Attachment__7_-_Submittal_Register_dated_14_March_2014.pdf

PDF 1 MB Posted

Attached to
Add/Repair Passenger Terminal, Bldg. 164
Solicitation number
FA4418-15-R-0009
Issued by

About this file

Attachment 7 - Submittal Register dated 14 March 2014 for Solicitation FA4418-16-R-0002 Add/Repair Passenger Terminal Bldg 164.

View the file

Other files

File Type Posted
Attachment__15_-_Spec_Section_01_32_16_00_20_dated_30_October_2013.pdf PDF
Attachment__14_-_Addendum__3_dated_9_February_2016.pdf PDF
FA4418-16-R-0002-0003_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__3.pdf PDF
FA4418-16-R-0002_-_Add_Repair_Passenger_Terminal _Bldg_164_-_Questions_and_Answers.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__2.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Site_Visit_Minutes_-_Passenger_Terminal.pdf PDF
Attachment__1_-_Pre-proposal_Site_Visit_Record_of_Attendance.pdf PDF
Attachment__2_-_Pre-proposal_Site_Visit_Presentation.pdf PDF
Attachment__11_-_Asbestos_ _Lead_Report_dated_10_October_2012.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_2.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_1.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_3.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_5.pdf PDF
FA4418-16-R-0002-0001_Add_Repair_Passenger_Terminal _Bldg_164_-_Amendment__1.pdf PDF
Attachment__12_-_Passenger_Terminal_OS-SWPPP_dated_2_October_2013.pdf PDF
Attachment__13_-_Temp_Facility_Specs_dated_12_June_2015_-_Part_4.pdf PDF
FA4418-16-R-0002_-_Pre-proposal_Conference_Transportation_Instructions.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_13.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_7.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__4_-_SID_Schedule_dated_30_October_2013.pdf PDF
Attachment__6_-_Green_Procurement_Form_dated_15_July_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__3_-_FF E_Schedule_dated_30_October_2013.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_10.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_8.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_14.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_11.pdf PDF
Attachment__10_-_Addendum__2_dated_10_November_2015.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_6.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_12.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_2.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_3.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_9.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_4.pdf PDF
Attachment__5_-_Wage_Determination_dated_22_May_2015.pdf PDF
FA4418-16-R-0002_Add_Repair_Passenger_Terminal _Bldg_164.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_5.pdf PDF
Attachment__9_-_Spec_Section_01_32_17_00_20_NAS_dated_30_October_2013.pdf PDF
Attachment__1_-_Specifications_dated_30_October_2013_-_Part_1.pdf PDF
Attachment__2_-_Drawings_dated_30_October_2013_-_Part_15.pdf PDF
Attachment__8_-_Addendum__1_dated_17_September_2014.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% CORRECTED SUBMITTAL

SUBMITTAL REGISTER

ADD/REPAIR

PASSENGER TERMINAL,

BLDG. 164

AT

JOINT BASE CHARLESTON – AIR BASE

STATION, SOUTH CAROLINA

PROJECT No.: DKFX 11-1122 A/B

SUBMITTAL DATE: 14 MARCH 2014

ARCHITECTURE / PLANNING / INTERIOR DESIGN

493 King Street, Suite 100 Charleston, South Carolina 29403

Telephone: 843.577.6377 / Fax: 722.1768 Internet: www.glickboehmarchitecture.com

GBA Project No.: 1207

FA4418-16-R-0002 ADD/REPAIR PASSENGER TERMINAL, BLDG. 164 ATTACHMENT #7

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 81 PAGES

Tom Bone

JBC - REPAIR PASSENGER TERMINAL

01 30 00 SD-01 Preconstruction Submittals

1.3 GView location map

1.4 GProgress and completion pictures

SD-04 Samples

1.2 GColor boards

01 33 00 SD-01 Preconstruction Submittals

1.6 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 G AAccident Prevention Plan (APP)

1.8 G AActivity Hazard Analysis (AHA)

1.7.1 G ACrane Critical Lift Plan

1.6.1.3 G ACrane Operators

SD-06 Test Reports 1.12Notifications and Reports 1.12.2Accident Reports 1.12.3Crane Reports

