Section J Atch 8 - Past Performance Info Sheets.docx

DOCX document 18 KB Posted

Attached to
T-1/T-6 (USAF) Aircraft Maintenance Support Services, Pensacola NAS, FL
Solicitation number
FA3002-09-R-0044
Issued by

About this file

Attachment 8 Past Performance Information Sheet

View the file

Other files

File Type Posted
09-R-0044 SF30 0003 canx 25 Jul 09.pdf PDF
09-R-0044-0002 22 Jul 09.pdf PDF
19 Jun RFP conformed thru 0001.pdf PDF
03 17 CSO Appendix 3FG GFP Training 10 Jul 09.pdf PDF
03 02 CSO Services Summary 10 Jul 09.pdf PDF
Government Response to Industry Comments.pdf PDF
03 01 CSO Description of Services 10 Jul 09.pdf PDF
03 11 CSO Appendix 3FB GFP EAID 10 Jul 09.pdf PDF
03 07 CSO Appendix 3D Required Reports 10 Jul 09.pdf PDF
FA3002-09-R-0044-0001.pdf PDF
02 01 CSO Applicable to All Services 10 Jul 09.pdf PDF
Atch 3 Schedule B 09-R-0044-0001 7 Jul 09.xls XLS spreadsheet
Pre-Proposal Conf Minutes 8 Jul 09.pdf PDF
Pensacola ACFT MX PreProposal Conf Briefing FINAL 8 Jul 09.pptx PPTX presentation
MFR Gov't response 7 Jul 09.pdf PDF
03-04-09 South Ramp Redesign Govt Approved.pdf PDF
AETC A47 Map directions.pptx PPTX presentation
Hangar Interior.pdf PDF
Notice Site Visit 20090702.pdf PDF
PWS Industry Questions.xls XLS spreadsheet
Sections H I and J Industry Questions.xls XLS spreadsheet
Section LM Industry Questions.xls XLS spreadsheet
Schedule B Industry Questions.xls XLS spreadsheet
Navy Instructions Part 2.pdf PDF
Navy Instructions Part 1.pdf PDF
NAVSEA OP5 7th rev.pdf PDF
19Jun09 Notice.pdf PDF
Attachment 5 Cover Page.doc DOC document
Schedule B 19 Jun 09.xlsx XLSX spreadsheet
WD 2005-3033 Rev 8 dated 26 May 09.pdf PDF
Attachment 2 Cover Page.doc DOC document
Attachment 11 Cover Page.docx DOCX document
09-R-0044 Jun 19.pdf PDF
Master PWS 19 Jun 09.pdf PDF
Manpower Matrix 15 June 09.xlsx XLSX spreadsheet
SCA Occ Index 5th Edition.pdf PDF
Section J Atch 7 - Small Business subcontracting checklist.docx DOCX document
Attachment 1 PWS.doc DOC document
Attachment 8 Cover Page.doc DOC document
Attachment 9 Past Performance Questionnaire 15 June.pdf PDF
Section J Attachment 10 Past Performance Consent Form.doc DOC document
Section J Atch 11 - Question and Comment Sheet 15 Jun 09.xlsx XLSX spreadsheet
CSO Pensacola PWS summary Sheet.xlsx XLSX spreadsheet
Section J Atch 6 - Performance Plan 11 Jun 09.docx DOCX document
Attachment 7 Cover Page.doc DOC document
Attachment 3 Cover Page.doc DOC document
Attachment 9 Cover Page.doc DOC document
Attachment 10 Cover Page.doc DOC document
Attachment 4 Cover Page.doc DOC document
Attachment 6 Cover Page.doc DOC document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 8

PAST PERFORMANCE INFORMATION SHEET

Submit information on contracts that you consider relevant in demonstrating your ability to perform the proposed effort. Include rationale supporting your assertion of relevance. For a description of the characteristics or aspects the Government will consider in determining relevance, see Section M. Note that the will not consider performance on an effort that concluded more than 3 years prior to the solicitation closing date. Additionally, performance must have been on-going for at least six months.

Offerors are encouraged to include efforts accomplished to resolve problems encountered on the referenced contract as well as efforts to identify and manage program risk. Merely having problems does not automatically equate to a lowered confidence rating since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems. The offeror should clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified.

Provide the information requested in this submittal for each contract/program being described. Limit the number of efforts submitted to no more than three (3) contracts and the length of each submission to no more than five (5) pages.

A. Offeror Name (Company/Division): ____________________

CAGE Code used on the effort discussed: ____________________

(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes. Refer to the "Organizational Structure Change History" you will provide as part of your Past Performance Volume).

B. Program Title: _______________________________________________

C. Contract Specifics:

1. Contracting Agency or Customer _____________________________________________
2. Contract Number__________________________________________________________
3. Contract Type __________________________
4. Period of Performance __________________________
5. Original Contract $ Value_________________ ( include unexercised options)
6. Current Contract $ Value_________________ ( include unexercised options)

7. If Amounts for 5 and 6 above are different, provide a brief description of the reason for contract growth. If cost increase is attributable only to wage increases without additional work, state so. ____________________________________________________________________________________________________________________________________________________________________________________________

8. How many of your company employees support this effort (on-site)

9. Brief Description of Effort as ____Prime or ____Subcontractor. Provide description of teaming arrangement, if applicable.

(Please indicate whether it was development and/or production, or other acquisition phase and highlight portions considered most relevant to current acquisition)

D. Completion Date:

1. Original date:____________________
2. Current Schedule: ____________________
3. How Many Times Changed: ____________________
5. Primary Causes of Change:

E. Primary Customer Points of Contact: (For Government contracts, provide current information on all three individuals. For commercial contracts, provide points of contact fulfilling these same roles).

1. Program Manager and/orName____________________
Site ManagerOffice____________________
Address____________________
____________________

Telephone__________________

2. Contracting Officer:Name____________________
Office____________________
Address____________________
____________________
Telephone__________________
3. AdministrativeName____________________
Contracting OfficeOffice ____________________
Address____________________
____________________
Telephone__________________

F. Address any technical (or other) area about this contract/program considered relevant to the proposed effort.

G. For each of the applicable subfactors under the Technical Acceptability factor in Section M, illustrate how your experience on this program applies to that subfactor.

1. Manpower Plan
2. Management Plan

H. Quality and Satisfaction Rating: Provide any objective information ( metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with overall job performance and quality of completed service.

I. If applicable, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods etc.

J. Include relevant information concerning your compliance with FAR 52.219-8, Utilization of Small Business Concerns, on the contract you are submitting.

K. Identify whether a subcontracting plan was required by the contract you are submitting. If one was required, identify, in percentage terms, the planned versus achieved goals during contract performance. If goals were not met, please explain.

L. Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor, or a corporate division related to the prime (define relationship). (This is especially important if requesting the Past Performance volume early, as the PCAG will not have any other source for this information, which is critical to their relevancy determination)

FA3002-09-R-0044

Attachment 8 15 Jun 09

File details come from the government source that posted it. Updated .