Attachment 4 - SABERSPECS2024 - Updated 07May2024.pdf

PDF 9 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER-IDIQ) Federal contract opportunity
Solicitation number
FA303024R0004
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is the SABER Specifications for 2024 for a Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract at Goodfellow Air Force Base, Texas. The contract will consist of a broad range of maintenance, alterations, repair, and minor construction work on real property at Goodfellow AFB and the Goodfellow AFB Recreation Camp. The work will be performed by a single 8(a) contractor selected through a competitive procurement process. The contract has a guaranteed minimum of $750,000 and a maximum of $25,000,000 over the base period plus four one-year option periods. The contractor will be required to provide design support, cost estimating, project management, and on-site personnel to complete the work in accordance with the specifications. Key requirements include compliance with environmental regulations, security access, and submission of various plans and reports. The Request for Proposal is expected to be issued on or around June 20, 2024 with an anticipated closing date of July 5, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER-IDIQ), newest first.
File Type Posted
Solicitation Amendment FA303024R00040003 SF 30.pdf PDF
Attachment 19 - FY24 SABER Q and A Worksheet Amendment 0003.pdf PDF
Attachment 13c - Seed RFP Construct Raised Crosswalks Topographical Drawing Amendment 0002-.pdf PDF
Attachment 14a - Revised Seed RFP_SOO with Drawings Water Main Hornet and Scherz Amendment 0002-.pdf PDF
Solicitation Amendment - FA303024R00040002.pdf PDF
Attachment 12c - Seed RFP B705 - Bldg 121 Changing Rooms Photo Examples Amendment 0002-.pdf PDF
Attachment 2 - Section L Instructions to Offerors -Revised Amendment 0002.pdf PDF
Attachment 3 - Section M Evaluation Factors -Revised Amendment 0002-.pdf PDF
Attachment 20 - Site Visit Sign-In Sheet FY24 SABER FA303024R0004 27 June 2024.pdf PDF
Solicitation Amendment FA303024R00040002 SF 30 CO Signed.pdf PDF
Attachment 15a - Seed RFP_SOO with Drawings Water Main Lancaster and Canberra Amendment 0002-.pdf PDF
Attachment 19 - FY24 SABER Q and A Worksheet Amendment 0002.pdf PDF
Solicitation Amendment FA303024R00040001 SF 30.pdf PDF
Attachment 2 - Section L Instructions to Offerors -Revised Amendment 0001-.pdf PDF
Attachment 10 - PPQ GAFB FY24 SABER -Revised Amendment 0001-.pdf PDF
Attachment 12 - Seed RFP B705 Renovate Changing Rooms -Revised Amendment 0001-.pdf PDF
Attachment 13 - Seed RFP Construct Raised Crosswalks -Revised Amendment 0001-.pdf PDF
Solicitation Amendment - FA303024R00040001.pdf PDF
Attachment 15 - Seed RFP Water Mains Lancaster and Canberra -Revised Amendment 0001-.pdf PDF
Attachment 11 Relevant Contracts FY24 SABER -Revised Amendment 0001-.pdf PDF
Attachment 14 - Seed RFP Water Mains Hornet and Scherz -Revised Amendment 0001-.pdf PDF
Attachment 3 - Section M Evaluation Factors -Revised Amendment 0001-.pdf PDF
Solicitation - FA303024R0004.pdf PDF
Attachment 16 - (CUI) BAL Template 21 SEP 2022.docx DOCX document
Attachment 14 - Seed RFP Water Mains Hornet and Scherz CO Sign.pdf PDF
Attachment 13 - Seed RFP Construct Raised Crosswalks CO Sign.pdf PDF
Attachment 13a - Seed RFP Construct Raised Crosswalks SOO.pdf PDF
Attachment 12 - Seed RFP B705 Renovate Changing Rooms CO Sign.pdf PDF
Attachment 12b - Seed RFP B705 Renovate Changing Rooms B705 Floor Plan.pdf PDF
Attachment 9 - Coefficient Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 17 - Site Visit Itinerary and Map - FY24 SABER Goodfellow AFB.pdf PDF
Attachment 15b - Seed RFP Water Mains Lancaster and Canberra Water Drawing.pdf PDF
Attachment 15 - Seed RFP Water Mains Lancaster and Canberra CO Sign.pdf PDF
Attachment 10 - PPQ GAFB FY24 SABER.pdf PDF
Attachment 7 - Wage Determination Heavy and Highway.pdf PDF
Attachment 5 - CEREG_17June_2024.pdf PDF
Attachment 3 - Section M Evaluation Factors.pdf PDF
Attachment 18 - NAF Standard Clauses -01May2024-.pdf PDF
Attachment 15a - Seed RFP Water Mains Lancaster and Canberra SOO.pdf PDF
Attachment 14a - Seed RFP Water Mains Hornet and Scherz SOO.pdf PDF
Attachment 12a - Seed RFP B705 Renovate Changing Rooms SOO.pdf PDF
Attachment 11 Relevant Contracts FY24 SABER.pdf PDF
Attachment 6 - Wage Determination Building.pdf PDF
Attachment 2 - Section L Instructions to Offerors.pdf PDF
Attachment 1 - Section H Special Contract Requirements.pdf PDF
Attachment 15c - Seed RFP Water Mains Lancaster and Canberra Composite Utility Drawing.pdf PDF
Attachment 14b - Seed RFP Water Mains Hornet and Scherz Concept Drawing Water Main.pdf PDF
Attachment 13b - Seed RFP Construct Raised Crosswalks Drawing Set.pdf PDF
Attachment 8 - Wage Determination Residential.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

for

2024 SABER CONTRACT

7 May 2024

PREPARED BY:

