NAVSEA OP5 7th rev.pdf
NAVSEA Ordnance Publication PDF 7 MB Posted
- Solicitation number
- FA3002-09-R-0044
About this file
Appendix 3A - NAVSEA OP5 7th Rev
View the file
Other versions and copies of NAVSEA OP 5
Who attaches NAVSEA OP 5
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This page left intentionally blank
Encl (1)
ABSTRACT OF SIGNIFICANT CHANGES
1. Revised terminology in Table 3-9 (Hazard Class/Division) to reflect current DoD criteria.
2. Added “accumulated grass clippings” to paragraph 4- 1.10.6, as a fire hazard near magazines.
3. Revised terminology in paragraph 4-4.1 (Fire Divisions) and Table 4-1 (Fire Symbol Hazard and Actions) to reflect current DoD criteria.
4. Added a standard magazine explosive limit placard, as Figure 7-0.
5. Modified paragraphs 7-6.2.1.5 and 7-6.2.1.6, and added paragraph 7-6.2.1.6.a, to convey revised Department of Defense Explosives Safety Board (DDESB) criteria for storage of less than 450 pounds net explosives weight (NEW) of Class/Division (C/D) 1.1 material, as approved by the 331st DDESB meeting.
6. Changed the NOTE following paragraph 7-6.2.3.4 to allow new construction of explosive facilities that encumber on-base roads with greater than 60% of inhabited building distance (IBD). The specific change was the word “shall”, changed to “should”, in alignment with criteria in DoD
6055.09-STD.
7. Revised paragraph 7-13.13 to allow privately-owned vehicles to park 50 feet from explosive facilities, provided certain conditions can be met. Reflects a criteria change approved by the 331st DDESB meeting.
8. Revised Table 7-22 to reflect revised DoD criteria for siting earth-covered magazines (ECMs) storing C/D 1.4 material, as well as separation of aboveground magazines (AGMs) sited in relation to other ECMs, as approved by the 331st DDESB meeting.
9. Added an allowance to paragraph 10-2.3 for eliminating strapping of palletized unit loads of containers with interlocking features.
10. Removed sub-paragraph 10-5.5.1.d, which required the inspection of wire ropes within one rope lay length of any fitting, as this requirement had been eliminated by PHS&T Tech Memo 70-07.
11. Modified paragraph 11-1.4 to allow storage of TOMAHAWK missiles in an encapsulated/encanistered configuration, as opposed to having to be stored in their shipping containers.
12. Standardized empty container marking in paragraph 11- 1.5, as agreed upon by the Ammunition Sentencing Configuration Control Board.
13. Qualified the military rank for a Safety Loading Officer in paragraph 12-10.1.1.a as an E6 or above.
14. Modified paragraph 12-3.2.6 to remove the requirement for pneumatic nailer operators to be qualified/certified in accordance with OPNAVINST 8020.14/MCO P8020.11 (series), unless they handle explosives. The operators must be trained annually, in accordance with manufacturing instructions and ANSI SNT-101-2002.
15. Modified paragraph 14-7.5.g, requiring the escort for authorized personnel within an exclusion zone (EZ) to be assigned to the munitions response project.
16. Added paragraph 14-11.11.3.d(5) to define and explain siting requirements for “collection points”.
17. Added the following definitions to Appendix A (Definitions and Abbreviations): Combustible Construction;
Mission-Essential Quantities; Non-combustible Construction.
18. Modified paragraph G-6.2 to provide flexibility for Research, Development, Test, and Evaluation (RDT&E) activities in implementing the stability requirements for storage and handling of ordnance items from hostile nations.
NAVSEA OP 5 VOLUME 1
SEVENTH REVISION
AMMUNITION AND EXPLOSIVES
SAFETY ASHORE
DISTRIBUTION STATEMENT C
Distribution authorized to U.S. Government agencies and their contractors;
administrative/operational use; 15 January 2001. Other requests for this document must be referred to the Naval Ordnance Safety and Security Activity (NOSSA) (N5).
