Report 1777 PH B101 FM200 Service call 4-5-21.pdf

PDF 260 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This notice provides information regarding a future solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The Department of the Air Force plans to release a solicitation in January 2024 seeking proposals for a contractor to operate and maintain all facilities and functions at the government-owned, contractor-operated installation. Services will include physical security, civil engineering, communications systems administration, logistics management, and environmental and occupational health compliance. The acquisition is designated as a 100% small business set-aside and will utilize a best value tradeoff source selection approach. The resulting contract will have a period of performance beginning October 2024 to coincide with the planned transition of responsibility for the site from the Navy to the Space Force.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

YES NO

YES NO

YES NO

MATERIALS USED

MAINTENACE & INSPECTION REPORT

(ONE FOR EACH PIECE OF EQUIPMENT)

WILL MATERIALS NEED TO BE ORDERED? HOW LONG IS THE LEED TIME?

EXPLAIN BELOW

HAVE NOT BEEN MET

(BELOW) FOR ADMINISTRATION USE ONLY

DATE IT WILL BE RECEIVED :

PROPER PPE BEING WORN

YES

CONTRACTOR: TECHNICIANS NAME:

LOCATION WEATHERBUILDING NAME or #

CONTRACTOR/SIGNATURE CCI/ SIGNATURE SITE INSPECTOR/SIGNATURE

CONTRACT # ELIN # REPORT NO.

HAVE BEEN MET

DATE:

General Direct Condition Rating

TYPE OF EQUIPMENT MAKE MODEL

WORK DESCRIPTION & PROBLEMS FOUNDS

TIME TO COMPLETE TASK

IS INSPECTION CHECK LIST ATTACHED?

SAFETY REQUIREMENTS

WAS WORK COMPLETED?

IF NO EXPLAIN BELOW

General Direct Condition Rating Notes ( Explain Conditions found for the Rating given above)

N40085-17-D-7201

NO

HOUSE KEEPING COMPLETE

YES

NO

MAXIMO # Work Order #

4/5/2021

FM200 release panel Autopulse IQ318 2 Dean & Allyn, Inc. Barry Prescott

Prospect Harbor 101 Cool/drizzle Green +

Service call to check repeated intermittent trouble from module 1M018. Checked connections and replaced the module with a new FMM-1 module from customer stock.

x

1777E002AB

(Print) Name of Authorized Buyer

TERMS OF THIS AGREEMENT ARE:

The price for work to be performed under this agreement shall be based on prevailing Dean & Allyn prices for material, labor and related items, in effect at the time supplied under this agreement.

Description of work or material:

Dean & Allyn, Inc. for and in consideration of the prices herein named, proposed to furnish the work and/or materials hereinafter described, subject to the conditions outlined below, and on the reverse side of this order.

Cust. P.O. No.

LOCATION OF WORK TO BE PERFORMED (PLEASE PRINT)

116 Lewiston Road Gray, Maine 04039 207/657-5646 fax 207/657-5647

Job Name__________________________________________

Street_____________________________________________

City___________________State ________ Zip ___________

BILLING ADDRESS Telephone No. ____________________

SERVICE

WORK ORDER

Customer__________________________________________

Street_____________________________________________

City___________________State ________ Zip ___________

(HEREINAFTER CALLED “BUYER”)

Service Representative Terms

NET TEN (10) DAYS

Customer has inspection contract: with

■ Yes

■ No

Dean & Allyn Other

A.

B.

C.

The terms of payment for invoices rendered against this order shall be net 10 days from date of invoice. Invoices may be rendered on a “Progress” basis, and the Buyer agrees to pay such progress billing in full, in accordance with the terms of payment.

Travel time will be included in the hours on all time and material orders.

See reverse side of this order for other General Terms and Conditions.

■ Time and Material ■ Lump Sum $______________________________

Any changes to scope and price of the work will be described in a “Field Change Order” and must be acknowledged by the Buyer.

TERMS OF THIS AGREEMENT ARE:

ADDITIONAL TERMS:

BUYERʼS ACCEPTANCE:

Title

Signature

Date

No.

DATE _____________________________

DEAN & ALLYN, INC.

FIRE PROTECTION • SPECIAL HAZARD

OFFICE

04/05/2021

Prospect Harbor Naval station CCI

Prospect Harbor Maine

Barry Prescott

Service call for an intermittent and repeated trouble on the FM200 release alarm panel. Checked history o arrival and found multiple troubles from module 1-M018. Checked connections and replaced with a new F module from customer stock.

Labor - 1 service call

Derek McCaslin