SD-07 Certificates 1.9Confined Space Entry Permit 1.9Hot work permit

License Certificates

1.4 G AContractor Safety Self-Evaluation

Checklist Machinery & Mechanized Equipment Certification Form

01 35 40.00 20 SD-01 Preconstruction Submittals

1.8 GEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

FA4418-14-R-0022 ADD/REPAIR PASSENGER TERMINAL, BLDG. 164 ATTACHMENT #7

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 35 40.00 20 1.9.1Instructor Qualifications SD-06 Test Reports

3.2Field Quality Control Reports SD-07 Certificates

1.6Environmental Regulatory Requirements

SD-08 Manufacturer’s Instructions 1.7.1Material Safety Data Sheets

SD-11 Closeout Submittals 1.9.3Training Program 3.1Protection of Natural Resources

01 45 00 SD-01 Preconstruction Submittals GCertificates of insurance GSurety bonds GList of proposed subcontractors GList of proposed products GConstruction Progress Schedule GSchedule of prices GHealth and safety plan GWork plan GQuality control plan GEnvironmental protection plan

SD-02 Shop Drawings GShop Drawings

SD-03 Product Data GProduct Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 45 00 SD-04 Samples GSamples

SD-05 Design Data GDesign Data

SD-06 Test Reports GTest Reports GInvestigation reports GDaily checklists GFinal acceptance test and operational test procedure SD-07 Certificates

GConfined space entry permits SD-08 Manufacturer’s Instructions

GMaterial Safety Data SD-09 Manufacturer’s Field Reports

GFactory test reports SD-10 Operation and Maintenance Data

GMaintenance Manuals SD-11 Closeout Submittals

GAs-built Drawings 01 45 35 SD-07 Certificates

1.5 GSpecial Inspector

1.4 GQuality Control Plan

01 50 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 50 00 1.4 GConstruction site plan

3.3.1 GTraffic control plan

SD-06 Test Reports

2.2.5 GBackflow Preventer Tests

SD-07 Certificates

1.5.1 GBackflow Tester

01 50 10 SD-01 Preconstruction Submittals GCertificates of insurance GSurety bonds GList of proposed subcontractors GList of proposed products GConstruction Progress Schedule GSchedule of prices GHealth and safety plan GWork plan GQuality control plan GEnvironmental protection plan

SD-02 Shop Drawings GShop Drawings

SD-03 Product Data GProduct Data

SD-04 Samples GSamples

SD-05 Design Data GDesign Data

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 50 10 GTest Reports GInvestigation reports GDaily checklists GFinal acceptance test and operational test procedure SD-07 Certificates

GConfined space entry permits SD-08 Manufacturer’s Instructions

GMaterial Safety Data SD-09 Manufacturer’s Field Reports

GFactory test reports SD-10 Operation and Maintenance Data

GMaintenance Manuals SD-11 Closeout Submittals

GAs-built Drawings Item Requiring Submittal

01 57 19.00 25 SD-01 Preconstruction Submittals

1.5.1 GPreconstruction Survey

3.4 GSolid Waste Management Plan

and Permit

1.5.2 GRegulatory Notifications

3.1 GEnvironmental Management Plan

3.2.2.1 GStorm Water Pollution Prevention

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 57 19.00 25 3.2.2.1 GStorm Water Notice of Intent (for NPDES coverage under the general permit for construction activities)

3.14.1 GDirt and Dust Control Plan

3.6 GContractor Hazardous Material

Inventory Log SD-06 Test Reports

3.15.2 GDisposal Requirements

3.2.2 GErosion and Sediment Control

Inspection Reports

3.2.2 GStorm Water Inspection Reports

for General Permit

1.5.5 GContractor 40 CFR employee

training records

3.4.1 GSolid Waste Management Report

SD-11 Closeout Submittals

3.2.2.2 GStorm Water Pollution Prevention

Plan compliance notebook

3.5 GWaste Determination

Documentation

3.6.1 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 GContractor 40 CFR Employee

Training Records

3.4 GSolid Waste Management Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 57 19.00 25 3.4.1 GSolid Waste Management Report

3.6 GContractor Hazardous Material

Inventory Log

3.13.2 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

01 57 20 SD-01 Preconstruction Submittals GCertificates of insurance GSurety bonds GList of proposed subcontractors GList of proposed products GConstruction Progress Schedule GSchedule of prices GHealth and safety plan GWork plan GQuality control plan GEnvironmental protection plan

SD-02 Shop Drawings GShop Drawings

SD-03 Product Data GProduct Data

SD-04 Samples GSamples

SD-05 Design Data GDesign Data

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 57 20 GTest Reports GInvestigation reports GDaily checklists GFinal acceptance test and operational test procedure SD-07 Certificates

GConfined space entry permits SD-08 Manufacturer’s Instructions

GMaterial Safety Data SD-09 Manufacturer’s Field Reports

GFactory test reports SD-10 Operation and Maintenance Data

GMaintenance Manuals SD-11 Closeout Submittals

GAs-built Drawings 01 74 19.00 25 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records 01 78 00 SD-03 Product Data

1.2.2As-Built Record of Equipment and Materials

1.6.1Warranty Management Plan 1.6.2Warranty Tags

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

01 78 00 1.3Spare Parts Data SD-08 Manufacturer’s Instructions

1.4Preventative Maintenance 1.4Condition Monitoring (Predictive

Testing) 1.4Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.7Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.2.1Record Drawings

1.5 GCertification of EPA Designated

Items 02 41 00 SD-01 Preconstruction Submittals

1.10 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

SD-11 Closeout Submittals 3.3.4Receipts

02 82 16.00 20 SD-03 Product Data 3.1.4Local exhaust equipment 3.1.5Vacuums 3.1.1.1Respirators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

02 82 16.00 20 3.1.4Pressure differential automatic recording instrument

1.2.2Amended water 1.3.8Material Safety Data Sheets

(MSDS) for all materials 2.1Encapsulants

SD-06 Test Reports Air sampling results

1.5.6Pressure differential recordings for local exhaust system

3.3.3.2Asbestos disposal quantity report Encapsulation test patches

3.2.6.3Clearance sampling SD-07 Certificates

1.3.9Asbestos hazard abatement plan 1.3.10Testing laboratory 1.5.1Private qualified person documentation 1.5.4Contractor's license 1.5.2Competent person 1.5.3Worker's license 1.3.11Landfill approval 1.3.3Employee training 1.3.12Medical certification 1.3.11Waste shipment records 1.3.6Respiratory Protection Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

02 82 16.00 20 1.3.11Delivery tickets 3.1.5Vacuums 3.1.2.3Water filtration equipment 3.1.5Ventilation systems 3.1equipment used to contain airborne asbestos fibers 2.1encapsulants

Notifications SD-11 Closeout Submittals Notifications

1.6.1Rental equipment 1.3.6.1Respirator program records

Permits and licenses 1.5.7Protective clothing decontamination quality control records

1.5.8Protective clothing decontamination facility notification

02 82 33.13 20 SD-03 Product Data 1.6.4Vacuum Filters 1.6.1Respirators

SD-06 Test Reports 1.5.2.3sampling results 1.5.2.3Occupational and Environmental

Assessment Data Report SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

02 82 33.13 20 1.5.1.1Qualifications of CP 1.5.1.3Testing Laboratory

Occupant Notification 1.5.1.2Training Certification 3.1.1.1Notification of the

Commencement of LBP Hazard Abatement

1.5.1.4Third Party Consultant Qualifications

1.5.3lead-based paint/paint with lead removal/control plan

1.6.3Rental equipment notification 1.5.2.6Respiratory Protection Program 1.5.2.7Hazard Communication Program

EPA and SCDHEC, Bureau of Solid Waste Management approved hazardous waste treatment, storage, or disposal facility

1.5.2.8Lead Waste Management Plan 1.6.4Vacuum filters 3.5.1.1Clearance Certification

SD-11 Closeout Submittals 3.5.2.1hazardous waste manifest 1.5.2.4Medical Examinations 1.5.1.2Training Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

02 82 33.13 20 turn-in documents or weigh tickets

03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler 2.3Sealant

03 20 00.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-03 Product Data 1.3.1Welding

SD-07 Certificates 2.3Reinforcing Steel 1.3.2Qualification of Steel Bar

Butt-Splicers 03 30 00 SD-03 Product Data

2.4.7Materials for curing concrete 2.4.1Cement 2.4.1.2Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor retarder and Vapor barrier 2.5Bonding Materials 2.3.3Concrete Curing Materials

SD-05 Design Data

2.3.1 Gmix design

SD-06 Test Reports

1.6.2.1 GConcrete mix design

1.6.2.2Fly ash

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

03 30 00 1.6.2.2Pozzolan 1.6.2.3Ground granulated blast-furnace slag 3.11.2.3Compressive strength tests 3.11.2.4Air Content 2.6.4Slump 2.6.1Air Entrainment

03 30 53 SD-02 Shop Drawings 1.5Installation Drawings

SD-03 Product Data 2.1.3.1Air-Entraining Admixtures 2.2Air-Entraining Admixtures 2.1.3.2Accelerating Admixtures 2.2Accelerating Admixtures 2.1.3.3Water-Reducing or Retarding

Admixture 2.1.10Curing Materials 2.1.6Expansion Joint Filler Strips, Premolded 2.1.7Joint Sealants - Field Molded

Sealants 2.2Ready-Mix Concrete 2.2Mix Design Data 2.2Fly Ash 2.5.1Curing Compound

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

03 30 53 2.1.2Aggregates 1.3.3Concrete Mixture Proportions 3.11Compressive Strength Testing 3.11Slump

SD-07 Certificates 2.1.1Cementitious Materials 2.1.2Aggregates

03 37 13 SD-06 Test Reports

2.2 GMixture Proportions

2.1.2Aggregates

2.1.4 GAccelerator Compatibility

1.4.2Preconstruction Test Panels

SD-07 Certificates 2.1.1.1Portland Cement 2.1.1.3Pozzolans 2.1.4Accelerating Admixtures 2.1.5Curing Materials

1.4.1 G AEQualifications

04 20 00 SD-02 Shop Drawings

1.4.4 GDetail Drawings

SD-04 Samples

2.4 GConcrete Masonry Units (CMU)

GCast Stone Items

2.2 GClay or Shale Brick

2.10 GAnchors, Ties, and Bar

Positioners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

04 20 00 2.14 GExpansion-Joint Materials

2.11 GJoint Reinforcement

SD-05 Design Data

2.8.4 GPre-mixed Mortar

1.2.2.1 GUnit Strength Method

SD-06 Test Reports

3.20.3 GEfflorescence Test

3.20.1 GField Testing of Mortar

3.20.2 GField Testing of Grout

2.8.3 GMasonry Cement

GMasonry Inspector Qualifications SD-07 Certificates

2.2Clay or Shale Brick 2.4Concrete Masonry Units (CMU) 2.10Anchors, Ties, and Bar

Positioners 2.14Expansion-Joint Materials 2.11Joint Reinforcement 2.8.3Masonry Cement

Insulation 2.5Precast Concrete Items 2.8.1Admixtures for Masonry Mortar 2.9.1Admixtures for Grout 1.4.2Contamination

SD-08 Manufacturer’s Instructions 2.8.3Masonry Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

05 05 23 SD-03 Product Data

1.5 GWelding Procedure Qualifications

1.5.5Welder, Welding Operator, and

Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination

05 12 00 SD-02 Shop Drawings

1.6.1 G AEFabrication drawings

SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.4Load indicator washers 2.3.2Non-Shrink Grout

SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.5Galvanizing 1.4AISC Quality Certification

05 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

05 30 00 1.3.5Fabrication Drawings 2.3.1.1Cant Strips 2.3.1.2Ridge and Valley Plates 2.3.1.3Metal Closure Strips

SD-03 Product Data 2.2Accessories 2.1.6Galvanizing Repair Paint 2.2.8Mechanical Fasteners 1.3.2Powder-Actuated Tool Operator 2.3.5Repair Paint 2.1.8Sound Absorbing Material 1.3.3Welder Qualifications 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-05 Design Data 2.3.1Roof Deck

SD-07 Certificates 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance

05 40 00 SD-02 Shop Drawings

1.5.1 GFraming Components

SD-03 Product Data 2.1studs,joists

SD-05 Design Data

1.5.2 G AEMetal framing calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

05 40 00 SD-07 Certificates 3.1.1Welds

05 51 33 SD-02 Shop Drawings 2.3Ladders

SD-03 Product Data 2.3Ladders

06 10 00 SD-06 Test Reports 1.4.2Preservative-treated

SD-07 Certificates 1.7Preservative treatment

06 20 00 SD-02 Shop Drawings 1.3Detail Drawings

SD-03 Product Data GWood

SD-04 Samples GMoldings GFascias and Trim

SD-07 Certificates 1.4Certificates of grade 1.4Certificates of compliance

06 41 16.00 10 SD-02 Shop Drawings 1.4.2Shop Drawings 2.11Shop Drawings 3.1Installation

SD-03 Product Data 2.1Wood Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

06 41 16.00 10 Wood Finishes 2.11.7.3Finish Schedule

Certification SD-04 Samples

2.4Plastic Laminates 2.7Cabinet Hardware

SD-07 Certificates 1.4Quality Assurance 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

1.5.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid polymer material 1.5.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

2.3.4 GCounter and Vanity Tops

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

06 61 16 3.2Clean-up SD-11 Closeout Submittals LEED Documentation

07 11 13 SD-07 Certificates 1.3Materials

07 21 16 SD-03 Product Data 2.1Blanket insulation 2.2Accessories

SD-08 Manufacturer’s Instructions 3.3.1Insulation

07 22 00 SD-02 Shop Drawings Wood nailers

SD-03 Product Data

2.3 GFasteners

2.1 GInsulation

2.1.2Recycled materials

SD-07 Certificates qualifications

SD-08 Manufacturer’s Instructions 2.3fasteners 2.1insulation

07 25 00 SD-03 Product Data GProduct Data

SD-08 Manufacturer’s Instructions GManufacturer's Printed

Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

07 41 13 SD-02 Shop Drawings

1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

1.4.5 GGutter/Downspout Assembly

SD-03 Product Data

2.1 GRoof panels

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GPressure Sensitive Tape

2.7 GUnderlayments

2.8 GGaskets and Sealing/Insulating

Compounds

1.4.5 GAluminized Steel Repair Paint

1.4.5 GEnamel Repair Paint

SD-04 Samples

2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GGaskets and Sealant/Insulating

Compounds SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

1.2.1.1 GLeakage Test Report

1.2.1.2 GWind Uplift Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

07 41 13 2.2 GFactory Finish and Color Performance Requirements

SD-07 Certificates

2.1 GRoof Panels

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

1.4.5 GINSTALLATION MANUAL

SD-09 Manufacturer’s Field Reports

3.10.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.11 GInformation Card

GDate Of Installation Wall-Mounted Placard

07 42 63 SD-01 Preconstruction Submittals 1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.4.1Qualifications for Welding Work

SD-02 Shop Drawings 1.5.1Fabrication and Installation drawings 1.5.1Wall Panel Assemblies 1.5.1Flashing and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

07 42 63 1.5.1Anchorage Systems SD-03 Product Data

1.5.1sustainable acquisition 1.5.1Manufacturer's catalog data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 2.5.3.1Sealants and Caulking 1.5.1Rated Wall Assembly

Galvanizing Repair Paint Enamel Repair Paint Aluminized Steel Repair Paint

1.5.1Accessories SD-04 Samples

1.5.1Wall Panel Assemblies 1.5.1Fasteners 1.5.1Metal Closure Strips 1.5.1Insulation 1.5.1manufacturer's color charts and chips SD-05 Design Data

1.5.1wind design analysis SD-06 Test Reports

3.7.2Leakage Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

07 42 63 1.3.2wind load tests 1.3.2seismic tests 1.5.1Factory Color Finish

SD-07 Certificates 1.5.1Fasteners

Galvanizing Repair Paint Enamel Repair Paint

1.5.3Qualification of Manufacturer 1.5.4Qualification of Installer 1.5.1wall system assembly wind load and fire rating classification listings SD-08 Manufacturer’s Instructions

1.5.1Installation of Wall panels SD-11 Closeout Submittals Warranty

1.5.1Instructions 1.5.1Material Safety Data Sheets

1.5.120 year 'No-Dollar-Limit' warranty

07 60 00 SD-02 Shop Drawings

3.1.14 GGutters

3.1.15 GDownspouts

3.1.12 GGravel stops and fascias

3.1.10 GCounterflashing

3.1.18 GFlashing at roof penetrations

3.1.11 GReglets

3.1.13 GDrip edge

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

07 60 00 3.1.16 GOpen valley flashing

3.1.17 GEave flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.2Accessories

SD-03 Product Data

2.1 GDoors

2.4 GFrames

2.2Accessories

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

2.2Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 14 00 1.4warranty SD-04 Samples

2.1Doors GDoor finish colors

08 33 23 SD-02 Shop Drawings

2.4 GOverhead Coiling Doors

1.4 GCounterbalancing Mechanism

2.6 GCounterbalancing Mechanism

1.4 GElectric Door Operators

2.7 GElectric Door Operators

2.4.3 GBottom Bars

1.3 GGuides

2.6.1 GMounting Brackets

2.4.8 GOverhead Drum

1.4 GHood

1.4 GPainting

1.3 GInstallation Drawings

SD-03 Product Data

2.4 GOverhead Coiling Doors

2.5 GHardware

1.4 GCounterbalancing Mechanism

2.6 GCounterbalancing Mechanism

1.4 GElectric Door Operators

2.7 GElectric Door Operators

SD-05 Design Data

2.4 GOverhead Coiling Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 33 23 2.5 GHardware

1.4 GCounterbalancing Mechanism

2.6 GCounterbalancing Mechanism

1.4 GElectric Door Operators

2.7 GElectric Door Operators

SD-10 Operation and Maintenance Data

3.3 GOperation and Maintenance

Manuals

1.4 GMaterials

1.4 GDevices

1.4 GProcedures

1.4 GManufacture's Brochures

1.4 GParts Lists

3.2.2 GCleaning

08 39 54 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

1.2 GDoor Description

1.2.1 GDesign Requirements

3.3Manufacturer's Field Service

SD-06 Test Reports

3.2 GTests

2.6Tests, Inspections, and

Verifications GFire Rating Test and Inspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 39 54 2.6.1 GPrototype Static Test

2.6.2 GPrototype Blast Test

SD-07 Certificates

2.1 GMaterials

2.4.3 GThermal Insulation

GSound Rating Test SD-10 Operation and Maintenance Data

1.2Door Description 08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GListing of Product Installations

SD-02 Shop Drawings

1.2.1 GInstallation Drawings

1.2.1 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

SD-07 Certificates

3.4 GManufacturer's Product Warranty

08 42 29.43 SD-02 Shop Drawings GSliding Automatic Entrances

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 42 29.43 WARNING: Text in tags exceeds the maximum length of 300 characters

SD-03 Product Data Manufacturer's Catalog Data; G

SD-04 Samples Finish and Color Samples; G

SD-08 Manufacturer’s Instructions GSubmit detailed instructions for installation, adjustments, cleaning and maintenance

SD-10 Operation and Maintenance Data

GImpact Rated Sliding Automatic Entrance Doors

08 42 29.53 SD-02 Shop Drawings GSliding Automatic Entrances

WARNING: Text in tags exceeds the maximum length of 300 characters

SD-03 Product Data Manufacturer's Catalog Data; G

SD-04 Samples Finish and Color Samples; G

SD-05 Design Data GEngineering Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 42 29.53 SD-08 Manufacturer’s Instructions GSubmit detailed instructions for installation, adjustments, cleaning and maintenance

SD-10 Operation and Maintenance Data

GBlast Resistant Sliding Automatic Entrance Doors

08 43 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GListing of Product Installations

SD-02 Shop Drawings

1.2.1 GInstallation Drawings

1.2.1 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-06 Test Reports

1.2.1 GCertified Test Reports

SD-07 Certificates

3.4 GManufacturer's Product Warranty

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.3.7Keying system

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 71 00 2.3 GHardware items SD-08 Manufacturer’s Instructions

3.1Installation SD-10 Operation and Maintenance Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

Installation SD-03 Product Data

1.6.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.6.1Insulating Glass

Impact Rated Glass Blast Resistant Glass Safety Glass Float Glass Glazing Compound

2.3.4Tape 2.3.1.1Sealant

SD-07 Certificates 1.6.1Insulating Glass

Impact Rated Glass Blast Resistant Glass

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

08 81 00 Safety Glass SD-08 Manufacturer’s Instructions

2.3Setting and sealing materials 3.2Glass setting

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data 2.1.7Cementitious backer units 2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board 2.1.2Water-Resistant Gypsum

