ATTACHMENT 3

View the file

Other versions and copies of NAVSEA OP 5

Who attaches NAVSEA OP 5

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVE SE

WASHING TON NA VY YARD DC 20376-0001

IN REPLY REFER TO

Ser OOV/788

JUL ~ 0 2017

From: Director, Department of the Navy Weapons, Ordnance and Explosives Safety (SEA OOV)

Subj: CHANGE 14 TO NAVAL SEA SYSTEMS COMMAND ORDNANCE PAMPHLET 5, VOLUME 1, SEVENTH REVISION, "AMMUNITION AND EXPLOSIVES SAFETY

ASHORE"

Ref: (a) DoD 6055.09-M, DoD Ammunition and Explosives Safety Standards of 29 February 2008

Encl: (1) Abstract of Significant Changes

(2) Change 14 to NAVSEA OP 5, Volume 1, Seventh Revision of 1June2017

1. Enclosure (1) highlights the significant changes occurring in Change 14 to NA VSEA OP 5, Volume 1, Seventh Revision.

2. Change 14, issued for incorporation into all existing copies of this document, is provided as enclosure (2) and reflects:

a. Modifications to reference (a), generated by the 333th and 339th Department of Defense Explosives Safety Board meetings and Correspondence Votes.

b. Clarification of existing criteria to address stakeholder requests, and changes in other related governing documents.

3. All modifications of explosives safety criteria included in this change are effective on the date of this change. ~ (_ ..C

L. c./j Distribution:

NA VSURFW ARCENIHEODTECHDIV DET Picatinny NJ (G 13)

Enclosure (1)

NAVSEA OP 5 VOLUME 1 REVISION 7 CHANGE 14

ABSTRACT OF SIGNIFICANT CHANGES

1. Revised requirements for paragraph 1-4.4 Safety Department or Office, 1-4.4.1.b-d and 1-

4.4.1.k Explosive Safety Officer (ESO) Responsibilities.

2. Removed the words “military working dog” from paragraph 2-1.4.13.a to increase process efficiency enabled by the addition of newly purchased training equipment to CNIC inventory.

3. Added references to paragraph 2-4.6.7 for requirements when handling Otto Fuel II and other liquid propellants.

4. Revised paragraph 2-4.9.1 and added sub-paragraph 2-4.9.1(f) to reflect requirements for the newly emerging technology of radiating devices.

5. Added electronic cigarette devices to paragraph 2-4.9.5, 4-1.3.g and 4-2.6.1 in areas where ammunition and explosives are present, for fire inspection violations and as a Flame- and spark-producing device.

6. Revised paragraph 4-1.16.2.b to reflect a reduction of 500 feet to 100 feet of separation between hot work and any external ammunition movement.

7. Revised paragraph 4-3.2 requiring that fire maps be kept up to date either by posting, or by using an electronic database/ spreadsheet, in order to aid first responders.

8. Revised paragraph 5-8.1 to resolve two regulations that conflicted with each other.

9. Revised Figure 6-2 “Connections of Metal Masts to the Ground Girdle”, to reflect correct measurements.

10. Added “Ready Service Lockers” to paragraph 7-4.4.2 in order to identify ready service lockers requiring the same information to be posted just like its required inside a magazine.

11. Revised paragraph 7-6.2.5 to clarify possible misleading/incorrect definition of the word fragment and firebrand.

12. Revised paragraph 7-10.c to reflect parameters dealing with security ammunition at piers, wharves and on ships and small craft.

13. Clarified paragraph 7-11.1.1 by adding hazard Class/division 1.3 pyrotechnic items as well as some restrictions on 30mm and below ammunition. Added precaution to paragraph

2 Enclosure (1)

7.11.1.1.1(d) to avoid CATMs from being stored in skids, therefore avoiding additional wear and tear.

