Pre-proposal Conference Site Visit Attachment 2 PowerPoint Presentation for Solicitation FA4418-16-R-0002 - Add/Repair Passenger Terminal Bldg. 164
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOINT BASE CHARLESTON
Add/Repair Passenger Terminal, Bldg 164
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
Solicitation: FA4418-16-R-0002
12 January 2016
Agenda
Introductions
Emergency Procedures, Rest Rooms
Contracting Solicitation Review
Civil Engineer Project Review
Preliminary Questions
Proceed to Site SSgt Brittany Kempton
628 CONS/LGCB
843-963-5178
E-mail: brittany.kempton@us.af.mil
In the case of an emergency and evacuation is necessary, exit the conference room and proceed to the nearest Exit. Everyone will gather in the parking lot across the street.
Rest Rooms
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
Contracting Solicitation Review
• 100% Total Small Business Set-Aside
• Project: DKFX 11-1122-A/B & DKFX 15-1011 (FIRM FIXED PRICE)
Formerly solicited as FA4418-15-R-0009
• “FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT. NO AWARD WILL BE
MADE UNDER THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT
RESERVES THE RIGHT TO CANCEL THIS SOLICITATION, EITHER BEFORE OR AFTER
THE CLOSING DATE. IN THE EVENT THE GOVERNMENT CANCELS THIS SOLICITATION,
THE GOVERNMENT HAS NO OBLIGATION TO REIMBURSE AN OFFEROR FOR ANY
COSTS.”
• All amendments to the Solicitation will be posted on FedBizOpps
(www.fbo.gov)
• Please submit any questions in writing to:
brittany.kempton@us.af.mil
Questions in writing deadline is 2:00 PM EST on 15 January 2016
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
• Proposals Due No Later Than 2:00 PM EST on 28 Jan 16
Referenced in Block 13a of Solicitation
Mail or Hand deliver
Hand carrier – Expect delays “ALWAYS”
Mail – Do not rely on United States Postal Service
Use FedEx, UPS, or any other door to door service company
• Faxed or Emailed Proposals will NOT be accepted
Faxed Modifications or Revisions Only
• Specifications & Drawings to the Solicitation
Referenced under Section J of Solicitation
Located on FedBizOpps
• All badge procedures will apply to this project
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
Section C – Bonds
Referenced under Section C page 11 of Solicitation
PERFORMANCE AND PAYMENT BOND REQUIREMENTS
(IAW FAR 28.101-2 and FAR 28.102-3)
PROPOSAL BOND: The offeror shall submit a Proposal Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government. Proposal Bond, in the amount of 20 percent (20%) of the proposal price. The Proposal Bond penalty may be expressed in terms of a percentage of the proposal price or may be expressed in dollars and cents.
The contractor shall submit a Performance Bond (Standard Form 25) and a Payment Bond (Standard
Form 25-A) with good and sufficient surety and sureties to the Government within 15 days of award.
The penal sum of such bonds will be as follows:
PERFORMANCE BOND: The penal amount of the performance bonds shall equal one hundred percent (100%) of the contract price.
PAYMENT BOND: The penal amount of the payment bonds shall equal one hundred percent
(100%) of the contract price.
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
Project Time Allowed
Referenced clauses on page 17 of Solicitation
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 499 calendar days. The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $222.00 for each calendar day of delay until the work is completed or accepted.
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
WHAT TO SUBMIT TO CONTRACTING
(Section L)
• Signed Copy - blocks 14 through 20 of SF 1442 and all amendments acknowledging you have received, reviewed, and understand them
• The Schedule, Section B – Price
• Proposal/Bid Bond - 20% of offer
• Fill-ins and certifications in Sections I through K
• Past Performance Information
• If applicable, provide a letter from the Small Business
Administration (SBA) showing proof of HUBZone or Section
8(a) status.
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
Past Performance Information (Section M):
• Past Performance must be recent and relevant
• Performance/Price Trade-Off procedures apply
M001. BASIS FOR CONTRACT AWARD: This is a competitive best value source selection in which competing offerors' past performance history will be evaluated on a basis significantly more important than cost or price considerations. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. All offers shall be treated equally except for their prices and performance records. (Failure to meet a requirement may result in the removal from competition or an offer may not be considered). Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The evaluation process shall proceed as follows:
A. Price Evaluation. Initially offers shall be ranked according to total proposed price for the Base Bids (CLINs
0001 - 0005) and Bid Options (CLINs 0006 - 0014). An offeror’s proposed prices will be determined by multiplying the quantities identified in Section B, Price Schedule, by the proposed unit price for each Line
Item to confirm the extended amount for each. The extended amounts will be added together to determine the total evaluated price. Offerors whose total evaluated price is unreasonable (in accordance with FAR 15.404 and FAR 31.201-3), unbalanced (in accordance with FAR 15.404-1), or unaffordable (not within any budgetary information included in the solicitation) may not be considered for award. A Statutory Cost Limitation of
$1,000,000 applies to the total of “minor construction” line items awarded under each project number respectively (Project DKFX 11-1122-A/B: CLINs 0001, 0006, and 0007; Project DKFX 15-1011: CLIN 0004). A
Contractor’s offer may be found unacceptable if it exceeds 90% of the Statutory Cost Limitation ($900,000).
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
B. Performance Confidence Assessment. The contracting officer shall seek recent and relevant performance information on the lowest priced offeror based on (1) the past efforts provided by the offeror and (2) data independently obtained from other Government and commercial sources.
C. Relevant performance includes performance of efforts involving building renovations, addition, or repair that are similar or greater in scope, magnitude and complexity than the effort described in this solicitation.
The purpose of the past performance evaluation is to allow the Government to assess the offeror’s ability to perform the effort described in this RFP, based on the offeror’s demonstrated past performance. The assessment process will result in an overall performance confidence assessment of Substantial Confidence, Satisfactory Confidence, Limited Confidence, No Confidence, or Unknown Confidence, as defined in DoD
Source Selection Procedures, Table 5. Past performance regarding predecessor companies, key personnel who have relevant experience, or sub-contractors that will perform major or critical aspects of the requirement will not be considered as highly as past performance information for the principal offeror. Offerors with no relevant past performance history shall receive the rating "Unknown Confidence," meaning the rating is treated neither favorably nor unfavorably (neutral).
D. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this RFP.
E. If the lowest priced offeror is judged to have a “Substantial Confidence” performance confidence assessment, that offer represents the best value for the Government and the evaluation process stops at this point. Award shall be made to that offeror without further consideration of any other offers.
Joint Base Charleston (AB), SC
Pre-proposal Conference & Site Visit
F. If the lowest priced offeror is not judged to have a “Substantial Confidence” performance confidence assessment, the next lowest priced offeror will be evaluated and the process will continue (in order by price) until an offeror is judged to have a “Substantial Confidence” performance assessment or until all offerors are evaluated. The Source Selection Authority shall then make an integrated assessment best value award decision.
G. Offerors are cautioned to submit sufficient information and in the format specified in Section L. Offerors may be asked to clarify certain aspects of their proposal (for example, the relevance of past performance information) or respond to adverse past performance information to which the offeror has not previously had an opportunity to respond. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system. Communication conducted to resolve minor or clerical errors will not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for proposal revision.
H. The Government intends to award a contract without discussions with respective offerors. The
Government, however, reserves the right to conduct discussions if deemed in its best interest. If, during the evaluation period, it is determined to be in the best interest of the government to hold discussions, offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. If the offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the Final Proposal Revision are subject to evaluation and may introduce risk that the offeror’s proposal be determined unacceptable and ineligible for award.
CLIN Structure:
• Statutory Limitation for Minor Construction - $1M
• DKFX 11-1122A/B - CLINs 0001, 0006, & 0007
• DKFX 15-1011 - CLIN 0004
• 5 Base Bids & 9 Bid Options
• Base Bid CLINs 0001-0005 will be awarded initially
• Bid Option CLINs 0006-0014 will be awarded based on funds availability
• Depending on funding received, the Government will award all, some, or none of the Bid Option CLINs
CLIN Description CLIN Type
0001 Base Bid (MC) – Bldg 164 Addition FFP
0002 Base Bid (Repair) – Bldg 164 Repair FFP
0003 Base Bid (Repair) – Estimated Quantity - Roofing FFP
0004 Base Bid (MC) – Temporary Facilities Sitework FFP
0005 Base Bid – Provide Temporary Facilities FFP
0006 Bid Option #1 - Bid Alt. #1 (MC) – Drop Off Loop FFP
0007 Bid Option #2 - Bid Alt. #3 (MC) – Play Area FFP
0008 Bid Option #3 – Ancillary Item #1 - FF&E FFP
0009 Bid Option #4 – FF&E Play Area Equip. FFP
0010 Bid Option #5 – FF&E Play Area Furniture FFP
0011 Bid Option #6 – Ancillary Item #2 - Baggage Handling Equip FFP
0012 Bid Option #7 – Ancillary Item #3 - Intrusion Detection Sys FFP
0013 Bid Option #8 – Ancillary Item #4 - Audio Visual System FFP
0014 Bid Option #9 – Ancillary Item #5 - Wi-Fi FFP
Joint Base Charleston (AB), SC
Civil Engineer Project Review – Mr. David Caimbeul