WARNING
This document contains technical data that is subject to the Arms Export
Control Act, 22 USC Sec. 2751 et. seq. and is protected from release by 10 USC Sec. 130.
Violations of these laws are subject to severe criminal penalties.
DESTRUCTION NOTICE
Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
THIS PUBLICATION SUPERSEDES NAVSEA OP 5 VOLUME 1 SIXTH REVISION
DATED 1 MARCH 1995
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
http://www.nossa.navsea.navy.mil
NAVSEA OP 5 VOLUME 1
SEVENTH REVISION
AMMUNITION AND EXPLOSIVES
SAFETY ASHORE
DISTRIBUTION STATEMENT C
Distribution authorized to U.S. Government agencies and their contractors;
administrative/operational use; 15 January 2001. Other requests for this document must be referred to the Naval Ordnance Safety and Security Activity (NOSSA) (N5).
WARNING
This document contains technical data that is subject to the Arms Export
Control Act, 22 USC Sec. 2751 et. seq. and is protected from release by 10 USC Sec. 130.
Violations of these laws are subject to severe criminal penalties.
DESTRUCTION NOTICE
Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
THIS PUBLICATION SUPERSEDES NAVSEA OP 5 VOLUME 1 SIXTH REVISION
DATED 1 MARCH 1995
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
15 JANUARY 2001
Change 7 - 1 JULY 2008
NAVSEA OP 5 VOLUME 1 SEVENTH REVISION
Reproduction for nonmilitary use of the information or illustrations contained in this publication is not permitted. This does not preclude reproduction and use of any part of this manual by contracted agencies responsible for the training and instruction of personnel who handle and transport military ammunition, explosives, and related hazardous materials. The policy for military use reproduction is established for the Army in AR 380-5, for the Navy and Marine Corps in SECNAVINST 5510.36 (series), and for the Air Force in Air Force Regulations 205-1.
Page *Change Page *Change No. No. No. No.
LIST OF EFFECTIVE PAGES
The total number of pages in this manual is 874. Revision Seven pages affected by Change 6 are marked accordingly at the bottom of the page.
Title/A
B thru E
F/(G Blank)
Foreword-1/(Foreword-2 Blank) i thru xxvi xxvii/(xxviii Blank)
1-1
1-2
1-3
1-4 thru 1-5
1-6 thru 1-8
1-9 thru 1-13
1-14
1-15 thru 1-16
1-17 thru 1-18
1-19/(1-20 Blank)
2-1
2-2
2-3
2-4
2-5
2-6
2-7
2-8
2-9
2-10
2-11 thru 2-13
2-14
2-15
2-16 thru 2-23
2-24
2-25
2-26 thru 2-27
2-28 thru 2-30 Date of Issue for Original and Changed Pages is:
Original Revision 7 . . . . . . . . . 15 January 2001 Change 1 . . . . . . . . . . . . . . . . . . . . 1 May 2002 Change 2 . . . . . . . . . . . . . . . . . . 1 March 2003 Change 3 . . . . . . . . . . . . . . . . . . . 1 June 2004 Change 4 . . . . . . . . . . . . . . . . . . . 1 June 2005 Change 5 . . . . . . . . . . . . . . . . . . . 1 June 2006 Change 6 . . . . . . . . . . . . . . . . . . . . 1 July 2007 Change 7 . . . . . . . . . . . . . . . . . . . . 1 July 2008 *Zero in this column indicates an original page.
A Change 7 http://neds.daps.dla.mil/551036.htm
Page *Change Page *Change No. No. No. No.
LIST OF EFFECTIVE PAGES (Continued) 2-31
2-32 thru 2-34
2-35 thru 2-39
2-40
2-41/(2-42 Blank)
3-1
3-2 thru 3-4
3-5
3-6
3-7
3-8
3-9
3-10 thru 3-11
3-12
3-13
3-14 thru 3-15
3-16 thru 3-17
3-18 thru 3-19
3-20
3-21
3-22
4-1 thru 4-5
4-6
4-7
4-8
4-9
4-10 thru thru 4-16
4-17
4-18 thru 4-20
4-21
4-22 thru 4-25
4-26
4-27
4-28 thru 4-29
4-30
4-31
4-32
4-33
4-34 thru 4-35
4-36
4-37
4-38
4-39 thru 4-40
4-41
4-42
4-43 thru 4-44
4-45 thru 4-46
5-1
5-2
5-3 thru 5-5
5-6 thru 5-8
5-9 thru 5-10
5-11
5-12 thru 5-24
5-25
5-26 thru 5-30
5-31
5-32
5-33 thru 5-44
5-45 thru 5-46
6-1 thru 6-2
6-3 thru 6-4
6-5 thru 6-6
6-7 Change 7 B
*Zero in this column indicates an original page.
No. No. No. No.
LIST OF EFFECTIVE PAGES (Continued) 6-8
6-9
6-10 thru 6-12
6-13 thru 6-14
6-15
6-16 thru 6-18
7-1
7-2
7-3 thru 7-6
7-7
7-8 thru 7-9
7-10 thru 7-12
7-13
7-14
7-15 thru 7-22
7-23
7-24
7-25 thru 7-26
7-27 thru 7-28
7-29
7-30
7-31 thru 7-32
7-33
7-34
7-35
7-36 thru 7-37
7-38
7-39
7-40
7-41 thru 7-44
7-45 thru 7-46
7-47
7-48
7-49
7-50 thru 7-52
7-53
7-54
7-55
7-56 thru 7-57
7-58
7-59 thru 7-60
7-61
7-62
7-63
7-64
7-65 thru 7-67
7-68
7-69 thru 7-70
7-71
7-72
7-73
7-74 thru 7-82
7-83 thru 7-93
7-94
7-95
7-96
7-97 thru 7-98
7-99
7-100 thru 7-101
7-102
7-103 thru 1-104
7-105
7-106
7-107 thru 7-110 C Change 7
No. No. No. No.
LIST OF EFFECTIVE PAGES (Continued) 7-111 thru 7-113
7-114 thru 115
7-116 thru 7-117
7-118
7-119 thru 7-133
7-134 thru 7-146
8-1
8-2 thru 8-4
8-5 thru 8-6
8-7
8-8
8-9
8-10
8-11
8-12
8-13
8-14
8-15 thru 8-16
8-17 thru 8-18
8-19 thru 8-42
9-1 thru 9-2
9-3
9-4
9-5
9-6 thru 9-8
9-9 thru 9-14
9-15
9-16
9-17 thru 9-18
9-19
9-20
9-21
9-22
9-23 thru 9-26
9-27 thru 9-29
9-30 thru 9-37
9-38
9-39 thru 9-40
9-41/(9-42 Blank)
10-1
10-2
10-3 thru 10-26
11-1
11-2 thru 11-5
11-6
11-7
11-8 thru 11-9
11-10
11-11
11-12 thru 11-17
11-18
11-19 thru 11-25
11-26
11-27 thru 11-33
11-34
11-35
11-36 thru 11-54
11-55/(11-56 Blank)
12-1 thru 12-2
12-3
12-4
12-5 thru 12-6
12-7
12-8 thru 12-9 Change 7 D
No. No. No. No.
LIST OF EFFECTIVE PAGES (Continued) 12-10 thru 12-11
12-12 thru 12-14
12-15
12-16
12-17 thru 12-24
12-25 thru 12-26
12-27
12-28
13-1 thru 13-4
13-5
13-6 thru 13-7
13-8
13-9 thru 13-16
13-17
13-18 thru 13-46
13-47/(13-48 Blank)
14-1 thru 14-6
14-7
14-8 thru 14-17
14-18
14-19
14-20 thru 14-26
14-27/(14-28 Blank)
A-1 thru A-3
A-4
A-5
A-6
A-7 thru A-8
A-9
A-10 thru A-18
A-19 thru A-21
A-22 thru A-25
A-26 thru A-28
A-29 thru A-31
A-32 thru A-39
A-40 thru A-56
A-57/(A-58 Blank)
B-1
B-2
B-3 thru B-16
B-17/(B-18 Blank)
C-1 thru C-4
C-5 thru C-6
D-1
D-2 thru D-7
D-8 thru D-9
D-10
D-11
D-12
D-13
D-14
D-15
D-16 thru D-18
E-1 thru E-14
E-15/(E-16 Blank)
F-1 thru F-5
F-6
F-7 thru F-12
G-1
G-2 thru G-4
G-5
G-6 thru G-8
G-9 thru G-10
G-11 E Change 7
No. No. No. No.
