Report 2180 PH B101 FM200 Fire System PM 3-9-22.pdf

PDF 678 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This document provides details on an upcoming solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 for a new contract with a period of performance beginning on October 1, 2024. The requirement is for operation of the government-owned facility on a contractor-operated basis. The contractor will be responsible for all base operations support including physical security, civil engineering, communications systems administration, logistics management, environmental services, and occupational health and safety compliance. The procurement will be set aside exclusively for small businesses and utilize a best value source selection methodology. Offerors must register in the Procurement Integrated Enterprise Environment system in order to receive solicitation materials and submit proposals through the online solicitation module. The pre-solicitation notice provides point of contact information for any questions.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

Barry Prescott #135

200000047937Inspection Ref:

Conducted by:

Report of Inspection/Test

Property Owner/Agent

526 Western Ave.

Augusta, ME 04430

CCI Group, LLCUS Navy - Prospect Harbor -

Bldg 101

Light House Point Road

Prospect Harbor, ME

Annual Special Hazard

Derek McCaslin

(207)620-7172 x111 Print Date: 3/30/2022

03/09/2022

Signatures

Inspector - Printed Date CompletedInspector - Signature

Barry Prescott 3/9/22

I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.

Equipment Summary

Site

Description

Inspected Unable to

Inspect Serviced

Repaired Failed

%Qty%Qty%Qty%QtyQty

Special Hazard Agent Cylinder

FM 200 3 3 0 0100.0% 0.0% 0.0% 0 0.0%

Special Hazard Battery

Sealed Lead Acid 1 1 0 0100.0% 0.0% 0.0% 0 0.0%

System and Panel Information

Type Amount of Agent Hazard FM200 92# Control Room

Panel Manufacturer Model Serial No. Location

Ansul Autopulse Iq318 Panel PP2 circuit #23

Overcurrent Protection Type Overcurrent Size (Amps) Primary Supply Disconnect Location / Panel # / Breaker

#Breaker Panel PP2 circuit #2320

Battery Test

Location Type Manufacturer

Model

R e p la ce m e n t

D a te

Q u a n tit iy

C o n d iti o n

L e a ks o r

C o rr o si o n

C o n n e ct io n s

V o lta g e N o

L a d

M e a su re d

C a p a ci ty A

-H r

R a te d C a p a ci ty

A -H r O k?

V o lta g e W ith h a rg e r

V o lta g e N

L a d

M e a su re d a p a ci ty A

-H r

FM200 System #1 3/20/2019 Ok OkOk OkUltra power 12-552 Sealed Lead Acid 50 13.18 5113.1826.5

Cylinder(s)

SizeLocation / Description Manufacturer Model

Inspection - Service

B ra ck e t

G a u g e

Ta g g e d

C o lla r

S a fe ty C a p

H o se

C o n d iti o n

H yd ro T e st

F ill e d

L iq u id

L e ve l

G a u g e P re s

Cylinder Fill

Weight

A g e n t

Ta re

To ta l

Ok Ok Ok206FM200 Cylinder #1 Pyrochem P/N 570006 OkOk360 Ok OkOk Ok204.4122.4 82 NA

Ok Ok Ok92#FM200 Cylinder #2 Pyrochem P/N 570006 OkOk360 Ok OkOk Ok410.95204.95 206 38

Ok Ok Ok92#FM200 Cylinder #3 Pyrochem P/N 570006 OkOk360 Ok OkOk Ok215.8108.8 107 NA

Ok - Passes Inspection S - Serviced on site X - Requires Service NA - Not Applicable

Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software

Report of Inspection/Test

US Navy - Prospect Harbor - Bldg 101Property:

Owner: CCI Group, LLC 200000047937Inspection Ref:

Annual Special Hazard

03/09/2022

Device Summary

Device Qty Manufacturer Model Quantity

Failed

% of Total

Tested

Quantity

Tested

Initiating Devices

Pull Station 4 Autopulse AP-NBG-12LR 4 0100%

Smoke PE 16 Notifier addressable 16 0100%

Abort Switch 4 4 0100%

Indicating Devices

Horn/Strobe 3 3 0100%

Strobe 3 3 0100%

Print Date: 3/30/2022

Owner: CCI Group, LLC 200000047937Inspection Ref:

Annual Special Hazard

03/09/2022

System Function Summary & Test

Function Description Test Result

Alarm Panel Supervisory Functions

Panel AC Power Loss Loss of AC power to the alarm panel is detected by the alarm system. Pass

Panel Sec Power Loss Loss of Secondary power to the alarm panel is detected by the alarm system. Pass

Open Alarm Circuits Electrical opens in initiating and indicating circuits are detected. Pass

Short Alarm Circuits Electrical shorts in initiating and indicating circuits are detected. Pass

Panel to Panel Circuits Integrity of single or multiple circuits providing interface between two or more control panels verified.

Pass

Ground Faults Detected Ground faults in alarm circuits are detected Pass

Alarm Functions - Chemical Suppression

Discharge disabled for test? System electric actuator and control head disconnected so that system will not discharge during testing?

Pass

1st Alarm First alarm (warning) occurs upon activation of a single initiating device. Pass

2nd Alarm Second alarm occurs upon activation of a second initiating device/zone/or matrix of devices. Pass

Time Delay Delay between 2nd alarm and agent discharge measured. Pass

Timer Function Timer completes cycle even if wiring to the first alarm initiating circuit is interupted Pass

Cross Zone Detection One sensor or detector on each zone is operated with correct sequence of operation with first device and then with operation of the second device verified.

Pass

Verified, sequential or counting circuit

Sensors at a minimum of four locations in circuit are operated with correct sequence for both the first and second sensors verified.

Pass

Matix-type circuit All sensors in the system are operated with development of the correct matrix with each sensor operated verified.

Pass

Discharge Alarm Audible alarm upon agent discharge. Pass

Abort Switch Abort switch operates properly and the correct sequence and operation is verified. Pass

Selonoid Release Circuit Selonoid actuated and operation verified. Pass

Squibb Release Circuit AGI flashbulb or other test light approved by the manufacturer is used and operation verified. NA

Agent discharge Actual discharge of chemical fire suppression agent. Pass

System returned to service System is returned to service with all electric actuators and control heads reconnected. Pass

Auxiliary Functions

Remote Annunciator Remote annunciator shows properly Pass

HVAC Shutdown HVAC shutdown upon an alarm condition. Pass

Computer Power Shutdown Computer power is shutdown upon an appropriate alarm condition NA

Elevator Recall Elevators are recalled upon an alarm condition. NA

Chemical Suppression Documentation

Yes Modification made to systems fully reviewed and documented?

YesAll prior inspection reports, logs and test data are available for review?

Yes Is the occupancy and hazard the same reported on the last inspection?

YesReports of system actuation fully reviewed and documented?

Yes Have all deficiencies reported at last inspection been corrected?

Print Date: 3/30/2022

Owner: CCI Group, LLC 200000047937Inspection Ref:

Annual Special Hazard

03/09/2022

Chemical Suppression Inspection

Yes All ceiling and floor panels are in place.YesThe size of the hazard area is unchanged. All room dimesions, ceiling elevations and openings are unchanged from the original design.

Yes Doors are not blocked open.YesWarning signs are proper and visible.

Yes Agent control heads or nozzles are clean, secure, properly oriented and sealed (where needed).

YesManual pull station(s) and abort switch(es) are easily accessible with all covers in place.

Yes Cylinder(s) are clean, free from dents, corrosion, abrasions or weld damage.

YesPipe is secure, properly supported, undamaged with no signs of corrosion.

NA Equipment shutdown functions are adequate with all necessary equipment included.

YesSelector valves are exercised and properly reset.

Yes Explosive release devices (if any) in good condition and within any replacement date?

NADampers (if any) close completely.

Panel Inspection

Yes Panel and surrounding equipment, conduit and wiring well secured and in good condition

YesSystem was in operation upon arrival?

Yes Primary power supply operates properly under full load

YesAre all lamps and displays operating correctly?

Yes Have all fuses been checked for rating and supervision

YesTransient suppressors visually inspected?

Yes Are operating instructions posted or available at the panel?

YesAre drawings and wiring diagrams available at the panel?

Yes Are zones labeled and identified?

Central Station Test

Alarm, Trouble and Supervisory indication tested and verified with the central station?

NAType Transmission

NA Operator spoke to

Inspector's Recommendations

None The inspector recommends the following system changes/improvements, however, these suggestions are not the result of an engineering survey.

Note: All cylinders activated with any single pull station or any 2 smoke detectors

Alarm Device List

P h ys ic a l

C o n d iti o n

F u n ct io n a l

Te st

Manufacturer ModelLocation/DescriptionZone/ AddressDevice Type

HVAC Shutdown Notifier 1M016 OkOkSupport equipment room

Alarm Device

Detail Summary

Number of Items:

S

X 0

Number of Items Requiring Service

Repaired, Replaced and Tested Ok

NI Number of Items NOT InspectedOk - Item passed 0 0

Print Date: 3/30/2022

Owner: CCI Group, LLC 200000047937Inspection Ref:

Annual Special Hazard

03/09/2022

Deficiency / Recommendations Summary

These items were deficient and do not meet the requirements of the applicable code at the time of the inspection. Items marked

Recommendation are not required by the applicable code but are opportunities to improve the Life Safety of the property.

Inspector's Recommendations FM200 System #1 Recommendations FM200 System #1

None The inspector recommends the following system changes/improvements, however, these suggestions are not the result of an engineering survey.

Note: All cylinders activated with any single pull station or any 2 smoke detectors

Print Date: 3/30/2022

DATE: 3/9/2022
TYPE OF EQUIPMENTRow1: FM200 release panel
MAKERow1: Autopulse
MODELRow1: IQ318
TIME TO COMPLETE TASKRow1: 2
CONTRACTOR: Dean & Allyn, Inc.
TECHNICIANS NAME: Barry Prescott
LOCATIONRow1: Prospect Harbor
BUILDING NAME or Row1: 101
WEATHERRow1: Cool/overcast
General Direct Condition RatingRow1: Green +
General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1:
WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW:
MATERIALS USEDRow1:
DATE IT WILL BE RECEIVED:
CCI SIGNATURERow1:
ELIN N4008517D7201: F002AM
REPORT NON4008517D7201: 2080
REPORT NOWork Order:
MAXIMO Row1:
Work Order Row1:
REPORT NORow3:
Text1: Annual inspections of two FM200 systems controlled by one release panel.
Text2:
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Yes
Check Box8: Off
Check Box9: Yes
Check Box10: Off
Check Box11: Yes
Check Box12: Off
Check Box13: Yes
Check Box14: Off