14. Revised paragraph 7-13.13 with new DDESB language on requirements for parking areas.

15. Created Table 7-13A per DDESB criteria, “Intermagazine Hazard Factors and Distances for Hazard Class/Division 1.1to Existing Type I, Type IIA, and Type IIB Smokeless

Powder/Projectile Magazines” to add new criteria.

16. Revised paragraphs 8-1.2.6.a and 8-1.2.6.d, 8-1.6.a, 8-1.6.3 and 8-1.6.4. to clarify and identify new site submission requirements of those facilities that were previously unsited or are in violation of current ESQD criteria.

17. Changed acronym Material Safety Data Sheets (MSDSs) to Safety Data Sheets (SDSs) in paragraph 10-1.1.19 to agree with globally harmonized system cited in 29 CFR 1910.1200.

18. Revised paragraph 10-2.1 to update reference MIL-STD-1320.

19. Revised paragraph 10-2.4 to update reference to MIP 7721/R85-Series and R86-Series.

20. Changed governing documents cited in paragraph 10-3.2, in accordance with which modifications to OHE or MHE may be made.

21. Removed paragraph 10-5.3.3 and replaced it with a new reference for marking tested OHE.

22. Modified and added wording to paragraphs 11-1.5, 11-1.5.2, 11-1.5.3, 13-15, 13-15.1.b, 13-15.4.1.1.c, 13-15.10.1 and Appendix A regarding empty container certification as directed by Advanced Change Notice (ACN), Naval Message R 171635Z FEB 16.

23. Revised paragraph 11-2.6 to provide reference and guidelines to determine magazine storage layouts.

24. Words “and each stack shall be placarded” deleted from paragraph 11-8.5.3.in order to remove the requirement to create placards. The placards are labor intensive and offer little return on investment.

25. Added requirements to paragraph 11-8.13.6.b due to potential injury to personnel.

26. Added paragraph 12-1.l, referencing NAVSEA SW023-AK-SAF-010.

27. Expanded paragraph 12-6.6.3, providing a reference for SOLAS material items and performance criteria.

28. Updated paragraphs 13-2.2 through 13.2.2.11 and appendix A to reflect changes from

DDESB with regard to intentional burning requirements.

3 Enclosure (1)

29. Changed vegetation clearing requirements for detonation sites from 500 feet to 300 feet in paragraph 13-3.2.1.c.

30. Changed definition in appendix A for “Qualified Receiver of MPPEH” to “…of MDEH” to clarify that no MPPEH shall be sold or transferred, unless it is assessed and determined to be MDAS or assessed and determined to be MDEH.

31. Modified paragraph B-2.1.7 to reflect cancelation and/or replacement of various Unified

Facilities Criteria (UFC) documents.

32. Replaced canceled military handbooks in paragraph B-3.1 with appropriate updates.

33. Revised Table G-1 to identify all RDT&E activities to avoid confusion and give the activities the ability to implement their own training program and SOP doctrine.

34. Added subparagraph G-10.3 to expand on the classification of hazardous material for local transportation and transportation over public traffic routes.

35. Modified paragraph I-1 to place ultimate responsibility for explosives safety with the installation CO and the regional commander.

NAVSEA OP 5 VOLUME 1

0640-LP-115-7509 SEVENTH REVISION

AMMUNITION AND EXPLOSIVES

SAFETY ASHORE

DISTRIBUTION STATEMENT C

Distribution authorized to U.S. Government agencies and their contractors;

administrative/operational use; 15 January 2001. Other requests for this document must be referred to the Naval Ordnance Safety and Security Activity (NOSSA).

WARNING

This document contains technical data that is subject to the Arms Export

Control Act, 22 USC Sec. 2751 et. seq. and is protected from release by 10 USC Sec. 130.

Violations of these laws are subject to severe criminal penalties.

DESTRUCTION NOTICE

Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

THIS PUBLICATION SUPERSEDES NAVSEA OP 5 VOLUME 1 SIXTH REVISION

DATED 1 MARCH 1995

PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND

http://www.nossa.navsea.navy.mil http://www.esd.whs.mil/Directives/issuances/dodd/

This page left intentionally blank

NAVSEA OP 5 VOLUME 1

0640-LP-115-7509 SEVENTH REVISION

AMMUNITION AND EXPLOSIVES

SAFETY ASHORE

DISTRIBUTION STATEMENT C

Distribution authorized to U.S. Government agencies and their contractors;

administrative/operational use; 15 January 2001. Other requests for this document must be referred to the Naval Ordnance Safety and Security Activity (NOSSA).

WARNING

This document contains technical data that is subject to the Arms Export

Control Act, 22 USC Sec. 2751 et. seq. and is protected from release by 10 USC Sec. 130.

Violations of these laws are subject to severe criminal penalties.

DESTRUCTION NOTICE

Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

THIS PUBLICATION SUPERSEDES NAVSEA OP 5 VOLUME 1 SIXTH REVISION

DATED 1 MARCH 1995

PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND

15 JANUARY 2001

Change 14 - 1 JUNE 2017

NAVSEA OP 5 VOLUME 1 SEVENTH REVISION

Reproduction for nonmilitary use of the information or illustrations contained in this publication is not permitted. This does not preclude reproduction and use of any part of this manual by contracted agencies responsible for the training and instruction of personnel who handle and transport military ammunition, explosives, and related hazardous materials. The policy for military use reproduction is established for the Army in AR 380-5, for the Navy and Marine Corps in SECNAV M-5510.36, and for the Air Force in Air Force Regulations 205-1.

Page *Change Page *Change No. No. No. No.

LIST OF EFFECTIVE PAGES

The total number of pages in this manual is 904. Revision Seven pages affected by Change 14 are marked accordingly at the bottom of the page.

Title/A

B thru E

F/(G Blank)

Foreword-1/(Foreword-2 Blank) i thru xxviii

1-1

1-2

1-3

1-4 thru 1-5

1-6

1-7 thru 1-9

1-10 thru 1-12

1-13

1-14 thru 1-18

1-19 thru 1-20

1-21/(1-22 Blank)

2-1

2-2

2-3

2-4 thru 2-5

2-6

2-7

2-8

2-9 thru 2-11

2-12

2-13 Date of Issue for Original and Changed Pages is:

Original Revision 7 . . . . . . . . . 15 January 2001 Change 1 . . . . . . . . . . . . . . . . . . . . 1 May 2002 Change 2 . . . . . . . . . . . . . . . . . . 1 March 2003 Change 3 . . . . . . . . . . . . . . . . . . . 1 June 2004 Change 4 . . . . . . . . . . . . . . . . . . . 1 June 2005 Change 5 . . . . . . . . . . . . . . . . . . . 1 June 2006 Change 6 . . . . . . . . . . . . . . . . . . . . 1 July 2007 Change 7 . . . . . . . . . . . . . . . . . . . . 1 July 2008 Change 8 . . . . . . . . . . . . . . . . . . . . 1 July 2009 Change 9 . . . . . . . . . . . . . . . . . . . . 1 July 2010 Change 10 . . . . . . . . . . . . . . . . . . . 1 July 2011 Change 11 . . . . . . . . . . . . . . . 15 January 2013 Change 12 . . . . . . . . . . . . . . . 15 January 2014 Change 13 . . . . . . . . . . . . . . . . 15 March 2015 Change 14 . . . . . . . . . . . . . . . . . . 1 June 2017 *Zero in this column indicates an original page.

A Change 14 http://neds.daps.dla.mil/551036.htm

Page *Change Page *Change No. No. No. No.

LIST OF EFFECTIVE PAGES (Continued) 2-14 thru 2-15

2-16 thru 2-17

2-18

2-19

2-20 thru 2-21

2-22

2-23 thru 2-24

2-25 thru 2-26

2-27 thru 2-28

2-29 thru 2-32

2-33

2-34

2-35 thru 2-36

2-37/(2-38 Blank)

3-1

3-2

3-3

3-4

3-5

3-6

3-7

3-8

3-9

3-10 thru 3-11

3-12

3-13

3-14

3-15

3-16

3-17

3-18

3-19

3-20 thru 3-21

3-22

4-1

4-2 thru 4-5

4-6 thru 4-7

4-8

4-9 thru 4-10

4-11

4-12

4-13

4-14 thru 4-17

4-18

4-19 thru 4-40

4-41

4-42 thru 4-44

4-45/(4-46 Blank)

5-1

5-2

5-3 thru 5-4

5-5

5-6

5-7

5-8 thru 5-11

5-12

5-13 thru 5-15

5-16 thru 5-17

5-18 thru 5-22

5-23

5-24

5-25 thru 5-27

5-28

5-29 thru 5-30

5-31 thru 5-34

5-35

5-36 thru 5-37

5-38 Change 14 B

*Zero in this column indicates an original page.

No. No. No. No.

LIST OF EFFECTIVE PAGES (Continued) 5-39 thru 5-41

5-42

5-43

5-44

5-45

5-46

5-47 thru 5-48

5-49/(5-50 Blank)

6-1 thru 6-2

6-3 thru 6-5

6-6 thru 6-7

6-8

6-9 thru 6-10

6-11 thru 6-14

6-15 thru 6-19

6-20

7-1

7-2

7-3

7-4

7-5 thru 7-8

7-9 thru 7-10

7-11

7-12

7-13

7-14

7-15

7-16 thru 7-17

7-18

7-19 thru 7-20

7-21 thru 7-22

7-23 thru 7-24

7-25

7-26

7-27 thru 7-28

7-29 thru 7-30

7-31 thru 7-32

7-33

7-34

7-35

7-36

7-37

7-38

7-39

7-40

7-41 thru 7-44

7-45 thru 7-46

7-47

7-48

7-49

7-50

7-51

7-52

7-53

7-54 thru 7-56

7-57

7-58 thru 7-65

7-66 thru 7-68

7-69 thru 7-74

7-75 thru 7-77

7-78

7-79 thru 7-80

7-81 thru 7-105

7-106

7-107 thru 7-109

7-110 thru 7-150

8-1 thru 8-2

8-3 C Change 14

No. No. No. No.

LIST OF EFFECTIVE PAGES (Continued) 8-4

8-5

8-6 thru 8-20

8-21 thru 8-40

8-41 thru 8-42

8-43 thru 8-44

8-45/(8-46 Blank)

9-1 thru 9-2

9-3 thru 9-5

9-6

9-7 thru 9-8

9-9 thru 9-14

9-15

9-16

9-17

9-18

9-19

9-20

9-21

9-22

9-23 thru 9-25

9-26 thru 9-29

9-30 thru 9-35

9-36 thru 9-37

9-38

9-39 thru 9-40

9-41/(9-42 Blank)

10-1

10-2

10-3 thru 10-6

10-7 thru 10-8

10-9

10-10 thru 10-11

10-12

10-13 thru 10-26

11-1

11-2

11-3 thru 11-12

11-13 thru 11-14

11-15 thru 11-22

11-23

11-24 thru 11-26

11-27 thru 11-33

11-34 thru 11-36

11-37 thru 11-39

11-40

11-41

11-42 thru 11-45

11-46 thru 11-47

11-48

11-49

11-50

11-51

11-52 thru 11-53

11-54

11-55/(11-56 Blank)

12-1 thru 12-3

12-4

12-5

12-6

12-7

12-8

12-9 thru 12-10

12-11 thru 12-12

12-13 thru 12-17

12-18

12-19 thru 12-27

12-28

12-29/(12-30 Blank)

13-1 Change 14 D

No. No. No. No.