LIST OF EFFECTIVE PAGES (Continued) G-12 thru G-20
G-21
G-22 thru G-24
G-25
G-26 thru G-27
G-28
G-29
G-30
G-31 thru G-33
G-34
G-35
G-36 thru G-37
G-38
G-39 thru G-43
G-44 thru G-45
G-46 thru G-51
G-52
G-53 thru G-54
G-55
G-56 thru G-58
H-1/(H-2 Blank)
I-1
I-2
I-3
I-4
I-5
I-6
I-7
I-8
J-1
J-2
J-3 thru J-4
J-5
J-6
J-7
J-8
Index-1 thru Index-18
Index-19/(Index-20 Blank) Change 7 F/(G-Blank)
Change 4 Foreword-1/(Foreword-2 Blank)
FOREWORD
1. It is the policy of the Department of the Navy to maintain an effective and aggressive ordnance safety program throughout the Department. Adherence to the instructions and regulations contained in NAVSEA OP 5, “Ammunition and Explosives Safety Ashore” will provide a continuing, aggressive accident prevention program throughout all commands where military or civilian personnel are stationed or employed and ordnance equipment, ammunition, and explosives are used.
2. NAVSEA OP 5 consists of three volumes, as follows:
Volume 1 - Safety Regulations for Handling, Storing, Production, Renovation and Shipping of Ammunition and Explosives Ashore.
Volume 2 - Storage Data. (Replaced by NAVSEA SW020-AC-SAF-010)
Volume 3 - Advanced Bases.
3. The purpose of this volume is to acquaint personnel engaged in operations involving ammunition, explosives, and other hazardous materials, and to prescribe standardized safety regulations for the production, renovation, care, handling, storage, preparation for shipment, and disposal of these items.
4. The instructions and regulations prescribed in NAVSEA OP 5 for handling, storing, preparation for shipment, production, renovation, surveillance, and maintenance of ammunition and explosives are considered minimum criteria. The specific items, technical manuals, drawings, and specifications referenced in this publication should be consulted for additional, detailed requirements.
5. This publication is not intended to supersede, contravene, or modify any Federal, state, municipal, or local laws and their supplements. If any provision of this publication appears to conflict with any other published regulation, this fact should be reported in detail to the Naval Ordnance Safety and Security Activity (NOSSA) (N5).
6. Changes to this manual will be issued as required. Comments or suggestions relative to material to be included in such changes should be forwarded as specified in chapter 1.
