Industry Comments
| Question # | Section | Page | Paragraph | Comment | Date Submitted | Response | Date Posted | Response |
| 1 | PWS | 3-1-32 | 3.1.11.7.2 | States that "Parts required to build up canopies will be supplied by the T-6 Service Provider." Please clarify if this is supplied by the COMBS provider. If not, will it be allowed under CLIN 0006? | 15-Jun-09 | Parts will be provided by the T-6 COMBS. | ||
| 2 | CSO_ACMX_Overview. Pptx and PWS | Slide 11 | In the referenced powerpoint presentation posted in April 2009, it appeared Transient Maintenance would be a part of the requirement. It is not referenced in the PWS. Is the transient requirement only for visiting T-1/T-6 aircraft or is there a larger requirement for visiting USAF aircraft? | 15-Jun-09 | Transient Maintenance will not be part of this requirement. The Host base will be responsible for the transient maintenance. (Navy) | |||
| 3 | PWS | 3F-1 |
3-1-33 3-1-10 3F.1.3 3.1.11.8.1
| Table 3-1 | Reference: Paragraph 3F.1.3 states that "AIMD support includes on-and-off-equipment maintenance capability for NDI, including determining structural integrity of aircraft, aircraft engine components, and associated support equipment, and to aid in foreign object (FO) searches". Paragraph 3.1.11.8.1 states that "the service provider shall provide on-equipment maintenance capability for nondestructive inspection (NDI) including determining structural integrity of aircraft, aircraft engine components, and associated support equipment, and to aid in foreign object (FO) searches". Table 3-1 shows Non Destructive Inspection On-equipment as a service provider responsibility. | ||||||
| Question: Does the Government intend for On-Equipment NDI support to be supplied by the AIMD contractor, or the service provider for this solicitation? | 11-Jun-09 | The PWS paragraph 3F.1.3 has been revised to indicate that AIMD will perform only Off equipment maintenance. The SP will be responsible for On-equipment NDI support. | |||||
| 4 | PWS 3.1 | 3-1-29 | PWS 3.1.9.30 | When does the Government anticipate installing aircraft shelters? | 11-Jun-09 | Response: Aircraft Shelters are scheduled to completed by Jan 2010. | |
| 5 | PWS 3.1 | 3-1-10 | Table 3-1 | Is the requirement for T-1 Egress correct? | 11-Jun-09 | No, Table 3-1 has been corrected. | |
| 6 | PWS 3.1 | 3B-3 | Appendix 3B, Table 3B-2 | Estimated T-1 sorties per day was changed from 24 to 25. Given 2 Goes Per Day, should CAP be changed to 13? | 11-Jun-09 | Response: At this time the estimated sorties per day is 25 however this may change based on average sortie duration which has not officially been determine. | |
| 7 | PWS 2.1 | 2-1-31 | PWS 2.1.26.6 | Must the SP provide racks and/or dollies for storing aircraft parts and panels off the hangar floors, i.e., engine cowlings? | 11-Jun-09 | Yes, the SP can purchase racks under the a CLIN of this contract. | |
| 8 | PWS 2.1 | 2-1-30 | PWS 2.1.25.13.7 | A tow tractor was added to the list of required vehicles. Can the Government identify the PWS tasks that require the use of a tow tractor, given that 4 warehouse tugs must be provided? | 11-Jun-09 | PWS has been corrected to reflect a total of 4 tugs | |
| 9 | PWS 2.1 | 2-1-7 | PWS 2.1.6.8 | Does the requirement refer to "...initial equipment custodial [training] for personnel…"? | 11-Jun-09 | Yes | |
| 10 | PWS App 3B | 3BA-1 | PWS App 3BA | Workload data (man-hours) for on-equipment maintenance associated with NDI, sheet metal, corrosion and metals technology was not provided. | 11-Jun-09 | PWS has been revised to reflect workload data in Appendix 3B. The estimated workload data for NDI, Sheet metal, corrosion control and metals technology is 20,367,00. | |
| 11 | PWS 2.1 | 2-1-26 | PWS 2.1.21 | Will the Government provide a copy of its PMAP to bidders? | 11-Jun-09 | Yes | |
| 12 | Key Milestone Dates | 1 | 2 | Has there been a change to the RFP release date and have the other dates that follow changed as a result? | 17-Jun-09 | The RFP was release on 19 June 09. | |
| 13 | CSO Overview | Slide 5 | 1 | Based on the sortie number can we assume this is a three go day with 14 front lines 12 lines on the second go and 10 lines on the 3rd go for the T6 aircraft and a two go day for the T1 of 12 turn 8? What is the average sortie duration for each aircraft | 17-Jun-09 | Please refer to the PWS Appendix 3B for average sortie duration for each aircraft. | |
| 14 | CSO Overview | Slide 6 | 1 | What type of phase inspections are required? How many flying hours equate to the need for a phase inspection? Can we view an inspection checklist for the inspection to determine personnel and equipment requirements | 17-Jun-09 | Please refer to the PWS Section 3-1 and Appendix 3B. | |
| 15 | CSO Overview | Slide 8 | 1 | Is there any Government furnished equipment? | 17-Jun-09 | Please refer to the PWS Appendix 3FB and 3FD for Government furnished equipment. | |
| 16 | General | n/a | n/a | Is there a requirement for the government to certify training or approve training plans for each of the areas of the contract? | 17-Jun-09 | Please refer to the Section 2-1 & 3-1 of the PWS. |
&CT-1A and T-6A Aircraft Maintenance NAS Pensacola