D42
D42
D42
D39
D39
D43
D43 D43D43
D43 D43D43D43 D43
D43
D46
D39
D39
D39
D39
D39
D39
D39
D39
D39 D39
D39
D39
D39
D39
D39
D39
D33
D33
D46
D31
D33 D33
A050
D19
C.4
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
D43
DEMOLISH EXISTING CANOPY ABOVE EXISTING CONCRETE CANOPY & COLUMNS TO REMAIN
A051
DKFX 11-1122 A
"MC" WORK
LIMITS OF DEMO
40'-2" +/-
D36
D35
D48
D48
D19
D19
D19
D19
NOTE:
NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE
WORK REMAINS. REFER TO A000 FOR MASTER LIST.
SCOPE OF WORK LEGEND
THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:
DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)
AND
DKFX: 11-1122 B FOR REPAIR
INDICATES WORK AS REQUIRED FOR - -
MINOR CONSTRUCTION (MC)
ALL OTHER WORK IS REPAIR
GLICK/BOEHM
CHARLESTON
NO. B-80006 T
CE
TIHCRADER
ET
SI
G E
R
TH CARO
LIN
A
S
TA
TE
OF
SOU
& ASSOCIATES, INC.
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
OFSHEET
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T
HE
A
IR
F
OR
C E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
A004
DE
M
OL
IT
IO
N
PL
AN
S
OU
TH
S
ID
E
GB
KR
S
SM
/30
/20
AD
D/
RE
PA
IR
P
AS
SE
NG
ER
T
ER
M
IN
AL
B
UI
LD
IN
G
DKFX:11-1122 A / B
N
KEYLAN NOT TO SCALE
SOUTH
SIDE
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"A040 A004
1 DEMOLITION FLOOR PLAN - SOUTH SIDE
DEMOLITION PLAN NOTES
1 REFER TO G111 FOR GENERAL PROJECT NOTES
2 REFER TO A003 FOR GENERAL DEMOLITION NOTES.
3 REFER TO DEMOLITION ELEVATIONS FOR ADDITIONAL DEMOLITION
INFORMATION.
4 DEMOLITION PLANS WERE CREATED USING EXISTING PLANS
PROVIDED BY THE USERS THUS ALL DIMENSIONS ARE +/- AND
SHOULD BE FIELD VERIFIED.
DEMOLITION KEYNOTES
D23 DEMOLISH EXISTING CASEWORK AND COUNTERTOPS. COMPLETE.
D26 DEMOLISH EXISTING DOOR, FRAME, HARDWARE INCLUDING
THRESHOLD IF APPLICABLE AND FLASHING. COMPLETE.
D27 DEMOLISH EXISTING WINDOW, SILL PAN, FLASHING AND HARDWARE.
COMPLETE.
D28 DEMOLISH EXISTING STOREFRONT SYSTEM INCLUDING
ATTACHMENTS AND ASSOCIATED WIRING. COMPLETE.
D31 DEMOLISH EXISTING ROOF, ROOF FRAMING, EXISTING CONCRETE
DECK AND CONCRETE DECK FRAMING AS REQUIRED FOR NEW
CLERESTORY WORK. COORDINATE DEMOLITION WITH NEW WORK.
PLACEMENT AND DIMENSION WITH NEW CLERESTORY FRAMING ARE
BASED ON STRUCTURAL. FIELD VERIFY ALL DIMENSIONS BEFORE
BEGINNING DEMOLTION WORK.
D33 DEMOLISH EXISTING GYPSUM WALL BOARD AND FURRING STRIPS OR
STUDS FROM INTERIOR FACE OF EXTERIOR MASONRY WALL,
INCLUDING FLOOR AND CEILING TRACKS AND ANCHORS.
D34 SALVAGE EXISTING CHILLER. REFER TO MECHANICAL AND CIVIL
DRAWINGS.
D35 DEMOLISH EXISTING CONCRETE EQUIPMENT SLAB, REFER TO CIVIL
DRAWINGS.
D36 PROTECT EXISTING TRANSFORMER AND CONCRETE EQUIPMENT
SLAB DURING DEMOLITION AND NEW WORK. REFER TO CIVIL
DRAWINGS.
D37 DEMOLISH EXISTING FLOOR TILE, TOPPINGS, MUD BEDS AND/OR
ADDITIONAL FLOOR MATERIALS. (DEPTH OF 1-1/2" IS INDICATED ON
EXISTING DRAWINGS, DETAIL #11 ON SHEET 1, DATED APRIL 8, 1959).
REFER TO STRUCTURAL FOR INFILL. COORDINATE TOLERANCES OF
TOP OF EXISTING STRUCTURAL SLAB WITH NEW FLOOR FINISH
MANUFACTURERS WRITTEN INSTRUCTIONS. SELF LEVELING
COMPOUNDS MAY BE REQUIRED.
D38 REMOVE PORTION OF WOODEN (IMC) FENCE AS REQUIRED ONCE
CONSTRUCTION FENCE IS CONSTRUSTED TO ALLOW CONSTRUCTION
ACTIVITIES TO BE PERFORMED. ONCE CONSTRUCTION ACTIVITIES
HAVE BEEN COMPLETED RE-CONSTRUCT PORTION OF REMOVED
FENCE PRIOR TO REMOVAL OF CONSTRUCTION FENCE.
D39 DEMOLISH EXISTING FLOOR FINISHES INCLUDING ADHESIVES,
MASTIC AND/OR MORTAR BEDS TO STRUCTURAL SLAB TO ACHIEVE A
LEVEL FINISH PREPPED TO RECEIVE NEW FINISHES. COORDINATE
TOLERANCES OF TOP OF EXISTING STRUCTURAL SLAB WITH NEW
FLOOR FINISH MANUFACTURERS WRITTEN INSTRUCTIONS. SELF
LEVELING COMPOUNDS MAY BE REQUIRED.
D40 DEMOLISH EXISTING GYPSUM WALL BOARD, FURRING STRIPS AND/OR
STUDS INCLUDING ANCHORS FROM INTERIOR FACE OF CMU WALLS.
D41 EXISTING BAGGAGE HANDLING EQUIPMENT (BHE) INDICATED FOR
COORDINTATION OF SALVAGEABLE ITEMS. EXISTING EQUIPMENT
SHALL BE REMOVED BY GOVERNMENT PRIOR TO START OF
DEMOLITION. REMAINING DEVICES ARE LISTED AS SALVAGEABLE.
REFER TO SPECIFICATION SECTION 01 11 00 - SUMMARY OF WORK.
D42 EXISTING SECURITY SCANNING (SSE) INDICATED FOR
COORDINTATION OF SALVAGEABLE ITEMS. EXISTING EQUIPMENT
SHALL BE REMOVED BY GOVERNMENT PRIOR TO START OF
DEMOLITION. REMAINING DEVICES ARE LISTED AS SALVAGEABLE.
REFER TO SPECIFICATION SECTION 01 11 00 - SUMMARY OR WORK.
D43 DEMOLISH RAISED PLANTER(S) - REFER TO CIVIL.
D44 DEMOLISH EXISTING PLUMBING FIXTURES, TRIM AND ASSOCIATED
PIPING. REFER TO PLUMBING DRAWINGS.
D45 DEMOLISH EXISTING TOILET PARTITIONS, TRIM AND ANCHORS.
COMPLETE.
D46 DEMOLISH EXISTING SIDEWALK, RAMPS, CURB AND GUTTER AND/OR
ASPHALT PAVING. REFER TO CIVIL FOR LIMITS.
D48 DEMOLITION OF PORTION OF SLAB TO ALLOW FOR INSTALLATION OF
AUTOMATIC SLIDING ENTRANCES DOOR TRACKS. REFER TO
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.
DEMOLITION KEYNOTES
D1 DEMOLISH PORTION OF CONCRETE SLAB, PREPARE FOR NEW WORK.
REFER TO STRUCTURAL FOR EXTENTS AND DETAILS. COORDINATE
WITH NEW WORK.
D2 DEMOLISH EXISTING OVERHEAD DOOR, HOOD, TRACKS, OPERATOR
AND ASSOCIATED WIRING. COMPLETE. REFER TO ELECTRICAL FOR
ADDITIONAL DEMOLITION INFORMATION.
D5 DEMOLISH AUTOMATIC ENTRANCE DOOR SYSTEM INCLUDING
ACTIVATION MONITOR, JUNCTION BOXES AND WIRING. REFER TO
ELECTRICAL FOR ADDITIONAL INFORMATION.
D6 SALVAGE ITEM(S) REFER TO SPECIFICATION SECTION 01 11 00 -
SUMMARY OF WORK. ALL LISTED ITEMS SHALL BE DELIVERED TO THE
AREA AS DIRECTED BY THE CONTRACTING OFFICER.
D8 DEMOLISH EXISTING UTILITY CONNECTIONS. CAP SUPPLY AND DRAIN
LINES BELOW EXISTING SLAB OR IN EXISTING WALLS TO REMAIN.
REFER TO CIVIL, MECHANICAL, ELECTRICAL AND PLUMBING
DEMOLITION PLANS FOR ADDITIONAL UTILITY CONNECTION
LOCATIONS. REFER TO STRUCTURAL FOR SLAB INFILL DETAIL(S).
D9 DEMOLISH EXISTING DOWNSPOUTS, INCLUDING HANGERS
COMPLETE. REFER TO CIVIL FOR DEMOLITION OR TIE-IN OF EXISTING
UNDERGROUND PIPING. DEMOLISH EXISTING SPLASH BLOCKS IF
APPLICABLE.
D12 DEMOLISH EXISTING ENTRANCE ROOF, ROOF FRAMING, GUTTERS,
DOWNSPOUTS, CEILING AND LIGHTS, INCLUDING ASSOCIATED
WIRING. COORDINATE WITH NEW WORK. REFER TO STRUCTURAL AND
ELECTRICAL FOR ADDITIONAL INFORMATION.
D17 DEMOLISH ALL OR PORTION OF EXISTING MASONRY EXTERIOR WALL
AS REQUIRED FOR NEW WORK. COORDINATE DEMOLITION WITH NEW
WORK. DIMENSIONS INDICATED ARE APPROXIMATE. ALL DIMENSIONS
SHALL BE FIELD VERIFIED. DEMOLISH EXISTING BRICK AT TRANSITION
TO NEW TO ALLOW FOR STAGGERED MORTAR JOINTS. BRICK
VENEER ABOVE NEW WALL OPENINGS FOR STOREFRONT SYSTEM TO
BE DEMOLISHED FULL HEIGHT OF BRICK. DEMOLISH ADDITIONAL
COURSE OF BRICK BELOW SILL OF NEW WINDOW TO ALLOW FOR
INSTALLATION OF NEW ROWLOCK. REFER TO 2/A051.
D18 DEMOLISH EXISTING MASONRY COLUMN AND/OR PIER. REFER TO
STRUCTURAL TO COORDINATE EXISTING STEEL COLUMN(S) AND/OR
CONCRETE FOOTINGS TO BE DEMOLISHED OR TO REMAIN. PROTECT
EXISTING STEEL TO REMAIN FROM DEMOLITION ACTIVITIES.
D19 DEMOLISH COLUMN DECORATIVE WRAP. REFER TO STRUCTURAL TO
COORDINATE EXISTING STEEL COLUMNS TO BE DEMOLISHED OR
REMAIN. PROTECT EXISTING STEEL TO REMAIN FROM DEMOLITION
ACTIVITIES.
D20 DEMOLISH EXISTING INTERIOR PARTITION WALL, INCLUDING FLOOR
AND CEILING TRACKS AND ANCHORS.
D21 DEMOLISH ALL OR PORTION OF INTERIOR CMU WALL, INCLUDING
FURRING AND GYPSUM WALL BOARD AS REQUIRED FOR NEW WORK.
COORDINATE DEMOLITION WITH NEW WORK. DIMENSIONS INDICATED
ARE APPROXIMATE. ALL DIMENSIONS SHALL BE FIELD VERIFIED.
D22 DEMOLISH GLASS BLOCK AND ATTACHED INTERIOR PARTITION
WALLS INCLUDING FLOOR AND CEILING TRACKS AND ANCHORS.
