Appendix_6_19_Jul_13.pdf
PDF 181 KB Posted
- Attached to
- Air Combat Training Systems (ACTS) Services Federal contract opportunity
- Solicitation number
- FA300213R0026
About this file
PWS Appendix 6 (revised)
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR COMBAT TRAINING SYSTEM
APPENDIX 6 TO ATTACHMENT 1 – Historical Workload Estimates i
TABLE OF CONTENTS
1. HISTORICAL WORKLOAD ESTIMATES……………………………………………………………………………... 1
1.1. Holloman AFB (Reserved for Future Use)……………………………………………
1.1.1. ACTS Operational Workload (Reserved for Future Use)……………….…………………………... 1
1.1.2. ACTS Maintenance Workload (Reserved for Future Use)………………………………………... 1
1.1.3. ACTS Demonstrations (Reserved for Future Use)………………….………………………………. 1
1.2. Luke AFB…………………………………………………………………………………………………….. 2
1.2.1. ACTS Operational Workload……………………………………………………………………...… 2
1.2.2. ACTS Demonstrations………………………………………………………………………………. 2
1.2.3. Gila Bend AFAF Communications-Electronics Services…………………………………………… 2
1.2.4. Manned Range Workload
1.2.5 ACTS Maintenance Workload……………………………………………………………………….. 3
1.2.6 Link 16 Operational Workload ……………………………………………………………………… 3
1.2.7 Mobile Target System (MTS) Operational Workload …………………………………………..……4
APPENDIX 6
WORKLOAD INFORMATION
1.1. Holloman AFB (Reserved for Future Use)
1.1.1. ACTS OPERATIONAL WORKLOAD (Reserved for Future Use)
1.1.2. ACTS MAINTENANCE WORKLOAD (Reserved for Future Use)
1.1.3. ACTS DEMONSTRATIONS (Reserved for Future Use)
1.2. Luke
1.2.1. ACTS OPERATIONAL WORKLOAD
The following table depicts the historical operational workload at Luke AFB. The table depicts total 'Sorties Scheduled' and 'Sorties Flown' per fiscal year (FY). The data provided is based on information available.
OPERATIONAL WORKLOAD AT LUKE AFB
FY11 FY12 TO TAL AVG PER FY
SO RTIES SCHEDULED 8337 6792 15129 7564
SO RTIES FLO WN 7702 6280 13982 6991
EW OPERATIONAL WORKLOAD AT LUKE AFB
MISSIONS 571 558 993 496
1.2.2. ACTS DEMONSTRATIONS
The following table depicts hours expended providing demonstrations at Luke AFB. The table depicts total hours expended per FY. The data provided is based on information available.
DEMONSTRATION WORKLOAD
DEMO NSTRATIO N HO URS 48 50 98 49
1.2.3. GILA BEND AFAF COMMUNICATIONS -ELECTRONICS SERVICES
1.2.3.1. OPERATIONS WORKLOAD
The following estimated workload is based on normal daily performance. These figures are a combined average workload for all ranges and Childs Mtn. NOTE: Unscheduled maintenance varies widely, dependent primarily on usage of the equipment and climatic conditions (i.e., lightning strikes, heat, etc.)
1.2.3.2. MAINTENANCE WORKLOAD
EW THREAT MAINTENANCE
MAINTENANCE TASKS ESTIMATED MONTHLY MAINTENANCE WO RKLOAD
Maintenance and PMIs 2.5 hours
Travel Time 2 hours
Base Support 0.5 hour
RADIO MAINTENANCE
MAINTENANCE TASKS ESTIMATED MONTHLY MAINTENANCE WO RKLOAD
Maintenance and PMIs 8 hours
Base Support 1.1 hours
WEATHER/METEORO LOGICAL MAINTENANCE
MAINTENANCE TASKS TIME EXPENDED (SCHEDULED MONTHLY)
PMIs 4 hours
Travel Time 1.5 hours
RANGE MICROWAVE SYSTEM MAINTENANCE
MAINTENANCE TASKS TIME EXPENDED (SCHEDULED MONTHLY)
PMIs 1 hour
1.2.4. MANNED RANGES WORKLOAD
RCO / TRACKER WORKLOAD
TASKS ESTIMATED ANNUAL WO RKLO AD (Range Period Aprox. 40 minutes)
Scoring and Operational Control of Range 3400 range periods (day/night)
Set-Up of strafe pits 2400 periods
Inspect Facilities and Test Equipment 540 periods
Administrative Duties 1500 hours
1.2.5 ACTS MAINTENANCE WORKLOAD
The following table depicts the projected maintenance workload at Luke AFB. The table depicts total expected number of unscheduled ‘Maintenance Manhours Expended (per Subsystem)’. The data provided is based on information available.
MAINTENANCE WORKLOAD AT Luke AFB
FY14 FY15
AS 270 270
GS 30 30
1.2.6 LINK 16 OPERATIONAL WORKLOAD
The following table depicts the projected operational workload at Luke AFB Link 16. The data provided is based on information available.
Link 16 Operations FY11 FY12
Mission Scenarios 54 77
SADL Sorties 11,495 8,106
Link 16 Sorties 17,193 14,146
1.2.7 Mobile Target System (MTS) WORKLOAD
The following table depicts the projected operational workload for the Mobile Target System. The data provided is based on information available.
MTS Operations FY11 FY12
Vehicle/System Maintenance (Hours)/Month N/A 2
Missions/Month (Number and duration in hours) N/A 5/2
File details come from the government source that posted it. Updated .