6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS.pdf

PDF 531 KB Posted

Attached to
Sheppard AFB MA-SASC Solicitation Federal contract opportunity
Solicitation number
FA3020-10-R-0041
Issued by
Department of the Air Force Air Education and Training Command

About this file

FA3020-10-R-0041 6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS

View the file

Other files for this federal contract opportunity

Other files attached to Sheppard AFB MA-SASC Solicitation, newest first.
File Type Posted
Atch 8. 0006--Door Locks Bldgs 1670 530 527 280 Task Order PWS —
Amendment 0003 —
Atch 5. 0003--82 TRG Dorms 596 776 862 Task Order PWS —
Amendment 0002 —
16. M -SASC ITO Eval Criteria —
7. 0005--PA Systems Hangars 1040 1080 1090 Task Order PWS —
1. M -SASC PWS Final —
16. M -SASC ITO Eval Criteria.pdf PDF
5. 0003--82 TRG Dorms 596 776 862 Task Order PWS —
1. M -SASC PWS Final —
6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS —
3. 0001--Dorm 622 Task Order PWS —
Amendment 0001 —
7. 0005--PA Systems Hangars 1040 1080 1090 Task Order PWS —
4. 0002--Post Office Surveillance Task Order PWS —
8. 0006--Door Locks Bldgs 280 527 530 1670 Task Order PWS —
Initial M -SASC Task Orders —
Sheppard AFB Contractors —
M -SASC Site Visit.pptx PPTX presentation
M -SASC RFP.pdf PDF
13. Past Performance Questionnaire.pdf PDF
4. 0002--Post Office Surveillance Task Order PWS.pdf PDF
10. General WD TX 43.pdf PDF
11. General WD TX 302.pdf PDF
12. Contractor Past Performance Submittal Form.pdf PDF
2. SECTION 13280 Asbestos Abatetement.pdf PDF
8. 0006--Electronic Door Lock Systems Bldgs 280 527 530 1670 Task Order PWS.pdf PDF
1. M -SASC PWS Final —
15. M -SASC Performance Plan.pdf PDF
3. 0001--Dorm 622 Task Order PWS.pdf PDF
7. 0005--Public Address Systems Hangars 1040 1080 and 1090 Task Order PWS.pdf PDF
14. Base Pass Forms.pdf PDF
5. 0003--82 TRG Dorms 596 776 862 Task Order PWS.pdf PDF
9. Service Contract WD TX 2005-2525.pdf PDF
M -SASC RFP.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order #4 5 Sep 2010

MA-SASC Task Order:

Performance Work Statement on

Monitored Panic System (Vindicator System), Buildings 315 and 317

1. Project Scope: To supply all necessary components and labor required to install a multi zone panic system for the receptionist, command section, military justice section and the court house that will interface with the existing base Vindicator System at Sheppard AFB, TX. The design and installation shall provide state-of-the-art technology monitored panic system for legal personnel to security personnel. All installed cabling must meet Air Force quality, safety, and installation standards.

2. Panic System Requirements for Legal Office at SAFB:

2.1.1. Provide all labor and materials to connect the receptionist and judge in separate buildings that are within close proximity to the existing base Vindicator duress alarm system.

2.1.2. Unit will contact Security Forces via the base Vindicator duress alarm system to notify security forces to dispatch in the event of safety/security issues requiring law enforcement response.

2.2. Unit Specifications.

A. Compatibility: Unit will need communications cable installed to from the duress alarm

(panic buttons) in the facility to connect to the existing Sheppard AFB Vindicator system.

B. Capacity: Four panic buttons to be installed at the front desk, military justice and command section of Building 315, fourth button to be installed on judge’s bench in Building 317.

C. Dry Contacts: Based on current Vindicator system requirements.

D. Range: Range from sensors to control panel is up to 1.7 miles depending on local site conditions (based on current Vindicator system requirements).

3. Electrical Work and Building Modifications:

3.1. The contractor shall provide any required electrical work and building modifications necessary for system operation.

3.2. The contractor shall install communication cable between duress (panic buttons) and base Vindicator equipment.

4. System Training and Documentation:

4.1. System shall be tested by contractor with the approval of appropriate SAFB personnel.

4.2. A minimum of two (2), training sessions on all equipment shall be conducted for personnel to familiarize them with operation and maintenance of the system.

4.3. Training materials, including user manuals, shall be duplicated and distributed for usage and future training.

4.4. A one-year warranty shall be provided from the date of acceptance on all installation-related cabling and workmanship.

5. Preventative Maintenance Inspections (PMI) and Service Plans:

5.1.

A: Quarterly operational checks of the equipment shall be conducted for a period of one

(1) year to ensure equipment is in optimum working condition. This includes services such as checking battery power, cleaning contacts, and communication testing.

Exhibits

1. Layouts, Buildings 315 and 317

Task Order Contract Line Items (CLINS):

CLIN Description 0001 Design and provide all labor and materials to provide Vindicator duress alarm connectivity between Buildings 315 and 317, the existing Vindicator alarm system and the Law Enforcement Desk at Building 2118.

0002 Provide a minimum of two training sessions to familiarize users with the operation and maintenance of the system and a minimum of two hard and soft copies of any manufacturer’s information on the installed system

Exhibit 1

Exhibit 1