PWS Industry Questions.xls

XLS spreadsheet 31 KB Posted

Attached to
T-1/T-6 (USAF) Aircraft Maintenance Support Services, Pensacola NAS, FL
Solicitation number
FA3002-09-R-0044
Issued by

About this file

Attachment 1 PWS Industry Questions and Answers

View the file

Other files

File Type Posted
09-R-0044 SF30 0003 canx 25 Jul 09.pdf PDF
09-R-0044-0002 22 Jul 09.pdf PDF
19 Jun RFP conformed thru 0001.pdf PDF
03 17 CSO Appendix 3FG GFP Training 10 Jul 09.pdf PDF
03 02 CSO Services Summary 10 Jul 09.pdf PDF
Government Response to Industry Comments.pdf PDF
03 01 CSO Description of Services 10 Jul 09.pdf PDF
03 11 CSO Appendix 3FB GFP EAID 10 Jul 09.pdf PDF
03 07 CSO Appendix 3D Required Reports 10 Jul 09.pdf PDF
FA3002-09-R-0044-0001.pdf PDF
02 01 CSO Applicable to All Services 10 Jul 09.pdf PDF
Atch 3 Schedule B 09-R-0044-0001 7 Jul 09.xls XLS spreadsheet
Pre-Proposal Conf Minutes 8 Jul 09.pdf PDF
Pensacola ACFT MX PreProposal Conf Briefing FINAL 8 Jul 09.pptx PPTX presentation
MFR Gov't response 7 Jul 09.pdf PDF
03-04-09 South Ramp Redesign Govt Approved.pdf PDF
AETC A47 Map directions.pptx PPTX presentation
Hangar Interior.pdf PDF
Notice Site Visit 20090702.pdf PDF
Sections H I and J Industry Questions.xls XLS spreadsheet
Section LM Industry Questions.xls XLS spreadsheet
Schedule B Industry Questions.xls XLS spreadsheet
Navy Instructions Part 2.pdf PDF
Navy Instructions Part 1.pdf PDF
NAVSEA OP5 7th rev.pdf PDF
19Jun09 Notice.pdf PDF
Attachment 5 Cover Page.doc DOC document
Schedule B 19 Jun 09.xlsx XLSX spreadsheet
WD 2005-3033 Rev 8 dated 26 May 09.pdf PDF
Attachment 2 Cover Page.doc DOC document
Attachment 11 Cover Page.docx DOCX document
09-R-0044 Jun 19.pdf PDF
Master PWS 19 Jun 09.pdf PDF
Manpower Matrix 15 June 09.xlsx XLSX spreadsheet
SCA Occ Index 5th Edition.pdf PDF
Section J Atch 7 - Small Business subcontracting checklist.docx DOCX document
Attachment 1 PWS.doc DOC document
Attachment 8 Cover Page.doc DOC document
Attachment 9 Past Performance Questionnaire 15 June.pdf PDF
Section J Attachment 10 Past Performance Consent Form.doc DOC document
Section J Atch 11 - Question and Comment Sheet 15 Jun 09.xlsx XLSX spreadsheet
CSO Pensacola PWS summary Sheet.xlsx XLSX spreadsheet
Section J Atch 6 - Performance Plan 11 Jun 09.docx DOCX document
Attachment 7 Cover Page.doc DOC document
Attachment 3 Cover Page.doc DOC document
Attachment 9 Cover Page.doc DOC document
Attachment 10 Cover Page.doc DOC document
Section J Atch 8 - Past Performance Info Sheets.docx DOCX document
Attachment 4 Cover Page.doc DOC document
Attachment 6 Cover Page.doc DOC document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Comments

Question #SectionPageParagraphCommentDate SubmittedResponseDate PostedResponse
1PWS3-1-323.1.11.7.2States that "Parts required to build up canopies will be supplied by the T-6 Service Provider." Please clarify if this is supplied by the COMBS provider. If not, will it be allowed under CLIN 0006?15-Jun-09Parts will be provided by the T-6 COMBS.
2CSO_ACMX_Overview. Pptx and PWSSlide 11In the referenced powerpoint presentation posted in April 2009, it appeared Transient Maintenance would be a part of the requirement. It is not referenced in the PWS. Is the transient requirement only for visiting T-1/T-6 aircraft or is there a larger requirement for visiting USAF aircraft?15-Jun-09Transient Maintenance will not be part of this requirement. The Host base will be responsible for the transient maintenance. (Navy)
3PWS3F-1

3-1-33 3-1-10 3F.1.3 3.1.11.8.1

Table 3-1Reference: Paragraph 3F.1.3 states that "AIMD support includes on-and-off-equipment maintenance capability for NDI, including determining structural integrity of aircraft, aircraft engine components, and associated support equipment, and to aid in foreign object (FO) searches". Paragraph 3.1.11.8.1 states that "the service provider shall provide on-equipment maintenance capability for nondestructive inspection (NDI) including determining structural integrity of aircraft, aircraft engine components, and associated support equipment, and to aid in foreign object (FO) searches". Table 3-1 shows Non Destructive Inspection On-equipment as a service provider responsibility.
Question: Does the Government intend for On-Equipment NDI support to be supplied by the AIMD contractor, or the service provider for this solicitation?11-Jun-09The PWS paragraph 3F.1.3 has been revised to indicate that AIMD will perform only Off equipment maintenance. The SP will be responsible for On-equipment NDI support.
4PWS 3.13-1-29PWS 3.1.9.30When does the Government anticipate installing aircraft shelters?11-Jun-09Response: Aircraft Shelters are scheduled to completed by Jan 2010.
5PWS 3.13-1-10Table 3-1Is the requirement for T-1 Egress correct?11-Jun-09No, Table 3-1 has been corrected.
6PWS 3.13B-3Appendix 3B, Table 3B-2Estimated T-1 sorties per day was changed from 24 to 25. Given 2 Goes Per Day, should CAP be changed to 13?11-Jun-09Response: At this time the estimated sorties per day is 25 however this may change based on average sortie duration which has not officially been determine.
7PWS 2.12-1-31PWS 2.1.26.6Must the SP provide racks and/or dollies for storing aircraft parts and panels off the hangar floors, i.e., engine cowlings?11-Jun-09Yes, the SP can purchase racks under the a CLIN of this contract.
8PWS 2.12-1-30PWS 2.1.25.13.7A tow tractor was added to the list of required vehicles. Can the Government identify the PWS tasks that require the use of a tow tractor, given that 4 warehouse tugs must be provided?11-Jun-09PWS has been corrected to reflect a total of 4 tugs
9PWS 2.12-1-7PWS 2.1.6.8Does the requirement refer to "...initial equipment custodial [training] for personnel…"?11-Jun-09Yes
10PWS App 3B3BA-1PWS App 3BAWorkload data (man-hours) for on-equipment maintenance associated with NDI, sheet metal, corrosion and metals technology was not provided.11-Jun-09PWS has been revised to reflect workload data in Appendix 3B. The estimated workload data for NDI, Sheet metal, corrosion control and metals technology is 20,367,00.
11PWS 2.12-1-26PWS 2.1.21Will the Government provide a copy of its PMAP to bidders?11-Jun-09Yes
12Key Milestone Dates12Has there been a change to the RFP release date and have the other dates that follow changed as a result?17-Jun-09The RFP was release on 19 June 09.
13CSO OverviewSlide 51Based on the sortie number can we assume this is a three go day with 14 front lines 12 lines on the second go and 10 lines on the 3rd go for the T6 aircraft and a two go day for the T1 of 12 turn 8? What is the average sortie duration for each aircraft17-Jun-09Please refer to the PWS Appendix 3B for average sortie duration for each aircraft.
14CSO OverviewSlide 61What type of phase inspections are required? How many flying hours equate to the need for a phase inspection? Can we view an inspection checklist for the inspection to determine personnel and equipment requirements17-Jun-09Please refer to the PWS Section 3-1 and Appendix 3B.
15CSO OverviewSlide 81Is there any Government furnished equipment?17-Jun-09Please refer to the PWS Appendix 3FB and 3FD for Government furnished equipment.
16Generaln/an/aIs there a requirement for the government to certify training or approve training plans for each of the areas of the contract?17-Jun-09Please refer to the Section 2-1 & 3-1 of the PWS.

&CT-1A and T-6A Aircraft Maintenance NAS Pensacola

File details come from the government source that posted it. Updated .