Report 1455 PH B103 Fire Alarm PM 6-30-20.pdf

PDF 679 KB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This document contains a report on the annual inspection of the fire alarm system at the Prospect Harbor Space Force Station in Maine, as well as a notice regarding an upcoming solicitation for base operations support services at that location.

The fire alarm inspection report documents the testing and status of the system's components, including the alarm panel, pull stations, smoke detectors, horns, strobes, and backup battery. All equipment was found to be in working order. The base operations support solicitation is expected to be released in January 2024 seeking services to manage, operate, maintain, and provide logistical and security support for the station under a GOCO contract. The requirement is set aside for small businesses and will utilize a best value tradeoff source selection process. Offerors are advised to register for the Procurement Integrated Enterprise Environment to submit proposals electronically.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

x

D002AM #1455

Barry Prescott #135

200000030927Inspection Ref:

Conducted by:

Report of Inspection/Test

Property US Navy - Prospect Harbor -

Bldg 103

Light House Point Road

Prospect Harbor, ME

Annual Alarm

Print Date: 7/31/2020

06/30/2020

Signatures

Inspector - Printed Date CompletedInspector - Signature

Barry Prescott 6/30/20

I state that the information on this form is correct at the time and place of my inspection, and all equipment tested at this time was left in operational condition upon completion of this inspection except as noted.

Equipment Summary

Site

Description

Inspected Unable to

Inspect

Serviced

Repaired Failed

%Qty%Qty%Qty%QtyQty

Alarm Alarm Panel 2

1 1 0 0100.0% 0.0% 0.0% 0 0.0%

Alarm Battery

Sealed Lead Acid 1 1 0 0100.0% 0.0% 0.0% 0 0.0%

Alarm Panel Information

Panel Manufacturer Model Serial No. Location

Simplex 4010ES

Software Rev Software Updated

Overcurrent Protect Type Overcurrent Size (Amps) Primary Supply Disconnect Location / Panel # / Breaker #

Battery Test

Location Type Manufacturer

Model

R e p la ce m e n t

D a te

Q u a n tit iy

C o n d iti o n

L e a ks o r

C o rr o si o n

C o n n e ct io n s

V o lta g e N o

L a d

M e a su re d

C a p a ci ty A

-H r

R a te d C a p a ci ty

A -H r O k?

V o lta g e W ith h a rg e r

V o lta g e N

L a d

M e a su re d a p a ci ty A

-H r

Ok OkOk Ok 12-182 Sealed Lead Acid 14 13.8 2013.06

Device Summary

Device Qty Manufacturer Model Quantity

Failed

% of Total

Tested

Quantity

Tested

Initiating Devices

Pull Station 2 2 0100%

Smoke PE 11 11 0100%

Indicating Devices

Horn/Strobe 4 4 0100%

Strobe 1 1 0100%

Print Date: 7/31/2020 Copyright 2002-2020 Life Safety Inspector, OnSite Software

Report of Inspection/Test

US Navy - Prospect Harbor - Bldg 103Property:

200000030927Inspection Ref:

Annual Alarm

06/30/2020

System Function Summary & Test

Function Description Test Result

Alarm Functions

Alarm Bells/Horns/Strobes Evacuation Alarm functions including Bells/Horns/Strobes actuate properly Pass

Alarm Panel Supervisory Functions

Panel AC Power Loss Loss of AC power to the alarm panel is detected by the alarm system. Pass

Panel Sec Power Loss Loss of Secondary power to the alarm panel is detected by the alarm system. Pass

Open Alarm Circuits Electrical opens in initiating and indicating circuits are detected. Pass

Short Alarm Circuits Electrical shorts in initiating and indicating circuits are detected. Pass

Ground Faults Detected Ground faults in alarm circuits are detected Pass

Panel Inspection

Yes Panel and surrounding equipment, conduit and wiring well secured and in good condition

YesSystem was in operation upon arrival?

Yes Primary power supply operates properly under full load ?

YesAre all lamps and displays operating correctly?

Yes Have all fuses been checked for rating and supervision ?

YesTransient suppressors visually inspected?

Yes Are operating instructions posted or available at the panel?

YesAre drawings and wiring diagrams available at the panel?

Yes Are zones labeled and identified?

Central Station Test

Yes Operator spoke toAlarm, Trouble and Supervisory indication tested and verified with the central station?

Print Date: 7/31/2020 Copyright 2002-2020 Life Safety Inspector, OnSite Software