Backing Board 2.1.4Glass Mat Covered or Reinforced

Gypsum Sheathing 2.1.4.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant Mold and Moisture Resistant Gypsum Board

2.1.5Impact Resistant Gypsum Board 2.1.12Accessories

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions Material Safety Data Sheets

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 29 00 Manufacturer maintenance instructions

3.7Waste Management 09 30 00 SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data

2.1 GTile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1.3 GAccessories

2.4 GGrout

SD-07 Certificates

2.1 GTile

2.4 GMortar, Grout, and Adhesive

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data Acoustical Ceiling Systems

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-07 Certificates 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 54 00 SD-02 Shop Drawings GShop Drawings

SD-03 Product Data GProduct Data

SD-04 Samples GSamples

SD-10 Operation and Maintenance Data

GMaintenance Manuals GMaintenance Materials

09 54 23 SD-02 Shop Drawings GShop Drawings

SD-03 Product Data GProduct Data

SD-04 Samples GSamples

SD-10 Operation and Maintenance Data

GMaintenance Manuals GMaintenance Materials

09 65 00 SD-02 Shop Drawings

2.9 GResilient Flooring and

Accessories SD-03 Product Data

2.9 GResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 65 00 2.5Adhesives SD-04 Samples

2.9 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance Data

2.9 GResilient Flooring and

Accessories

09 66 23 SD-02 Shop Drawings

1.2 GApproved Detail Drawings

2.5 GStrips

2.5.2 GControl Joint Strips

SD-03 Product Data 2.2Resin 3.2Mixing, Proportioning, and

Installation 3.3Cleaning and Sealing

SD-04 Samples 1.2Resinous Terrazzo Flooring

09 68 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 68 00 3.4 GInstallation

2.8 GMoldings

SD-03 Product Data

2.1 GCarpet

3.1 GSurface Preparation

3.4 GInstallation

SD-04 Samples

2.1 GCarpet

2.8 GMoldings

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

2.1 GCarpet

1.4 GRegulatory Requirements

SD-10 Operation and Maintenance Data

2.1 GCarpet

3.5 GCleaning and Protection

Maintenance Service 09 72 00 SD-03 Product Data

GWallcoverings and Accessories 2.3Primer and Adhesive

SD-04 Samples GWallcoverings and Accessories

SD-07 Certificates Wallcoverings and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 72 00 SD-08 Manufacturer’s Instructions Wallcoverings and Accessories

SD-10 Operation and Maintenance Data

GWallcoverings and Accessories 09 83 13 SD-02 Shop Drawings

2.1 GApproved Detail Drawings

SD-03 Product Data

3.2Installation

2.1 GAcoustical Wall Panels

SD-04 Samples

2.1 GAcoustical Wall Panels

SD-07 Certificates 2.1Acoustical Wall Panels

SD-11 Closeout Submittals LEED Documentation

09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil

SD-04 Samples

1.9 GColor

SD-07 Certificates 1.3Applicator's qualifications

SD-08 Manufacturer’s Instructions 3.3.1Application instructions 3.7.2Mixing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 90 00 1.7.2Manufacturer's Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1 GCoatings:

09 97 13.00 40 SD-01 Preconstruction Submittals

1.4Material, Equipment, and Fixture Lists

1.4Safety Plan SD-03 Product Data

2.1Abrasive Blasting Material 2.2Sealant Compound

Inorganic Zinc Inhibitive Polyamide Epoxy Aliphatic Polyurethane

SD-04 Samples 1.4Manufacturer's Standard Color

Charts 3.7Inspection Forms

SD-05 Design Data 1.4Mix Designs

Inorganic Zinc Inhibitive Polyamide Epoxy Aliphatic Polyurethane

SD-06 Test Reports 3.7Inspection reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 81 PAGES

JBC - REPAIR PASSENGER TERMINAL

09 97 13.00 40 SD-07 Certificates 2.1Abrasive Blasting Material 2.2Sealant Compound

Inorganic Zinc Coating Inhibitive Polyamide Epoxy Aliphatic Polyurethane

SD-08 Manufacturer’s Instructions 2.3Protective Coatings

10 21 13 SD-02 Shop Drawings 1.2Fabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data 1.2Cleaning and Maintenance

Instructions 2.1.1Anchoring…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .