Atch 8. 0006--Door Locks Bldgs 1670 530 527 280 Task Order PWS

2 MB Posted

Attached to
Sheppard AFB MA-SASC Solicitation Federal contract opportunity
Solicitation number
FA3020-10-R-0041
Issued by
Department of the Air Force Air Education and Training Command

About this file

attachment 8 amendment

Text of this file

FA3020‐10‐R‐0041, A0001A0003

Attachment 8

Task Order # 6 10 Sep 1021 Sep 10

MA-SASC Task Order:

Performance Work Statement on

Building 280, 527, 530 & 1670 Electronic Door Lock (RFID) System

(82 CES/CEHD)

REQUIREMENTS:

82 CES/CEHD has a requirement to install electronic door locking systems in buildings 280, 527, 530 and 1670. The equipment used to install the system shall be radio frequency identification device (RFID) (often referred as proximity locks). The system shall have the capability to program RFID cards to provide access or to deny access to dormitory entrance doors. The RFID cards need to have the ability to be updated, restricted or deleted remotely.

RFID cards need to have ability to be recycled. The dormitory locks shall have the ability to open doors mechanically using conventional keys. Door room locks and deadbolt must meet ANSI Grade 1 standards. All electronics, cabling and switches used in the system must meet current Air Force configuration standards IAW AFI 31-101, "Air Force Physical Security Program. The system shall include initial user training and include a minimum 1-year maintenance agreement for all installed equipment.

Installation

This system shall cover the facility areas as detailed below.

Exterior: All entrance doors in Bldg 280, 527, 530 and 1670 will have mortise or cylindrical locks installed depending on the current door’s lock style.

Interior: All entrance doors in Bldg 280, 527, 530 and 1670 will have mortise or cylindrical locks installed depending on the current door’s lock style. All electronic control equipment will be installed Buildings 373, 530 and 1670.

The contractor shall design the system based on the building diagram in the Exhibits 1-4 building layouts.

The contractor shall provide all necessary system design elements. All required equipment, software, hardware; cabling and electrical connections shall be provided and installed by the contractor.

The contractor shall be responsible for coordinating all installation permits and facility modification/construction requests through 82d Civil Engineering Squadron (DS2), 82d Security Forces Squadron, and 82d Civil Engineering Squadron Fire Department.

Door Breakout/type by Building

Building

Number of Doors w/ Panic Bars (Monarch Exit Device currently installed)

Number of Cylindrical Locks Currently Installed

Number of Mortise Locks Currently Installed

Number of Doors (total)

280 2 0 208 210 527 0 0 96 96 530 4 0 6 10 1670 1 183 0 184 Totals 7 183 310 500

Exhibits

1. 82 CES/CEHD SAFB Building 280 Layout

2. 82 CES/CEHD SAFB Building 527 Layout

3. 82 CES/CEHD SAFB Building 530 Layout

4. 82 CES/CEHD SAFB Building 1670 Layout

5. Pictures of existing dorm door hardware

Task Order Contract Line Items (CLINS):

CLIN Description 0001 Design an electronic door lock system using RFID technology for Bldg 280, 527, 530 and 1670 to be controlled from 373, 530 and 1670.

0002 Provide and install all equipment and supplies for the electronic door lock (RFID) system.

0003 Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system

CLIN Description

(Base)

Design an electronic door lock system using RFID technology for Bldg 1670 to be controlled from 373, 530 and 1670.

(Base)

Provide and install all equipment and supplies for the Bldg 1670 electronic door lock (RFID) system.

(Base)

Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the Bldg 1670 system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system

(Option)

Design an electronic door lock system using RFID technology for Bldg 530 to be controlled from 373, 530 and 1670.

(Option)

Provide and install all equipment and supplies for the Bldg 530 electronic door lock (RFID) system.

(Option)

Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the Bldg 530 system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system

(Option)

Design an electronic door lock system using RFID technology for Bldg 527 to be controlled from 373, 530 and 1670.

(Option)

Provide and install all equipment and supplies for the Bldg 527 electronic door lock (RFID) system.

(Option)

Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the Bldg 527 system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system

00010 (Option)

Design an electronic door lock system using RFID technology for Bldg 280 to be controlled from 373, 530 and 1670.

00011 (Option)

Provide and install all equipment and supplies for the Bldg 280 electronic door lock (RFID) system.

00012 (Option)

Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the Bldg 280 system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system

Exhibit 1

Exhibit 1

Permanent Party- First, Second, and Third Floors Building 527

N

A

Exhibit 2

Exhibit 3

Randell.Smith Line

Dorm Managers Office #119 Janitor #124

BUILDING 1670

1ST FLOOR QUAD 102-110

Exhibit 4

STORAGE

ROOM #219

2ND FLOOR QUAD 202-210

Mechanical Room

3RD FLOOR QUAD 302-310

Roof Access

4TH FLOOR QUAD 402-410

3 Sep 201010 Sep 10

Exhibit 5

Dorms 280 and 527 Hardware

Dorm 530 (side view)

Dorms 280, 527 frame view

Dorm 530 Door Hardware

Other files for this federal contract opportunity

Other files attached to Sheppard AFB MA-SASC Solicitation, newest first.
File Type Posted
Amendment 0003 —
Atch 5. 0003--82 TRG Dorms 596 776 862 Task Order PWS —
Amendment 0002 —
16. M -SASC ITO Eval Criteria —
7. 0005--PA Systems Hangars 1040 1080 1090 Task Order PWS —
1. M -SASC PWS Final —
6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS —
16. M -SASC ITO Eval Criteria.pdf PDF
5. 0003--82 TRG Dorms 596 776 862 Task Order PWS —
1. M -SASC PWS Final —
3. 0001--Dorm 622 Task Order PWS —
Amendment 0001 —
7. 0005--PA Systems Hangars 1040 1080 1090 Task Order PWS —
4. 0002--Post Office Surveillance Task Order PWS —
8. 0006--Door Locks Bldgs 280 527 530 1670 Task Order PWS —
Initial M -SASC Task Orders —
Sheppard AFB Contractors —
M -SASC Site Visit.pptx PPTX presentation
M -SASC RFP.pdf PDF
13. Past Performance Questionnaire.pdf PDF
4. 0002--Post Office Surveillance Task Order PWS.pdf PDF
10. General WD TX 43.pdf PDF
11. General WD TX 302.pdf PDF
12. Contractor Past Performance Submittal Form.pdf PDF
2. SECTION 13280 Asbestos Abatetement.pdf PDF
8. 0006--Electronic Door Lock Systems Bldgs 280 527 530 1670 Task Order PWS.pdf PDF
1. M -SASC PWS Final —
15. M -SASC Performance Plan.pdf PDF
3. 0001--Dorm 622 Task Order PWS.pdf PDF
7. 0005--Public Address Systems Hangars 1040 1080 and 1090 Task Order PWS.pdf PDF
14. Base Pass Forms.pdf PDF
5. 0003--82 TRG Dorms 596 776 862 Task Order PWS.pdf PDF
6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS.pdf PDF
9. Service Contract WD TX 2005-2525.pdf PDF
M -SASC RFP.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe