Report 2176 PH B112 Fire Alarm PM 3-9-22.pdf
PDF 369 KB Posted
- Solicitation number
- FA255024R0003
About this file
This document contains a maintenance report and federal contract opportunity notice for base operations support services at Prospect Harbor Space Force Station in Maine. The maintenance report details the results of an annual fire alarm inspection at Building 112, noting no deficiencies. The federal contract opportunity is a pre-solicitation notice for base operations support at the station, including operation of facilities, physical security, engineering, communications, logistics, and environmental services. The planned full small business set-aside contract would transition station responsibilities from the Navy to the Space Force in October 2024. The solicitation is expected to release in January 2024 for these government-owned contractor-operated services. Offerors should register in the Procurement Integrated Enterprise Environment to submit proposals through its solicitation module.
View the file
Other files
Show 40 more
Latest 50 of 292 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
YES NO
YES NO
YES NO
MATERIALS USED
MAINTENACE & INSPECTION REPORT
(ONE FOR EACH PIECE OF EQUIPMENT)
WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?
EXPLAIN BELOW
HAVE NOT BEEN MET
(BELOW) FOR ADMINISTRATION USE ONLY
DATE IT WILL BE RECEIVED :
PROPER PPE BEING WORN
YES
CONTRACTOR: TECHNICIANS NAME:
LOCATION WEATHERBUILDING NAME or #
CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE
CONTRACT # ELIN # REPORT NO.
HAVE BEEN MET
DATE:
General Direct Condition Rating
TYPE OF EQUIPMENT MAKE MODEL
WORK DESCRIPTION & PROBLEMS FOUNDS
TIME TO COMPLETE TASK
IS INSPECTION CHECK LIST ATTACHED?
SAFETY REQUIREMENTS
WAS WORK COMPLETED?
IF NO EXPLAIN BELOW
General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)
N40085-17-D-7201
NO
HOUSE KEEPING COMPLETE
YES
NO
MAXIMO # Work Order #
Barry Prescott #135
200000048624Inspection Ref:
Conducted by:
Report of Inspection/Test
Property Owner/Agent
526 Western Ave.
Augusta, ME 04430
CCI Group, LLCUS Navy - Prospect Harbor -
Bldg 112 (admin)
Light House Point Road
Prospect Harbor, ME
Annual Alarm
Derek McCaslin
(207)620-7172 x111 Print Date: 3/30/2022
03/09/2022
Signatures
Inspector - Printed Date CompletedInspector - Signature
Barry Prescott 3/9/22
I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.
Equipment Summary
Site
Description
Inspected Unable to
Inspect Serviced
Repaired Failed
%Qty%Qty%Qty%QtyQty
Alarm Alarm Panel 2
1 1 0 0100.0% 0.0% 0.0% 0 0.0%
Alarm Battery
Sealed Lead Acid 1 1 0 0100.0% 0.0% 0.0% 0 0.0%
Alarm Panel Information
Panel Manufacturer Model Serial No. Location
Silent Night 5208 Boiler room circuit #2
Software Rev Software Updated
Overcurrent Protect Type Overcurrent Size (Amps) Primary Supply Disconnect Location / Panel # / Breaker #
Breaker Boiler room circuit #220
Battery Test
Location Type Manufacturer
Model
R e p la ce m e n t
D a te
Q u a n tit iy
C o n d iti o n
L e a ks o r
C o rr o si o n
C o n n e ct io n s
V o lta g e N o
L a d
M e a su re d
C a p a ci ty A
-H r
R a te d C a p a ci ty
A -H r O k?
V o lta g e W ith h a rg e r
V o lta g e N
L a d
M e a su re d a p a ci ty A
-H r
FACP 3/2018 Ok OkOk OkGenesis 12v 17.2ah2 Sealed Lead Acid 14 13.18 1213.1826.5
Device Summary
Device Qty Manufacturer Model Quantity
Failed
% of Total
Tested
Quantity
Tested
Initiating Devices
Pull Station 2 Gamewell M46-28 2 0100%
Smoke PE 6 6 0100%
Heat Detector 5 ROR 5 0100%
Indicating Devices
Horn/Strobe 2 2 0100%
Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software
Report of Inspection/Test
US Navy - Prospect Harbor - Bldg 112 (admin)Property:
Owner: CCI Group, LLC 200000048624Inspection Ref:
Annual Alarm
03/09/2022
System Function Summary & Test
Function Description Test Result
Alarm Functions
Alarm Bells/Horns/Strobes Evacuation Alarm functions including Bells/Horns/Strobes actuate properly Pass
Alarm Panel Supervisory Functions
Panel AC Power Loss Loss of AC power to the alarm panel is detected by the alarm system. Pass
Panel Sec Power Loss Loss of Secondary power to the alarm panel is detected by the alarm system. Pass
Open Alarm Circuits Electrical opens in initiating and indicating circuits are detected. Pass
Short Alarm Circuits Electrical shorts in initiating and indicating circuits are detected. Pass
Ground Faults Detected Ground faults in alarm circuits are detected Pass
Panel Inspection
Yes Panel and surrounding equipment, conduit and wiring well secured and in good condition
YesSystem was in operation upon arrival?
Yes Primary power supply operates properly under full load
YesAre all lamps and displays operating correctly?
Yes Have all fuses been checked for rating and supervision
YesTransient suppressors visually inspected?
Yes Are operating instructions posted or available at the panel?
YesAre drawings and wiring diagrams available at the panel?
Yes Are zones labeled and identified?
Battery Replace Sealed Lead Acid
No Battery replaced ?
Inspector's Suggestions
None In addition to the problems noted in this report the inspector suggests the following system changes/improvements, however, these suggestions are not the result of an engineering survey.
Print Date: 3/30/2022 Copyright 2002-2020 Life Safety Inspector, OnSite Software
| DATE: 3/9/2022 |
| TYPE OF EQUIPMENTRow1: Fire alarm system |
| MAKERow1: Silent Knight |
| MODELRow1: SK5208 |
| TIME TO COMPLETE TASKRow1: 2 |
| CONTRACTOR: Dean & Allyn, Inc. |
| TECHNICIANS NAME: Barry Prescott |
| LOCATIONRow1: Prospect harbor |
| BUILDING NAME or Row1: #112 |
| WEATHERRow1: Cool/overcast |
| General Direct Condition RatingRow1: Green + |
| General Direct Condition Rating Notes Explain Conditions found for the Rating given aboveRow1: |
| WILL MATERIALS NEED TO BE ORDERED HOW LONG IS THE LEED TIME EXPLAIN BELOW: |
| MATERIALS USEDRow1: |
| DATE IT WILL BE RECEIVED: |
| CCI SIGNATURERow1: |
| ELIN N4008517D7201: F002AM |
| REPORT NON4008517D7201: 2176 |
| REPORT NOWork Order: |
| MAXIMO Row1: |
| Work Order Row1: |
| REPORT NORow3: |
| Text1: Performed annual fire alarm test |
| Text2: |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Yes |
| Check Box8: Off |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Yes |
| Check Box12: Off |
| Check Box13: Yes |
| Check Box14: Off |
File details come from the government source that posted it. Updated .