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SD
SD
SD
SDSD
SD
SD SD
SD
SD
SD SD
SD SD
1 2
3 4 5 6 8
A
B
C
D
E
H
N
75.2 7.1 7.9
L.8
M
A050
A051
A040
A040
A040
D16 D16
D32
D16 D16 D25 D16
D16
D16
D16
D16
D16 D16
D16D16
D16
D16
D16
D16
D16
D16D16
D16
D16
D16
D25
D16
D25
D16
D25
D16
D25
D16
D25
D25
D25 D16
D16 D16
D16
D16 D16
D32 D4
D16
D16
D12
D32
D9 D32
D9
D32
D9
D9
D32
D9
D32
D9 D32 D9
D9
D29
D29
D29
D29
D29
D29
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
D16
D31
A.F.F.
EXISTING METAL SOFFIT
10' - 0 1/2"
D32
D32
D26
D26
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
DKFX 11-1122 A
"MC" WORK
A051
D50
D50
D50
D50
D50
D32
D50
D50
NOTE:
NOT ALL KEYNOTES ARE USED ON ALL SHEETS. THE INTENT OF THE
WORK REMAINS. REFER TO A000 FOR MASTER LIST.
SCOPE OF WORK LEGEND
THE SCOPE OF WORK IS DIVIDED INTO TWO SEPARATE DESIGNATIONS:
DKFX: 11-1122 A FOR ADD (MINOR CONSTRUCTION)
AND
DKFX: 11-1122 B FOR REPAIR
INDICATES WORK AS REQUIRED FOR - -
MINOR CONSTRUCTION (MC)
ALL OTHER WORK IS REPAIR
LEGEND & SYMBOLS
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE DEMOLISHED
EXISTING WINDOW TO REMAIN
EXISTING WINDOW TO BE DEMOLISHED
ROOM NAME & NUMBER
WORKING POINT
COLUMN GRID MARK
CENTERLINE
REVISION MARK1
Room Name A0000
EXISTING ITEM / AREA TO BE DEMOLISHED
2' X 2' ACT CEILING GRID SYSTEM
GYPSUM BOARD CEILING SYSTEM
PERFORATED METAL PANEL SOFFIT GLICK/BOEHM
CHARLESTON
NO. B-80006 T
CE
TIHCRADER
ET
SI
G E
R
TH CARO
LIN
A
S
TA
TE
OF
SOU
& ASSOCIATES, INC.
G
E W
BAIR AS
I N62 8T H
IR
A D
MAN
COM
MO
IT Y
B I L
SEAL AREA
OFSHEET
DA
TE
P R E P
B Y
A P P R 'D
RECORD DRAWING DATE
DRAWING SIZE:
PROJECT NO.
DE
PA
RT
M
EN
T
OF
T
HE
A
IR
F
OR
C E
AI
R M
OB
IL
IT
Y C
OM
M
AN
D
R E V
D A
TE
D E S C R
IP
TI
O N
D R A W
IN
G
R E V
IS
IO
N S
CH
K B
Y:
DR
AW
N
BY
DS
GN
BY
SU
PV
CH
EN
GR
GL
IC
K/
BO
EH
M
AS
SO
CI
AT
ES
, IN
C
3 K
IN
G
ST
RE
ET
, S
UI
TE
CH
AR
LE
ST
ON
, S
C
JO
IN
T B A S E
C H A R
LE
S
TO
N
A B
C H A R
LE
S
TO
N S C
ARCH30 E(30X42)
A020
DE
M
OL
IT
IO
N
C
EI
LI
NG
P
LA
N
N
OR
TH
S
ID
E
GB
KR
S
SM
/30
/20
AD
D/
RE
PA
IR
P
AS
SE
NG
ER
T
ER
M
IN
AL
B
UI
LD
IN
G
DKFX:11-1122 A / B
N
KEYLAN NOT TO SCALE
NORTH
SIDE
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"A040 A020
1 DEMOLITION CEILING PLAN - NORTH SIDE
DEMOLITION PLAN NOTES
1 REFER TO G111 FOR GENERAL PROJECT NOTES
2 REFER TO A003 FOR GENERAL DEMOLITION NOTES.
3 REFER TO…