11. General WD TX 302.pdf

PDF 580 KB Posted

Attached to
Sheppard AFB MA-SASC Solicitation Federal contract opportunity
Solicitation number
FA3020-10-R-0041
Issued by
Department of the Air Force Air Education and Training Command

About this file

FA3020-10-R-0041 11. General WD TX 302

View the file

Other files for this federal contract opportunity

Other files attached to Sheppard AFB MA-SASC Solicitation, newest first.
File Type Posted
Amendment 0003 —
Atch 8. 0006--Door Locks Bldgs 1670 530 527 280 Task Order PWS —
Atch 5. 0003--82 TRG Dorms 596 776 862 Task Order PWS —
Amendment 0002 —
16. M -SASC ITO Eval Criteria —
7. 0005--PA Systems Hangars 1040 1080 1090 Task Order PWS —
1. M -SASC PWS Final —
6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS —
16. M -SASC ITO Eval Criteria.pdf PDF
5. 0003--82 TRG Dorms 596 776 862 Task Order PWS —
1. M -SASC PWS Final —
7. 0005--PA Systems Hangars 1040 1080 1090 Task Order PWS —
4. 0002--Post Office Surveillance Task Order PWS —
8. 0006--Door Locks Bldgs 280 527 530 1670 Task Order PWS —
3. 0001--Dorm 622 Task Order PWS —
Amendment 0001 —
M -SASC Site Visit.pptx PPTX presentation
Initial M -SASC Task Orders —
Sheppard AFB Contractors —
M -SASC RFP.pdf PDF
13. Past Performance Questionnaire.pdf PDF
4. 0002--Post Office Surveillance Task Order PWS.pdf PDF
14. Base Pass Forms.pdf PDF
5. 0003--82 TRG Dorms 596 776 862 Task Order PWS.pdf PDF
6. 0004--Courthouse Vindicator Duress Alarms Task Order PWS.pdf PDF
9. Service Contract WD TX 2005-2525.pdf PDF
M -SASC RFP.pdf PDF
10. General WD TX 43.pdf PDF
12. Contractor Past Performance Submittal Form.pdf PDF
2. SECTION 13280 Asbestos Abatetement.pdf PDF
8. 0006--Electronic Door Lock Systems Bldgs 280 527 530 1670 Task Order PWS.pdf PDF
1. M -SASC PWS Final —
15. M -SASC Performance Plan.pdf PDF
3. 0001--Dorm 622 Task Order PWS.pdf PDF
7. 0005--Public Address Systems Hangars 1040 1080 and 1090 Task Order PWS.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: TX100302 08/13/2010 TX302

Superseded General Decision Number: TX20080302

State: Texas

Construction Type: Building

County: Wichita County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 04/16/2010

3 08/13/2010

* BOIL0074-001 08/08/2010

Rates Fringes

BOILERMAKER......................$ 25.95 16.88

BRTX0005-002 12/01/2009

Bricklayer.....................$ 24.82 7.53

* ELEC0681-001 06/01/2010

ELECTRICIAN......................$ 22.24 7.55+3.75%

ENGI0178-004 12/01/2009

OPERATOR: Forklift..............$ 21.20 9.35

IRON0263-017 06/01/2008

Ironworker, reinforcing........$ 20.90 4.60

PAIN0053-003 04/01/2008

Painter - Brush, Roller &

Spray............................$ 15.81 4.56

FA3020-10-R-0041

Attachment 11

* PLUM0389-006 07/01/2010

PLUMBER/PIPEFITTER...............$ 21.52 7.05

* SUTX2009-174 06/03/2009

CARPENTER, Includes

Acoustical Ceiling

Installation, Form Work, and

Metal Stud Installation..........$ 13.20 0.00

CEMENT MASON/CONCRETE FINISHER...$ 12.98 0.00

IRONWORKER, STRUCTURAL...........$ 11.24 0.00

LABORER: Common or General......$ 8.63 0.00

LABORER: Mason Tender - Brick...$ 11.00 0.00

OPERATOR: Backhoe/Excavator.....$ 13.81 0.00

OPERATOR: Blade/Grader..........$ 13.06 0.00

OPERATOR: Front End Loader......$ 13.30 0.00

ROOFER...........................$ 11.42 0.00

TILE SETTER......................$ 8.50 0.00

TRUCK DRIVER.....................$ 10.53 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined

FA3020-10-R-0041

to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction

Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR

Part 7).

Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested

FA3020-10-R-0041

party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board

(formerly the

Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

FA3020-10-R-0041

File details come from the government source that posted it. Updated .