Solicitation - FA303024R0004.pdf
PDF 1 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER-IDIQ) Federal contract opportunity
- Solicitation number
- FA303024R0004
About this file
This document is a Solicitation for a Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract at Goodfellow Air Force Base in Texas. The contract has a base period of one year plus four one-year option periods, with a guaranteed minimum value of $750,000 and a maximum value of $25 million over the life of the contract. The work consists of a broad range of maintenance, repair, alteration, and minor construction on real property at Goodfellow AFB and the Goodfellow AFB Recreation Camp. Pricing will be based on a unit price book using RSMeans data, with coefficients applied to cover the contractor's costs and profit. This solicitation is set-aside for certified 8(a) small businesses under NAICS code 236220. Proposals are due by 1pm CST on July 1, 2024. The agency is the Department of the Air Force, Air Education and Training Command.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
Goodfellow AFB FY24 SABER
Product Service Code: Z2JZ
FA303024R0004
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Additional Information/Notes
SUPPLIES AND SERVICES
(a) Bare Cost Total in the current year's RS Means (Computerized Pricing Guide - CPG) cost estimating database compatible with e4Clicks Premier and Assemblies, Facilities and Master Composite (e4Clicks P/N E4CBundle-010) shall be referred to as the Unit Price Book (UPB). Additionally, the Bare Costs listed in the UPB listed above will not be localized.
(b) PRICING COEFFICIENTS: The purpose of applying the coefficients to direct pre-priced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The Offeror's coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S. Means costs data books listed in paragraph (a), above, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax;
general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork /reports associated with the contract; consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. The coefficients will not be localized and are not subject to economic price adjustments. The coefficients will remain unchanged under the terms and conditions of the contract.
The categories of pricing coefficients in this contract are based on work hours, location of the work and bare cost dollar value. If a task order includes work that has more than one applicable pricing coefficient category, then the coefficient will be determined based on the preponderance of the work and applied to the total direct costs.
(c) Hours of Work shall be defined as follows:
(1) Standard Working Hours (also referred to as Normal Duty Hours). The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays and Family Days (see Section F, paragraph entitled "NORMAL WORK HOURS"). The Contractor may elect, at his option and at no additional cost to the Government, to work hours other than standard working hours provided that (a) the request is submitted in writing at least four (4) full work days in advance of the desired date, and (b) the Contracting Officer approves the request. Non-standard hours worked at the convenience of the Contractor and with the approval of the Contracting Officer will be at a standard hours coefficient.
(2) Non-Standard Working Hours. Non-standard working hours are defined as the period from 4:30 p.m. to 7:30 a.m., Monday through Friday, as well as weekends and federal holidays. Items of work to be accomplished during non-standard hours shall be clearly identified in contractor technical/cost proposals, including justification for the request. Non-standard hours, worked without the express approval of the Contracting Officer, will be at the coefficient for standard hours. Non-Standard work hours requested by the Government will be stated on the Request for Proposal. Task Orders subject to an accelerated construction schedule may also have the non-standard working hours coefficient applied to the Task Order (TO) items.
(d) Work Areas shall be defined as follows:
(1) Secured Area. USAF Controlled access areas are the higher-level security areas. Presence within these controlled access areas is by escort; and the movement of authorized personnel in and out of these areas is limited. Contractor personnel are permitted access to these areas on a need basis only.
(2) Non-Secured Area. The lowest level of security exists in general access areas. These areas are all of Goodfellow AFB outside of the USAF Controlled areas.
(e) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
(f) Sections K, L and M will be deemed incorporated in the resultant award, by reference.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM QUANTITY
MINIMUM AMOUNT $750,000.00
MAXIMUM QUANTITY
MAXIMUM AMOUNT $25,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM QUANTITY
MINIMUM AMOUNT $15,000.00
MAXIMUM QUANTITY
MAXIMUM AMOUNT $750,000.00
Item Supplies/Service Estimated Quantity
Unit Unit Price Amount
Basic Period, Under $200k, FFP.
