About this file

This document is a Statement of Objectives (SOO) for the renovation of the changing rooms at McGarr Pool B705 at Goodfellow Air Force Base. The work includes demolition, painting, carpentry, mechanical, electrical, plumbing, and other tasks to fully renovate the changing rooms. Key requirements include providing waterproof flooring, new fixtures and plumbing, lighting, and electrical improvements. The Contractor must submit various submittals for approval, including design drawings, product materials, and environmental reports. The work must be performed outside of the peak pool season from May through September. This SOO is part of a broader Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract solicitation for Goodfellow AFB. The SABER IDIQ will be a single award set-aside for certified 8(a) businesses, with a contract value between $1,000,000 and $500,000,000. The Request for Proposal is expected to be issued on or around June 20, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER-IDIQ), newest first.
File Type Posted
Solicitation Amendment FA303024R00040003 SF 30.pdf PDF
Attachment 19 - FY24 SABER Q and A Worksheet Amendment 0003.pdf PDF
Attachment 13c - Seed RFP Construct Raised Crosswalks Topographical Drawing Amendment 0002-.pdf PDF
Attachment 14a - Revised Seed RFP_SOO with Drawings Water Main Hornet and Scherz Amendment 0002-.pdf PDF
Solicitation Amendment - FA303024R00040002.pdf PDF
Attachment 12c - Seed RFP B705 - Bldg 121 Changing Rooms Photo Examples Amendment 0002-.pdf PDF
Solicitation Amendment FA303024R00040002 SF 30 CO Signed.pdf PDF
Attachment 15a - Seed RFP_SOO with Drawings Water Main Lancaster and Canberra Amendment 0002-.pdf PDF
Attachment 19 - FY24 SABER Q and A Worksheet Amendment 0002.pdf PDF
Attachment 2 - Section L Instructions to Offerors -Revised Amendment 0002.pdf PDF
Attachment 3 - Section M Evaluation Factors -Revised Amendment 0002-.pdf PDF
Attachment 20 - Site Visit Sign-In Sheet FY24 SABER FA303024R0004 27 June 2024.pdf PDF
Solicitation Amendment FA303024R00040001 SF 30.pdf PDF
Attachment 2 - Section L Instructions to Offerors -Revised Amendment 0001-.pdf PDF
Attachment 10 - PPQ GAFB FY24 SABER -Revised Amendment 0001-.pdf PDF
Attachment 12 - Seed RFP B705 Renovate Changing Rooms -Revised Amendment 0001-.pdf PDF
Attachment 13 - Seed RFP Construct Raised Crosswalks -Revised Amendment 0001-.pdf PDF
Solicitation Amendment - FA303024R00040001.pdf PDF
Attachment 15 - Seed RFP Water Mains Lancaster and Canberra -Revised Amendment 0001-.pdf PDF
Attachment 11 Relevant Contracts FY24 SABER -Revised Amendment 0001-.pdf PDF
Attachment 3 - Section M Evaluation Factors -Revised Amendment 0001-.pdf PDF
Attachment 14 - Seed RFP Water Mains Hornet and Scherz -Revised Amendment 0001-.pdf PDF
Solicitation - FA303024R0004.pdf PDF
Attachment 16 - (CUI) BAL Template 21 SEP 2022.docx DOCX document
Attachment 14 - Seed RFP Water Mains Hornet and Scherz CO Sign.pdf PDF
Attachment 13 - Seed RFP Construct Raised Crosswalks CO Sign.pdf PDF
Attachment 13a - Seed RFP Construct Raised Crosswalks SOO.pdf PDF
Attachment 12 - Seed RFP B705 Renovate Changing Rooms CO Sign.pdf PDF
Attachment 12b - Seed RFP B705 Renovate Changing Rooms B705 Floor Plan.pdf PDF
Attachment 9 - Coefficient Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 4 - SABERSPECS2024 - Updated 07May2024.pdf PDF
Attachment 17 - Site Visit Itinerary and Map - FY24 SABER Goodfellow AFB.pdf PDF
Attachment 15b - Seed RFP Water Mains Lancaster and Canberra Water Drawing.pdf PDF
Attachment 15 - Seed RFP Water Mains Lancaster and Canberra CO Sign.pdf PDF
Attachment 10 - PPQ GAFB FY24 SABER.pdf PDF
Attachment 7 - Wage Determination Heavy and Highway.pdf PDF
Attachment 5 - CEREG_17June_2024.pdf PDF
Attachment 3 - Section M Evaluation Factors.pdf PDF
Attachment 15c - Seed RFP Water Mains Lancaster and Canberra Composite Utility Drawing.pdf PDF
Attachment 14b - Seed RFP Water Mains Hornet and Scherz Concept Drawing Water Main.pdf PDF
Attachment 13b - Seed RFP Construct Raised Crosswalks Drawing Set.pdf PDF
Attachment 8 - Wage Determination Residential.pdf PDF
Attachment 18 - NAF Standard Clauses -01May2024-.pdf PDF
Attachment 15a - Seed RFP Water Mains Lancaster and Canberra SOO.pdf PDF
Attachment 14a - Seed RFP Water Mains Hornet and Scherz SOO.pdf PDF
Attachment 11 Relevant Contracts FY24 SABER.pdf PDF
Attachment 6 - Wage Determination Building.pdf PDF
Attachment 2 - Section L Instructions to Offerors.pdf PDF
Attachment 1 - Section H Special Contract Requirements.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE (1)

AS OF: 09/01/2023

SABER

STATEMENT OF OBJECTIVES (SOO)

RENOVATE CHANGING ROOMS B705

PROJECT #1136835

1.0 PROJECT SCOPE: The work under this task order shall consist of providing all labor, tools, transportation, supplies, supervision, materials, equipment, and associated design to renovate the changing rooms at McGarr Pool B705. The work includes, but is not limited to all demolition, painting, carpentry, mechanical, electrical, plumbing, and associated tasks/crafts, required to successfully complete this project’s requirements. All work shall be in strict accordance with the Goodfellow AFB SABER Contract.

2.0 MATERIAL AND DEBRIS REMOVAL: All demolished materials and debris shall become the property of the Contractor and shall be disposed or recycled off base at the Contractor’s expense in accordance with local, state, and federal environmental laws and regulations.

3.0 CONTRACTOR FURNISHED MATERIALS: Contractor shall furnish all materials to accomplish the work as shown on attached drawings and described in this SOO.

4.0 PROJECT DESCRIPTION: The following requirements are intended to describe the general scope of the project, but in no way limit the contract with respect to the extent of work indicated in the project documents and are subject to the terms and conditions of the contract. It is the intent and meaning of this document that the Contractor shall provide a renovation of the changing rooms at the McGarr Pool B705 that is complete with all items and appurtenances necessary, reasonably incidental, or customarily included, even though each item is not specifically called out.

A. DEMOLITION:

1) Contractor shall remove all existing floor paint via buffer/sander or grinder.

2) Contractor shall demolish existing mirrors, laminate countertops, lavatory sinks, fixtures, p-trap drain lines, water supply piping, braided hoses and angle stop valves.

3) Contractor shall demolish existing toilets, urinals, flush-valves, p-trap drain lines, water supply piping.

4) Contractor shall demolish existing shower valves, heads, trim and piping.

5) Contractor shall demolish existing interior light fixtures.

6) Contractor shall demolish existing black electrical light switches, receptacles, covers plates, boxes, conduit and wiring as needed.

7) Contractor shall demolish existing cracked and deteriorated exterior stucco as needed.

8) Contractor shall remove existing hand soap, paper towel, toilet paper, napkin dispensers and towel racks and retain for reinstall.

PAGE (2)

B. NEW WORK:

Architectural:

1) Contractor shall provide primer and 2 coats of Rubberize It Dura-Rubber Brand or equal, liquid rubber floor coating on all concrete flooring and concrete cove base that is 100% waterproof and resistant to chemicals such at chlorine. The floor coating shall be mixed with Dura-Rubber Crumb Rubber Aggregate so that the final floor finish shall be slip resistant and color tinted to our choice. The floor shall be sealed with Rubberize It Industrial Grade Clear-Coat Sealer or equal.

2) Contractor shall provide floor leveler prep as needed prior to floor coating.

3) Contractor shall provide 1 coat primer and 2 new coats latex semi-gloss paint on all CMU block walls, shower benches, window frames and exposed electrical conduit/boxes.

Exposed wooden rafter ceilings shall remain as-is.

4) Contractor shall provide screw hole repair as needed prior to wall paint.

5) Contractor shall sand and prep existing metal screen doors/frames and provide 1 coat primer and 2 coats oil-based semi-gloss paint.

6) Contractor shall sand and prep interior wooden doors/frames and provide 2 new coats of stain and 2 coat clear on door and 1 coat primer and 2 new coats of oil base paint on metal frames.

7) Contractor shall provide new brushed finish metal framed mirrors and solid surface countertops with 4” backsplash and all required support bracing and mounting hardware in changing rooms.

8) Contractor shall provide new color matched siliconized caulk around new plumbing fixtures, countertops and back splashes.

9) Contractor shall provide new Gray plastic Koala Bear Kare Brand or equal baby changing tables, 1ea in both changing rooms like at B121.

10) Contractor shall provide steam cleaning of all wall/floor shower tile and grout.

11) Contractor shall provide primer and new 2-part epoxy shower tile paint on pink/white tiled shower walls and curbs ONLY. The Gray 2x2 Ceramic floor tile will remain unpainted.

12) Contractor shall remove all stains and provide epoxy ceramic tile/grout sealer on Gray 2x2 Ceramic floor tile ONLY.

13) Contractor shall provide a new color matched Gray phenolic urinal screen between the 2 new urinals in the Men’s changing room. New urinal screen shall be floor and wall mounted and may need to be notched for externally wall mounted drain lines.

14) Contractor shall provide new stucco wall patch/repair on all existing cracked and deteriorated exterior walls and provide 2 new coats Elastomeric stucco paint on all exterior walls.

15) Contractor shall pressure wash exterior stucco walls prior to applying new stucco paint.

16) Contractor shall reinstall existing hand soap, paper towel, toilet paper dispensers and towel racks.

Electrical:

1) Contractor shall provide new 4’ L.E.D. light fixtures with new 3-way motion sensor light switches and covers at the entrance/exits and occupancy sensors in center of rooms.

Sensors shall be the same type at B121 and be adjustable to 30min ON time.

PAGE (3)

2) Contractor shall provide new Hunter Brand or equal outdoor rated, multi speed, 60” aluminum blade ceiling fans in the changing rooms to include all switches, covers, j-box, conduit, wiring and circuits required. Fan color shall match the ones at B121.

3) Contractor shall replace all existing switches, receptacles, cover plates through out so that they all match in color.

4) Contractor shall provide new Xlerator Brand or equal hand dryers in the changing rooms to match B121 and shall include all required electrical circuits and wiring.

5) Contractor shall replace existing 20A duplex receptable outlets and covers to match new light/fan switches and covers.

6) Contractor shall provide new conduit, wiring and electrical boxes as needed.

7) Contractor shall paint all exposed electrical shall be painted to match the wall/ceiling color.

Plumbing:

1) Contractor shall provide new porcelain oval 20x17 sinks with DELTA Brand or equal single lever fixtures, new ¼ turn angle stops and braided hose connections.

2) Contractor shall provide new porcelain tankless toilets with elongated bowls, new porcelain low-flow urinals, new SLOAN Brand or Equal flush valves and all required connections and trim. Both restrooms shall have a taller chair height toilet and a normal height toilet for children. The Men’s restroom shall have a normal height urinal and a lowered height urinal for children.

3) Contractor shall provide new DELTA Brand or equal single lever shower fixture, mixing valves with integral stops and replaceable cartridges, matching shower head and all necessary trim and plumbing connections for the showers.

4) Contractor shall provide new PVC drain lines and connections.

5) Contractor shall provide new cast drain lines and connections at new urinals if applicable.

5.0 SPECIAL CONSIDERATIONS: Work shall be performed in a manner to create minimum disturbance and inconvenience to the Goodfellow AFB. The contractor shall protect existing site conditions. The troopwalk and sidewalks shall remain open for use. As a minimum the Contractor shall give the Contracting Officer 72 hours advance notice for any utility outages affecting the building. The Contractor shall perform the work in this Task Order outside peak pool season which is from May thru September. This may require the Contracting Officer to hold the issuance of the NTP until the Pool is closed for the season.

6.0 GENERAL QUALITY CONTROL TESTING: The Contractor is responsible for all quality control testing. All testing shall be performed at no additional cost to the Government.

No work requiring additional testing will be permitted until the required tests have been identified and approved by the Contracting Officer.

7.0 SUBMITTALS: The Contractor shall provide the following submittals along with the basic required contract submittals, to the Contracting Officer for approval:

1) AF Form 103/Work Clearance Request

2) Renovation Design Drawings

PAGE (4)

3) Product Material Submittals

4) O&M Manuals

5) Environmental Reports

6) As-built Drawings

7) DD Form 1354

8) Pass Thru Warranty(s)

END OF STATEMENT OF OBJECTIVES

B. NEW WORK:
Architectural:
7.0 SUBMITTALS: The Contractor shall provide the following submittals along with the basic required contract submittals, to the Contracting Officer for approval:

File details come from the government source that posted it. Updated .