LIST OF EFFECTIVE PAGES (Continued) 13-2

13-3 thru 13-4

13-5

13-6

13-7

13-8

13-9

13-10 thru 13-52

13-53/(13-54 Blank)

14-1 thru 14-3

14-4 thru 14-7

14-8

14-9

14-10

14-11 thru 14-15

14-16

14-17 thru 14-23

14-24 thru 14-26

14-27 thru 14-28

14-29/(14-30 Blank)

A-1 thru A-3

A-4

A-5 thru A-12

A-13

A-14

A-15

A-16 thru A-24

A-25

A-26 thru A-31

A-32

A-33

A-34 thru A-35

A-36 thru A-38

A-39

A-40 thru A-44

A-45

A-46 thru A-49

A-50

A-51 thru A-52

A-53

A-54 thru A-60

B-1

B-2 thru B-16

B-17/(B-18 Blank)

C-1

C-2

C-3

C-4

C-5 thru C-6

D-1 thru D-11

D-12 thru D-20

D-21/(D-22 Blank)

E-1 thru E-14

E-15/(E-16 Blank)

F-1 thru F-5

F-6

F-7 thru F-12

G-1 thru G-3

G-4

G-5

G-6

G-7

G-8

G-9

G-10

G-11

G-12

G-13 E Change 14

No. No. No. No.

LIST OF EFFECTIVE PAGES (Continued)

Change 14 F/(G Blank)

*Zero in this column indicates an original page.

G-14

G-15 thru G16

G-17

G-18 thru G-20

G-21 thru G-23

G-24

G-25

G-26 thru G-27

G-28

G-29

G-30

G-31

G-32

G-33

G-34

G-35

G-36

G-37

G-38

G-39 thru G-43

G-44

G-45

G-46

G-47

G-48 thru G-51

G-52

G-53 thru G-54

G-55

G-56

G-57

G-58

H-1/(H-2 Blank)

I-1

I-2

I-3 thru I-5

I-6 thru I-8

J-1 thru J-2

J-3 thru J-5

J-6 thru J-7

J-8

Index-1 thru Index-18

Index-19/(Index-20 Blank)

Change 9 Foreword-1/(Foreword-2 Blank)

FOREWORD

1. It is the policy of the Department of the Navy to maintain an effective and aggressive ordnance safety program throughout the Department. Adherence to the instructions and regulations contained in NAVSEA OP 5, “Ammunition and Explosives Safety Ashore” will provide a continuing, aggressive accident prevention program throughout all commands where military or civilian personnel are stationed or employed and ordnance equipment, ammunition, and explosives are used.

2. NAVSEA OP 5 consists of three volumes, as follows:

Volume 1 - Ammunition and Explosives Safety Ashore.

Volume 2 - Storage Data. (Replaced by NAVSEA SW020-AC-SAF-010)

Volume 3 - Ammunition and Explosives Safety Ashore for Contingencies, Combat Operations, Military Operations other than War and Associated Training.

3. The purpose of this volume is to acquaint personnel engaged in operations involving ammunition, explosives, and other hazardous materials, and to prescribe standardized safety regulations for the production, renovation, care, handling, storage, preparation for shipment, and disposal of these items.

4. The instructions and regulations prescribed in NAVSEA OP 5 for handling, storing, preparation for shipment, production, renovation, surveillance, and maintenance of ammunition and explosives are considered minimum criteria. The specific items, technical manuals, drawings, and specifications referenced in this publication should be consulted for additional, detailed requirements.

5. This publication is not intended to supersede, contravene, or modify any Federal, state, municipal, or local laws and their supplements. If any provision of this publication appears to conflict with any other published regulation, this fact should be reported in detail to the Naval Ordnance Safety and Security Activity (NOSSA) (N5).

6. Changes to this manual will be issued as required. Comments or suggestions relative to material to be included in such changes should be forwarded as specified in chapter 1.

TABLE OF CONTENTS

Chapter/Paragraph Page Number List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xx

List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxii

Safety Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxv

1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1

1-1 Purpose of NAVSEA OP 5 Volume 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-2 Scope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-2.1 Outside Continental United States (OCONUS).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3 Department of Defense Explosives Safety Board (DDESB).. . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.1 Purpose.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.2 Authority. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.3 Responsibilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-3.4 Interaction with DDESB. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1-4 Responsibilities for Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-4.1 Commanding Officer, Naval Ordnance Safety and Security Activity.. . . . . . . . . . . . . . . . . 1-5 1-4.2 Director, Safety Division HQMC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-4.3 Commanding Officer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5 1-4.4 Safety Department or Office. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 1-4.5 Supervisory Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-9 1-4.6 Operating Personnel.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11 1-5 Activity Administration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-5.1 Mission.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-5.2 Issuance of Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-5.3 Accident Investigation and Reporting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12 1-6 Deviations from Explosives Safety Criteria. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13 1-6.1 Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.2 Exemptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.3 Request for Exemptions or Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.4 Renewal of Waivers or Exemptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.5 Event Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 1-6.6 Request for Event Waivers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17 1-6.7 Secretarial Certification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-6.8 Request for Secretarial Certification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 1-7 Intended Use of This Manual.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19 1-7.1 Applicability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19 1-7.2 Mandatory and Advisory Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 1-7.3 Supplementary Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 1-7.4 Clarification of Regulations.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 1-8 Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 1-9 Reference Documents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 1-10 Reporting Deficiencies in Manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 1-11 Date of Publication. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-21 Change 14 i

TABLE OF CONTENTS (Continued)

Chapter/Paragraph Page Number

2 GENERAL REQUIREMENTS, STANDARDS, AND PRACTICES . . . . . . . . . . . . . . 2-1

2-1 General Safety Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2-1.1 Written Operating Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 2-1.2 Hazard Analysis and Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1.3 Reporting Unsafe Conditions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1.4 Unauthorized Use of Ammunition.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 2-1.5 Housekeeping.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9 2-1.6 Hunting and Fishing.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10 2-1.7 Aircraft Operations in the Vicinity of Ordnance Facilities. . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-1.7A Surface Danger Zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-1.8 Privately Owned Vehicles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2-1.9 Photography in Hazardous Areas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2-1.10 Radio/Radar Transmissions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2-1.11 Fireworks Display. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 2-1.12 Explosives Demonstrations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 2-1.13 Termination of Use of Potential Explosion Sites.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-14 2-1.14 Decontamination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15 2-2 Security Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-18 2-2.1 Authority Entry. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-18 2-2.2 Restricted Areas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-18 2-2.3 Port Emergency Signals.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-19 2-2.4 Duties of Guards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-19 2-2.5 Military Working Dogs Explosive Search Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-19 2-3 Personnel Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-20 2-3.1 Medical Fitness. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-20 2-3.2 Qualification and Certification Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-21 2-3.3 Safety Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-21 2-3.4 Working Parties. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-22 2-3.5 Work Shift Changing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-22 2-4 Personal Protective Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-4.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-4.2 Policy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-4.3 Determining Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-4.4 Training. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23 2-4.5 Maintenance.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24 2-4.6 Protective Clothing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24 2-4.7 Personal Protective Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-26 2-4.8 Miscellaneous Personal Protective Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28 2-4.9 Prohibited Articles in Hazardous Areas.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-29 2-4.10 Hearing Aids and Pacemakers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30 2-4.11 Eating. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30 2-5 Ship Berthing and Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30 2-5.1 Berthing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-31 2-5.2 Handling.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-34 ii Change 14

Chapter/Paragraph Page Number

3 CHARACTERISTICS OF AMMUNITION, EXPLOSIVES AND

RELATED HAZARDOUS MATERIALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1

3-1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2 Characteristics of Ammunition and Explosives.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2.1 Available Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 3-2.2 Composition of High Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2 3-2.3 Insensitive Munitions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3 3-2.4 Initiation and Detonation of an Explosive Main Charge. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3 3-2.5 Deliberate Detonation of an Explosive. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4 3-2.6 Detonation of a Fuel Air Explosive (FAE). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-2.7 Inadvertent Detonation of an Explosive. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-3 Test and Evaluation of Navy Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-3.1 Tests to Determine the Properties of Navy Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 3-3.2 Hazard Assessment Tests.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6 3-3.3 Qualification of Navy Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-3A Hazards Due to Triboelectric Charging of Gases, Vapors, Liquids, and Dusts. . . . . . . . . . 3-7 3-3A.1 Charge Accumulation and Charge Decay. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-3A.2 Dangerous Charge Accumulation and Ignition of Flammable and

Combustible Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-3A.3 Process Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-3A.4 Prevention of Hazards Due to Triboelectric Charging of Process Ingredients. . . . . . . . . . . 3-8 3-3A.5 Requirement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 3-4 Characteristics of Propellants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.1 Solid Propellants (Cast or Pellets). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.2 Energetic Liquids. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.3 Hybrid Propellants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-4.4 Propellants for Insensitive Munitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9 3-5 Characteristics of Pyrotechnics. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.1 Signaling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.2 Smoke Screening. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.3 Simulators and Decoys. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.4 Illuminating. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-10 3-5.5 Dye Marker Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-5.6 Chemiluminescent Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-5.7 Weather Modification Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-5.8 Pyrotechnics for Insensitive Munitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-11 3-6 Characteristics of Chemical Agents.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-6.1 Chemical Group A: Lethal -Toxic. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-6.2 Chemical Group B: Riot Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 3-6.3 Chemical Group C: Smoke. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 3-6.4 Chemical Group D: Incendiary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 3-7 Generic Classes of Mishaps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 3-7.1 Rough Handling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 Change 14 iii

Chapter/Paragraph Page Number 3-7.2 Improper Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14 3-7.3 Excess Exposure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-7.4 Natural Events. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-7.5 Byproducts or Residue.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-8 Hazard Classification of Ammunition and Explosives. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 3-8.1 Class/Divisions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-8.2 Minimum Separation Distance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-8.3 Assigning Hazard C/Ds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16 3-9 Storage Compatibility Groups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 3-9.1 Criteria for Assigning Compatibility Groups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-17 3-9.2 Compatibility Group Descriptions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18 3-9.3 Relationship Between Class, Division and Compatibility Group. . . . . . . . . . . . . . . . . . . . 3-21 3-9.4 Chemical Groups. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21

4 FIRE PREVENTION, PROTECTION, AND EMERGENCY PLANNING . . . . . . . . 4-1

4-1 Fire Prevention.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1.1 Personnel Indoctrination. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1.2 Fire Watch. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-1.3 Fire Inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-1.4 Pre-Operation Pier and Wharf Fire Inspections and Tests.. . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-1.5 Fire Protection Equipment Inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3 4-1.6 Smoking Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 4-1.7 Housekeeping.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 4-1.8 Floor Cleaning and Protecting Materials. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6 4-1.9 Trash Burning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 4-1.10 Firebreaks.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 4-1.11 Open Burn/Open Detonation Treatment Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8 4-1.12 Boilers and Heating Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8 4-1.13 Powered Industrial Materials Handling Equipment.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9 4-1.14 Illuminating Devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9 4-1.15 Heat or Spark-Producing Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9 4-1.16 Welding and Cutting Operations On Ships. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 4-1.17 Open Flames. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-11 4-1.18 Electrical Equipment and Machinery. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.19 Electrical Service and Wiring. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.20 Spray Painting and Finishing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.21 Defective Machinery, Equipment, and Tools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12 4-1.22 Defective Transmission Lines. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-1.23 Motor Vehicles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-1.24 Refueling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13 4-1.25 Locomotive and Self-Propelled Rail Vehicles.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14 4-1.26 Dunnage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14 4-1.27 Open Storage of Combustibles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15 iv Change 14

Chapter/Paragraph Page Number 4-1.28 Fires Caused by Ammunition, Explosives, and Hazardous Materials.. . . . . . . . . . . . . . . . 4-15 4-2 Emergency Planning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-16 4-3 Fire Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17 4-3.1 Fire Bills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17 4-3.2 Fire Map.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-18 4-3.3 Fire Alarm and Detection Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-18 4-3.4 Fire Drills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4-3.5 Fire Department. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4-3.6 Portable Fire Extinguishers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19 4-3.7 Water Supply Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-21 4-3.8 Water Distribution Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-24 4-3.9 Sprinkler Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-26 4-3.10 Other Fire Protection Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-29 4-3.11 Standby Tugs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-30 4-3.12 Fire Rate Assemblies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-32 4-4 Firefighting Hazard Identification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-33 4-4.1 Fire Divisions.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-33 4-4.2 Fire Hazard Symbols. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-33 4-5 Firefighting Measures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-41 4-5.1 Safety Considerations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-41 4-5.2 Use of Available Cover. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-43 4-5.3 Approaching Fires. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-43 4-5.4 Using Hazard Symbol Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-44 4-5.5 Special Firefighting Procedures.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-44

5 ELECTRICAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1

5-1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5-2 Hazardous (Classified) Locations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5-2.1 Class I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 5-2.2 Class II. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 5-2.3 Class III. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-2.4 Change of Classification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-2.5 Multiple Classifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3 Static Electricity.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3.1 General.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 5-3.2 Sources of Static Electricity.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 5-3.3 Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 5-3.4 Materials Sensitive to Static Spark Discharge. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 5-3.5 Dissipation of Static Electricity. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 5-4 Lightning Protection Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 5-4.1 Resistance of System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8 5-4.2 Bonding of Electrodes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 5-5 Secondary Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 Change 14 v

Chapter/Paragraph Page Number 5-5.1 Power System Ground. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10 5-5.2 Instrumentation Ground. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11 5-5.3 Static Grounds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11 5-5.4 Ordnance Ground.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-20 5-5.5 Structural Grounds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23 5-5.6 Ground Loops. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-24 5-6 Bonding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-24 5-6.1 Direct Bonding Techniques. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25 5-6.2 Indirect Bonding Techniques.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-27 5-7 Miscellaneous Grounding Requirements.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28 5-7.1 Machinery and Equipment.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28 5-7.2 Spray Painting Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28 5-8 Test and Inspection of Ground Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28 5-8.1 Grounding System Test Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28 5-8.2 Electrical Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-34 5-8.3 Visual Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40 5-9 Operational Grounding Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42 5-9.1 Grounding Weapons During Checkout. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-43 5-9.2 Grounding of Nuclear Weapons. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-43 5-9.3 Aircraft Grounding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-43 5-9.4 Grounding of Permanent Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-43 5-9.5 Identification of Miscellaneous Conductive Items. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-43 5-9.6 Grounding of Items Awaiting Processing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44 5-9.7 Grounding Cables. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-44 5-10 Electrical Services. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-45 5-10.1 Power Lines. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-45 5-10.2 Uninterruptible Power Sources. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-46 5-10.3 Ground Fault Interrupters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-47 5-10.4 Electrical Service Equipment.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-47

6 LIGHTNING PROTECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1

6-1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2 Storm Warning Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2.1 Pre-Strike Warning Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1 6-2.2 Spherics Warning Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 6-2.3 Implementations of Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 6-3 Policy for Lightning Protection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 6-3.1 Exceptions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 6-4 Lightning Protection Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 6-4.1 Air Termination Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 6-4.2 Down Conductors. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 6-5 Grounding. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8 6-5.1 Lightning Protection Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8 vi Change 14

Chapter/Paragraph Page Number 6-5.2 Secondary Grounding System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9 6-5.3 Interconnection of Grounding Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.