3. (4) TASK ORDER 0002 POST OFFICE SURVEILLANCE PWS
Text of this file
FA3020‐10‐R‐0041, A0001
Attachment 4
Task Order #2 18 Aug 2010
MA-SASC Task Order:
Performance Work Statement on
Bldg 551, Base Postal Services Facility Video Surveillance System
REQUIREMENTS:
1. The vendor will design a turnkey, IP based, private network, video observation system for the Postal Services in building 551, Sheppard AFB TX.
a. At a minimum, the system should consist of IP cameras, CAT 5e or CAT 6 cabling, a network video recorder, manageable, IPv6 network switch, UPS, equipment cabinet and computer.
b. The design should consist of approximately 12 interior cameras and two exterior cameras
c. Cameras may be POE if more advantageous than running AC electrical power
2. The vendor will provide all equipment, software and necessary installation tasks to provide the video observation system for the Postal Services in building 551, Sheppard AFB TX.
3. The system will provide a 7 - 14 day storage capability.
4. The IP cameras will be motion activated to conserve storage requirements.
5. The recording and storage equipment will be maintained in a locked room (comm room).
6. Uninterrupted power source (UPS) for a minimum of 60 minutes
7. All computers provided under this contract will meet applicable Air Force standards
8. All network switches provided under this contract will be CISCO brand and meet applicable Air Force standards.
9. All cable installation will meet or exceed industry and Air Force standards
10. The vendor will submit a proposal of the system design and list of components
11. The vendor will provide a minimum of two training sessions to familiarize users with the operation and maintenance of the system
12. The vendor will provide a minimum of two hard and soft copies of any manufacturer information on equipment installed, installation drawings and training material.
13. The vendor will provide a 12 month warranty for the installation and all equipment and supplies used in the installation. This is in addition to any manufacturer’s warranty
FA3020‐10‐R‐0041, A0001
Attachment 4
Task Order #2 18 Aug 2010
Task Order Contract Line Items (CLINS):
CLIN Description 0001 Design a turnkey, IP based, private network, video observation system for the Postal Services operation in bldg 551, Sheppard AFB TX
0002 Provide and install all equipment and supplies for the video observation system
0003 Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system
Exhibits
1. Bldg 571 Drawing
2. Bldg 571 Asbestos Survey (7 pages)
USPS Area = 1,791 SF (for Custodial Purposes)
X marks surveillance coverage areas
Break Room
X
XX X
X
X X X
X
XX
X
Exhibit 1
Randell.Smith Line
SHEPPARD AFB
ASBESTOS-CONTAINING BUILDING MATERIALS
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1996 1 FT Floor NAD Fair
Not Abated
Galson 1993 KI01BAKE Wall SR Sheetrock 6800 sq. ft. Positive 3
Not Abated
Galson 1993 EX0XEXT Wall WL Unspecified Type
Ass. Negative Exterior surfacing material with stucco finish, termed dry-vit, was sampled in bldg - as material -, in building - as mateial and in bldg - as
Not Abated
Galson 1993 CS0BCRAW L
Floor SFPPT Structural Fireproofing Patch
15000 sq. ft. Negative Gray material sprayed on underside of concrete.
Not Abated
1996 3 MAST Mastic No sample. Fair
Not Abated
Sunday, September 12, 2010 Page 1 of 7Exhibit 2
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1996 3 FT Floor NAD Fair
Not Abated
1996 2 MAST Mastic NAD Fair
Not Abated
1998 1 EXT Exterior Wall Material
NAD Fair Tan.
Not Abated
1996 1 MAST Mastic NAD Fair
Not Abated
Galson 1993 KI01BAKE Batt Insulation Material
IM Insulating Material
6300 sq. ft. Negative Dark gray fibers between 2 paper layers. Above ceiling.
Sunday, September 12, 2010 Page 2 of 7Exhibit 2
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1998 4 Kitchen CT Ceiling Tile NAD Fair 2x4 white/gray.
Not Abated
1998 3 Kitchen CT Ceiling Tile NAD Fair 2x4 white/gray.
Not Abated
1998 2 Kitchen CT Ceiling Tile NAD Fair 2x4 white/gray.
Not Abated
1998 1 Kitchen CT Ceiling Tile NAD Fair 2x4 white/gray.
Not Abated
1998 3 EXT Exterior Wall Material
NAD Fair Tan.
Sunday, September 12, 2010 Page 3 of 7Exhibit 2
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
1998 2 EXT Exterior Wall Material
NAD Fair Tan.
Not Abated
1996 2 FT Floor NAD Fair
Not Abated
Galson 1993 OF01POST Wall SR Sheetrock 7600 sq. ft. Positive 3
Not Abated
Lambert & Associates, INC.
6/14/2010 box A0969 drywall 551-1 tan surfaced white compound none detected
Not Abated
Galson 1993 RF0RROOF Roof RFAG Asphalt and Gravel
17000 sq. ft. Ass. Positive 7 Peaked roof.
Sunday, September 12, 2010 Page 4 of 7Exhibit 2
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 OF01POST Floor FLVCT Vinyl Composite Tile
1100 sq. ft. Ass. Positive 7 1'x1' pink mottled.
Not Abated
Galson 1993 OF01POST Floor FLVCT Vinyl Composite Tile
5300 sq. ft. Ass. Positive 7 1'x1' gray mottled.
Not Abated
Galson 1993 OF01POST Ceiling CLLI Lay-in 4400 sq. ft. Negative 2'x4' white fissures.
Not Abated
Galson 1993 OF01POST Batt Insulation Material
IM Insulating Material
7200 sq. ft. Negative Dark gray fibers between 2 paper layers. Above ceiling.
Not Abated
Galson 1993 KI01BAKE Ceiling SR Sheetrock 3300 sq. ft. Positive 4 Wall and ceiling material considered identical.
Sunday, September 12, 2010 Page 5 of 7Exhibit 2
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 OF01POST Ceiling SR Sheetrock 1800 sq. ft. Positive 3 Wall and ceiling material considered identical.
Not Abated
Galson 1993 KI01BAKE Ceiling CLLI Lay-in 3000 sq. ft. Negative 2'x4' tiny fissure.
Not Abated
Galson 1993 MR01MECH Fitting FI Unspecified Type
Ass. Negative Fiberglass, non-suspect ACM.
Not Abated
Galson 1993 MR01MECH Piping PI Unspecified Type
Ass. Negative Fiberglass, non-suspect ACM.
Not Abated
Galson 1993 MR01MECH Batt Insulation Material
IM Insulating Material
250 sq. ft. Negative Dark gray fibers between 2 paper layers. Above ceiling.
Sunday, September 12, 2010 Page 6 of 7Exhibit 2
Bldg No/Street Address 551 Construction Date
Description of Building Housing Group (if applicable)
Sampled by
Sampling Date
Space ID Material Location
Sample
ID
Material Approximate Quantity
Asbestos Content
Asbestos Type
Condition Comments
Galson 1993 MR01MECH Ceiling SR Sheetrock 250 sq. ft. Positive 2 Wall and ceiling material considered identical.
Not Abated
Galson 1993 MR01MECH Wall SR Sheetrock 560 sq. ft. Positive 1
Not Abated
Galson 1993 KI01BAKE Piping PI Unspecified Type
Ass. Negative Foam rubber. Non-suspect
ACM.
Not Abated
Lambert & Associates, INC.
6/14/2010 box A0969 drywall 551-1(1-2) whited drywall with paper none detected
Not Abated
Galson 1993 OF01POST Ceiling CLLI Lay-in 960 sq. ft. Negative 2'x4' tiny fissure.
Sunday, September 12, 2010 Page 7 of 7Exhibit 2
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .