Attachment 14 Addendum 3 dated 9 February 2016 for Solicitation FA4418-16-R-0002 - Add/Repair Passenger Terminal Bldg. 164
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #3
To
Project: DKFX 11-1122 A/B
Add/Repair Passenger Terminal, Building 164
Joint Base Charleston (Air Base)
South Carolina
09 February 2016
1. SPECIFICATION 01 30 00 ADMINSTRATIVE REQUIREMENTS:
DELETE
1.6 SUPERVISION: Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a
Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
REPLACE WITH
1.6 SUPERVISION: Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a
Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.
1.6.1 SUPERINTENDENT: Superintendent must have a minimum of 5 years experience as a project manager, project engineer, superintendent, or quality control manager on projects similar in size, scope and complexity to this project. The project superintendent is subject to removal by the
Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion. Furthermore, the Contracting Officer may issue an order stopping work on all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop work orders shall be made the subject of a claim for extension of time for excess costs or damages by the contractor. Approval of the project superintendent is required prior to the start of construction. Provide a resume for the proposed superintendent describing their experience with references and qualifications to the contracting officer for approval. The contracting officer reserves the right to interview the proposed project superintendent at any time in order to verify the submitted qualifications.
1.6.1.1 The Superintendent cannot also hold position of Quality Control Manager or Site Safety and
Health Officer .
1.6.1.2 The Superintendent may also hold the position of Environmental Manager, if qualified.
2. Specification 01 35 26: Delete Section 1.6.1.1.1 Contractor Quality Control (QC) Person
3. Specification 01 35 40.00 20: Add 1.5.3 DUAL ROLE: The Environmental Manager can be the
Superintendent or the Quality Control Manager.
Attachment #14 Add/Repair Passenger Terminal, Bldg 164 FA4418-16-R-0002
4. Specification 01 45 00Section 1.4 QC Program Requirements: Delete the sentence “The QC
Manager shall report to the Project Superintendent.”
5. Drawings E020 and E102: Delete requirement for 60A, 2P Breaker in spaces 40, 42.
6. Drawing E021: Contractor shall provide 3-phase breaker with size as indicated on Conveyor
Drawings for outbound baggage on Sheet E021, Panel MEP-2, Spaces 22, 24 and 26.
7. Drawing M002: Delete the requirement for acoustic duct lining downstream of the VAV boxes.
8. Drawing C30: Delete Keynote #12.
9. Signage Schedule: The signage Schedule and Legend detail the signs indicated with references to
UFC 3-120-01, February 6, 2003 edition. UFC 3-120-01 was updated in March 2014. Use the latest version.
10. Drawings: There is no sheet AVS02. Delete all references to Sheet AVS02.
11. Specifications: Add Specification 01 32 16.00 20 Project Schedule and Progress Documentation
12. Specifications: Delete Specification 01 32 17.00 20 Network Analysis Schedules (NAS); A NAS is not required for this project.
13. Specification Section 23 09 23 1.2.A: The second Section A rename to B. and shall read:
“Manufacturer of operator workstation software, controller software, custom application programming language, building controllers, custom application controllers, and application specific controllers will be Trane Tracer or government approved equal. Substitutions must be fully integrated and fully functional with base control architecture. All other products specified herein (i.e., sensors, valves, dampers, and actuators) need not be manufactured by theabove manufacturers.
14. Drawings IDS01and IDS02: Manufacturer of Intrusion Detection System shall be Advantor and
Arecont Vision or government approved equal. System must be fully integrated and fully functional with existing base security systems.
15. Drawing FP001: Delete Fire Protection General Note #8
16. Drawing FP001 Detail 3: Revise shop drawings to delete the double check valve and provide reduced pressure principle backflow assembly per Specification 21 13 13.00 2.2.10
17. Specification 09 90 00: Government will allow SSPC QP5 in lieu of SSPC QP1 certification.
18. Drawing A021: Delete Keynote D30 under the entry canopy.
19. Drawing A000: Revise New Construction Keynotes Master List #3 to read: BAGGAGE
HANDLING EQUIPMENT (BHE) SHALL BE COORDINATED BY PRIME CONTRACTOR.
REFER TO MEP DRAWINGS FOR REQUIREMENTS.
END OF ADDENDUM #3