Report 1998 PH B103 HVAC PM 9-30-21.pdf
PDF 166 KB Posted
- Solicitation number
- FA255024R0003
About this file
This document contains a maintenance inspection report for HVAC equipment at Prospect Harbor Space Force Station and a presolicitation notice for base operations support services at the same location.
The maintenance inspection report details servicing of HVAC units including cleaning, safety checks, and operational testing. Issues were not found and the system was deemed to be in good working order.
The presolicitation notice provides advance notice of a solicitation planned for release in January 2024 for base operations support services at Prospect Harbor SFS under Solicitation FA255024R0003. The services required include physical security, civil engineering, communications systems administration, logistics management, and environmental and safety compliance. The contract will be a small business set-aside awarded on a best value basis. The solicitation and proposal submissions will utilize the Procurement Integrated Enterprise Environment system. The document cautions that no funding is presently available and the solicitation may be cancelled.
View the file
Other files
Show 40 more
Latest 50 of 292 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x YES
YES x x YES NO x x x
MAINTENACE & INSPECTION REPORT
(ONE FOR EACH PIECE OF EQUIPMENT)
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE: 9/30/2021
TYPE OF EQUIPMENT MAKE MODEL TIME TO COMPLETE TASK
HVAC 2
Company: Gatcomb P&H Tech Name :
LOCATION BUILDING NAME or # WEATHER
Prospect harbor 103 Sunny / Windy in afternoon Green
WORK DESCRIPTION & PROBLEMS FOUNDS
See attached
NO
IF NO EXPLAIN BELOW
WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME? EXPLAIN BELOW NO
IS INSPECTION CHECK LIST ATTACHED? DATE IT WILL BE RECEIVED :
SAFETY REQUIREMENTS PROPER PPE BEING WORN HOUSE KEEPING COMPLETE
HAVE BEEN MET
HAVE NOT BEEN MET
YES
NO
YES
NO
CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE
Derek E. McCaslin
(BELOW) FOR ADMINISTRATION USE ONLY
CONTRACT # ELIN # REPORT NO.
N40085-17-D-7201 E002AK 1987
MAXIMO # Work Order #
Gatcomb Plumbing & Heating, Inc 65 Park Street
Cherryfield, ME 04626 Office Phone : 207-259-2082
Cell : 207-263-7828 Email : Gatcombplumbingandheating@ne.twcbc.com
Efficiency Report
Date: Location: Building:
Model: Serial:
Fuel Type:
Test Conducted:
Outside Delta T
Technician Comments
Serviced By:
09-30-2021 Prospect 103
Electric
Blake Olsen
Cooling: Daikin
Inside Delta T
Low Side High Side
Superheat
SubCool
60F Ouside 70F Off Fan ( 10 degree Split) 67F Inside 58F Off Fan ( 9 degree Split)
13 degree
System Running Good
115 PSI
205 PSI
5 Degree
RKN18NMVJU G003070
| Daikin Cooling.pdf |
| Blank Page |
File details come from the government source that posted it. Updated .