Government Response to Industry Comments.pdf

PDF 61 KB Posted

Attached to
T-1/T-6 (USAF) Aircraft Maintenance Support Services, Pensacola NAS, FL
Solicitation number
FA3002-09-R-0044
Issued by

About this file

Government Response to Industry Comment

View the file

Other files

File Type Posted
09-R-0044 SF30 0003 canx 25 Jul 09.pdf PDF
09-R-0044-0002 22 Jul 09.pdf PDF
19 Jun RFP conformed thru 0001.pdf PDF
03 17 CSO Appendix 3FG GFP Training 10 Jul 09.pdf PDF
03 02 CSO Services Summary 10 Jul 09.pdf PDF
03 01 CSO Description of Services 10 Jul 09.pdf PDF
03 11 CSO Appendix 3FB GFP EAID 10 Jul 09.pdf PDF
03 07 CSO Appendix 3D Required Reports 10 Jul 09.pdf PDF
FA3002-09-R-0044-0001.pdf PDF
02 01 CSO Applicable to All Services 10 Jul 09.pdf PDF
Atch 3 Schedule B 09-R-0044-0001 7 Jul 09.xls XLS spreadsheet
Pre-Proposal Conf Minutes 8 Jul 09.pdf PDF
Pensacola ACFT MX PreProposal Conf Briefing FINAL 8 Jul 09.pptx PPTX presentation
MFR Gov't response 7 Jul 09.pdf PDF
03-04-09 South Ramp Redesign Govt Approved.pdf PDF
AETC A47 Map directions.pptx PPTX presentation
Hangar Interior.pdf PDF
Notice Site Visit 20090702.pdf PDF
PWS Industry Questions.xls XLS spreadsheet
Sections H I and J Industry Questions.xls XLS spreadsheet
Section LM Industry Questions.xls XLS spreadsheet
Schedule B Industry Questions.xls XLS spreadsheet
Navy Instructions Part 2.pdf PDF
Navy Instructions Part 1.pdf PDF
NAVSEA OP5 7th rev.pdf PDF
19Jun09 Notice.pdf PDF
Attachment 5 Cover Page.doc DOC document
Schedule B 19 Jun 09.xlsx XLSX spreadsheet
WD 2005-3033 Rev 8 dated 26 May 09.pdf PDF
Attachment 2 Cover Page.doc DOC document
Attachment 11 Cover Page.docx DOCX document
09-R-0044 Jun 19.pdf PDF
Master PWS 19 Jun 09.pdf PDF
Manpower Matrix 15 June 09.xlsx XLSX spreadsheet
SCA Occ Index 5th Edition.pdf PDF
Section J Atch 7 - Small Business subcontracting checklist.docx DOCX document
Attachment 1 PWS.doc DOC document
Attachment 8 Cover Page.doc DOC document
Attachment 9 Past Performance Questionnaire 15 June.pdf PDF
Section J Attachment 10 Past Performance Consent Form.doc DOC document
Section J Atch 11 - Question and Comment Sheet 15 Jun 09.xlsx XLSX spreadsheet
CSO Pensacola PWS summary Sheet.xlsx XLSX spreadsheet
Section J Atch 6 - Performance Plan 11 Jun 09.docx DOCX document
Attachment 7 Cover Page.doc DOC document
Attachment 3 Cover Page.doc DOC document
Attachment 9 Cover Page.doc DOC document
Attachment 10 Cover Page.doc DOC document
Section J Atch 8 - Past Performance Info Sheets.docx DOCX document
Attachment 4 Cover Page.doc DOC document
Attachment 6 Cover Page.doc DOC document
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T-1A and T-6A Aircraft Maintenance

NAS Pensacola

Question # Section/CLIN Page Paragraph Cross

Reference

Comment Response

1 Section I 15 of 78 List of clauses included by reference

We are concerned that offerors could suffer irreparable financial loss in certain situations unless the Government places some limits on service provider liability for all classes of losses. Recommendation:

We recommend the Government add FAR Clauses 52.246-23, Limitation of Liability, and 52-246-24, Limitation of Liability - High

Value Items, to the contract.

These clauses will not be included in this contract as this is a service contract.

These clauses address delivery of end-items and delivery of high value items.

2 Section B, CLIN X004

3, 4 of 78 B-1.4, B-3 Section B-1, CLIN X004 “Weekend/Flying Support” (page 3, 4 of 78)

– Industry previously requested that loads and profit be applicable to

CLIN X004 (0004). This CLIN is currently a cost reimbursable CLIN.

The Government responded to the Industry Question that Section B-3

Direct Reimbursable has been removed. The Government never actually stated that loads and profit can be applied. Removing

Section B-3 Direct Reimbursable still doesn’t make it clear what loads can be applied on top of costs.

Please review the CLIN descriptions and PWS

Section 2.1.17, as well as clause B-4. G&A, overhead, profit, fee or other burdens are only excluded from CLINs X005 and X006. Invoices submitted for cost reimbursable CLINs will be reviewed by the ACO at the time of submission for approval.

3 Section H 12 of 78 H003 Section H, H003 Insurance Endorsements (page 12 of 78) – Before commencing work under this contract, the Contractor must certify in writing they have obtained the required insurance. The RFP does not identify what the specific insurance requirements are. Please provide the specific insurance requirements.

In accordance 52.228-5, the service provider shall maintain insurance coverage as prescribed by the laws of the State in which this contract service is to be performed. It is the offerors responsibility to determine which coverage is necessary and required.

4 Section I 23 of 78 52.246-20 Section I

Contract

Clause

52.246-20

Warranty of

Services

(page 23 of

78)

In previous answers to Clin B questions, Government state Clause

B3 would be deleted. However, CLIN 6 in the attachment still states that G&A, Overhead, Profit, and Fee are excluded. We did not receive an answer to our specific question concerning pricing this

CLIN. Question: will the Government readdress the question of allowing these loads to be included in pricing for this CLIN in order that we may comply with our CAS?

CAS requirements are not required IAW FAR

Appendix 1 Subpart

9903.201-1 (b)(15) which states CAS requirements are exempt for firm-fixed-price contracts or subcontracts awarded on the basis of adequate price competition without submission of cost or pricing data.

5 Section L 61 of 78 Volume II, Para d.

Questionnair es

IAW the RFP it is the Government’s responsibility to send out past performance questionnaires to each POC identified in our past performance information sheets. Will Contractor ratings be negatively affected if the Government does not receive completed questionnaires back by the time past performance evaluations are scheduled to take place?

Contractor ratings will not be negatively affected if the

Government does not receive completed questionnaires, It is the

Government's responsibility to contact those POCs you provide in the PPIS.

However, it is important that each offeror state those contracts along with current, reliable POCs you consider most relevant to this requirement.

According to Section M, paragraph D, the PCAG uses the past performance questionnaire as one method to obtain performance information.

6 Section J, Attachment 1

PWS

3D-1 3D.1

Required

Reports

PWS Appendix 2D.1 Required Reports describes the form of the report as an electronic document. Appendix 3D.1 Required Reports does not describe the form of the report as an electronic document or hard copy. We assume the Required Reports in Section 2D.1 and

3D.1 can be submitted as electronic documents. Please confirm.

Required Reports can be submitted as electronic documents.

7 Section B 4 of 78 B-1.7 9 of 78 Section B-1.7 specifies a 41-day mobilization/transition period, whereas Section F (Page 9) and Section J Attachment 3, Schedule B indicate a 29-day mobilization period. Please confirm the length of the transition period. Also, the RFP indicates that T-1A flying training is to take place during this period. When is the SP supposed to recruit and train the employees who are to support this activity, and at whose expense?

The basic contract period has changed therefore, the

Mobilization period is now from 2 Nov through 30

November. Although no specific reference was provided in the question, Appendix 3FG addresses

Initial T-1 Maintenance

Training which is only for T-

1 upgrade modifications.

Government furnished training will be provided to only 6-8 employees.

8 Section L 65 of 78 L-F.2. Volume ! Technical page limit is currently 50 pages. Since offerors must respond to all PWS requirements, request and increase of 25 to

30 pages for this critical volume to allow offerors to properly explain

HOW they will accomplish PWS requirements.

The Government has determined that 50 pages can adequately address all the requirements of the

PWS.

9 PWS 3FG-1 Appendix

3FG

Discussion: PWS Appendix 3FG provides a listing of T-6 and T-1

Government-Furnished training, by block and course, and limits the number of employees that can attend the course to 25 percent of the target population.

Question: Will the Government provide the planned schedule for the

Government-Furnished Training listed in Appendix 3FG, and clarify the maximum number of personnel authorized to receive said training?

The schedule for training will be provided by the

Government. Amendment

0001 provides the number of slots for each training class

10 PWS 2-3-2

3-1-26

2.3.2.2

3.1.9.22

Appendix 3FD

& 3FD-A

Discussion: PWS paragraph 2.3.2.2 states that at the beginning of the contract, the Government will furnish the common hand tools, special tools, expendable tools (see Appendix 3FD & 3FD-A).

Paragraph 3.1.9.22 states that the SP shall: Furnish sufficient quantities of common hand tools and toolboxes and equipment to meet all aircraft maintenance mission requirements. These common hand tools include all tools and tool boxes necessary to accomplish the aircraft maintenance mission that are not provided by the

Government under this contract. Upon examination of Appendix 3FD

& 3FD-A, the CTKs provided by the Government are limited to 5 ea T-

1A Overhaul Sets, 3 ea T-1A Engine Rinse Boxes, 1 ea T-1A spline screwdriver set, 1 ea T-1A nut driver set, 1 ea T-1A lube kit, and 1 ea

T-1A tire change kit. There appears to be no provision for additional

T-1 common hand tools to support the expanded T-1A mission at

NASP, nor any provision for common hand tools to support the T-6A mission.

Question: Is it the Government's intent that all common hand tools required to perform the PWS mission, that are not provided by the

Government, be provided by the service provider within the firm fixed price CLIN, or does the Government intend for the service provider to purchase required tools through the simplified purchase plan (CLIN

X006) following contract start?

The Government intends for the service provider to begin purchasing required tools through the simplified purchase program following contract award.

11 PWS 2-1-27 2.1.22.3.2 Discussion: PWS paragraph 2.1.22.3.2 requires the successor service provider to provide a sufficient number of personnel to conduct a joint inventory of all Government-furnished equipment

(GFE)… It is our understanding that the current T-1A maintenance operation at NASP will be using those same T-1A tools during the mobilization period.

Question: Will the Government allow time during the mobilization period for inventory and re-etching of CTK numbers for tools currently in-use by the T-1A maintenance operation, so that this turn-over process does not impact the T-1A flying program?

Yes, Inventory and re-etching of CTK numbers for tools are all part of the mobilization concept/period.

12 PWS 3-1-35 3.1.13 Discussion: PWS paragraph 3.1.13 provides guidance for off-station recovery of disabled aircraft, and defines the recovery area and response times. During recent Unit build-ups, AETC has relieved the service provider from accomplishing off-station recoveries for a number of months in order to accomplish smooth and thorough aircraft and equipment Transfer/Acceptance and mobilization processes.

Question: At what point, following the contract start date, will the service provider become responsible for recovery of disabled aircraft?

Service Provider will be responsible for recovering disable aircraft 60 days after performance start date.

13 PWS 3-1-13 3.1.9.7.4 Discussion: PWS paragraph 3.1.9.7.4 requires the service provider to manage fleet time IAW AFI 21-101 and the performance thresholds provided in paragraph 3.2.1, Table 3.2.1, Note B.

Question: Will the Government provide a listing of the current aircraft hours for each aircraft that is planned for assigment on this program, when the aircraft is projected to transfer, and the next phase inspection that is due?

The government can not provide fleet time for each aircraft that are planned for assignment on this program at this time. Once a list if fiinalized, it will be provided. The Government understands that for planning purposes that fleet time plays an important factor. We estimate six new T-6 aircraft will be assigned and the remaining will have an average of approximately 150 hours.

The T-1's will have an average of 200 hours.

14 PWS 2-1-23 2.1.16.3.2 At the end of contract performance common tools and special tools purchased by the SP in performance of this contract will be turned over to the Government. We were unable to find specific guidance in the RFP as to who will own the contractor furnished trailers and vehicles. Question: Will trailers, tugs, vehicles, etc. remain the property of the SP, or will they become Government Property after they are purchased and placed into service on the contract?

The vehicles will be property of the service provider at the end of the contract. The trailer for off-station recovery is consider equipment and will be purchase under the simplified purchasing program and will become

Government Property at the end of the contract.

15 PWS 3-1-29 3.1.9.32 Requirement states that SP will provide maintenance support for all inflight and ground emergency responses. The depth of support is not clear. Is the requirement that the SP will have comm with the aircraft from the MOC for inflight or ground emergencies? What crash recovery functions is the SP required to perform?

The Crash and Recovery functions will be primarily

Navy, however the Service

Provider will assist as necessary. The support of

In Flight Emergencies

(IFE)/Ground Emergencies

(GE) will be normal coordination with the

Maintenance Operations

Center (MOC), via

Command Post/Ground

Control to support the emergency.

16 RFP Which copy of RFP do I use when submitting my offer? Use the latest conformed copy of the RFP that is posted to FBO.