17TH CIVIL ENGINEER SQUADRON (AETC)

460 E. KEARNEY BOULEVARD

GOODFELLOW AFB, TX 76908-4104

POC: Ronald Trepanier

SABER SPECIFICATIONS 2024

PROJECT TABLE OF CONTENTS Page 2 SPECIFICATIONS Total Pages 1333

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 01 ....................................GENERAL REQUIREMENTS AND WORKING CONDITIONS

01 14 01 ....................................ENVIRONMENTAL PROTECTION

01 30 00 ....................................ADMINISTRATIVE REQUIREMENTS

01 33 00 ....................................SUBMITTAL PROCEDURES

01 33 29 ....................................SUSTAINABILITY REPORTING

01 35 26 ....................................GOVERNMENTAL SAFETY REQUIREMENTS

01 41 00 ....................................REGULATORY REQUIREMENTS

01 42 00 ....................................SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 20 ..........................QUALITY CONTROL FOR MINOR CONSTRUCTION

01 50 00 ....................................TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.11 ...............................INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 67 00 ....................................ENVIRONMENTAL REQUIREMENTS FOR PRODUCTS

01 74 13 ....................................PROGRESS CLEANING

01 74 19 ....................................CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 75 00 ....................................STARTING AND ADJUSTING

01 78 00 ....................................CLOSEOUT SUBMITTALS

01 78 23 ....................................OPERATION AND MAINTENANCE DATA

01 91 00 ....................................COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 32 00 ....................................SUBSURFACE DRILLING, SAMPLING, AND TESTING

02 41 00 ....................................DEMOLITION

02 42 51 ....................................CARPET REMOVAL AND RECLAMATION

02 81 00 ....................................TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 14.00 10 ..........................ASBESTOS HAZARD CONTROL ACTIVITIES

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 40 00.00 10 ..........................PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 ....................................MASONRY

04 23 13 ....................................GLASS MASONRY UNITS

DIVISION 05 - METALS

05 12 00 ....................................STRUCTURAL STEEL

05 21 13 ....................................DEEP LONGSPAN STEEL JOIST FRAMING

05 21 19 ....................................OPEN WEB STEEL JOIST FRAMING

05 21 23 ....................................STEEL JOIST GIRDER FRAMING

05 30 00 ....................................STEEL DECKS

05 40 00 ....................................COLD-FORMED METAL FRAMING

05 50 13 ....................................MISCELLANEOUS METAL FABRICATIONS

05 51 33 ....................................METAL LADDERS

05 52 00 ....................................METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 05 73 ....................................WOOD TREATMENT

06 10 00 ....................................ROUGH CARPENTRY

06 20 00 ....................................FINISH CARPENTRY

06 41 16.00 10 ..........................LAMINATE CLAD ARCHITECTURAL CASEWORK

06 60 00 ....................................PLASTIC FABRICATIONS

06 61 16 ....................................SOLID POLYMER (SOLID SURFACING) FABRICATIONS

PROJECT TABLE OF CONTENTS Page 3 SPECIFICATIONS Total Pages 1333

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 14 00 ....................................FLUID-APPLIED WATERPROOFING

07 21 13 ....................................BOARD AND BLOCK INSULATION

07 21 16 ....................................MINERAL FIBER BLANKET INSULATION

07 22 00 ....................................ROOF AND DECK INSULATION

07 60 00 ....................................FLASHING AND SHEET METAL

07 61 14.00 20 ..........................STEEL STANDING SEAM ROOFING

07 84 00 ....................................FIRESTOPPING

07 92 00 ....................................JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 ....................................STEEL DOORS AND FRAMES

08 11 16 ....................................ALUMINUM DOORS AND FRAMES

08 11 69 ....................................METAL STORM DOORS

08 14 00 ....................................WOOD DOORS

08 56 53 ....................................BLAST RESISTANT TEMPERED GLASS WINDOWS

08 71 00 ....................................DOOR HARDWARE

08 72 00 ....................................ELECTRONIC CARD ACCESS LOCKING SYSTEM (ECALS)

08 81 00 ....................................GLAZING

08 91 00 ....................................METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 22 00 ....................................SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 ....................................GYPSUM BOARD

09 30 00 ....................................CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ....................................ACOUSTICAL CEILINGS

09 65 00 ....................................RESILIENT FLOORING

09 65 36 ....................................STATIC-CONTROL RESILIENT FLOORING

09 65 66 ....................................RESILIENT ATHLETIC FLOORING

09 67 23.13 ...............................STANDARD RESINOUS FLOORING

09 68 00 ....................................CARPET

09 69 13 ....................................RIGID GRID ACCESS FLOORING

09 72 00 ....................................WALL COVERINGS

09 90 00 ....................................PAINTS AND COATINGS

09 97 13.28 ...............................PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD TIE RODS

DIVISION 10 - SPECIALTIES

10 26 13 ....................................WALL AND CORNER GUARDS

10 28 13 ....................................TOILET ACCESSORIES

10 44 16 ....................................FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 21 00 ....................................WINDOW BLINDS

12 36 00.00 20 ..........................MANUFACTURED VANITIES

12 48 13.13 ...............................ENTRANCE FLOOR MATS

12 50 00 ....................................FURNITURE SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 ..........................WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 ....................................PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 ....................................AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS 23 05 93 ....................................TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 07 00 ....................................THERMAL INSULATION FOR MECHANICAL SYSTEMS

PROJECT TABLE OF CONTENTS Page 4 SPECIFICATIONS Total Pages 1333

23 09 23 ....................................DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL

SYSTEMS

23 11 25 ....................................FACILITY GAS PIPING

23 52 00 ....................................HEATING BOILERS

23 64 10 ....................................WATER CHILLERS, VAPOR COMPRESSION TYPE 23 64 26 ....................................CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

DIVISION 26 - ELECTRICAL

26 00.00.00 20 ..........................BASIC ELECTRICAL MATERIALS AND METHODS

26 08.00 ....................................APPARATUS INSPECTION AND TESTING

26 09.23.00 40 ..........................LIGHTING CONTROL DEVICES

26 20.00 ....................................INTERIOR DISTRIBUTION SYSTEM

26 23.00.00 40 ..........................SWITCHBOARDS

26 27.13.10 30 ..........................ELECTRIC METERS

26 29.23 ....................................VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41.01.00 10 ..........................LIGHTNING PROTECTION SYSTEM

26 51.00 ....................................INTERIOR LIGHTING

26 53.00 10 ...............................EXTERIOR LIGHTING INCLUDING SECURITY AND CCTV APPLICATIONS

DIVISION 27 - COMMUNICATIONS

27 10 00 ....................................BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 51 26 ....................................MASS NOTIFICATION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 64.00 10 ..........................FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 ....................................EARTHWORK

31 11 00 ....................................CLEARING AND GRUBBING

31 31 16 ....................................SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

31 63 29 ....................................DRILLED CONCRETE PIERS AND SHAFTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 93 31 ....................................PLANTING OF TREES, SHRUBS AND VINES

32 99 01 ....................................PAVING DEMOLITION

32 99 02 ....................................PAVEMENT - REMOVALS AND REINSTALL

32 99 03 ....................................PAVEMENT - FULL DEPTH RECYCLING

32 99 04 ....................................PAVEMENT - EXCAVATION

32 99 05 ....................................PAVEMENT - EARTHWORK

32 99 06 ....................................PAVEMENT - LIME STABILIZED SUBGRADE

32 99 07 ....................................PAVEMENT - STABILIZED AGGREGATE BASE COURSE

32 99 08 ....................................PAVEMENT - COMPACTION

32 99 09 ....................................PAVEMENT - CONCRETE SIDEWALKS, TROOPWALKS, CURBS AND GUTTERS 32 99 10 ....................................PAVEMENT - MICROSURFACING AND SLURRY SEAL

32 99 11 ....................................ASPHALT CEMENT PAVEMENT

32 99 12 ....................................PAVEMENT - BITUMINOUS SINGLE/DOUBLE SURFACE TREATMENT

32 99 13 ....................................PAVEMENT - TACK COAT

32 99 14 ....................................PAVEMENT - PRIME COAT

32 99 15 ....................................PAVEMENT MARKINGS

32 99 16 ....................................PAVEMENT - COLD MILLING

32 99 17 ....................................PAVEMENT - STORM DRAINAGE

32 99 18 ....................................PAVEMENT - ESTABLISH TURF

32 99 19 ....................................PAVEMENT - IRRIGATION REPAIR

32 99 20 ....................................PAVEMENT - PCC FULL DEPTH REPAIR

32 99 21 ....................................PAVEMENT - EXPOSED AGGREGATE

32 99 22 ....................................PAVEMENT - PRECAST CONCRETE

PROJECT TABLE OF CONTENTS Page 5 SPECIFICATIONS Total Pages 1333

DIVISION 33 - UTILITIES

33 11 00 ....................................WATER DISTRIBUTION

33 30 00 ....................................SANITARY SEWERS

33 40 00 ....................................STORM DRAINAGE UTILITIES

33 51 13.00 30 ..........................NATURAL-GAS LINES

33 61 00 ....................................PREFABRICATED UNDERGROUND HEATING/COOLING DISTRIBUTION

SYSTEM

33 71 02.00 20 ..........................UNDERGROUND ELECTRICAL DISTRIBUTION

ATTACHMENTS

1. Base Standardization of Utility and Building Systems

2. Commissioning Intrusion Detection Systems

3. Base Division 01

- End of Project Table of Contents –

SECTION 01 10 01 Page 6 SPECIFICATIONS Total Pages 1333

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01.10.01

GENERAL REQUIREMENTS AND WORKING CONDITIONS

PART 1 GENERAL

1.1 .............................................DEFINITIONS

1.2 .............................................SUBMITTALS

1.3 .............................................WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 ..........................................Project Description

1.3.2 ..........................................Project Location

1.3.3 ..........................................Limitation of Government Obligation to Issue Work

1.3.4 ..........................................Government Installed Work

1.3.5 ..........................................Task Order Period of Performance

1.4 .............................................MINIMUM CONTRACTOR PERFORMANCE CAPABILITIES

1.5 .............................................MATERIAL AND WORKMANSHIP

1.6 .............................................PROJECT MANAGEMENT SUPPORT

1.7 .............................................TECHNICAL DESIGN SUPPORT

1.8 .............................................MINIMUM ON-SITE PERSONNEL

1.9 .............................................CONTRACTOR'S OFFICE

1.10 ...........................................COMPUTER REQUIREMENTS

1.11 ...........................................COMMUNICATION REQUIREMENTS

1.12 ...........................................PROPERTY CONTROL RECORDS

1.12.1 ........................................Government Furnished Material and Equipment

1.12.2 ........................................Government Furnished Material and Equipment Delivery Schedule

1.12.3 ........................................Delivery Location

1.13 ...........................................SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

1.14 ...........................................SEQUENCING AND SCHEDULING

1.15 ...........................................SUPERINTENDENCE BY THE CONTRACTOR

1.16 ...........................................QUALITY ASSURANCE

1.17 ...........................................EXISTING WORK

1.17.1 ........................................Protection of Government Property

1.17.2 ........................................Protection of Historical and Archeological Resources

1.18 ...........................................WORK PLAN

1.18.1 ........................................Standard and Non-Standard Work Hours

1.18.2 ........................................Traffic Plan

1.18.3 ........................................Work in Occupied Facilities

1.18.4 ........................................Adjacent Facilities

1.18.5 ........................................Communication Devices and Cables

1.18.6 ........................................Planned Utility Outages

1.18.7 ........................................Unplanned Utility Outage (Accidental Disruption)

1.18.8 ........................................Drinking Water

1.18.9 ........................................Phasing Requirements

1.19 ...........................................ENVIRONMENTAL

1.19.1 ........................................Environmental Goals

1.19.2 ........................................Environmental Goal Standards

1.19.2.1 .....................................NOT USED

1.19.2.2 .....................................NOT USED

1.19.2.3 .....................................EPA Energy Performance Rating

1.19.3 ........................................Hazardous Materials

1.19.4 ........................................Hazardous and Special Waste Generated by the Contractor

1.19.4.1 .....................................Contractor Encountered Hazardous Waste

1.19.5 ........................................Asbestos, Mold or Lead

1.19.6 ........................................Prohibited Nuisance and Polluting Activities

1.19.7 ........................................Release of Fluids to the Sanitary Sewer System

SECTION 01 10 01 Page 7 SPECIFICATIONS Total Pages 1333

1.19.8 ........................................Pesticides (Insecticides, Fungicides, Herbicides, Etc.)

1.19.9 ........................................Air Emissions

1.19.10 ......................................Construction and Debris

1.19.11 ......................................Indoor Air Quality

1.19.12 ......................................Protection of Water Resources

1.19.13 ......................................Notice of Intent

1.19.14 ......................................Ozone depleting substances

1.20 ...........................................PERMITS AND RESPONSIBILITIES

1.20.1 ........................................Work Clearance Request

1.20.2 ........................................Base Fire Regulations

1.21 ...........................................PROPERTY CONTROL RECORDS

1.22 ...........................................WARRANTY

1.23 ...........................................TESTING

PART 2 WORKING CONDITIONS

2.1 .............................................COMPLIANCE WITH LAWS

2.2 .............................................BASE AND WORK AREA ACCESS

2.3 .............................................SITE INVESTIGATIONS AND CONDITIONS AFFECTING WORK

2.4 .............................................FIELD OFFICE AND STORAGE AREAS

2.5 .............................................SITE MAINTENANCE

2.6 .............................................AVAILABILITY AND USE OF UTILITY SERVICES

2.7 .............................................MILITARY FAMILY HOUSING AREAS

2.8 .............................................TOILET FACILITIES

2.9 .............................................CONCRETE TRUCKS

2.10 ...........................................ROAD CLOSURES, OPEN CUTTING AND REPAIR

2.11 ...........................................NO SMOKING

PART 3 POLICY (NOT USED)

-- End of Section Table of Contents --

SECTION 01 10 01 Page 8 SPECIFICATIONS Total Pages 1333

SECTION 01 10 01

GENERAL REQUIREMENTS AND WORKING CONDITIONS

PART 1 GENERAL

1.1 DEFINITIONS

TO - Task Order.

Definitions pertaining to sustainable development are as defined in ASTM E 2114 and as specified.

A. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

B. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

C. "Operational performance" is the functional behavior of the building as a whole or of the building components.

D. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.2 SUBMITTALS

Submittals called out for in these specifications shall be required and shall be submitted for approval or information using AF Form 3000.

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

When a submittal cannot be provided within the required submission date, Contractor shall submit in writing a letter stating the reasons why and furnishing a new projected submission date.

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals Certificates of insurance; G Surety bonds; G AF Form 3064, Contract Progress Schedule; G AF Form 3065, Contract Progress Report; G Work Plan; G Work Clearance Request; G Environmental Protection Plan; G Storm Water Pollution Prevention Plan

SD-11 Closeout Submittals Property Control Records

1.3 WORK COVERED BY CONTRACT DOCUMENTS

1.3.1 Project Description

Applicable provisions of the contract clauses will govern work under each section of these specifications.

The work covered under this Simplified Acquisition of Base Engineering Requirements Indefinitie Delivery and Indefinite Quantity (SABER IDIQ) contract consists of the Contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, transportation, supplies, and incidentals.

Contractor shall perform all operations required to complete work awarded under the SABER IDIQ contract. Work shall be performed in strict accordance with the plans, specifications, terms and conditions of the contract. More specific details of the work will be provided by the Government for each specific Task Order in the form of an initial concept design.

Each Task Order issued on this contract is for a broad range of real property maintenance, repair, alteration, and minor construction work. The work is required in support of Base Civil Engineering activities on Goodfellow AFB, Texas to include Goodfellow Recreation Camp, Goodfellow AFB proper, Goodfellow Medical Clinic, Family Housing and all real property under the responsibility of Goodfellow AFB.During the contract period the

SECTION 01 10 01 Page 9 SPECIFICATIONS Total Pages 1333

Government will identify construction tasks and associated design requirements needed to complete each specified project. The Contractor shall be required to maintain a management office on Goodfellow AFB base in which he/she receives Task Orders and provides other technical management services required to accomplish those orders. The projects shall include tasks in a variety of trades such as carpentry, road repair, pavements, asbestos abatement, lead paint abatement, roofing, excavation, demolition, interior electrical, HVAC, steam fittings, plumbing, sheet metal, painting, concrete masonry, welding, etc.

Specific project requirements will be provided with each Task Order.

Existing dimensions and locations shown on applicable drawings provided by the Government are for approximation purposes only. Failure to verify the dimensions and locations will be at the contractor's risk and shall not relieve the contractor from accomplishing the work required by the contract at the price awarded by the government.

Note, USGBC LEED and Green Globes certification are not required for contract Task Orders. Also all construction work is unclassified and no security clearances are required.

The Contractor shall ensure all employees comply with all security requirements imposed by AFJI 31-102 and GAFBI 31-102. For SCI and secure facilities the Government will require the Contractor to wear identifying badges during work. The Contractor employee(s) shall obtain badges from the Government escort(s) at the beginning of the work for that day and relinquish the badge whenever leaving facilities; this process can take up to forty-five minutes per day, but is typically shorter. The Contractor and his personnel shall be required to coordinate and schedule all work in classified areas with appropriate Government representatives (Escorts) prior to entering these areas. Cleared DOD personnel shall escort Contractor personnel in secured facilities. The non-cleared Contractor personnel shall remain in the immediate presence of the Government escort(s) at all times.

Refer to Whole Building Design Guide (www.wbdg.org), all work shall comply with all DoD Unified Facility Codes (UFCs). For additional information, refer to web site link to Unified Facility Code Guide Specifications (UFCGS).

Full compliance is mandatory for all Task Orders.

1.3.2 Project Location

The work will be performed at Goodfellow AFB, Texas or at the Goodfellow AFB Recreation Camp, San Angelo, Tx. Goodfellow Air Force Base is located in Tom Green County, on the southeast side of San Angelo, Texas and is bounded to the north by Highway #388 (Paint Rock Rd.), to the west by Fort McKavitt Rd and Bell Street/Christoval Road, to the south by South Chadbourne St (Hwy. 1223) and to the east by the eastern city limits. Goodfellow AFB Recreation Camp is located on Lake Nasworthy at 1950 South Concho Drive, San Angelo, Tx.

1.3.3 Limitation of Government Obligation to Issue Work

In addition to other limitations, the Governement is not obligated to issue any particular type of work to the SABER Contractor and reserves the right to accomplish work using Government or other Contractor work forces, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this Contract.

1.3.4 Government Installed Work

If applicable, will be identifed per specific Task Order.

1.3.5 Task Order Period of Performance

The Period of Performance (POP) shall be as specified in the specific Task Order.

1.4 MINIMUM CONTRACTOR PERFORMANCE CAPABILITIES

The Contractor shall provide sufficient project management, design staff, sub-contractor pool and technical support to ensure: quality and completeness of designs and drawings; accuracy of estimates; ability to handle concurrent project requirements; ability to perform work on schedule and complete project on time; and, ability to process submittal, permits, payrolls, reports and other required documentation in a timely manner. The Contractor shall be responsible for development of the Government's initial concept design to a point where the Contractor's project documents including designs, drawings and specifications clearly indicate the proposed method of accomplishing the work, as well as the description, dimensions, and location of all proposed elements of the work. The Contractor's project documents must fully comply with the Government's initial concept design requirements as well as all applicable regulatory code requirements. The Contractor is expected to use recognized industry standard practice in determining their proposed design materials and methods, unless the Government specifies otherwise.

http://www.wbdg.org/

SECTION 01 10 01 Page 10 SPECIFICATIONS Total Pages 1333

1.5 MATERIAL AND WORKMANSHIP

As prescribed in "FAR 52.236-5 Material and Workmanship":

A. All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

B. The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

C. All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

1.6 PROJECT MANAGEMENT SUPPORT

As a minimum, the Contractor shall maintain the following management personnel.

A. Contractor's Project Manager (CPM) - CPM shall provide overall contract management including: subcontractor acquisition, oversight and administration; Contractor review of material submittals and shop drawings; permit processing required by Goodfellow AFB and all other applicable federal, state, regional and local entities having jurisdiction; full authority to develop cost proposals; negotiate and sign task orders; supervision of project superintendents; collection, submission and management of all Contractor and sub-contractor personnel documentation required to comply with Goodfellow AFB security requirements; and attendance at all joint Government/Contractor status meetings as well as site visits, pre-performance conferences, pre-final and final inspections. The CPM shall be available during normal duty hours within 30 minutes after notification to meet with the Contracting Officer (CO) at a location designated by the CO. CPM must have a minimum of 5 (five) year previous experience as primary manager of a SABER or SABER type contract or general contracting firm engaged in similar mutliple discipline commercial construction projects.

B. Quality Control and Safety Manager (QCSM)- Contractor shall provide a QCSM to provide quality control and safety management for up to 20 active task orders. The QCSM shall perform a minimum of two daily site visits to each active project site to ensure full compliance with all safety requirements and to verify that the work and materials installed and stored on site are in accordance with the approved construction drawings, shop drawings, and material submittals. The QCSM shall submit daily field notes recording activities at each project site, prepare and coordinate material submittal sheets and shop drawing submittals, prepare quality control reports, attend all pre-final and final inspections, and schedule and coordinate testing procedures. The QCSM shall be on-site for the delivery and installation of all time sensitive construction components including but not limited to concrete. QCSM shall be responsible for ensuring that all quality control sampling and testing required on-site (i.e. slump tests and preparation of concrete test cylinders) are prepared/performed in accordance with applicable standards. Attach safety inspection logs to the Contractor's production or quality control report.

Quality control and safety management shall be carried out by someone other than the CPM or Site Superintendent. Refer to Section 01 35 26 in this specification for additonal requirements.

C. Site Superintendent - Contractor shall provide site superintendence for up to 20 active Task Orders at a time.

Quantity of active task orders per site superintendent shall not exceed five. Site supervision shall include a minimum of twice daily visits to each active project site, submission of detailed semi-monthly progress reports for each task order (including work elements, percentage of work completed during the period with cumulative and total quantities. Site Superintendent shall schedule and coordinate subcontractors and material suppliers and shall attend all site visits, pre-performance conferences, and pre-final and final inspections. Site Superintendent shall ensure advance notice is provided to and approval is received from Contracting Officer prior to delivery

SECTION 01 10 01 Page 11 SPECIFICATIONS Total Pages 1333 and installation of any time sensitive construction components including but not limited to concrete. Site superintendence shall be carried out by someone other than the CPM or QCSM. CPM may fill in temporarily for one absent Site Superintendent at a time and for no more than five consecutive days.

D. Environmental Manager - Contractor shall provide an environmental manager responsible for overseeing the Contractor's conformance to environmental goals for the project and implementing procedures for environmental protection. The environmental manager shall have a minimum of 3 years construction experience on projects of similar size and scope; minimum 3 years experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs) such as ISO 14001;

familiarity with environmental regulations applicable to constuction operations. The Environmental manager shall be responsible for:

1. Compliance with applicable Federal, State and local environmental regulations, including maintaining required documentation.

2. Implementation of the Waste Management Plan.

3. Implementation of the IAQ Management Plan.

4. Implementation of the Environmental Protection Plan.

5. Training for Contractor personnel in accordance with their position requirements.

6. Monitoring and documentation of environmental procedures.

The Waste Management Plan and Indoor Air Quality Management Plan (IAQ) may be incorporated into the Environmental Protection Plan. If not incorporated into the Environmental Protection Plan, these plans will be submitted seperately and added to the required submittal list.

1.7 TECHNICAL DESIGN SUPPORT

A. The Contractor's in-house minimal design capabilities are of utmost importance. Areas of required minimal design competence shall include, but are not limited to: architectural, civil, structural, mechanical, electrical, and drafting/surveying capabilities. Minimal design effort is defined as the capability to provide builder's plans of the type routinely developed in commercial practice and/or as provided and supplemented by industry such as pre-engineered building manufacturers, major heating ventilating and air conditioning equipment suppliers, fire suppression system suppliers and similar suppliers and sources. The Contractor's staff should either include at least one registered Professional Engineer (PE) or architect well versed in multi-discipline design and construction or have an established relationship with an A/E firm to provide professional services when required. The Contractor shall have a person proficient in the use of AutoCAD computer aided drafting software on staff at all times. Contractor design personnel shall be proficient in the requirements and application of all codes (building, environmental, safety, etc.) related to the work included in each specific Task Order.

Contractor shall supplement in-house staffing whenever necessary to provide personnel and/or services required to meet code requirements (i.e. asbestos or lead abatement) related to specific Task Order requirements.

B. Contractor shall provide design support producing an accurate, complete, code compliant, and cost effective product for several task orders simultaneoulsy within the time constraints specified by the Contract and specific Task Order. The Contractor shall be responsible for full development of the Government's intitial concept design to a point where the Contractor's design and construction documents (including drawings) clearly indicate the proposed method of accomplishing the work including description, size, and location of all proposed elements of the work. The Contractors' design must fully comply with the Government's intitial concept design requirements as well as all applicable federal, state, regional, and local governing code requirements. The Contractor shall comply with Goodfellow AFB design standards and shall use recognized industry standard practice in determining the proposed construction materials and methods.

C. The Contractor shall be capable of providing accurate construction surveys required to lay out the project work.

Contractor shall provide elevation surveys as required for grading and drainage. Contractor shall provide accurate existing and new survey information including elevations in the as-built drawings.

1.8 MINIMUM ON-SITE PERSONNEL

Contractor shall provide as a minimum the following personnel on-site at all times during normal duty hours.

A. Contractor's Project Manager (CPM)

B. Contractor's Site Superintendent (Quantity of personnel shall be sufficient to ensure coordination and supervision of work including timely completion of all project documentation and reporting requirements).

C. Quality Control and Safety Manager

SECTION 01 10 01 Page 12 SPECIFICATIONS Total Pages 1333

D. Cost Estimator with e-4 Clicks software subscription. The Contractor shall also provide the Government with

(3) three RS Means Cost Estimating (Facilities Construction Costs with RS Means Data) hardbound books and 1 yearly license of e4Clicks software for the duration of the SABER contract. Note new hardbound copies to be provide for each year (Base and each Option year) of the contract. This position can be filled by one of the other required on-site positions.

E. Draftsman with AutoCAD software. This position can be filled by one of the other required on-site positions.

1.9 CONTRACTOR'S OFFICE

A. Contractor's office shall be located on-base.

B. The items listed below will be furnished for use in the operation of the SABER Contract without cost to the contractor. Any other equipment, such as communications and material handling equipment other than referenced below, and administrative supplies necessary for contractor operation will be furnished by the contractor at the Contractor's expense. The Government furnished items listed below will not be used for any purpose other than fulfilling the requirements of this contract.

a. Land - Space to install office. Typically 100' x 100' but will vary depending on availability and proximity to utilities.

b. Utilities (Water, electricity, and sewer). Contractor is responsible for costs incurred to connect and disconnect from utilities. Refer to paragraph titled "Availability and Use of Utility Services in this Section of the Specifications.

c. Outside storage space, as designated by the Contracting Officer.

C. The Government shall provide a space for the Contractor to set their office trailer to conduct business on this SABER contract. Contractor shall be responsible for all expenses associated with connection to and disconnection from utilities. No other business transactions, of any type, may be conducted out of that office.

The Contractor is responsible for providing a commercial telephone service. Any other equipment, such as communications and material handling equipment, and administrative supplies necessary for contractor operation will be furnished at the Contractor's expense.

D. The Contractor shall maintain their office area in a clean condition and free from clutter. The Contractor shall furnish thier own housekeeping and janitorial services for the SABER office space. The Contractor is required to maintain the facilities in a neat appearance at all times.

E. The Government is not liable for the theft, vandalism or damage of any Contractor supplies or equipment.

Contractor shall be responsible for securing their office facilities.

1.10 COMPUTER REQUIREMENTS

A. Hardware - The Contractor shall provide, install and maintain their own computer hardware as required for all management, communication, cost estimating, scheduling and other tasks to the Contractor's obligations under the SABER contract.

B. The Contractor will provide, install and maintain their own software required for management, communication, cost estimating, scheduling and other tasks to the Contractor's obligations under the SABER contract.

1. Cost Estimating Software - The Government utilizes 4Clicks estimating software with RSMeans Cost Data.

The Contractor's cost estimating software must be capable of providing electronic data file transfer capability to the Contracting Officer that is 100% compatible with the Government's estimating software. The Contractor's cost database must utilize RSMeans Cost Data of the version required at award of the SABER contract and updated at Contractor's expense for each Option Period. Standard of 100% compatibility will require that the Contractor's software provide electronic data files to the Contracting Officer that do not require any manipulation or modification by the Government in order to be imported directly into the Government's software for technical and cost estimating evaluation purposes. The Contractor's software shall be capable of providing hard copy reports in the format and detail directed by the Contracting Officer.

2. Computer Aided Drafting Software - The Government utilizes AutoCAD computer aided drafting software.

The Contractor shall provide to the Contracting Officer electronic drawings that are 100% compatible with AutoCAD software. Standard of 100% compatibility will require that the Contractor's software provide electronic data files to the Contracting Officer that do not require any manipulation or modification by the

SECTION 01 10 01 Page 13 SPECIFICATIONS Total Pages 1333

Government in order to be fully utilized in AutoCAD software. This applies to all standard AutoCAD features including but not limited to layering, fonts, formats, data linkage, colors, blocks, fill patterns, tables, backgrounds, etc.

1.11 COMMUNICATION REQUIREMENTS

A. Telephone - The Contractor shall provide and maintain a two way voice communication system for all supevisory personnel and the SABER office. Cell phones meet this requirement. The Contractor's office telephone number and supervisor cell phone numbers shall be set up to ensure that the Government will not incur any toll charges during communication with these devices when called locally from Goodfellow AFB.

B. Daily Correspondence - A Contractor employee shall visit the 17th Contracting Squadron, Bldg 707, at least once each workday for distribution of correspondence.

C. The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for official electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc.

D. It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this email address.

1.12 PROPERTY CONTROL RECORDS

1.12.1 Government Furnished Material and Equipment

If applicable, per specific Task Order requirements the Government may furnish some quantities of materials and equipment for installation by the Contractor. The Contractor shall abide by Federal Acquistion Regulation (FAR)52.245-1 and 52.245-9 in the handling of all Government provided material and equipment.

Some quantities may be estimates and will be identified as such. It is the intention of the Government to furnish all quantities of the estimated items required to complete the work as specified and the various quantities will be adjusted when necessary.

Quantities not identified as estimates are all that will be furnished by the Government. Contractor shall furnish any additional quantities required.

1.12.2 Government Furnished Material and Equipment Delivery Schedule Notify the Contracting Officer in writing at least 30 calendar days in advance of the date on which the Government furnished materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at a reasonable rate set by the Contracting Officer per 100 pounds or cubic feet per month or fraction thereof.

1.12.3 Delivery Location

The materials and equipment will be located at a site on-base designated by the Contracting Officer for Contractor to pick up and transport to work site.

1.13 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

A. The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.

B. Wherever in the specifications or upon the drawings the words “directed,” “required,” “ordered,” “designated,” “prescribed,” or words of like import are used, it shall be understood that the “direction,” “requirement,”

SECTION 01 10 01 Page 14 SPECIFICATIONS Total Pages 1333

“order,” “designation,” or “prescription,” of the Contracting Officer is intended and similarly the words “approved,” “acceptable,” “satisfactory,” or words of like import shall mean “approved by,” or “acceptable to,” or “satisfactory to” the Contracting Officer, unless otherwise expressly stated.

C. Where “as shown,” “as indicated,” “as detailed,” or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word “provided” as used herein shall be understood to mean “provide complete in place,” that is “furnished and installed.”

D. Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

E. The Contractor shall coordinate all shop drawings and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review.

Shop drawings submitted to the Contracting Officer without evidence of the Contractor’s approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government’s reasons therefor. Any work done before such approval shall be at the Contractor’s risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) of this clause.

F. If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.

G. The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor.

As applicable per specific task order requirements, the Government may provide when available project concept and as-built drawings in electronic format. Typical Government format for electronic drawings are Adobe (pdf) or AutoCAD (dwg). Many of the older as-built drawings were in hard copy format only and these drawings were electronically scanned into Adobe (pdf) format.

Contractor shall immediately check furnished drawings and notify the Government of any discrepancies. Contractor shall be responsible for confirming all dimensions and other documentation relied upon by the Contractor in the performance of the work.

Data contained on Government furnished electronic drawing files or hard copy drawings shall not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files.

The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.

Government furnished electronic as-built drawing files or hard copy as-built drawings are not construction documents.

Differences may exist between the files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic files, nor does it make representation to the compatibility of these files with the Contractors hardware or software.

In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.

SECTION 01 10 01 Page 15 SPECIFICATIONS Total Pages 1333

If the…

This is the start of the file's text. The full file is on GovTribe.