Attachment__14_-_Addendum__3_dated_9_February_2016.pdf

PDF 103 KB Posted

Attached to
Add/Repair Passenger Terminal, Bldg. 164
Solicitation number
FA4418-15-R-0009
Issued by

About this file

Attachment 14 Addendum 3 dated 9 February 2016 for Solicitation FA4418-16-R-0002 - Add/Repair Passenger Terminal Bldg. 164

View the file

Other files

File Type Posted
Attachment__15_-_Spec_Section_01_32_16_00_20_dated_30_October_2013.pdf PDF
FA4418-16-R-0002-0003_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__3.pdf PDF
FA4418-16-R-0002_-_Add_Repair_Passenger_Terminal _Bldg_164_-_Questions_and_Answers.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__2.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Site_Visit_Minutes_-_Passenger_Terminal.pdf PDF
Attachment__1_-_Pre-proposal_Site_Visit_Record_of_Attendance.pdf PDF
Attachment__2_-_Pre-proposal_Site_Visit_Presentation.pdf PDF
Attachment__11_-_Asbestos_ _Lead_Report_dated_10_October_2012.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_2.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_1.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_3.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_5.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__1.pdf PDF
Attachment__12_-_Passenger_Terminal_OS-SWPPP_dated_2_October_2013.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_4.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Conference_Transportation_Instructions.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_13.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_7.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__4_-_SID_Schedule_dated_30_October_2013.pdf PDF
Attachment__6_-_Green_Procurement_Form_dated_15_July_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__3_-_FF E_Schedule_dated_30_October_2013.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_10.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_8.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_14.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_11.pdf PDF
Attachment__10_-_Addendum__2_dated_10_November_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_6.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_12.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_9.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_4.pdf PDF
Attachment__5_-_Wage_Determination_dated_22_May_2015.pdf PDF
FA4418-16-R-0002_Add_Repair_Passenger_Terminal _Bldg_164.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_5.pdf PDF
Attachment__7_-_Submittal_Register_dated_14_March_2014.pdf PDF
Attachment__9_-_Spec_Section_01_32_17_00_20_NAS_dated_30_October_2013.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_15.pdf PDF
Attachment__8_-_Addendum__1_dated_17_September_2014.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #3

To

Project: DKFX 11-1122 A/B

Add/Repair Passenger Terminal, Building 164

Joint Base Charleston (Air Base)

South Carolina

09 February 2016

1. SPECIFICATION 01 30 00 ADMINSTRATIVE REQUIREMENTS:

DELETE

1.6 SUPERVISION: Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a

Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.

REPLACE WITH

1.6 SUPERVISION: Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a

Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.

1.6.1 SUPERINTENDENT: Superintendent must have a minimum of 5 years experience as a project manager, project engineer, superintendent, or quality control manager on projects similar in size, scope and complexity to this project. The project superintendent is subject to removal by the

Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion. Furthermore, the Contracting Officer may issue an order stopping work on all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop work orders shall be made the subject of a claim for extension of time for excess costs or damages by the contractor. Approval of the project superintendent is required prior to the start of construction. Provide a resume for the proposed superintendent describing their experience with references and qualifications to the contracting officer for approval. The contracting officer reserves the right to interview the proposed project superintendent at any time in order to verify the submitted qualifications.

1.6.1.1 The Superintendent cannot also hold position of Quality Control Manager or Site Safety and

Health Officer .

1.6.1.2 The Superintendent may also hold the position of Environmental Manager, if qualified.

2. Specification 01 35 26: Delete Section 1.6.1.1.1 Contractor Quality Control (QC) Person

3. Specification 01 35 40.00 20: Add 1.5.3 DUAL ROLE: The Environmental Manager can be the

Superintendent or the Quality Control Manager.

Attachment #14 Add/Repair Passenger Terminal, Bldg 164 FA4418-16-R-0002

4. Specification 01 45 00Section 1.4 QC Program Requirements: Delete the sentence “The QC

Manager shall report to the Project Superintendent.”

5. Drawings E020 and E102: Delete requirement for 60A, 2P Breaker in spaces 40, 42.

6. Drawing E021: Contractor shall provide 3-phase breaker with size as indicated on Conveyor

Drawings for outbound baggage on Sheet E021, Panel MEP-2, Spaces 22, 24 and 26.

7. Drawing M002: Delete the requirement for acoustic duct lining downstream of the VAV boxes.

8. Drawing C30: Delete Keynote #12.

9. Signage Schedule: The signage Schedule and Legend detail the signs indicated with references to

UFC 3-120-01, February 6, 2003 edition. UFC 3-120-01 was updated in March 2014. Use the latest version.

10. Drawings: There is no sheet AVS02. Delete all references to Sheet AVS02.

11. Specifications: Add Specification 01 32 16.00 20 Project Schedule and Progress Documentation

12. Specifications: Delete Specification 01 32 17.00 20 Network Analysis Schedules (NAS); A NAS is not required for this project.

13. Specification Section 23 09 23 1.2.A: The second Section A rename to B. and shall read:

“Manufacturer of operator workstation software, controller software, custom application programming language, building controllers, custom application controllers, and application specific controllers will be Trane Tracer or government approved equal. Substitutions must be fully integrated and fully functional with base control architecture. All other products specified herein (i.e., sensors, valves, dampers, and actuators) need not be manufactured by theabove manufacturers.

14. Drawings IDS01and IDS02: Manufacturer of Intrusion Detection System shall be Advantor and

Arecont Vision or government approved equal. System must be fully integrated and fully functional with existing base security systems.

15. Drawing FP001: Delete Fire Protection General Note #8

16. Drawing FP001 Detail 3: Revise shop drawings to delete the double check valve and provide reduced pressure principle backflow assembly per Specification 21 13 13.00 2.2.10

17. Specification 09 90 00: Government will allow SSPC QP5 in lieu of SSPC QP1 certification.

18. Drawing A021: Delete Keynote D30 under the entry canopy.

19. Drawing A000: Revise New Construction Keynotes Master List #3 to read: BAGGAGE

HANDLING EQUIPMENT (BHE) SHALL BE COORDINATED BY PRIME CONTRACTOR.

REFER TO MEP DRAWINGS FOR REQUIREMENTS.

END OF ADDENDUM #3