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
0001AA
Standard Hours - Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
3 Lot
0001AB
Standard Hours - Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0001AC
Non-Standard Hours - Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0001AD
Non-Standard Hours - Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Basic Period, $200k-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
0002AA
Standard Hours - Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0002AB
Standard Hours - Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0002AC
Non-Standard Hours - Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0002AD
Non-Standard Hours - Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Basic Period, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
0003AA
Standard Hours - Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0003AB
Standard Hours - Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0003AC
Non-Standard Hours - Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
0003AD
Non-Standard Hours - Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Base Period, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.
Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 1, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
1001AA
Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
7 Lot
Option Line Item
1001AB
Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
2 Lot
Option Line Item
1001AC
Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
1001AD
Non-Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Period 1, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit
Option Line Item
Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
1002AA
Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
5 Lot
Option Line Item
1002AB
Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
1002AC
Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
1002AD
Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price 1 Lot
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
Option Line Item
Option Period 1, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
1003AA
Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
1003AB
Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
1003AC
Non-Standard Hours, Non-Secure Area
Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
1003AD
Non-Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 1, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.
Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 2, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
2001AA
Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
2 Lot
Option Line Item
2001AB
Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
2001AC
Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
2001AD
Non-Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Period 2, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
2002AA
Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
2002AB
Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
2002AC
Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
1 Lot
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
Option Line Item
2002AD
Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 2, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
2003AA
Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
2 Lot
Option Line Item
2003AB
Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
2003AC
Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
2003AD
Non-Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 2, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.
Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Period 3, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
3001AA
Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3001AB
Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3001AC
Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3001AD
Non-Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Period 3, $200K to $500K, FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
3002AA
Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3002AB
Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
3002AC
Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3002AD
Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 3, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
3003AA
Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3003AB
Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3003AC
Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
3003AD
Non-Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 3, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.
Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Period 4, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
4001AA
Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
2 Lot
Option Line Item
4001AB
Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4001AC
Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
4001AD
Non-Standard Hours, Secure Area Under $200K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 4, $200K to $500K, FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
4002AA
Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4002AB
Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4002AC
Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4002AD
Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 4, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.
Means costs data books, general & administrative expense; overhead;
profit; project direct costs; bond premiums; licenses; certifications;
protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;
daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;
portable toilets; flag persons;
safety equipment; additional supervision; paperwork/ reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given
SLIN.
Option Line Item
4003AA
Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4003AB
Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4003AC
Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
4003AD
Non-Standard Hours, Secure Area Over $500K Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Option Line Item
Option Period 4, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.
Firm Fixed Price
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
Section C - Description/Specifications/Statement of Work
Requirements Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX and Goodfellow AFB Recreation Camp.
-Site Visit information: A site visit has been scheduled for Thursday 27 June 2024 at 9am CST. Attendees will meet at building 723 (Powell Event Center) in the Texas Star Room. Interested parties will provide personnel information for base passes no later than 25 June 2024 at 1pm CST. Please provide personnel information on Attachment 16 - (BAL) Base Access Letter Template. Directions to building 723 are provided on Attachment 17
- Site Visit Itinerary and Map - FY24 SABER Goodfellow AFB.
-Verbal explanations given before award will NOT be binding. Any authorized changes to this solicitation will be made in writing by issuing an amendment(s) to the offerors. Offerors shall acknowledge the amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) with the offer.
-Set aside for all responsible 8(a) concerns -Questions: Due to the Government no later than 1pm CST on Thursday 11 July 2024 -Answers: Posted by the Government no later than 1pm CST on Thursday 18 July 2024 -Enter coefficients into Attachment 9 - Coefficient Pricing Worksheet -Proposals are due to the Government no later than 1pm CST on Thursday 01 August 2024 -Projects under the resulting SABER contract will consist of construction work based on the -Specifications located in Attachments 12-15.
-Work to be performed under the SABER contract will be within NAICS code 236220.
-Classification Code: Z - Maintenance, repair, and alteration of real property.
-Size Standard: $45,000,000.00 -FAR 36.204 Disclosure of Magnitude of Construction Projects
1. Replace Water Mains Hornet and Scherz - Between $250,000.00 and $500,000.00
2. Replace Water Mains Lancaster and Canberra - Between $250,000.00 and $500,000.00
3. B705 Renovate Changing Rooms - Between $100,000.00…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .