3. (7) TASK ORDER 0005--PA Systems Hangars 1040 1080 1090 PWS (A0002)
Text of this file
FA3020‐10‐R‐0041, A0002A0001
Attachment 7
Task Order #5 13 Sep 1015 Sep 10
MA-SASC Task Order:
Performance Work Statement on
Intercom/Paging Systems Hangars 1040, 1080, and 1090
REQUIREMENTS:
SCOPE OF WORK:
Provide independent intercom and paging system in hangars 1040, 1080, and 1090 with devices as marked on drawings.
1 Capable of supporting vocal and music formats. The sound quality shall be at a level which will enable listeners to readily recognize songs being played over the system (e.g., The Star-Spangled Banner).
2 Capable of using two wireless digital microphones simultaneously 3 Wireless digital microphones require pre-approved frequency with 82 CS/SCOS, Robert Walton, 700 MHz band not to be used 4 Speakers to be suspended from the hangar ceiling only 5 Speaker wiring shall be rodent resistant 6 Wireless portable remote operating panel for use during ceremonies
Call-in switches and two-way horns in hangar areas to be surface mounted with moldings or enclosures extending to an inaccessible area. All cable may be run open and concealed as much as possible. Cable to classroom wall call-in switches shall be run within the wall enclosure to a cut-in single gang box. Wire type and gauges as recommended by manufacturer. Each building shall be a local self-contained system dedicated to the specific hangar. A dedicated independent power line to operate system, 120VAC source shall be provided by the owner in the designated equipment room. Contractor shall utilize Hangar 1090 Blue Print (TAG 72-20877-2) use Exhibit 1 drawings when locating and installing equipment. Each system shall be software programmable to provide intercom talk-back from each classroom, specific all-call zone paging
Task Order #5 13 Sep 1015 Sep 10 for each administrative console, all-call zone paging to each separate hangar, and all-call paging to all zones.
Each hangar shall have different quantities of equipment as marked on the plans and consist of the same type of equipment as follow:
1. 19” equipment rack with front door, skirted wheelbase, blank filler panels, and surge protected power strip
2. Program Distribution Panel
3. AM/FM/CD Program Control Panel
4. Digital microphone system consisting of handheld microphones & Omni-directional antenna
5. Administrative Console
6. 2”x2” lay-in ceiling speakers
7. Cut-in ceiling speaker with speaker enclosure and bar hanger for support
8. Rafter mounted flex horn
9. Flex horn with vandal-resistant enclosure and faceplate for hangar area call-in button
10. Call switch
HANGAR 1040-SPECIFIC REQUIREMENTS
INTERCOM SYSTEM
Contractor shall install independent power line to operate system.
Contractor shall use Hangar 1040 Hangar Diagram (see Exhibit 1) when locating and installing equipment.
Supervisory Personnel with access to the intercom system shall be RFB1, RFB2, RF1, and RF2
Zone Definitions
Supervisor-to-Classroom – Capability for supervisor to two-way communicate with one specific classroom.
Supervisor-to-North Bay – Supervisor capable of two-way communicating with North Hangar Bay utilizing 4 Push To Talk (PTT) mounted on the wall of each corner of the hangar Bay. Once answered, only the unit used to answer the supervisor operates for that conversation.
Supervisor to Support Room – Supervisor capable of two-way communicating with Support Room (A102).
Supervisor to Technical Order Room – Supervisor capable of two-way communicating with Technical Order Room (A107).
Supervisor to Entire Building – Supervisor capable of one-way communication with the entire building simultaneously in the event of an emergency.
Supervisor-to-Flight Chief – Supervisor capable of two-communication with Flight Chief.
Flight Chief-to-Supervisor – Flight Chief capable of two-way communication with a Supervisor.
Zone Groups
Supervisor to Support Room (2 Zones) (Room A102); RFB1, RFB2
Supervisor to Technical Order Room (2 Zones) (Room A107); RFB1, RFB2
Supervisor to North Bay (4 Zones); RFB1, RFB2; RF1; RF2
Supervisor to Entire Bldg (4 Zones); RFB1, RFB2; RF1; RF2
Equipment Information
Equipment Room – Location of equipment rack shall be in room C209. Instructor Supervisor will determine exact location upon installation.
Supervisor Control Panel Locations – Supervisor Control Panels shall be located in the following rooms (North Bay 2nd Floor South Wall);
RFB1/RFB2 Room C209
Flight Chief Control Panel Locations – Flight Chief Control Panels shall be located in rooms (2nd Floor “D” Corridor);
RF1 Room C211 (Only accessible through room D224)
RF2 Room D224
Each Supervisor shall have access to;
(1) All Supervisor to Classroom zones
(2) North Bay
(3) Support Room (A102)
(4) Technical Order Room (A107)
(5) Entire Building for emergency purposes
Each Flight Chief shall have access to;
(1) Each Supervisor (RFB1 / RFB2)
(2) North Bay
(3) Support Room (A102)
(4) Technical Order Room (A107)
(5) Flight Chief
(6) Entire Building for emergency purposes
Electrical wiring running from North Bay classrooms to the equipment room shall be encased in PVC conduit.
PUBLIC ADDRESS (PA) SYSTEM
Design and install a wireless Public Address System independent of each other in the North Hangar Bay of Hangar 1090 with the following restrictions;
1 Capable of supporting vocal and music formats.
2 Capable of using two wireless digital microphones simultaneously 3 Wireless digital microphones require pre-approved frequency with 82 CS/SCOS, Robert Walton, 700 MHz band not to be used 4 Speakers to be suspended from the hangar ceiling only
HANGAR 1080-SPECIFIC REQUIREMENTS
(comparable to Hangar 1090 requirements below)
HANGAR 1080-SPECIFIC REQUIREMENTS
INTERCOM SYSTEM
Contractor shall install independent power line to operate system.
Contractor shall use Hangar 1080 Diagram when locating and installing equipment.
Supervisory Personnel with access to the intercom system will be Fundamental (RHF1/RHF2), Tanker (RHT1/RHT2), Airlift (RHA1/RHA2/RHA3), and Flight Chiefs (RH1/RH2)
Supervisor-to-Group – Capability of supervisor to two-way communicate with a specific group of classrooms either individually or simultaneously all at once.
Supervisor-to-South Bay – Supervisor capable of two-way communicating with South Hangar Bay utilizing 4 Push to Talk (PTT) mounted on the wall of each corner of the hangar Bay. Once answered, only the unit used to answer the supervisor operates for that conversation.
Supervisor-to-North Bay – Supervisor capable of two-way communicating with North Hangar Bay utilizing 4 Push To Talk (PTT) mounted on the wall of each corner of the hangar Bay. Once answered, only the unit used to answer the supervisor operates for that conversation.
Supervisor-to-CAMS Lab/Testing Room – Supervisor capable of two-way communicating with CAMS Lab/Testing Room (1A1)
Supervisor-to-Testing Room – Supervisor capable of two-way communicating with Testing Room (2B3).
Supervisor-to-Graduation Room – Supervisor capable of two-way communicating with Graduation Room (2A2/3A2).
Supervisor-to-Breakroom 1 – Supervisor capable of two-way communicating with Breakroom 1 (2B8).
Supervisor-to-Breakroom 2 – Supervisor capable of two-way communicating with Breakroom 2 (3B8).
Supervisor-to-Entire Building – Supervisor capable of one-way communication with the entire building simultaneously in the event of an emergency.
Supervisor-to-Flight Chief – Supervisor capable of two-communication with Flight Chief.
RHF Group (8 Rooms)
(1ST FLR North Bay, North Wall) 1A3, 1A5, 1A7
(2ND FLR North Bay, North Wall) 1B1, 1B3, 1B5, 1B7, 1B9
RHT Group (15 Rooms)
(1ST FLR, North Bay, South Wall) 2A4, 2A5, 2A6
(1ST FLR, South Bay, North Wall) 3A4, 3A5, 3A6, 3A7
(1ST FLR, North Bay, South Wall) 4A1, 4A2, 4A3, 4A4
(2nd FLR, North Bay, South Wall) 2B2
(2nd FLR, South Bay, North Wall) 3B3, 3B5, 3B6
RHA Group (16 Rooms)
(1ST FLR, North Bay, South Wall) 2A1, 2A3
(1ST FLR, South Bay, North Wall) 3A1, 3A3
(2nd FLR, North Bay, South Wall) 2B9
(2nd FLR, South Bay, North Wall) 3B10
(2nd FLR, South Bay, South Wall) 4B1, 4B2, 4B3, 4B4, 4B5, 4B6, 4B7, 4B8, 4B9, 4B10
CAMS Lab/Testing Room (1A1) 1ST FLR, North Bay, North Wall
Graduation Room (2A2/3A2) 1ST FLR, South Bay, North Wall
Testing Room (2B3) 2nd FLR, North Bay, South Wall
Breakroom 1 (2B8) 2nd FLR, North Bay, South Wall
Breakroom 2 (2B8) 2nd FLR, South Bay, North Wall
Snack Bar (3B9) 2nd FLR, South Bay, North Wall
Supervisor-to-North Bay (9 Zones); RHF1, RHF2, RHT1, RHT2, RHA1, RHA2,RHA3, RH1, RH2
Supervisor-to-South Bay (9 Zones); RHF1, RHF2, RHT1, RHT2, RHA1, RHA2,RHA3, RH1, RH2
Supervisor-to-Entire Bldg (9 Zones); RHF1, RHF2, RHT1, RHT2, RHA1, RHA2,RHA3, RH1, RH2
Equipment Room – Location of equipment rack will be in Instructor Supervisor’s Office (2B5)
Supervisor Control Panel Locations – Supervisor Control Panels will be located in the following rooms (2nd Floor Central);
RHF1/RHF2 Room 2B5, two each (2nd FLR North Bay, South Wall)
RHT1/RHT2 Room 2B5, two each (2nd FLR North Bay, South Wall)
RHA1/RHA2/RHA3 Room 2B5, two each (2nd FLR North Bay, South Wall)
Flight Chief Control Panel Locations – Flight Chief Control Panels will be located in rooms (2nd Floor Central);
RH1 Room 3B1, one each (2ND flr South Bay, North Wall)
RH2 Room 3B2, one each (2ND flr South Bay, North Wall)
Each Supervisor shall have access to;
(1) Their specific classroom group
(2) North Bay
(3) South Bay
(4) Flight Chief
(5) CAMS Lab/Testing Room (1A1)
(6) Testing Room (2B3)
(7) Graduation Room (2A2/3A2)
(8) Breakroom 1 (2B8)
(9) Breakroom 2 (2B8)
(10) Entire Building for emergency purposes
(1) Each Supervisor
(2) North Bay
(3) South Bay
(4) Flight Chief
(5) Entire Building for emergency purposes
Electrical wiring running from North and South Bay classrooms to the equipment room shall be encased in PVC conduit.
PUBLIC ADDRESS (PA) SYSTEM
Design and install a wireless Public Address System independent of each other in the North and South Hangar Bays of Hangar 1080 with the following restrictions;
1 Capable of supporting vocal and music formats.
2 Capable of using two wireless digital microphones simultaneously 3 Wireless digital microphones require pre-approved frequency with 82 CS/SCOS, Robert Walton, 700 MHz band not to be used 4 Speakers to be suspended from the hangar ceiling only
HANGAR 1090-SPECIFIC REQUIREMENTS
(NOTE: corresponding drawings that accompany Hangar 1090 narrative below included with Exhibit 1)
INTERCOM SYSTEM
Contractor shall install independent power line to operate system.
Contractor shall use Hangar 1090 Blue Print (TAG 72-20877-2) when locating and installing equipment.
Supervisory Personnel with access to the intercom system shall be RFA, RFC, RFJ, RFX1, RF1 and RF2
Supervisor-to-Group – Capability of supervisor to two-way communicate with a specific group of classrooms either individually or simultaneously all at once.
Supervisor-to-South Bay – Supervisor capable of two-way communicating with South Hangar Bay utilizing 4 Push to Talk (PTT) mounted on the wall of each corner of the hangar Bay. Once answered, only the unit used to answer the supervisor operates for that conversation.
Supervisor-to-North Bay – Supervisor capable of two-way communicating with North Hangar Bay utilizing 4 Push To Talk (PTT) mounted on the wall of each corner of the hangar Bay. Once answered, only the unit used to answer the supervisor operates for that conversation.
Supervisor-to-Support Room – Supervisor capable of two-way communicating with Support Room (2A2/2A3).
Supervisor-to-Technical Order Room – Supervisor capable of two-way communicating with Technical Order Room (3A2/3A3).
Supervisor-to-Entire Building – Supervisor capable of one-way communication with the entire building simultaneously in the event of an emergency.
Supervisor-to-Flight Chief – Supervisor capable of two-communication with Flight Chief.
RFA Group (16 Rooms); (1st Floor) 4A1/4A2; 4A3/4A4; 4A5/4A6; 4A7/4A8; (2nd Floor Center) 2B7/2B8; 2B9/2B10; 3B4; 3BB7/3B8; 3B9/3B10; (2nd Floor South) 4B1;
4B2; 4B5; 4B7; 4B8; 4B9/4B10
RFC Group (10 Rooms); (1st Floor North) 1A1; 1A2; 1A3/1A4; 1A5/1A6; 1A7; 1A8;
(2nd Floor North) 1B1/1B2; 1B3/1B4; 1B5/1B6; 1B7/1B8
RFJ Group (4 Rooms); (1st Floor Center) 3A1; 3A4; 3A5; 3A6
RFX1 Group (30 Rooms); All rooms listed in RFA/RFC/RFJ Groups
Supervisor-to-Support Room (6) (Room 2A2/2A3); RFA; RFC; RFJ; RFX1; RF1; RF2
Supervisor-to-Technical Order Room (6) (Room 2A2/2A3); RFA; RFC; RFJ; RFX1;
RF1; RF2
Supervisor-to-North Bay (6 Zones); RFA; RFC; RFJ; RFX1; RF1; RF2
Supervisor-to-South Bay (6 Zones); RFA; RFC; RFJ; RFX1; RF1; RF2
Supervisor-to-Entire Bldg (6 Zones); RFA; RFC; RFJ; RFX1; RF1; RF2
Task Order #5
Equipment Room – Location of equipment rack shall be in a storage room on the West wall of rooms 3B1 and 2B1. Both rooms share access to the storage room.
Supervisor Control Panel Locations – Supervisor Control Panels shall be located in the following rooms (2nd Floor Central);
RFA Room 3B2 and 2B2/2B3, one each RFC Room 1B10 and 2B2/2B3, one each RFJ Room 2B2/2B3, one each RFX1 Room 2B2/2B3, one each
Flight Chief Control Panel Locations – Flight Chief Control Panels shall be located in rooms (2nd Floor Central);
RF1 Room 2B1, one each RF2 Room 3B1, one each
Each Supervisor shall have access to;
(1) Their specific classroom group
(2) North Bay
(3) South Bay
(4) Support Room
(5) Technical Order Room
(6) Entire Building for emergency purposes
(7) RFX1 Supervisor shall have access to RFA/RFC/RFJ classroom groups
(1) Each Supervisor
(2) North Bay
(3) South Bay
(4) Support Room
(5) Technical Order Room
(6) Flight Chief
(7) Entire Building for emergency purposes
Task Order #5 13 Sep 1015 Sep 10
Electrical wiring running from North and South Bay classrooms to the equipment room shall be encased in PVC conduit.
PUBLIC ADDRESS (PA) SYSTEM
Design and install a wireless Public Address System independent of each other in the North and South Hangar Bays of Hangar 1090 with the following restrictions;
1 Capable of supporting vocal and music formats.
2 Capable of using two wireless digital microphones simultaneously 3 Wireless digital microphones require pre-approved frequency with 82 CS/SCOS, Robert Walton, 700 MHz band not to be used 4 Speakers to be suspended from the hangar ceiling only
Task Order #5 13 Sep 1015 Sep 10
Exhibits
1. First and Second Floor Drawings; Hangars 1040, 1080, & 1090
2. Hangar 1040 Asbestos Survey (45 pages)
3. Hangar 1080 Asbestos Survey (25 pages)
4. Hangar 1090 Asbestos Survey (1 page)
Task Order Contract Line Items (CLINS):
CLIN Description
Design a turnkey, IP based, private network, intercom/paging system for Hangars 1040, 1080, and 1090, Sheppard AFB TX
0002 Provide and install all equipment and supplies for the intercom/paging system for Hangar 1040
0003 Provide and install all equipment and supplies for the intercom/paging system for Hangar 1080
0004 Provide and install all equipment and supplies for the intercom/paging system for Hangar 1090
Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system
Exhibit 1
Randell.Smith Text Box 1st Floor
Randell.Smith Text Box Hangar 1040
Hangar 1040 Classroom dimensions
Room Room A110 C115 A109 C113 A108 C111 A107 C109 A106 A102
Room D122 D120 D118 D119
Room Room A210 C211 B208 C209 A208 C207 B206 C205 A206 C201 A204B B204 A202
Room D224 D222 D220 D218 D216 D212
N/A N/A
2nd Floor "D" Corridor Classrooms Dimension 13' x 21' 22' x 41' 21' x 41' 22' x 41'
North Bay 2nd Floor South Wall Rooms Dimension 13' X 22' 22' X 41' 22' X 41' 22' X 41' 13' X 22'
20' X 20' 20' X 20' 20' X 20' 17' X 20' 20' X 20' 20' X 41'
20' x 20'
22' x 41' 30' x 30'
North Bay 2nd Floor North Wall Rooms Dimension 13' x 20'
1st Floor "D" Corridor Classrooms Dimension 22' x 41' 22' x 41'
20' x 20' 20' x 50'
22' x 41'
North Bay 1st Floor North Wall Rooms Dimension 20' x 20' 20' x 20' 20' x 20' 20' x 20'
North Bay 1st Floor South Wall Rooms Dimension 21' x 40' 20' x 20' 20' x 20'
Exhibit 1
Line
CAMS Lab 1A3 1A5 1A7
Testing Room
40’ X 18’40’ X 18’40’ X 18’40’ X 18’
H 1080 R Di i
= Tanker/Bomber Classroom
= Fundamentals Classroom NORTH BAY
Hangar 1080 Room Dimensions
2A1 2A2 2A3 2A4 2A5 2A6 2A7
= Airlift Classroom
Latrine
Latrine 3A1 3A2 3A3 3A4 3A5 3A6 3A7
Graduation
Room
21’ X 20’21’ X 20’ 21’ X 18’
21’ X 18’ 21’ X 21’ 21’ X 21’
Room
21’ X 20’21’ X 20’ 21’ X 18’
21’ X 18’ 21’ X 21’ 21’ X 20’
41’ X 20’
First Floor
SOUTH BAY
4A1 4A2 4A44A3
18’ X 21’ 18’ X 21’ 18’ X 21’ 18’ X 21’ Exhibit 1
1B1 1B3 1B7 1B91B5
18’ X 34’ 18’ X 34’18’ X 40’ 18’ X 40’ 18’ X 40’
H 1080 R Di i
= Fundamentals IS Desk Location
= Fundamentals Classroom
= Tanker/Bomber Classroom
NORTH BAY
Hangar 1080 Room Dimensions
2B1 2B2 2B3 2B4 2B5 2B8 2B9 2B10
= Tanker/Bomber IS Desk Location
= Airlift IS Desk Location= Airlift Classroom
3B103B1 3B2 3B3 3B5 3B6 3B8 3B9
Conference Room
Flight Chief Assistant
Testing Room Break Room Storage Room
21’ X 13’ 21’ X 13’ 21’ X 20’ 21’ X 20’29’ X 21’
34’ X 21’ 22’ X 21’
Flight Chief Office
Assistant Flight Chief Office
Break Room Snack Bar
21’ X 13’ 21’ X 13’ 20’ X 21’20’ X 21’
20’ X 21’ 29’ X 21’18’ X 40’’ 18’ X 40’’
Second Floor
SOUTH BAY
4B1 4B2 4B104B74B3 4B4 4B5 4B6 4B8 4B9
18’ X 16’18’ X 16’ 18’ X 20’18’ X 20’18’ X 20’18’ X 20’18’ X 20’ 18’ X 20’18’ X 20’ 18’ X 13’ Exhibit 1
Mech.
Equip.
1A1 20 x 20
400 Sq. Ft.
1A2 20 x 27
540 Sq. Ft.
1A3 1A4 20 x 30
600 Sq. Ft.
1A5 1A6 20 x 36
720 Sq. Ft. 500 Sq. Ft.
20 x 25
1A7
202’
1A8 20 x 20
400 Sq. Ft.
Open Bay Area 110 x 200
22000 Sq. Ft.
(High Ceiling)
Open Bay Area 110 x 200
22000 Sq. Ft.
(High Ceiling)
2A1 20 x 42
840 Sq. Ft.
2A2 2A3 21 x 39
819 Sq. Ft.
21 x 39 819 Sq. Ft.
2A4 22 x 42
924 Sq. Ft. 714 Sq. Ft.
17 x 42 2A5 2A6 2A7
20 x 42 20 x 21 840 Sq. Ft. 420 Sq. Ft.
20 x 21 420 Sq. Ft.
2A8
Latrine
Lat.
3A83A73A63A53A43A33A23A1
4A1 20 x 40
800 Sq. Ft. 800 Sq. Ft. 800 Sq. Ft.
4A2 20 x 40 20 x 40
4A3 4A4 4A5 4A6 4A7 4A8 20 x 40
800 Sq. Ft.
Scale: 1” = 20’
Note: Scale is only approximate and dimensions are to nearest foot
Building 1090 (1st Floor)
20 - 192/1A
BUILDING 1090
CATEGORY CODE:
BLDG. ASSIGNMENT:
BLDG. CUSTODIAN:
AREA IN SQUARE FEET:
Gross:
Net:
CLASSROOMS:
Air Conditioned:
Non Air Conditioned:
OPEN BAY AREA:
Ceiling:
SPECIALIZED LABS:
Type:
ADMINISTRATIVE ROOMS:
TRAINING SUPPORT ROOMS:
UTILITIES AVAILABLE
Lights:
Water: Air:
Gas:
ELECTRICAL POWER
A.C. Voltages:
Phase:
KVA- Transformer:
KVA- Pole:
D.C. Voltages:
Current:
OTHER DATA:
REMARKS:
202’
1B101B91B81B71B61B5 1B4 1B3 1B2 1B1 13 x 20 20 x 20
Sq. Ft.
400 Sq. Ft.
20 x 40
800 Sq. Ft.
20 x 40
800 Sq. Ft.
20 x 40
800 Sq. Ft.
20 x 20
400 Sq. Ft.
13 x 20
Sq. Ft.
2B102B9 21 x 33
693 Sq. Ft.
2B82B7 2B6 2B5 2B4 2B3 2B2 2B1 21 x 40
840 Sq. Ft.
21 x 33 693 Sq. Ft.
21 x 40 840 Sq. Ft.
1680 Sq. Ft.
40 x 42
3B9 3B103B83B73B63B53B4
20 x 21 420 Sq. Ft.840 Sq. Ft.
21 x 40
630 Sq. Ft.
21 x 3015 x 21
315.
Sq. Ft.
3B33B23B1
15 x 2113 x 21 315.
Sq. Ft.
273.
Sq. Ft.
273.
Sq. Ft.
13 x 21
19 x 33 627 Sq. Ft.
4B104B94B84B74B64B54B44B34B24B1 19 x 20
380 Sq. Ft.380 Sq. Ft.
19 x 209 x 20
Sq. Ft.
171579 Sq. Ft.
19 x 3014 x 19
Sq. Ft.
19 x 25 475 Sq. Ft.380 Sq. Ft.
19 x 2013 x 19
Sq. Ft.
Scale: 1” = 20’
Note: Scale is only approximate and dimensions are to nearest foot
Building 1090 (2nd Floor)
20 - 192 / 1B
BUILDING 1090
(2nd Floor)
CATEGORY CODE:
BLDG. ASSIGNMENT:
BLDG. CUSTODIAN:
AREA IN SQUARE FEET:
Gross:
Net:
CLASSROOMS:
Air Conditioned:
Non Air Conditioned:
OPEN BAY AREA:
Ceiling:
SPECIALIZED LABS:
Type:
ADMINISTRATIVE ROOMS:
TRAINING SUPPORT ROOMS:
UTILITIES AVAILABLE
Lights:
Water: Air:
Gas:
ELECTRICAL POWER
A.C. Voltages:
Phase:
KVA- Transformer:
KVA- Pole:
D.C. Voltages:
Current:
OTHER DATA:
REMARKS:
Exhibit 1
SHEPPARD AFB
ASBESTOS-CONTAINING BUILDING MATERIALS
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Hall 2 Ceiling Sheetrock 2300 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Hall 5 Floor Vinyl composite tile
935 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 Hall 5 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Hall 5 Chilled Water System Piping
Mud fittings 2 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 Hall 4 Chilled Water System Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Tuesday, August 17, 2010 Page 1 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Hall 4 Floor Vinyl composite tile
935 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 Hall 4 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Hall 4 Chilled Water System Piping
Fittings 2 ftgs Positive 3
Not Abated
Galson 1993 Hall 3 Floor Vinyl composite tile
2500 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 Hall 3 Ceiling Sheetrock 2300 sq ft Positive 3 Wall and ceiling material considered identical
Tuesday, August 17, 2010 Page 2 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Hall 3 Wall Sheetrock 40000 sq ft Positive 3
Not Abated
Galson 1993 Hall 2 Fitting Insulation Negative Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Classroom 5 Wall Sheetrock 2400 sq ft Positive 3
Not Abated
Galson 1993 Hall 2 Wall Transite 15 sq ft Assumed positive
Not Abated
Galson 1993 Miscellaneo us 1
Wall Sheetrock 800 sq ft Positive 3
Tuesday, August 17, 2010 Page 3 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Hall 2 Wall Sheetrock 4900 sq ft Positive 3
Not Abated
Galson 1993 Hall 1 Fitting Insulation Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Hall 1 Pipe (type not specified)
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Hall 1 Wall Transite 15 sq ft Assumed positive
Not Abated
Galson 1993 Hall 1 Ceiling Sheetrock 2000 sq ft Positive 3 Wall and ceiling material considered identical
Tuesday, August 17, 2010 Page 4 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Hall 1 Wall Sheetrock 4500 sq ft Positive 3
Not Abated
Galson 1993 Exterior Wall Transite 17000 sq ft Assumed positive
Not Abated
Galson 1993 Classroom 6 Ceiling Tile - Lay In Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Classroom 6 Wall Sheetrock 3800 sq ft Positive 3
Not Abated
Galson 1993 Classroom 5 Ceiling Tile - Lay In Negative Fiberglass, non-suspect ACM
Tuesday, August 17, 2010 Page 5 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER5 Ceiling Sheetrock 63 sq ft Positive 2 Wall and ceiling material considered identical
Not Abated
Galson 1993 Hall 2 Pipe (type not specified)
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Stair 3 Floor Vinyl composite tile
30 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 MER1 Ceiling Sheetrock 800 sq ft Positive 2 Wall and ceiling material considered identical
Not Abated
Galson 1993 MER1 Wall Sheetrock 1200 sq ft Positive 2
Tuesday, August 17, 2010 Page 6 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER1 Hot Water Heating Piping
Mud fittings 12 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 MER1 Chilled Water System Piping
Mud fittings 20 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 Stair 6 Floor Vinyl composite tile
160 sq ft Assumed positive
7 12" x 12" white with beige streaks
Not Abated
Galson 1993 Stair 6 Ceiling Sheetrock 160 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Stair 6 Wall Sheetrock 840 sq ft Positive 3
Tuesday, August 17, 2010 Page 7 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Stair 5 Floor Vinyl composite tile
160 sq ft Assumed positive
7 12" x 12" white with beige streaks
Not Abated
Galson 1993 Stair 5 Ceiling Sheetrock 160 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Stair 5 Wall Sheetrock 840 sq ft Positive 3
Not Abated
Galson 1993 Stair 4 Floor Vinyl composite tile
30 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 Hall 5 Wall Transite 15 sq ft Assumed positive
Tuesday, August 17, 2010 Page 8 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Stair 4 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Hall 5 Chilled Water System Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Stair 3 Ceiling Sheetrock 378 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Stair 3 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Stair 2 Floor Vinyl composite tile
30 sq ft Assumed positive
7 9" x 9" green with white streaks
Tuesday, August 17, 2010 Page 9 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Stair 2 Ceiling Tile - Lay In 250 sq ft Negative 2' x 4' white, small and large perforation
Not Abated
Galson 1993 Stair 2 Ceiling Sheetrock 400 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Stair 2 Wall Sheetrock 850 sq ft Positive 3
Not Abated
Galson 1993 Stair 1 Floor Vinyl composite tile
30 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 Stair 1 Ceiling Tile - Lay In 250 sq ft Negative 2' x 4' white, small and large perforation
Tuesday, August 17, 2010 Page 10 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Stair 1 Ceiling Sheetrock 400 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Stair 1 Wall Sheetrock 850 sq ft Positive 3
Not Abated
Galson 1993 Miscellaneo us 1
Ceiling Sheetrock 400 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Classroom 4 Floor Vinyl composite tile
1600 sq ft Assumed positive
7 9" x 9" green with white streaks
Not Abated
Galson 1993 Stair 4 Ceiling Sheetrock 378 sq ft Positive 3 Wall and ceiling material considered identical
Tuesday, August 17, 2010 Page 11 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER6 Chilled Water System Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Office 3 Ceiling Ceiling Tile 2900 sq ft Negative
Not Abated
Galson 1993 Office 3 Wall Sheetrock 5200 sq ft Positive 2
Not Abated
Galson 1993 Office 2 Battery Insulation Material
Fiberglass Assumed negative
Fiberglass, non-suspect ACM. Above ceiling
Not Abated
Galson 1993 Office 2 Domestic Water Pipe Insulation
Fiberglass 240 sq ft Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Tuesday, August 17, 2010 Page 12 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Office 2 Floor Ninyl Composite Tile Floor
480 sq ft Assumed positive
7 Under carpet
Not Abated
Galson 1993 Office 2 Ceiling Ceiling Tile 240 sq ft Negative 2' X 4' White; grooved into 2' X 2' sections fissured appearance
Not Abated
Galson 1993 Office 2 Ceiling Ceiling Tile 240 sq ft Negative 2' X 4' White; Small and Large Perforation.
Not Abated
Galson 1993 Office 2 Wall Sheetrock 12800 sq ft Positive 3
Not Abated
Galson 1993 Office 1 Floor Vinyl Composite Tile Floor
1600 sq ft Assumed positive
7 9" X 9" gren with white streaks. Under Carpet.
Tuesday, August 17, 2010 Page 13 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Office 1 Ceiling Ceiling Tile 1600 sq ft Negative 2' X 4' White; Small and large perforation
Not Abated
Galson 1993 Office 1 Wall Sheetrock 2400 sq ft Positive 3
Not Abated
Galson 1993 Classroom 5 Ceiling Tile - Lay In 88 sq ft Negative 2' x 4' white, tiny fissured and perforations
Not Abated
Galson 1993 MER6 Piping - Heating Hot Water
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Office 4 Ceiling Sheetrock 80 sq ft Positive 3 Wall and ceiling material considered indentical
Tuesday, August 17, 2010 Page 14 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER6 HVAC-Flexible duct/flex duct J
Insulation 80 sq ft Assumed positive
Not Abated
Galson 1993 MER6 Domestic Water Piping
Mud fittings 1 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 MER6 Ceiling Sheetrock 870 sq ft Positive 2 Wall and ceiling material considered identical
Not Abated
Galson 1993 MER6 Wall Sheetrock 1200 sq ft Positive 2
Not Abated
Galson 1993 MER6 Hot Water Heating Piping
Mud fittings 10 ftgs Positive 3 Mud fittings on fiberglass line
Tuesday, August 17, 2010 Page 15 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER6 HVAC-Duct surface-trowelled
Insulation 600 sq ft Positive 2
Not Abated
Galson 1993 MER6 Chilled Water System Piping
Fittings 32 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 MER5 Domestic Water Pipe
Insulation Negative Fiberglass, non-suspect ACM
Not Abated
Galson 1993 MER5 Fitting on pipe Tar wrap 5 ftgs Negative
Not Abated
Galson 1993 MER5 Domestic Water Fitting
Mud fittings 8 ftgs Positive 3 Mud fittings on fiberglass line
Tuesday, August 17, 2010 Page 16 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER5 Mech Equip - Domestic Hot Water
Insulation 94 sq ft Positive 3
Not Abated
Galson 1993 MER6 Domestic Water Fitting Insulation
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Classroom 1 Ceiling Tile - Lay In 1600 sq ft Negative 2' x 4' white fissured pattern
Not Abated
Galson 1993 Classroom 4 Ceiling Tile - Lay In 800 sq ft Negative 2' x 4' white, tiny fissured and perforatiions
Not Abated
Galson 1993 Classroom 4 Ceiling Tile - Lay In 800 sq ft Negative 2' x 4' white, small and large perforation
Tuesday, August 17, 2010 Page 17 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Classroom 4 Wall Sheetrock 2400 sq ft Positive 3
Not Abated
Galson 1993 Classroom 3 Floor Vinyl composite tile
1600 sq ft Assumed positive
7 12" x 12" white with black streaks
Not Abated
Galson 1993 Classroom 3 Ceiling Tile - Lay In 600 sq ft Negative 2' x 4' white, small and large perforation
Not Abated
Galson 1993 Classroom 3 Wall Sheetrock 2400 sq ft Positive 3
Not Abated
Galson 1993 Classroom 2 Floor Vinyl composite tile
1200 sq ft Assumed positive
7 12" x 12" white with black streaks
Tuesday, August 17, 2010 Page 18 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Classroom 2 Ceiling Tile - Lay In 800 sq ft Negative 2' x 4' white, small and large perforation
Not Abated
Galson 1993 Classroom 2 Ceiling Sheetrock 400 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Classroom 2 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Classroom 1 Ceiling Tile - Lay In Negative Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Office 3 Duct Fiberglass Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Tuesday, August 17, 2010 Page 19 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Classroom 1 Floor Vinyl composite tile
1600 sq ft Assumed positive
7 12" x 12" white with beige streaks, under carpet
Not Abated
Galson 1993 Office 3 Battery Insulation Material
Fiberglass 2900 sq ft Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Classroom 1 Ceiling Tile - Lay In 11000 sq ft Negative 2' x 4' white, grooved into 2' x 2' sections, fissured appearance
Not Abated
Galson 1993 Classroom 1 Ceiling Tile - Lay In 8600 sq ft Negative 2' x 4' white, small and large perforation
Not Abated
Galson 1993 Classroom 1 Ceiling Sheetrock 399 sq ft Positive 2 Wall and ceiling material considered identical
Tuesday, August 17, 2010 Page 20 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Classroom 1 Wall Sheetrock 33000 sq ft Positive 2
Not Abated
Galson 1993 Office 4 Duct Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Office 4 Battery Insulation Material
Fiberglass Assumed negative
Above ceiling. Fiberglass, non-suspect ACM.
Not Abated
Galson 1993 Office 4 Floor Vinyl Composite Tile Floor
6500 sq ft Assumed Positive
7 9" X 9" green with white streaks
Not Abated
Galson 1993 Office 4 Ceiling Ceiling Tile 320 sq ft Negative 2' X 4' White; tiny fissured and perforations.
Tuesday, August 17, 2010 Page 21 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Office 4 Ceiling Ceiling Tile 210 sq ft Negative 2' X 4' White fissured pattern
Not Abated
Galson 1993 Office 4 Ceiling Ceiling Tile 300 sq ft Negative 2' X 4' White; Small and Large Perforation.
Not Abated
Galson 1993 Office 4 Wall Sheetrock 10500 sq ft Positive 3
Not Abated
Galson 1993 MER1 Domestic water piping
Insulation 5 ft Positive 2
Not Abated
Galson 1993 Classroom 1 Wall Transite 15 sq ft Assumed positive
Tuesday, August 17, 2010 Page 22 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1997 1 FTB Floor Tile B 7% Fair
Not Abated
1999 1 SR Sheetrock NAD Fair White.
Not Abated
1996 5 SR Sheetrock NAD Fair
Not Abated
1996 4 SR Sheetrock NAD Fair
Not Abated
1996 3 MAST Mastic NAD Fair
Tuesday, August 17, 2010 Page 23 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1996 3 FT Floor Tile NAD Fair
Not Abated
1996 2 MAST Mastic 3% Chrysotile Fair
Not Abated
1996 2 FT Floor Tile 3% Chrysotile Fair
Not Abated
1996 1 MAST Mastic 3% Chrysotile Fair
Not Abated
1996 1 FT Floor Tile 3% Chrysotile Fair
Tuesday, August 17, 2010 Page 24 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1997 3 SR Sheetrock NAD Fair
Not Abated
1997 2 SR Sheetrock NAD Fair
Not Abated
Galson 1993 MER1 Mechanical Equipment - Tank
Insulation 32 sq ft Positive/Inconc lusive
Not Abated
1997 2 CT Ceiling Tile NAD Fair
Not Abated
2001 1 Trainer Unit F-16 TSI Thermal System Insulation
NAD Fair Gray.
Tuesday, August 17, 2010 Page 25 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1997 1 FTA Floor Tile A NAD Fair
Not Abated
Galson 1993 Toilet 2 Domestic Water Pipe Insulation
Fiberglass Assumed negative
Fiberglass, Non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Toilet 2 Battery Insulation Material
Fiberglass Assumed negative
Above ceiling. Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Toilet 2 Ceiling Sheetrock 840 sq ft Positive 4 Wall and ceiling material considered identical
Not Abated
Galson 1993 Toilet 2 Wall Sheetrock 13600 sq ft Positive 4
Tuesday, August 17, 2010 Page 26 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Toilet 1 Ceiling Sheetrock 928 sq ft Positive 3 Wall and ceiling material considered identical
Not Abated
Galson 1993 Toilet 1 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Storage 4 Ceiling Ceiling Tile Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Storage 4 Floor Vinyl Composite Tile Floor
3000 sq ft Assumed positive
7 12" X 12" White with black streaks
Not Abated
Galson 1993 Storage 4 Ceiling Ceiling Tile 89 sq ft Negative 2' X 4' white; Tiny fissured and perforations
Tuesday, August 17, 2010 Page 27 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Storage 4 Wall Sheetrock 6400 sq ft Positive 3
Not Abated
1997 3 FT Floor Tile NAD Fair
Not Abated
1997 11 CT Ceiling Tile NAD Fair
Not Abated
2009 wall C111-3 sheetrock <1% chrysolite
Not Abated
2009 wall C111-2 sheetrock 2% chrysolite
Tuesday, August 17, 2010 Page 28 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
2009 Wall C111-1 sheetrock <1% chrysolite
Not Abated
1997 1 SR Sheetrock NAD Fair
Not Abated
1997 4 SR Sheetrock NAD Fair
Not Abated
1997 3 SR Sheetrock NAD Fair
Not Abated
1997 2 SR Sheetrock NAD Fair
Tuesday, August 17, 2010 Page 29 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1997 1 SR Sheetrock NAD Fair
Not Abated
1997 16 FT Floor Tile 10% Fair
Not Abated
1997 15 CT Ceiling Tile NAD Fair
Not Abated
1997 14 CT Ceiling Tile NAD Fair
Not Abated
1999 2 SR Sheetrock NAD Fair White.
Tuesday, August 17, 2010 Page 30 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1997 12 FT Floor Tile NAD Fair
Not Abated
1999 3 SR Sheetrock NAD Fair White.
Not Abated
1997 10 CT Ceiling Tile NAD Fair
Not Abated
1997 9 FT Floor Tile NAD Fair
Not Abated
1997 8 CT Ceiling Tile NAD Fair
Tuesday, August 17, 2010 Page 31 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1997 7 FT Floor Tile NAD Fair
Not Abated
1997 6 CT Ceiling Tile NAD Fair
Not Abated
1997 5 FT Floor Tile 2% Chrysotile Fair 7% in green tile, NAD in white tile.
Not Abated
1997 4 CT Ceiling Tile NAD Fair
Not Abated
2001 3 Trainer Unit F-16 TSI Thermal System Insulation
NAD Fair White.
Tuesday, August 17, 2010 Page 32 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
2001 3 Trainer Unit F-16 TSI Thermal System Insulation
NAD Fair Gray.
Not Abated
2001 2 Trainer Unit F-16 TSI Thermal System Insulation
NAD Fair Gray.
Not Abated
2001 1 Trainer Unit F-16 TSI Thermal System Insulation
NAD Fair White.
Not Abated
Galson 1993 Storage 3 Ceiling Ceiling Tile Assumed negative
Fiberglass, non-suspect ACM
Not Abated
1997 13 CT Ceiling Tile NAD Fair
Tuesday, August 17, 2010 Page 33 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER2 Chilled Water System Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Storage 3 Battery Insulation Material
Fiberglass Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 MER4 Hot Water Heating Piping
Mud fittings 10 ftgs Positive 3
Not Abated
Galson 1993 MER4 HVAC-Duct surface-trowelled
Insulation 350 sq ft Positive 2
Not Abated
Galson 1993 MER4 Chilled Water System Piping
Fittings 18 ftgs Positive 3
Tuesday, August 17, 2010 Page 34 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER3 Chilled Water System Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 MER3 Hot Water Heating Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 MER3 HVAC-Flexible duct/flex duct J
Insulation 80 sq ft Assumed positive
Not Abated
Galson 1993 MER3 Ceiling Sheetrock 841 sq ft Positive 2 Wall and ceiling material considered identical
Not Abated
Galson 1993 MER3 Wall Sheetrock 1100 sq ft Positive 2
Tuesday, August 17, 2010 Page 35 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER3 Hot Water Heating Piping
Mud fittings 12 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 MER3 HVAC-Duct surface-trowelled
Insulation 800 sq ft Positive 1
Not Abated
Galson 1993 MER4 Ceiling Sheetrock 400 sq ft Positive 2 Wall and ceiling material considered identical
Not Abated
Galson 1993 MER2 Hot Water Heating Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 MER4 HVAC-Flexible duct/flex duct J
Insulation 80 sq ft Assumed positive
Tuesday, August 17, 2010 Page 36 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER2 HVAC-Flexible duct/flex duct J
Insulation 80 sq ft Assumed positive
Not Abated
Galson 1993 MER2 Ceiling Sheetrock 399 sq ft Positive 2 Wall and ceiling material considered identical
Not Abated
Galson 1993 MER2 Wall Sheetrock 800 sq ft Positive 2
Not Abated
Galson 1993 MER2 Hot Water Heating Piping
Mud fittings 6 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 MER2 HVAC-Duct surface-trowelled
Insulation 400 sq ft Positive 2
Tuesday, August 17, 2010 Page 37 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER2 Chilled Water System Piping
Mud fittings 12 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
Galson 1993 MER1 Mechanical Equipment
Insulation Assumed negative
Rubber material
Not Abated
Galson 1993 MER1 Hot Water Heating Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 MER1 Chilled Water System Piping
Fiberglass Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 MER1 Mechanical Equipment
Gasket 3 sq ft Assumed positive
Tuesday, August 17, 2010 Page 38 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER1 Domestic water fitting
Insulation 24 ftgs Positive 3 Mud fittings on fiberglass line
Not Abated
2009 wall A108A-1 sheetrock <1 %chrysolite
Not Abated
Galson 1993 MER3 Chilled Water System Piping
Fittings 16 ftgs Positive 3
Not Abated
Galson 1993 Shop 1 Ceiling Ceiling Tile 480 sq ft Negative 2' X 4' White fissured pattern
Not Abated
Galson 1993 MER1 Fitting on pipe Tar wrap 4 ftgs Negative
Tuesday, August 17, 2010 Page 39 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Storage 3 Wall Sheetrock 1100 sq ft Positive 3
Not Abated
Galson 1993 Storage 2 Ceiling Ceiling Tile Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Storage 2 Battery Insulation Material
Fiberglass Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Storage 2 Duct Fiberglass Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Storage 2 Ceiling Ceiling Tile 5700 sq ft Negative 2' X 4' White; Tiny fissured and perforations
Tuesday, August 17, 2010 Page 40 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Storage 2 Wall Sheetrock 6800 sq ft Positive 3
Not Abated
Galson 1993 Storage 1 Ceiling Ceiling Tile Assumed negative
Fiberglass, non-suspect ACM
Not Abated
Galson 1993 Storage 1 Floor Vinyl Composite Tile Floor
1200 sq ft Assumed positive
7 12" X 12" White with beige streaks
Not Abated
Galson 1993 Storage 1 Ceiling Ceiling Tile 64 sq ft Negative 2' X 4' White fissured pattern
Not Abated
Galson 1993 Storage 1 Wall Sheetrock 2000 sq ft Positive 7
Tuesday, August 17, 2010 Page 41 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MER4 Wall Sheetrock 619 sq ft Positive 2
Not Abated
Galson 1993 Shop 1 Wall Wall Transite 15 sq ft Assumed positive
Not Abated
Galson 1993 Storage 3 Duct Fiberglass Assumed negative
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Shop 1 Wall Sheetrock 2000 sq ft Positive 3
Not Abated
Galson 1993 Shop 1 Chilled Water System Fittings
Fittings 6 ftgs Positive 3 Mud fittings on fiberglass line
Tuesday, August 17, 2010 Page 42 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 Roof Wall Wall Transite 3400 sq ft Assumed positive
Not Abated
Galson 1993 Roof Asphalt and Gravel
Asphalt and Gravel
75000 sq ft Assumed positive
Not Abated
Galson 1993 Office 6 Battery Insulation Material
Fiberglass Assumed negatie
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Office 6 Duct Fiberglass Assumed negatie
Fiberglass, non-suspect ACM. Above ceiling.
Not Abated
Galson 1993 Office 6 Ceiling Ceiling Tile Assumed negative
Fiberglass, non-suspect ACM
Tuesday, August 17, 2010 Page 43 of 45Exhibit 2
Bldg No/Street Address 1040 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .