PWS_Summary_of_Changes.pdf

PDF 207 KB Posted

Attached to
Air Combat Training Systems (ACTS) Services Federal contract opportunity
Solicitation number
FA300213R0026
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

PWS Summary of Changes

View the file

Other files for this federal contract opportunity

Other files attached to Air Combat Training Systems (ACTS) Services, newest first.
File Type Posted
FA3002-13-R-0026-0004_ACTS_PoP_Amendment.doc DOC document
RFP_Amendment_3.pdf PDF
Appendix_4_19_Jul_13.pdf PDF
Appendix_2_19_Jul_13.pdf PDF
RFP_Amendment_3.pdf PDF
Changes_to_Appendices_23_Jul_13.pdf PDF
Appendix_9__19_Jul_13.pdf PDF
Appendix_8_19_Jul_13.pdf PDF
Appendix_6_19_Jul_13.pdf PDF
Appendix_5_19_Jul_13.pdf PDF
PWS_31_Jul_13.pdf PDF
Appendix_7_19_Jul_13.pdf PDF
Appendix_1_19_Jul_13.pdf PDF
Appendix_3_19_Jul_13.pdf PDF
FA3002-13-R-0026-0002.pdf PDF
UPDATED_31_Jul_13_FA3002-13-R-0026_Amendment_0001.pdf PDF
Luke_AFB_Questions-_Updated_30_July_2013.xlsx XLSX spreadsheet
Luke_AFB_Questions.xlsx XLSX spreadsheet
Holloman_AFB_Q A.xlsx XLSX spreadsheet
Q A_1.docx DOCX document
ATCH_14_10_May_13_PAST_PERFORMANCE_INFORMATION_SHEET.pdf PDF
ATCH_3_10_May_13__PWS_Appendix_2.pdf PDF
FA3002-13-R-0026_ACTS_RFP.pdf PDF
ATCH_6_10_May_13__PWS_Appendix_5.pdf PDF
ATCH_10_8_May_13__PWS_Appendix_9.pdf PDF
ATCH_12_10_May_13_Past_Performance_Cover_Letter.pdf PDF
ATCH_5_8_May_13__PWS_Appendix_4.pdf PDF
ATCH_11_10_May_13__Wage_Determination_Holloman_AFB.pdf PDF
ATCH_2_10_May_13__PWS_Appendix_1.pdf PDF
ATCH_15__10_May_13_PAST_PERFORMANCE_CONSENT_FORM.pdf PDF
ATCH_4_8_May_13__PWS_Appendix_3.pdf PDF
ATCH_8_8_May_13_PWS_Appendix_7.pdf PDF
ATCH_9_8_May_13__PWS_Appendix_8.pdf PDF
ATCH_1_10_May_13_Performance_Work_Statement_(PWS).pdf PDF
ATCH_17_1_July_13_Contract_Security_Classification_Specification_(DD_Form_254).pdf PDF
ATCH_16_10_May_13_CBA_Luke_AFB _AZ_(WD_No2013-0111).PDF PDF
ATCH_13_10_May_13_PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATCH_7_16_May_13__PWS_Appendix_6.pdf PDF
ACTS_FA300213R0026.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Changes

- Removed section 3 from Table of Contents

- Renumbered Table of Contents

- 1.1.1 Removed reference to Holloman AFB and inserted a statement about future ACTS location at Holloman.

- 1.1.3. Removed reference to two different site specific sections of the PWS

- 1.1.4 Changed last sentence from:

o The following table depicts ACTS locations delineated by 'Primary' and 'Ancillary' location. Ancillary ACTS locations are those locations where ACTS equipment is physically stationed and the contractor has operation/maintenance responsibility. The contractor shall abide by all standards and expectations depicted in this PWS, sections two and three, when providing services at all ACTS locations, to;

o The following table depicts ACTS locations delineated by 'Primary' and 'Ancillary' location. Ancillary ACTS locations are those locations where ACTS equipment is physically stationed and the contractor has operation/maintenance responsibility. The contractor shall abide by all standards and expectations depicted in this PWS, section two when providing services at all ACTS locations. Section three reserved for Holloman.

o Table 1-1. Added Reserved to Holloman AFB

- 1.2.1.1 Removed reference to Holloman AFB

- 1.2.2.1. Removed reference to Holloman AFB

- 1.2.4. Changed 30 days to 1-month, and 30 days to month

- 1.2.4.1 Changed 30 days to 1-month

- 1.2.4.4 Changed 30 days to 1-month

- ADDED: 2.2.2.5.2. Computer Information Assurance (IA)/Network Support o Contractor will provide IA, computer, and network support for government systems within the 56 Range Management Organization (56 RMO) IAW applicable Air Force instructions. The government will provide all Air Force required training and associated costs on a reimbursable basis for computer, network, and IA certifications.

- 2.2.3.1.6. Removed reference to Air Combat Maneuvering and Instrumentation System and replace it with Air Combat Training System (ACTS)

- 2.4. Removed reference to Holloman AFB

- Removed Section 3 in its entirety

- 4.2.4. Removed reference to “For Luke only”

- Table 4-1 Removed reference to Holloman AFB

- 4.4. Removed reference to Holloman AFB

- Table 5-1 PO-1 removed reference to PWS para 3.2.1

- 5.2.1. Removed reference to para 3.2.1

- 6.2.9. Corrected spelling of Government

File details come from the government source that posted it. Updated .