TABLE OF CONTENTS
Chapter/Paragraph Page Number LIST OF FIGURES xx
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxii
SAFETY SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxv
1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1-1 Purpose of NAVSEA OP 5 Volume 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-2 Scope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-2.1 Outside Continental United States (OCONUS).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3 Department of Defense Explosive Safety Board (DDESB). . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.1 Purpose.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.2 Authority. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.3 Responsibilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.4 Interaction with DDESB. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1-4 Responsibilities for Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-4.1 Commanding Officer, Naval Ordnance Safety and Security Activity.. . . . . . . . . . . . . . . . . 1-5 1-4.2 Director, Safety Division HQMC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-4.3 Commanding Officer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-4.4 Safety Department or Office. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 1-4.5 Supervisory Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9 1-4.6 Operating Personnel.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11 1-5 Activity Administration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-5.1 Mission.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-5.2 Issuance of Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-5.3 Accident Investigation and Reporting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-6 Deviations from Explosives Safety Criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13 1-6.1 Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-6.2 Exemptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-6.3 Request for Exemptions or Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-6.4 Renewal of Waivers or Exemptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-6.5 Event Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-6.6 Request for Event Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.7 Secretarial Certification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.8 Request for Secretarial Certification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-7 Intended Use of This Manual.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-7.1 Applicability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-7.2 Mandatory and Advisory Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-7.3 Supplementary Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-7.4 Clarification of Regulations.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-8 Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-9 Reference Documents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19 1-10 Reporting Deficiencies in Manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19 1-11 Date of Publication. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19 Change 7 i
TABLE OF CONTENTS (Continued)
Chapter/Paragraph Page Number
2 GENERAL REQUIREMENTS, STANDARDS, AND PRACTICES . . . . . . . . . . . . . . 2-1
2-1 General Safety Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2-1.1 Written Operating Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2-1.2 Hazard Analysis and Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1.3 Reporting Unsafe Conditions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1.4 Unauthorized Use of Ammunition.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1.5 Housekeeping.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9 2-1.6 Hunting and Fishing.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2-1.7 Aircraft Operations in the Vicinity of Ordnance Facilities. . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-1.7A Surface Danger Zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-1.8 Privately Owned Vehicles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-1.9 Photography in Hazardous Areas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-1.10 Radio/Radar Transmissions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2-1.11 Fireworks Display. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2-1.12 Explosives Demonstrations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 2-1.13 Termination of Use of Potential Explosion Sites.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 2-1.14 Decontamination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15 2-2 Security Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-2.1 Authority Entry. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-2.2 Restricted Areas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-2.3 Port Emergency Signals.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24 2-2.4 Duties of Guards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24 2-2.5 Military Working Dogs Explosive Search Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24 2-3 Personnel Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-25 2-3.1 Medical Fitness. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-25 2-3.2 Qualification and Certification Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-26 2-3.3 Safety Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-26 2-3.4 Working Parties. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-26 2-3.5 Work Shift Changing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27 2-4 Personal Protective Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27 2-4.1 General.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27 2-4.2 Policy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28 2-4.3 Determining Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28 2-4.4 Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28 2-4.5 Maintenance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28 2-4.6 Protective Clothing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28 2-4.7 Personal Protective Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30 2-4.8 Miscellaneous Personal Protective Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-33 2-4.9 Prohibited Articles in Hazardous Areas.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-34 2-4.10 Hearing Aids and Pacemakers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35 2-4.11 Eating. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35 2-5 Ship Berthing and Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35 2-5.1 Berthing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35 2-5.2 Handling.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-38 ii Change 7
Chapter/Paragraph Page Number
3 CHARACTERISTICS OF AMMUNITION, EXPLOSIVES AND
RELATED HAZARDOUS MATERIALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3-1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2 Characteristics of Ammunition and Explosives.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2.1 Available Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2.2 Composition of High Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2 3-2.3 Insensitive Munitions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3 3-2.4 Initiation and Detonation of an Explosive Main Charge. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3 3-2.5 Deliberate Detonation of an Explosive. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 3-2.6 Detonation of a Fuel Air Explosive (FAE). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-2.7 Inadvertent Detonation of an Explosive. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-3 Test and Evaluation of Navy Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-3.1 Tests to Determine the Properties of Navy Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-3.2 Hazard Assessment Tests.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6 3-3.3 Qualification of Navy Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-3A Hazards Due to Triboelectric Charging of Gases, Vapors, Liquids, and Dusts. . . . . . . . . . 3-7 3-3A.1 Charge Accumulation and Charge Decay. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-3A.2 Dangerous Charge Accumulation and Ignition of Flammable and
Combustible Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-3A.3 Process Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-3A.4 Prevention of Hazards Due to Triboelectric Charging of Process Ingredients. . . . . . . . . . . 3-8 3-3A.5 Requirement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-4 Characteristics of Propellants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.1 Solid Propellants (Cast or Pellets). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.2 Energetic Liquids. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.3 Hybrid Propellants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.4 Propellants for Insensitive Munitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-5 Characteristics of Pyrotechnics. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.1 Signaling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.2 Smoke Screening. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.3 Simulators and Decoys. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.4 Illuminating. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.5 Dye Marker Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-5.6 Chemiluminescent Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-5.7 Weather Modification Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-5.8 Pyrotechnics for Insensitive Munitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-6 Characteristics of Chemical Agents.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-6.1 Chemical Group A: Lethal -Toxic. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-6.2 Chemical Group B: Riot Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-6.3 Chemical Group C: Smoke. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 3-6.4 Chemical Group D: Incendiary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 3-7 Generic Classes of Mishaps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 3-7.1 Rough Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 Change 7 iii
Chapter/Paragraph Page Number 3-7.2 Improper Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 3-7.3 Excess Exposure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-7.4 Natural Events. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-7.5 Byproducts or Residue.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-8 Hazard Classification of Ammunition and Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-8.1 Class/Divisions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-8.2 Minimum Separation Distance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-8.3 Assigning Hazard C/D’s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-9 Storage Compatibility Groups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 3-9.1 Criteria for Assigning Compatibility Groups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 3-9.2 Compatibility Group Descriptions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18 3-9.3 Relationship Between Class, Division and Compatibility Group. . . . . . . . . . . . . . . . . . . . 3-21 3-9.4 Chemical Groups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21
4 FIRE PREVENTION, PROTECTION, AND EMERGENCY PLANNING . . . . . . . . 4-1
4-1 Fire Prevention.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1.1 Personnel Indoctrination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1.2 Fireguard. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1.3 Fire Inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-1.4 Pre-Operation Pier and Wharf Fire Inspections and Tests.. . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-1.5 Fire Protection Equipment Inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3 4-1.6 Smoking Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 4-1.7 Housekeeping.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 4-1.8 Floor Cleaning and Protecting Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6 4-1.9 Trash Burning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 4-1.10 Firebreaks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 4-1.11 Open Burn/Open Detonation Treatment Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8 4-1.12 Boilers and Heating Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8 4-1.13 Powered Industrial Materials Handling Equipment.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9 4-1.14 Illuminating Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9 4-1.15 Heat or Spark-Producing Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9 4-1.16 Welding and Cutting Operations On Ships. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4-1.17 Open Flames. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-11 4-1.18 Electrical Equipment and Machinery. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.19 Electrical Service and Wiring. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.20 Spray Painting and Finishing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.21 Defective Machinery, Equipment, and Tools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.22 Defective Transmission Lines. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-1.23 Motor Vehicles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-1.24 Refueling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-1.25 Locomotive and Self-Propelled Rail Vehicles.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15 4-1.26 Dunnage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15 4-1.27 Open Storage of Combustibles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15 iv Change 7
Chapter/Paragraph Page Number 4-1.28 Fires Caused by Ammunition, Explosives, and Hazardous Materials.. . . . . . . . . . . . . . . . 4-15 4-2 Emergency Planning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-16 4-3 Fire Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17 4-3.1 Fire Bills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17 4-3.2 Fire Map.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-18 4-3.3 Fire Alarm and Detection Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-18 4-3.4 Fire Drills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4-3.5 Fire Department. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4-3.6 Portable Fire Extinguishers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-20 4-3.7 Water Supply Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-22 4-3.8 Water Distribution Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-24 4-3.9 Sprinkler Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-26 4-3.10 Other Fire Protection Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-29 4-3.11 Standby Tugs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-31 4-3.12 Fire Rate Assemblies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-33 4-4 Firefighting Hazard Identification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-34 4-4.1 Fire Divisions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-34 4-4.2 Fire Hazard Symbols. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-34 4-5 Firefighting Measures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-42 4-5.1 Safety Considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-42 4-5.2 Use of Available Cover. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-45 4-5.3 Approaching Fires. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-45 4-5.4 Using Hazard Symbol Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-45 4-5.5 Special Firefighting Procedures.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-45
