Solicitation Amendment - FA303024R00040002.pdf

PDF 1 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER-IDIQ) Federal contract opportunity
Solicitation number
FA303024R0004
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a Solicitation Amendment for a Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract at Goodfellow AFB, TX. The contract will provide a broad range of maintenance, alteration, repair, and minor construction work on real property at the base and recreation camp. Work will be firm-fixed price task orders issued against a unit price book, with coefficients to cover the contractor's costs. The contract has a basic period plus four one-year option periods, with a guaranteed minimum of $750,000 and a maximum of $25,000,000 over the life of the contract. The solicitation is set aside for certified 8(a) business concerns under NAICS code 236220. The Government expects to issue the Request for Proposals on or around June 20, 2024, with proposals due by July 5, 2024. The magnitude of the project is between $100,000 and $500,000, in accordance with FAR 36.204.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER-IDIQ), newest first.
File Type Posted
Solicitation Amendment FA303024R00040003 SF 30.pdf PDF
Attachment 19 - FY24 SABER Q and A Worksheet Amendment 0003.pdf PDF
Attachment 2 - Section L Instructions to Offerors -Revised Amendment 0002.pdf PDF
Attachment 3 - Section M Evaluation Factors -Revised Amendment 0002-.pdf PDF
Attachment 20 - Site Visit Sign-In Sheet FY24 SABER FA303024R0004 27 June 2024.pdf PDF
Attachment 13c - Seed RFP Construct Raised Crosswalks Topographical Drawing Amendment 0002-.pdf PDF
Attachment 14a - Revised Seed RFP_SOO with Drawings Water Main Hornet and Scherz Amendment 0002-.pdf PDF
Attachment 12c - Seed RFP B705 - Bldg 121 Changing Rooms Photo Examples Amendment 0002-.pdf PDF
Solicitation Amendment FA303024R00040002 SF 30 CO Signed.pdf PDF
Attachment 15a - Seed RFP_SOO with Drawings Water Main Lancaster and Canberra Amendment 0002-.pdf PDF
Attachment 19 - FY24 SABER Q and A Worksheet Amendment 0002.pdf PDF
Attachment 14 - Seed RFP Water Mains Hornet and Scherz -Revised Amendment 0001-.pdf PDF
Solicitation Amendment FA303024R00040001 SF 30.pdf PDF
Attachment 2 - Section L Instructions to Offerors -Revised Amendment 0001-.pdf PDF
Attachment 10 - PPQ GAFB FY24 SABER -Revised Amendment 0001-.pdf PDF
Attachment 12 - Seed RFP B705 Renovate Changing Rooms -Revised Amendment 0001-.pdf PDF
Attachment 13 - Seed RFP Construct Raised Crosswalks -Revised Amendment 0001-.pdf PDF
Solicitation Amendment - FA303024R00040001.pdf PDF
Attachment 15 - Seed RFP Water Mains Lancaster and Canberra -Revised Amendment 0001-.pdf PDF
Attachment 11 Relevant Contracts FY24 SABER -Revised Amendment 0001-.pdf PDF
Attachment 3 - Section M Evaluation Factors -Revised Amendment 0001-.pdf PDF
Attachment 18 - NAF Standard Clauses -01May2024-.pdf PDF
Attachment 15a - Seed RFP Water Mains Lancaster and Canberra SOO.pdf PDF
Attachment 14a - Seed RFP Water Mains Hornet and Scherz SOO.pdf PDF
Attachment 12a - Seed RFP B705 Renovate Changing Rooms SOO.pdf PDF
Attachment 11 Relevant Contracts FY24 SABER.pdf PDF
Attachment 6 - Wage Determination Building.pdf PDF
Attachment 2 - Section L Instructions to Offerors.pdf PDF
Attachment 1 - Section H Special Contract Requirements.pdf PDF
Solicitation - FA303024R0004.pdf PDF
Attachment 16 - (CUI) BAL Template 21 SEP 2022.docx DOCX document
Attachment 14 - Seed RFP Water Mains Hornet and Scherz CO Sign.pdf PDF
Attachment 13 - Seed RFP Construct Raised Crosswalks CO Sign.pdf PDF
Attachment 13a - Seed RFP Construct Raised Crosswalks SOO.pdf PDF
Attachment 12 - Seed RFP B705 Renovate Changing Rooms CO Sign.pdf PDF
Attachment 12b - Seed RFP B705 Renovate Changing Rooms B705 Floor Plan.pdf PDF
Attachment 9 - Coefficient Pricing Worksheet.xlsx XLSX spreadsheet
Attachment 4 - SABERSPECS2024 - Updated 07May2024.pdf PDF
Attachment 17 - Site Visit Itinerary and Map - FY24 SABER Goodfellow AFB.pdf PDF
Attachment 15b - Seed RFP Water Mains Lancaster and Canberra Water Drawing.pdf PDF
Attachment 15 - Seed RFP Water Mains Lancaster and Canberra CO Sign.pdf PDF
Attachment 10 - PPQ GAFB FY24 SABER.pdf PDF
Attachment 7 - Wage Determination Heavy and Highway.pdf PDF
Attachment 5 - CEREG_17June_2024.pdf PDF
Attachment 3 - Section M Evaluation Factors.pdf PDF
Attachment 15c - Seed RFP Water Mains Lancaster and Canberra Composite Utility Drawing.pdf PDF
Attachment 14b - Seed RFP Water Mains Hornet and Scherz Concept Drawing Water Main.pdf PDF
Attachment 13b - Seed RFP Construct Raised Crosswalks Drawing Set.pdf PDF
Attachment 8 - Wage Determination Residential.pdf PDF
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Section A - Solicitation/Contract Form

Goodfellow AFB FY24 SABER

Product Service Code: Z2JZ

FA303024R00040002

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Additional Information/Notes

SUPPLIES AND SERVICES

(a) Bare Cost Total in the current year's RS Means (Computerized Pricing Guide - CPG) cost estimating database compatible with e4Clicks Premier and Assemblies, Facilities and Master Composite (e4Clicks P/N E4CBundle-010) shall be referred to as the Unit Price Book (UPB). Additionally, the Bare Costs listed in the UPB listed above will not be localized.

(b) PRICING COEFFICIENTS: The purpose of applying the coefficients to direct pre-priced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The Offeror's coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S. Means costs data books listed in paragraph (a), above, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax;

general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork /reports associated with the contract; consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. The coefficients will not be localized and are not subject to economic price adjustments. The coefficients will remain unchanged under the terms and conditions of the contract.

The categories of pricing coefficients in this contract are based on work hours, location of the work and bare cost dollar value. If a task order includes work that has more than one applicable pricing coefficient category, then the coefficient will be determined based on the preponderance of the work and applied to the total direct costs.

(c) Hours of Work shall be defined as follows:

(1) Standard Working Hours (also referred to as Normal Duty Hours). The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays and Family Days (see Section F, paragraph entitled "NORMAL WORK HOURS"). The Contractor may elect, at his option and at no additional cost to the Government, to work hours other than standard working hours provided that (a) the request is submitted in writing at least four (4) full work days in advance of the desired date, and (b) the Contracting Officer approves the request. Non-standard hours worked at the convenience of the Contractor and with the approval of the Contracting Officer will be at a standard hours coefficient.

(2) Non-Standard Working Hours. Non-standard working hours are defined as the period from 4:30 p.m. to 7:30 a.m., Monday through Friday, as well as weekends and federal holidays. Items of work to be accomplished during non-standard hours shall be clearly identified in contractor technical/cost proposals, including justification for the request. Non-standard hours, worked without the express approval of the Contracting Officer, will be at the coefficient for standard hours. Non-Standard work hours requested by the Government will be stated on the Request for Proposal. Task Orders subject to an accelerated construction schedule may also have the non-standard working hours coefficient applied to the Task Order (TO) items.

(d) Work Areas shall be defined as follows:

(1) Secured Area. USAF Controlled access areas are the higher-level security areas. Presence within these controlled access areas is by escort; and the movement of authorized personnel in and out of these areas is limited. Contractor personnel are permitted access to these areas on a need basis only.

(2) Non-Secured Area. The lowest level of security exists in general access areas. These areas are all of Goodfellow AFB outside of the USAF Controlled areas.

(e) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.

(f) Sections K, L and M will be deemed incorporated in the resultant award, by reference.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM QUANTITY

MINIMUM AMOUNT $750,000.00

MAXIMUM QUANTITY

MAXIMUM AMOUNT $25,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM QUANTITY

MINIMUM AMOUNT $15,000.00

MAXIMUM QUANTITY

MAXIMUM AMOUNT $750,000.00

Item Supplies/Service Estimated Quantity

Unit Unit Price Amount

Basic Period, Under $200k, FFP.

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

0001AA

Standard Hours - Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

3 Lot

0001AB

Standard Hours - Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0001AC

Non-Standard Hours - Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0001AD

Non-Standard Hours - Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Basic Period, $200k-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

0002AA

Standard Hours - Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0002AB

Standard Hours - Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0002AC

Non-Standard Hours - Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0002AD

Non-Standard Hours - Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Basic Period, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

0003AA

Standard Hours - Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0003AB

Standard Hours - Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0003AC

Non-Standard Hours - Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

0003AD

Non-Standard Hours - Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Base Period, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 1, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

1001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

7 Lot

Option Line Item

1001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

2 Lot

Option Line Item

1001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

1001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Period 1, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit

Option Line Item

Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

1002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

5 Lot

Option Line Item

1002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

1002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

1002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price 1 Lot

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

Option Line Item

Option Period 1, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

1003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

1003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

1003AC

Non-Standard Hours, Non-Secure Area

Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

1003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 1, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 2, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

2001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

2 Lot

Option Line Item

2001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

2001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

2001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Period 2, $200K-$500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

2002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

2002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

2002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

1 Lot

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

Option Line Item

2002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 2, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

2003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

2 Lot

Option Line Item

2003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

2003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

2003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 2, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Period 3, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

3001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Period 3, $200K to $500K, FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

3002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

3002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 3, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

3003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

3003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 3, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Period 4, Under $200K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

4001AA

Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

2 Lot

Option Line Item

4001AB

Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4001AC

Non-Standard Hours, Non-Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

4001AD

Non-Standard Hours, Secure Area Under $200K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 4, $200K to $500K, FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

4002AA

Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4002AB

Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4002AC

Non-Standard Hours, Non-Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4002AD

Non-Standard Hours, Secure Area $200K to $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 4, Over $500K, FFP Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales, tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct pre-priced costs from the Unit Price Book is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.

Means costs data books, general & administrative expense; overhead;

profit; project direct costs; bond premiums; licenses; certifications;

protection or moving of Government property; mobilization and demolition expense; engineering/ technical design support services;

daily cleanup; payroll taxes (FICA, state, and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees;

portable toilets; flag persons;

safety equipment; additional supervision; paperwork/ reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. SLIN quantities represent historical data. The Government is not limited to the amount of task orders for any given

SLIN.

Option Line Item

4003AA

Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4003AB

Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4003AC

Non-Standard Hours, Non-Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

4003AD

Non-Standard Hours, Secure Area Over $500K Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Option Period 4, Non-Prepriced Items (NPI's) CLIN quantity represent historical data. The Government is not limited to the amount of task orders for the CLIN.

Firm Fixed Price

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

Section C - Description/Specifications/Statement of Work

Requirements Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX and Goodfellow AFB Recreation Camp.

-Site Visit information: A site visit has been scheduled for Thursday 27 June 2024 at 9am CST. Attendees will meet at building 723 (Powell Event Center) in the Texas Star Room. Interested parties will provide personnel information for base passes no later than 25 June 2024 at 1pm CST. Please provide personnel information on Attachment 16 - (BAL) Base Access Letter Template. Directions to building 723 are provided on Attachment 17

- Site Visit Itinerary and Map - FY24 SABER Goodfellow AFB.

-Verbal explanations given before award will NOT be binding. Any authorized changes to this solicitation will be made in writing by issuing an amendment(s) to the offerors. Offerors shall acknowledge the amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) with the offer.

-Set aside for all responsible 8(a) concerns -Questions: Due to the Government no later than 1pm CST on Thursday 11 July 2024 -Answers: Posted by the Government no later than 1pm CST on Thursday 18 July 2024 -Enter coefficients into Attachment 9 - Coefficient Pricing Worksheet -Proposals are due to the Government no later than 1pm CST on Thursday 01 August 2024 -Projects under the resulting SABER contract will consist of construction work based on the -Specifications located in Attachments 12-15.

-Work to be performed under the SABER contract will be within NAICS code 236220.

-Classification Code: Z - Maintenance, repair, and alteration of real property.

-Size Standard: $45,000,000.00 -FAR 36.204 Disclosure of Magnitude of Construction Projects

1. Replace Water Mains Hornet and Scherz - Between $250,000.00 and $500,000.00

2. Replace Water Mains Lancaster and Canberra - Between $250,000.00 and $500,000.00

3. B705 Renovate Changing Rooms - Between…

This is the start of the file's text. The full file is on GovTribe.