This document contains a maintenance report and federal contract opportunity notice. The maintenance report details an annual fire alarm inspection at Prospect Harbor Space Force Station Building 112. The inspection found the batteries should be replaced due to age but no other deficiencies.

The federal contract opportunity notice is for base operations support services at Prospect Harbor Space Force Station in Maine. The Department of the Air Force Space Command will release a solicitation in January 2024 for base operations and maintenance services at the facility, which is transitioning from Navy to Space Force responsibility on October 1, 2024. The requirements include staffing and managing physical security, civil engineering, communications systems administration, logistics, and environmental and safety compliance. The contract will be set aside for small businesses and use a subjective tradeoff source selection process.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE REPORT (ONE FOR EACH PIECE OF EQUIPMENT)

USE ADDITIONAL SHEETS IF NECESSARY)

DATE:

TYPE OF EQUIPMENT MAKE MODEL TIME TO COMPLETE TASK

Dean & Allyn, Inc. TECHNICIAN'S NAME:CONTRACTOR:

LOCATION BUILDING NAME OR # WEATHER

WORK DESCRIPTION & PROBLEMS FOUNDS

MATERIALS USED

YES N OWAS WORK COMPLETED?

IF NO EXPLAIN BELOW

YES NOWILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

YESIS INSPECTION CHECKLIST ATTACHED? DATE IT WILL BE RECEIVED:NO

PROPER PPE BEING WORN HOUSE KEEPING COMPLETESAFETY REQUIREMENTS

YESHAVE BEEN MET YES

HAVE NOT BEEN MET N ONO

SITE INSPECTOR/SIGNATURECCI /SIGNATURECONTRACTOR/SIGNATURE

(BELOW) FOR ADMINISTRATION USE ONLY

CONTRACT # ELIN # REPORT NO

MAXIMO #

dmccaslin Typewritten Text N40085-17-D-7201 dmccaslin Typewritten Text

B002AM

dmccaslin Typewritten Text #557

Barry Prescott #135

26871Inspection Ref:

Conducted by:

Report of Inspection/Test

Property Owner/Agent

526 Western Ave.

Augusta, ME 04430

CCI Group, LLCUS Navy - Prospect Harbor -

Bldg 112 (admin)

Light House Point Road

Prospect Harbor, ME

Annual Alarm

Derek McCaslin

(207)620-7172 x111 Print Date: 3/8/2018

February 27, 2018

Alarm Panel Information

Panel Manufacturer Model Serial No. Location

Silent Knight 5208 1st flr lobby

Overcurrent Protect Type Overcurrent Size (Amps) Primary Supply Disconnect Location / Panel # / Breaker #

Breaker 20

Battery Test

Location Type Manufacturer

Model R e p la ce m e n t

D a te

Q u a n tit iy

C o n d iti o n

L e a ks o r

C o rr o si o n

C o n n e ct io n s

V o lta g e N o

L a d

M e a su re d

C a p a ci ty A

-H r

R a te d C a p a ci ty

A -H r O k?

V o lta g e W ith h a rg e r

V o lta g e N

L a d

M e a su re d a p a ci ty A

-H r

1/2014 Ok OkOk Ok 12-172 Sealed Lead Acid 11 12.88 1112.88 batteries should be replaced due to age.

Device Summary

Device Qty Manufacturer Model Quantity

Failed

% of Total

Tested

Quantity

Tested

Initiating Devices

Heat Detector 3 3 0100%

Indicating Devices

Horn/Strobe 2 2 0100%

Initiating Devices

Pull Station 3 3 0100%

Smoke PE 8 8 0100%

System Function Summary & Test

Function Description Test Result

Alarm Functions 1st flr lobby

Alarm Bells/Horns/Strobes Evacuation Alarm functions including Bells/Horns/Strobes actuate properly

Alarm Panel Supervisory Functions 1st flr lobby

Panel AC Power Loss Loss of AC power to the alarm panel is detected by the alarm system.

Panel Sec Power Loss Loss of Secondary power to the alarm panel is detected by the alarm system.

Open Alarm Circuits Electrical opens in initiating and indicating circuits are detected.

Short Alarm Circuits Electrical shorts in initiating and indicating circuits are detected.

Ground Faults Detected Ground faults in alarm circuits are detected

Print Date: 3/8/2018 Copyright 2002-2017 Life Safety Inspector, OnSite Software

Report of Inspection/Test

US Navy - Prospect Harbor - Bldg 112 (admin)Property:

Owner: CCI Group, LLC 26871Inspection Ref:

Annual Alarm

February 27, 2018

Panel Inspection

Panel and surrounding equipment, conduit and wiring well secured and in good condition

System was in operation upon arrival?

Primary power supply operates properly under full load

Are all lamps and displays operating correctly?

Have all fuses been checked for rating and supervision

Transient suppressors visually inspected?

Are operating instructions posted or available at the panel?

Are drawings and wiring diagrams available at the panel?

Are zones labeled and identified?

Print Date: 3/8/2018

Report of Inspection/Test

US Navy - Prospect Harbor - Bldg 112 (admin)Property:

Owner: CCI Group, LLC 26871Inspection Ref:

Annual Alarm

February 27, 2018

Deficiency / Recommendations Summary

These items were deficient and do not meet the requirements of the applicable code at the time of the inspection. Items marked

Recommendation are not required by the applicable code but are opportunities to improve the Life Safety of the property.

Battery Test Sealed Lead Acid

1/2014 Replacement Date batteries should be replaced due to age.

Inspector's Suggestions

In addition to the problems noted in this report the inspector suggests the following system changes/improvements, however, these suggestions are not the result of an engineering survey.

Old unused alarm equipment shoudl be removed.

Bathrooms lack AVs

Print Date: 3/8/2018

Prospect Harbor 2018 Inspections 2.27.18.pdf
Prospect Harbor Backflow 2.27.18
Prospect Harbor Bldg #101 Alarm 2.27.18
Prospect Harbor Bldg #101 FM200 2.27.18
Prospect Harbor Bldg #102 CO2 2.27.18
Prospect Harbor Bldg #103 Alarm 2.27.18
Prospect Harbor Bldg #110 Alarm 2.27.18
Prospect Harbor Bldg #112 Alarm 2.27.18
Prospect Harbor Extinguisher 2.27.18
DATE: 02/27/2018
TYPE OF EQUIPMENTRow1: Fire Alarm system
MAKERow1: Silent Knight
MODELRow1: 5208
TIME TO COMPLETE TASKRow1: 1 hrs
WEATHER:
LOCATIONRow1: Prospect harbor
BUILDING NAME OR Row1: #112
WEATHERRow1: Cool and overcast
TECHNICIANS NAMERow2: Barry Prescott
WORK DESCRIPTION PROBLEMS FOUNDS:
MATERIALS USEDRow1:
DATE IT WILL BE RECEIVED:
CCI SIGNATURERow1:
SITE INSPECTORSIGNATURERow1:
Check Box1: Yes
Check Box2: Off
Check Box3: Off
Check Box4: Yes
Explanation of uncompleted work:
Materials needed info:
Check Box5: Yes
Check Box6: Off
Check Box7: Yes
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off

File details come from the government source that posted it. Updated .