5 ELECTRICAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5-1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5-2 Hazardous (Classified) Locations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5-2.1 Class I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 5-2.2 Class II. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 5-2.3 Class III. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-2.4 Change of Classification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-2.5 Multiple Classifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3 Static Electricity.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3.1 General.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3.2 Sources of Static Electricity.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 5-3.3 Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 5-3.4 Materials Sensitive to Static Spark Discharge. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 5-3.5 Dissipation of Static Electricity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 5-4 Lightning Protection Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 5-4.1 Resistance of System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8 5-4.2 Bonding of Electrodes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8 5-5 Secondary Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 Change 7 v
Chapter/Paragraph Page Number 5-5.1 Power System Ground. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10 5-5.2 Instrumentation Ground. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10 5-5.3 Static Grounds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11 5-5.4 Ordnance Ground.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-19 5-5.5 Structural Grounds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-21 5-5.6 Ground Loops. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22 5-6 Bonding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22 5-6.1 Direct Bonding Techniques. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-22 5-6.2 Indirect Bonding Techniques.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-7 Miscellaneous Grounding Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-7.1 Machinery and Equipment.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-7.2 Spray Painting Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-8 Test and Inspection of Ground Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-8.1 Grounding System Test Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-8.2 Electrical Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-31 5-8.3 Visual Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-37 5-9 Operational Grounding Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-39 5-9.1 Grounding Weapons During Checkout. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40 5-9.2 Grounding of Nuclear Weapons. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40 5-9.3 Aircraft Grounding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40 5-9.4 Grounding of Permanent Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40 5-9.5 Identification of Miscellaneous Conductive Items. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40 5-9.6 Grounding of Items Awaiting Processing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-41 5-9.7 Grounding Cables. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-41 5-10 Electrical Services. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42 5-10.1 Power Lines. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42 5-10.2 Uninterruptible Power Sources. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-43 5-10.3 Ground Fault Interrupters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44 5-10.4 Electrical Service Equipment.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44
6 LIGHTNING PROTECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6-1 General.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2 Storm Warning Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2.1 Spherics Warning Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2.2 Pre-Strike Warning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2.3 Implementations of Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 6-3 Policy for Lightning Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 6-3.1 Exceptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 6-4 Lightning Protection Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 6-4.1 Air Termination Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 6-4.2 Down Conductors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 6-5 Grounding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 6-5.1 Lightning Protection Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 vi Change 7
Chapter/Paragraph Page Number 6-5.2 Secondary Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8 6-5.3 Interconnection of Grounding Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 6-6 Bonding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 6-6.1 Direct Bonding Techniques. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 6-6.2 Indirect Bonding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 6-6.3 Interconnection of Conductive Bodies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 6-6.4 Sideflash Distance Calculations.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12 6-7 Surge Suppression. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12 6-7.1 General Theory of Lightning Arresters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12 6-7.2 Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13 6-8 Specific Lightning Protection Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13 6-8.1 Explosives Operating Buildings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13 6-8.2 Storage Facilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13 6-9 Test and Inspection of Lightning Protection Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15 6-9.1 Test Plans. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15 6-9.2 Electrical Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 6-9.3 Visual Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 6-10 Operations During Electrical Storms. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 6-10.1 Magazines and Open Storage Areas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 6-10.2 Explosives Operating Buildings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17 6-10.3 Railcars and Motor Vehicles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-17 6-10.4 Piers and Wharves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18 6-10.5 Disposal and Explosives Test Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18 6-10.6 Aircraft.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18
7 QUANTITY-DISTANCE REQUIREMENTS AND STANDARDS . . . . . . . . . . . . . . . 7-1
7-1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7-1.1 DDESB Standards and the UNO Hazard Classification. . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7-1.2 Deviations from Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2 7-1.3 Ammunition and Explosives, and Hazardous Materials in Transit. . . . . . . . . . . . . . . . . . . . 7-2 7-2 Basic Q-D Principles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2 7-2.1 Amount of Material. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2 7-2.2 Effects of Explosions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3 7-2.3 Degree of Protection. . . . . . . . .
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .