ATCH_8_8_May_13_PWS_Appendix_7.pdf

PDF 56 KB Posted

Attached to
Air Combat Training Systems (ACTS) Services Federal contract opportunity
Solicitation number
FA300213R0026
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

ATCH 8 PWS Appendix 7

View the file

Other files for this federal contract opportunity

Other files attached to Air Combat Training Systems (ACTS) Services, newest first.
File Type Posted
FA3002-13-R-0026-0004_ACTS_PoP_Amendment.doc DOC document
RFP_Amendment_3.pdf PDF
Appendix_4_19_Jul_13.pdf PDF
Appendix_2_19_Jul_13.pdf PDF
RFP_Amendment_3.pdf PDF
Changes_to_Appendices_23_Jul_13.pdf PDF
Appendix_9__19_Jul_13.pdf PDF
Appendix_8_19_Jul_13.pdf PDF
PWS_Summary_of_Changes.pdf PDF
Appendix_6_19_Jul_13.pdf PDF
Appendix_5_19_Jul_13.pdf PDF
PWS_31_Jul_13.pdf PDF
Appendix_7_19_Jul_13.pdf PDF
Appendix_1_19_Jul_13.pdf PDF
Appendix_3_19_Jul_13.pdf PDF
FA3002-13-R-0026-0002.pdf PDF
UPDATED_31_Jul_13_FA3002-13-R-0026_Amendment_0001.pdf PDF
Luke_AFB_Questions-_Updated_30_July_2013.xlsx XLSX spreadsheet
Luke_AFB_Questions.xlsx XLSX spreadsheet
Holloman_AFB_Q A.xlsx XLSX spreadsheet
Q A_1.docx DOCX document
ATCH_14_10_May_13_PAST_PERFORMANCE_INFORMATION_SHEET.pdf PDF
ATCH_3_10_May_13__PWS_Appendix_2.pdf PDF
FA3002-13-R-0026_ACTS_RFP.pdf PDF
ATCH_6_10_May_13__PWS_Appendix_5.pdf PDF
ATCH_10_8_May_13__PWS_Appendix_9.pdf PDF
ATCH_12_10_May_13_Past_Performance_Cover_Letter.pdf PDF
ATCH_5_8_May_13__PWS_Appendix_4.pdf PDF
ATCH_11_10_May_13__Wage_Determination_Holloman_AFB.pdf PDF
ATCH_2_10_May_13__PWS_Appendix_1.pdf PDF
ATCH_15__10_May_13_PAST_PERFORMANCE_CONSENT_FORM.pdf PDF
ATCH_4_8_May_13__PWS_Appendix_3.pdf PDF
ATCH_9_8_May_13__PWS_Appendix_8.pdf PDF
ATCH_1_10_May_13_Performance_Work_Statement_(PWS).pdf PDF
ATCH_17_1_July_13_Contract_Security_Classification_Specification_(DD_Form_254).pdf PDF
ATCH_16_10_May_13_CBA_Luke_AFB _AZ_(WD_No2013-0111).PDF PDF
ATCH_13_10_May_13_PAST_AND_PRESENT_PERFORMANCE_QUESTIONNAIRE.pdf PDF
ATCH_7_16_May_13__PWS_Appendix_6.pdf PDF
ACTS_FA300213R0026.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR COMBAT TRAINING SYSTEM

APPENDIX 7 TO ATTACHMENT 1 - REPORTS, PLANS, AND APPOINTMENTS

i

TABLE OF CONTENTS

REPORT 1: TRAVEL REIMBURSEMENT REQUEST

REPORT 2: TRIP REPORT

REPORT 3: MEETING MINUTES

REPORT 4: MONTHLY PERFORMANCE REPORT

REPORT 5: QC CROSSTELL REPORT

REPORT 6: CRYPTOGRAPHIC ACCESS CERTIFICATE

REPORT 7: BMGR EVENTS LOG...……………………

REPORT 8: OPEN PURCHASE REQUEST

REPORT 9: PRODUCT QUALITY DEFICIENCY REPORT...........………

REPORT 10: GFP LISTING.......…………………

REPORT 11: ANNUAL REPORT OF GOVERNMENT PROPERTY

REPORT 12: FINANCIAL REPORT..........................……………

REPORT 13: COMSEC INSECURITY REPORT......................................................…

REPORT 14: ACTS HARDWARE AND SOFTWARE CONFIGURATION REPORT…………………………………………….. 4

REPORT 15: ACTS PHYSICAL CONFIGURATION REPORT………………………………………………………………………. 4

REPORT 16: OVERTIME REQUEST…………………………………………………………………………………………………….. 4

REPORT 17: SYSTEM OVERHAUL FORECAST

PLAN 1: QUALITY CONTROL PLAN…………………………………………………………………………………………………..5

PLAN 2: PHASE-IN PLAN……………………………………………………………………………………………………………….. 5

PLAN 3: PHASE-OUT PLAN……………………………………………………………………………………………………………..5

PLAN 4: LOCAL WORKCARDS………………………………………………………………………………………………………… 6

PLAN 5: TRANSPORTATION PLAN……………………………………………………………………………………………………. 6

PLAN 6: PROJECT PLANS………………………………………………………………………………………………………………. 6

PLAN 7: SECURITY PROGRAM PLAN………………………………………………………………………………………………... 7

PLAN 8: ENVIRONMENTAL MANAGEMENT PLAN………………………………………………………………………………... 7

PLAN 9: CONFIGURATION MANAGEMENT PLAN……………………………………………………………………………….. 7

PLAN 10: STRIKE PLAN………………………………………………………………………………………………………………… 7

PLAN 11: PROJECT PLANS……………………………………………………………………………………………………………. 7

APPOINTMENT 1: SITE MANAGERS AND ALTERNATES………………………………………………………………………… 7

APPOINTMENT 2: COMSEC MANAGER AND ALTERNATE……………………………………………………………………. 8

APPOINTMENT 3: MATERIAL CONTROL MANAGERS…………………………………………………………………………… 8

APPOINTMENT 4: ASSET ACCOUNT CUSTODIANS……………………………………………………………………………….. 8

APPOINTMENT 5: ADPE CUSTODIAN………………………………………………………………………………………………. 8

APPOINTMENT 6: COMPUTER SYSTEMS SECURITY OFFICER…………………………………………………………………. 9

APPOINTMENT 7: FACILITY MANAGER…………………………………………………………………………………………….. 9

APPOINTMENT 8: LIBRARY

APPENDIX 7

REPORTS, PLANS AND APPOINTMENTS

Unless otherwise noted reports, plans and appointment formats shall be determined by the contractor, submitted to Government QA personnel (COR) at Holloman AFB and Luke AFB, and submitted in an electronic format (e.g. Microsoft Office Application) preferably as an e-mail attachment.

REPORT 1: TRAVEL REIMBURSEMENT REQUEST

Description: Reason for travel, itinerary, travelers, associated costs (e.g., airfare, rental car, lodging and per diem rates) to include any G&A and handling costs.

PWS Ref: 1.2.1.4.

Format: TBD by the contractor Submit to: Site-specific COR.

Delivery: Electronic format /E-mail with attachment Due by: NLT 5 duty days prior to travel date Frequency: As required.

REPORT 2: TRIP REPORT

Description: Purpose of trip, itinerary, travelers, points of contact, synopsis of meetings or events attended, training received, and/or tasks accomplished. Attach copies of briefings or other documentation received.

PWS Ref: 1.2.1.4.1.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Within 3 duty days of return from travel.

REPORT 3: MEETING MINUTES

Description: Date, time and purpose of meeting, agenda, attendees, and brief description of all proceedings including relevant discussion, action items, POCs, and time of adjournment. Attach copies of briefings or other documentation received.

PWS Ref: 1.2.1.6.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: By COB next business day following subject meeting.

Frequency: As required for each Government/contractor meeting.

REPORT 4: MONTHLY PERFORMANCE REPORT

Description: Substantiating data relevant to accurately calculate the monthly Operational Performance Rate, Equipment Availability Rate, and Quality Control Standard (e.g., daily sorties flown/sorties ineffective, daily equipment mission capability rates, daily quality control inspections scheduled/completed). Note any special conditions or considerations such as authorized down time, Government caused deviations/delays, etc.

PWS Ref: 1.2.2.2.1.1. and 3.5.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: COB of the tenth duty day of the following month (e.g., 10 June for month of May).

Frequency: Monthly.

REPORT 5: QC CROSSTELL REPORT

Description: QC and Government COR documented discrepancies, corrective actions and other improvements in all areas of operations, maintenance, and mission support.

PWS Ref: 1.2.2.2.1.

Format: TBD by the contractor.

Submit to: COR and site managers at all ACTS ‘primary’ locations.

Delivery: Electronic format/E-mail with attachment.

Due by: By COB of the tenth duty day of the following month (e.g., 10 June for month of May).

REPORT 6: CRYPTOGRAPHIC ACCESS CERTIFICATE

Description: The contract COMSEC Manager shall complete an AFCOMSEC Form 9, Cryptographic Access Certificate, prior to assumption of COMSEC duties.

PWS Ref: 1.2.3.2.2.

Format: IAW AFI 33-210.

Submit to: Applicable Host Base Government COMSEC Responsible Officer.

Delivery: Electronic media copy of AFCOMSEC Form 9.

Due by: Initial copy due 15 days prior to contract start date.

Frequency: As required by AFI 33-210.

REPORT 7: BMGR EVENTS LOG

Description: Daily events log for Range Control.

PWS Ref: 2.2.2.1.2.

Format: AF Form 3616.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: End of flying day.

Frequency: Daily.

REPORT 8: OPEN PURCHASE REQUEST

Description: Justification for open purchase, CLIN balances (to include G&A and any applicable handling charges), competitive pricing information, and recommended source.

PWS Ref: 4.3.3.7.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: COB the duty day following the day the requirement is recognized.

REPORT 9: PRODUCT QUALITY DEFICIENCY REPORT

Description: Identify and report deficiencies on military systems during operational deployment

IAW T.O. 00-35D-54.

PWS Ref: 4.3.3.9.

Format: IAW T.O. 00-35D-54 Submit to: Applicable Air Logistics Centers (ALC).

Delivery: Forward PQDRs IAW TO 00-35D-54 using the Deficiency Report Entry and Mail

System (DREAMS).

Due by: Within 3 duty days of identifying deficiency.

REPORT 10: GFP LISTING

Description: Provide a complete and accurate listing of Government Furnished Property to include, as a minimum, item name, owning system, manufacturer stock number, part number, serial number, physical location, quantity, inventory date, disposition date, remarks.

PWS Ref: 4.3.5.1.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial due 30 days after contract start, subsequent annual reports due by COB 1 October of each contract option year; updates within 1 duty day of new acquisition.

Frequency: Annually, with updates as required by acquisition.

REPORT 11: ANNUAL REPORT OF GOVERNMENT PROPERTY

Description: Complete and accurate listing of Government Furnished Property IAW FAR 52- 245-2 and DFAR 245.245-7001.

PWS Ref: 4.3.5.1.2.

Format: IAW DFAR 245.245-7001 Submit to: Government Property Administrator.

Delivery: IAW DFAR 245.245-7001 Due by: NLT 31 October of basic and option year(s).

Frequency: Annual.

REPORT 12: FINANCIAL REPORT

Description: This report allows the government to review and compare actual costs against a scheduled planned rate of expenditures and to report monthly and cumulative expenditures against reimbursable line items.

PWS Ref: 7.2.2.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: COB the 10th day of every month.

REPORT 13: COMSEC INSECURITY REPORT

Description: Identifies cryptographic, personnel, or physical insecurity of COMSEC materials.

PWS Ref: 7.4.4.

Format: IAW AFI 33-212 Submit to: Government COMSEC Responsible Officer.

Delivery: Electronic format/E-mail with attachment.

Due by: Immediately.

REPORT 14: ACTS HARDWARE AND SOFTWARE CONFIGURATION REPORT

Description: Identifies hardware and software configuration changes as they occur.

PWS Ref: 7.13.1.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial report due 90 days after contract start. Subsequent reports due on 1 October of every option year; updates NLT 3 duty days after configuration change.

Frequency: Annually/As required.

REPORT 15: ACTS PHYSICAL CONFIGURATION REPORT

Description: Illustrates physical location of all ACTS equipment.

PWS Ref: 7.13.2.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial report due 90 days after contract start. Subsequent reports due on 1 October of every option year; updates NLT 3 duty days after configuration change.

Frequency: Annually/As required.

REPORT 16: OVERTIME REQUEST

Description: Date of request, date of requirement, number of personnel and their positions, estimated number of hours required, estimated total cost of extended hours, and missions supported. Include summary of scheduling strategies utilized to minimize the use of overtime.

PWS Ref: 2.1.2.2.

Format: TBD by the contractor.

Submit to: Site-specific COR Delivery: Electronic format/E-mail with attachment.

Due by: COB of the duty day prior to the date of requirement.

REPORT 18: SYSTEM OVERHAUL FORECAST

Description: Forecast all system overhaul requirements for a minimum of 5 years to include both Depot and Command Supported equipment overhaul’s. The forecast shall be developed to minimize operations impact. This report shall be accurate within 90 days of changes to original forecast. The schedule shall include the last overhaul date.

SOW Ref: 4.2.8.1.

Format: TBD by the contractor.

Submit to: Site-specific COR personnel.

Delivery: Electronic format/E-mail with attachment.

Due by: First duty day of first month of every quarter (e.g., 1 Oct, 1 Jan, 1 Apr, 1 Jul) Frequency: Quarterly.

PLAN 1: QUALITY CONTROL PLAN

Description: Description and detail of the quality control initiative and procedures.

PWS Ref: 1.2.2.2.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial plan due NLT 60 days prior to contract start for review and acceptance.

Subsequent plans due upon changes and updates.

Frequency: Initial/As required.

PLAN 2: PHASE-IN PLAN

Description: Detailed description of the contractor’s mobilization/transition procedures.

PWS Ref: 1.2.4.5.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: NLT 60 days prior to contract start.

Frequency: Initial.

PLAN 3: PHASE-OUT PLAN

Description: Detailed description of the contractor’s mobilization/transition procedures.

PWS Ref: 1.2.4.6.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: NLT 270 days prior to follow-on contract start date.

Frequency: Initial.

PLAN 4: LOCAL WORKCARDS

Description: Detailed procedures outlining PMI requirements for all equipment with excessive failure rates.

PWS Ref: 4.2.10.1.

Format: IAW applicable governing TOs.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: NLT 60 days after requirement is determined.

PLAN 5: TRANSPORTATION PLAN

Description: Detailed procedures outlining compliance with all transportation requirements.

PWS Ref: 4.3.6.2.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial plan due NLT 60 days prior to contract start date. Subsequent plans due upon changes/updates.

Frequency: Initial/As required.

PLAN 6: PROJECT PLANS

Description: Each project plan shall include the project purpose, scope, technical requirements, schedule, deliverable product(s), level of effort, and estimated cost of materials required.

PWS Ref: 4.4.6.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: NLT 10 duty days after project request.

PLAN 7: SECURITY PROGRAM PLAN

Description: Detailed procedures outlining compliance with security requirements.

PWS Ref: 7.3.1.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial plan due NLT 60 days prior to contract start date. Subsequent plans due upon changes/updates.

Frequency: Initial/as required.

PLAN 8: ENVIRONMENTAL MANAGEMENT PLAN

Description: Detailed procedures outlining compliance with environmental requirements.

PWS Ref: 7.6.1.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial plan due NLT 60 days prior to contract start date. Subsequent plans due upon changes/updates.

PLAN 9: CONFIGURATION MANAGEMENT PLAN

Description: Detailed procedures outlining compliance with configuration management requirements.

PWS Ref: 7.13.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial plan due NLT 60 days prior to contract start date. Subsequent plans due upon changes/updates.

PLAN 10: STRIKE PLAN

Description: Detailed procedures outlining the contractor’s contingency in the event of a strike.

PWS Ref: 7.15.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail attachment.

Due by: Initial due NLT 60 days prior to contract start date. Subsequent plans due upon changes/updates.

PLAN 11: PROJECT PLANS

Description: Each project plan shall include the project purpose, scope, technical requirements, schedule, deliverable product(s), level of effort, and estimated cost of materials required.

PWS Ref: 4.4.6.

Format: TBD by the contractor.

Submit to: Site-specific COR personnel.

Delivery: Electronic format/E-mail with attachment.

Due by: NLT 10 duty days after project request.

APPOINTMENT 1: SITE MANAGERS AND ALTERNATES

Description: Identify Site Manager and Alternates at all ACTS primary locations.

PWS Ref: 1.2.1.1.

Format: TBD by the contractor.

Submit to: Contracting Officer and site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial appointment due NLT 30 days prior to contract start date. Subsequent appointments due as changes occur.

APPOINTMENT 2: COMSEC MANAGER AND ALTERNATE

Description: Identify COMSEC Manager and Alternate at all ACTS primary locations.

PWS Ref: 1.2.3.2.2.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial appointment due NLT 30 days prior to contract start date. Subsequent appointments due as changes occur.

APPOINTMENT 3: MATERIEL CONTROL MANAGERS

Description: Identify Materiel Control Managers at all ACTS primary locations.

PWS Ref: 4.3.3.1.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial appointment due NLT 15 days prior to contract start date. Subsequent appointments due as changes occur.

APPOINTMENT 4: ASSET ACCOUNT CUSTODIANS

Description: Identify Asset Account Custodians at all ACTS primary locations.

PWS Ref: 4.3.3.3.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial appointment due NLT 15 days prior to contract start date. Subsequent appointments due as changes occur.

APPOINTMENT 5: ADPE CUSTODIAN

Description: Identify ADPE Custodian at all applicable ACTS primary locations.

PWS Ref: 6.2.11.

Format: TBD by the contractor.

Submit to: Applicable site-specific COR.

Delivery: Electronic format/E-mail with attachments.

Due by: Initial appointment due NLT 15 days prior to contract start date. Subsequent appointments due as changes occur.

APPOINTMENT 6: COMPUTER SYSTEMS SECURITY OFFICER

Description: Identify Computer Systems Security Officer at all ACTS primary locations.

PWS Ref: 7.4.2.

Format: TBD by the contractor.

Submit to: Applicable site-specific COR.

Delivery: Electronic format/E-mail with attachments.

Due by: Initial appointment due NLT 15 days prior to contract start date. Subsequent appointments due as changes occur.

APPOINTMENT 7: FACILITY MANAGER

Description: Identify Facility Managers at all ACTS primary locations.

PWS Ref: 7.7.2.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachments.

Due by: Initial appointment due NLT 15 days prior to contract start date. Subsequent

APPOINTMENT 8: LIBRARY CUSTODIANS

Description: Identify Library Custodians at all ACTS primary locations.

PWS Ref: 7.8.1.1.

Format: TBD by the contractor.

Submit to: Site-specific COR.

Delivery: Electronic format/E-mail with attachment.

Due by: Initial appointment due NLT 15 days prior to contract start date. Subsequent

File details come from the government source that posted it. Updated .