PWS Summary of Changes
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Master List
| Question Number | Page | PWS Paragraph Reference | Additional/ | |||
| Cross Reference | Discussion/Action | Question | Response | |||
| 2-1-27 | 2.1.23.1 | Deleted, "and CDRL's 001-005", from PWS Section 2-1 | N/A | |||
| 2-1-26 | 2.1.22 | Deleted the word, "Changeover" | N/A | |||
| 3-1-1 | 3.1.2.3 | Revised paragraph to read "Weekend Flying for T-1 and T-6 aircraft is used to make up lost training days to meet graduation schedules or other mission requirements upon 479th FTG/CC request IAW the weekly flying schedule. Cost associated with these events shall be included in the Weekend Flying Support CLIN." | Please clarify what is covered by the WEEKEND/FLYING SUPPORT CLIN. The CLIN references the PWS. PWS paragraph 3.1.2.3 states the SP will include support for up to four local area weekend sorties in the Unit Price. The CLIN definition in paragraph B-4 of Section B states, "All contract services in support of weekend flying days required on other than Monday through Friday will be contractually covered by an order issued by the ACO." It also states that Saturday, Sunday and holiday cross country returns are included in contract performance, but is not clear if they are covered by this CLIN or included in Unit Price. | |||
| 2-1-4 | 2.1.4.10 | Revised paragraph to read "Ensure that clothes, jewelry, hairpieces and accessories worn by contract personnel with access to the flight line do not present a potential FOD hazard IAW AFI 21-101, para 14.19.2.7." | ||||
| 2-1-12 | 2.1.9.15 | Revised the paragraph to read "The total cost of lost keys, re-keying or lock replacement shall be deducted from the monthly payment due the service provider". | ||||
| 3-1-6 | 3.1.5.4.1 | Corrected paragraph listed/reference number from 3.1.1.3 to 3.1.2.3. | ||||
| 3-2-3 | 3.2.4 | Added PWS paragraph to Quarterly thresholds. | ||||
| 2-1-30 | 2.1.25.13.7 | Revised PWS to read "Provide a minimum of four (4) aircraft towing vehicles (tugs) capable of towing the T-1 and T-6 aircraft in accordance with aircraft technical order requirements". | ||||
| 3-1-10 | Table 3-1 | Corrected PWS by removing T-1 Egress requirement on Table 3-1. | Is the requirement for T-1 Egress correct? | |||
| 3-1-32 | 3.1.11.7.2 | Revised paragraph to read "Parts required to build up the canopies will be supplied by the T-6 COMBS". | ||||
| Appendix 3A | Delete "Navy Instruction 3730.2T" |
| 3B-3 | Table 3B.2 | Revised table to read T-6 Average Sortie Duration to 1.38 |
| 3-1-27 | 3.1.9.24.1 | Added paragraph that reads, "The service provider shall develop a natural disaster emergency evacuation operating instruction with 60 days of contract award date" |
| 3-1-36 | 3.1.13.1 | Added paragraph that reads," The service provider shall develop an Off Station aircraft recovery operating instruction with 60 days of contract award date. |
| 3F-1 | 3F.1.2 | Removed,"Precision Measurement equipment laboratory (PMEL) |
| 3F-1 | 3F.1.3 | Revised paragraphs to read, "AIMD support includes off-equipment maintenance capability for NDI including determining structural integrity of aircraft, aircraft engine components, and associated support equipment IAW NAS 410, AFI 21-105, TO 33B-1-1, AFI 21-101 and AETCI 21-106". |
| 2-1-25 | 2.1.19.2 | Removed,"Precision Measurement equipment laboratory (PMEL) |
| 3-1-12 | 3.1.8 , Table 3-1 | Added PMEL Calibration to Service Provider and removed from AIMD support |
| 3-1-26 | 3.1.9.21 | Added, "Test, Measurement, and Diagnostic Equipment (TMDE): The 46 MXS/MXMD, Eglin AFB through a Memorandum of Agreement with the 479 FTG will provide TMDE and Precision Measurement Equipment Laboratory (PMEL) support functions. Additionally, the SP shall:" |
| 3-1-26 | 3.1.9.21.2 | Added ,"Transport TMDE to and from 46 MXS/ MXMD Precision Measurement Equipment Laboratory" |
| 3B-4 | 3B.4.1.1, 3B.4.1.2, 3B.4.1.3, 3B.4.1.4, | Added workload data, on On equipment Nondestructive Inspection, Corrosion Control, Structural Repair and Metals Technology. |
| 3B-6 | 3B.5.2.2 | Added, "Maintain 28.5 Volt DC Three Phase Input Hanger Power Source/Aircraft Ground Power Unit (GPU) – 700 M/H per year (estimated)." |
| 3B-1 | Table 3B.1 | Revised table 3B.1. Removed flying hours for Nov. |
| 3-1-34 | 3.1.11.12 | Revised PWS to read "Aerospace Ground Equipment (AGE): The SP shall:" |
3-1-34 3.1.11.12.1 Revised PWS to read, "Maintain aircraft Ground Power Units (GPU) IAW Operation and Maintenance Manuals. The service provider shall be responsible for all above ground support equipment on the T-1A and T-6. (e.g., plugs, rectifiers, cables, and component frames)." Removed Centralized Aircraft Support System.
&"Arial,Bold"&12CSO NAS Pensacola Aircraft Maintenance
FA3002-09-R-0044