This document contains a maintenance inspection report for HVAC equipment at Prospect Harbor Space Force Station and a presolicitation notice for base operations support services at the same location.

The maintenance inspection report details servicing of HVAC units including cleaning, safety checks, and operational testing. Issues were not found and the system was deemed to be in good working order.

The presolicitation notice provides advance notice of a solicitation planned for release in January 2024 for base operations support services at Prospect Harbor SFS under Solicitation FA255024R0003. The services required include physical security, civil engineering, communications systems administration, logistics management, and environmental and safety compliance. The contract will be a small business set-aside awarded on a best value basis. The solicitation and proposal submissions will utilize the Procurement Integrated Enterprise Environment system. The document cautions that no funding is presently available and the solicitation may be cancelled.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

x YES

YES x x YES NO x x x

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE: 9/30/2021

TYPE OF EQUIPMENT MAKE MODEL TIME TO COMPLETE TASK

HVAC 2

Company: Gatcomb P&H Tech Name :

LOCATION BUILDING NAME or # WEATHER

Prospect harbor 103 Sunny / Windy in afternoon Green

WORK DESCRIPTION & PROBLEMS FOUNDS

See attached

NO

IF NO EXPLAIN BELOW

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME? EXPLAIN BELOW NO

IS INSPECTION CHECK LIST ATTACHED? DATE IT WILL BE RECEIVED :

SAFETY REQUIREMENTS PROPER PPE BEING WORN HOUSE KEEPING COMPLETE

HAVE BEEN MET

HAVE NOT BEEN MET

YES

NO

YES

NO

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

Derek E. McCaslin

(BELOW) FOR ADMINISTRATION USE ONLY

CONTRACT # ELIN # REPORT NO.

N40085-17-D-7201 E002AK 1987

MAXIMO # Work Order #

Gatcomb Plumbing & Heating, Inc 65 Park Street

Cherryfield, ME 04626 Office Phone : 207-259-2082

Cell : 207-263-7828 Email : Gatcombplumbingandheating@ne.twcbc.com

Efficiency Report

Date: Location: Building:

Model: Serial:

Fuel Type:

Test Conducted:

Outside Delta T

Technician Comments

Serviced By:

09-30-2021 Prospect 103

Electric

Blake Olsen

Cooling: Daikin

Inside Delta T

Low Side High Side

Superheat

SubCool

60F Ouside 70F Off Fan ( 10 degree Split) 67F Inside 58F Off Fan ( 9 degree Split)

13 degree

System Running Good

115 PSI

205 PSI

5 Degree

RKN18NMVJU G003070

Daikin Cooling.pdf