This document contains a federal contract opportunity notice and related annual fire alarm inspection report. The notice is for base operations support services at Prospect Harbor Space Force Station in Maine. Key details include:

  • The solicitation is expected to be released in January 2024 for a follow-on contract to provide base operations support services on a government owned, contractor operated basis. Services will include facility operations, security, engineering, communications, logistics, environmental compliance and safety support.

  • The procurement will be conducted as a 100% small business set-aside and use a best value tradeoff source selection method. The incumbent contractor was not identified. The contract period was not specified.

  • The solicitation will be released using the Procurement Integrated Enterprise Environment module. Offerors must register in this system and obtain required roles to submit proposals electronically.

  • The fire alarm inspection report provides equipment and system testing details for building 110 at the installation and found the system to be in good working order with no deficiencies noted. Recommendations included adding audio/visual devices in bathrooms.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

Barry Prescott #135

200000047938Inspection Ref:

Conducted by:

Report of Inspection/Test

Property Owner/Agent

526 Western Ave.

Augusta, ME 04430

CCI Group, LLCUS Navy - Prospect Harbor -

Bldg 110

Light House Point Road

Prospect Harbor, ME

Annual Alarm

Derek McCaslin

(207)620-7172 x111 Print Date: 3/30/2022

03/10/2022

Signatures

Inspector - Printed Date CompletedInspector - Signature

Barry Prescott 3/9/22

I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.

Equipment Summary

Site

Description

Inspected Unable to

Inspect Serviced

Repaired Failed

%Qty%Qty%Qty%QtyQty

Alarm Alarm Panel 2

1 1 0 0100.0% 0.0% 0.0% 0 0.0%

Alarm Battery

Sealed Lead Acid 1 1 0 0100.0% 0.0% 0.0% 0 0.0%

Alarm Panel Information

Panel Manufacturer Model Serial No. Location

Simplex 4001 outside of bldg

Software Rev Software Updated

Overcurrent Protect Type Overcurrent Size (Amps) Primary Supply Disconnect Location / Panel # / Breaker #

Fuse outside of bldg20

Battery Test

Location Type Manufacturer

Model

R e p la ce m e n t

D a te

Q u a n tit iy

C o n d iti o n

L e a ks o r

C o rr o si o n

C o n n e ct io n s

V o lta g e N o

L a d

M e a su re d

C a p a ci ty A

-H r

R a te d C a p a ci ty

A -H r O k?

V o lta g e W ith h a rg e r

V o lta g e N

L a d

M e a su re d a p a ci ty A

-H r

FACP 2018 Ok OkOk OkGenesis 12-72 Sealed Lead Acid 6.3 13.1 6.313.126.7

Device Summary

Device Qty Manufacturer Model Quantity

Failed

% of Total

Tested

Quantity

Tested

Intiating Devices

Pull Station 3 Simplex 2099-9756 3 0100%

Smoke PE 7 Simplex 7 0100%

Heat Detector 7 Fixed Temp 0 00%

Indicating Devices

Horn/Strobe 4 Simplex 4 0100%

Strobe 0 NA NANA%

Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software

Report of Inspection/Test

US Navy - Prospect Harbor - Bldg 110Property:

Owner: CCI Group, LLC 200000047938Inspection Ref:

Annual Alarm

03/10/2022

System Function Summary & Test

Function Description Test Result

Alarm Functions

Alarm Bells/Horns/Strobes Evacuation Alarm functions including Bells/Horns/Strobes actuate properly Pass

Alarm Panel Supervisory Functions

Panel AC Power Loss Loss of AC power to the alarm panel is detected by the alarm system. Pass

Panel Sec Power Loss Loss of Secondary power to the alarm panel is detected by the alarm system. Pass

Open Alarm Circuits Electrical opens in initiating and indicating circuits are detected. Pass

Short Alarm Circuits Electrical shorts in initiating and indicating circuits are detected. Pass

Ground Faults Detected Ground faults in alarm circuits are detected Pass

Panel Inspection

Yes Panel and surrounding equipment, conduit and wiring well secured and in good condition

YesSystem was in operation upon arrival?

Yes Primary power supply operates properly under full load

YesAre all lamps and displays operating correctly?

Yes Have all fuses been checked for rating and supervision

YesTransient suppressors visually inspected?

Yes Are operating instructions posted or available at the panel?

YesAre drawings and wiring diagrams available at the panel?

Yes Are zones labeled and identified?

Central Station Test

Alarm, Trouble and Supervisory indication tested and verified with the central station?

NAType Transmission

NA Operator spoke to

Inspector's Suggestions

See note In addition to the problems noted in this report the inspector suggests the following system changes/improvements, however, these suggestions are not the result of an engineering survey.

Bathrooms lack AVs

Print Date: 3/30/2022

Report of Inspection/Test

US Navy - Prospect Harbor - Bldg 110Property:

Owner: CCI Group, LLC 200000047938Inspection Ref:

Annual Alarm

03/10/2022

Deficiency / Recommendations Summary

These items were deficient and do not meet the requirements of the applicable code at the time of the inspection. Items marked

Recommendation are not required by the applicable code but are opportunities to improve the Life Safety of the property.

Inspector's Suggestions Recommendations

See note In addition to the problems noted in this report the inspector suggests the following system changes/improvements, however, these suggestions are not the result of an engineering survey.

Bathrooms lack AVs

Print Date: 3/30/2022

DATE: 3/9/2022
TYPE OF EQUIPMENTRow1: Fire alarm system
MAKERow1: Simplex
MODELRow1: 4001
TIME TO COMPLETE TASKRow1: 2
CONTRACTOR: Dean & Allyn, Inc.
TECHNICIANS NAME: Barry Prescott
LOCATIONRow1: Prospect Harbor
BUILDING NAME or Row1: #110
WEATHERRow1: Cool/overcast
General Direct Condition RatingRow1: Green +
General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1:
WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW:
MATERIALS USEDRow1:
DATE IT WILL BE RECEIVED:
CCI SIGNATURERow1:
ELIN N4008517D7201: F001AM
REPORT NON4008517D7201: 2181
REPORT NOWork Order:
MAXIMO Row1:
Work Order Row1:
REPORT NORow3:
Text1: Annual fire alarm inspection
Text2:
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Yes
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Yes
Check Box14: Off

File details come from the government source that posted it. Updated .