Industry Comments
| Question # | Section | Page | Paragraph | Comment | Date Submitted | Response | Response | |
| 1 | L | 7 | E2b | Given the tight schedule for past performance submission documents, can the Government provide the draft PPIS, Section J, Attachment 8 ahead of the RFP posting date of 16 Jun 09? | 11-Jun-09 | The PPIS will be posted ahead of RFP. | ||
| 2 | L | 11 of 13 | F.1.d | The paragraph prescribes that printing shall be one and one-half spaced, …, with font size no smaller than 11 point. Given the amount of information required to demonstrate technical acceptability, request the Government consider single spacing for proposal text, increasing pages from 30 to 50, or both. | 11-Jun-09 | Technical Volume Page Limit Increased to 50. | ||
| 3 | L | 4 | A.3. | Para says submit questions to "both email addresses in Para A.2." Para has only Capt Elliott's email address. We assume you mean Ms Smith's email address to be the second address. | 12-Jun-09 | Second address is teresa.yancey@randolph.af.mil | ||
| 4 | L | 7 | E.1.b.5), 6) | ITO say provide a Plan for recovery of disabled cross-county aircraft and Plan for natural disaster evacuation. Either of these plans or both together, if required to be submitted with the proposal, could exceed the 30 page limit for Volume I. Are the actual plans required to be submitted with the proposal? Will the Government exempt them from the page count limit as you have the QC Plan (ref Section L, para 2)? | 12-Jun-09 | Section L has been revised from a Plan to a brief description of how the SP will recover disabled cross-country aircraft and perform natural disaster evacuations. The SP will be required to develop Operating Instructions for both disabled cross country recovery and emergency natural disaster evacuations 60 days after contract award. | ||
| 5 | L | 10 | 4 | Para states small business participation goals in percentages, but does not state what these are percentage of. Are they percentages of total subcontracted dollars, or percentages of total contract value? Does the Government intend to state SB participation goals or minimum standards in terms of percentages of contract value? If so, will you provide these? | 12-Jun-09 | The current Government wide goals for small business participation were provided for reference and were based on total planned subcontracting dollars. There are no minimum standards-Offerors shall propose goals that are realistically obtainable and provide rationale for the proposed goals. If unable to meet referenced Government-wide goals for small business participation, fully explain that as well. | ||
| 6 | L | 11 | F1.b. | Para states, "If a section does not apply, do not re-number. Add numbered tab as a place holder." We do not understand this guidance. Please clarify and amplify. | 12-Jun-09 | To keep numbering consistent do not omit sections that do not apply to you. Simply add a numbered tab as a place holder. Thus the numbering stays consistent (there is just no information behind the tab if it does not apply to your proposal). | ||
| 7 | L | 11 of 13 | ||||||
| 12 of 13 | F.1.b | |||||||
| F.2 | Reference: Paragraph L.F.2 requires the offeror to identify each area of the proposal according to the title and paragraph identification numbers listed in the chart. Paragraph L.F.1.b states that "if a section does not apply, do not re-number. Add numbered tab as place holder". | |||||||
| Question: Due to the severe page limitations for the Technical volume, is it acceptable for us to provide tabs at only the single digit level (1, 2, 3) ? | Follow instructions for Paragraph L.F. 1.b. as tab pages do not contribute to your page count. | |||||||
| 8 | CLIN 0001 | No Number | POP | The CLIN description states the Period of Performance is 1 Nov 09 through 20 Sep 10. Section L instructions state to use 1,856 hours in the base period for calculating manning. The revised period of performance covers 231 work days or 1,848 hours. Does the Government intend to revise the instruction for annual work hours per employee for the base period? | 16-Jun-09 | The Period of Performance has now changed from 2 Nov 09 to 30 Sept 10. PWS Appendix 3B has been revised to reflect 211 work days or 1,744 hours. | ||
| 9 | L | 12 of 13 | F.2 | The "Proposal Organization Chart" associated with this paragraph specifies a page limit of 30 pages for Volume 1 Technical Volume. The Section L requirements for the information to be presented in this volume are virtually identical to the requirements for the technical volume in the Sheppard AFB Maintenance RFP FA3002-08-R-0020. That volume's page limit stared at 100 pages and was increased to 150 pages in an amendment to the RFP. Your draft PWS is 85 pages, exclusive of title page, TOC, attachments, and appendices. Comment/Question: We believe it may be unrealistic, even with the smaller program scope at NAS Pensacola, to expect the same information AETC CONS allowed 150 pages for at Sheppard to be condensed into 30 pages for NAS Pensacola. Further, we are concerned at how the Government expects offerors to address all PWS requirements the Government needed 85 pages to list, plus all the staffing information required, in less than half the number of pages the Government used to state the requirements. Will the Government consider increasing the page count for the Technical Volume? We suggest at least 100 pages. | The government considered all industry concerns and has decided to increase the number of pages to 50. The Government feels this number of pages should enable the offerors to demonstrate technical capability. This number of pages has been used in similar aircraft maintenance contract acquisitions. | |||
| 10 | Section L, Para E.2 | Para states, "Offerors are required to submit the Past Performance Information Sheets, by 4 PM Central time on 26 Jun 09 to jennifer.mcgee@randolph.af.mil and brian.elliot@randolph.af.mil." Para does not specify submission by email or other means. Question: May we assume that submission as attachments to email will comply with the requirement, or does the Government require hard copies and CD as well? | 22-Jun-09 | The Past Performance Information Sheets required by 4 PM Central time on 26 Jun 09 are e-mails only. The Past performance Information Sheets should be included in your Volume II-Past Performance Information (Factor 2) and submitted IAW the Proposal Organization Chart. |
&CT-1A and T-6A Aircraft Maintenance NAS Pensacola