Report 1179 PH B110 Heat PM 9-27-19 Nr 3.pdf

PDF 2 MB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This notice provides details for a prospective federal contract opportunity for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 for a firm-fixed price contract to provide staffing and management of site security, civil engineering, communications systems administration, logistics, environmental services, and occupational health and safety compliance at the government-owned, contractor-operated facility. The contract is planned as a 100% small business set-aside and will utilize best value tradeoff source selection. The government intends to release the solicitation through the Procurement Integrated Enterprise Environment module, requiring offerors to register and obtain necessary access roles to submit proposals electronically.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTたNANCE&lNSPECTIONREPORT �DA丁た: 易4/〃タ

(ONEFOREACHPiECEOFEQUIPMENT)

(ATTACHADDiT10NAしSHE打S昨NECESSARY)

教のとこ■〇〇〇〇喜

TYPEOFEQUIPMENT �MAKE �MODEし �TIMETOCOMPしETETASK

芽ア易石一∠もみ予 �音。ノ/音臆憂,閉園 �,/“猪 ′娩 �.ユタ左で

CONTRAC丁O R: Gatcomb Plumbing and Heating TECHNICIAN’s NAME: Tim Gatcomb

LOCATION BUILDiNG NAME OR NUMBER

Prospect Ha「bor, Maine

INSPECT10NしIST ATTACHED? NO IF NO, DATE ITWIししBE RECElVED:

SAFETYREQUIREMENTS

X �HAVEB旺NMET

HAVENOTB推NMET

CONTRACTORSIGN �CCISIGNATURE �S汀EINSPECTORSIGNATURE

/ノ � �

としiN ♯ dmccaslin Typewritten Text #1179 dmccaslin Typewritten Text

C002AL

dmccaslin Typewritten Text N40085-17-D-7201 dmccaslin Typewritten Text x dmccaslin Rectangle

G亀書蜘調も剛u競闘噂&柵eati調g血C・ p.0. Bo米539豊蹴Mac潰as, ME O4俄0

鵜06US請言Wす浦ng, M己O4の賞

0塙ce 207「259・2029

C(訊 207.之俄置7828

鵬幽 Jo唖me :

BST. 1985

しicensed Mas亡ers

/のし。。。ti。n拒み

B醐M重職二B …刷。d。⊥:_遊星」_ p剛油王室こし∴∴∴∴ N。乙とl。 Si之。」二幽_

Bo陸「 Sc「融No: _

器:‡霧覆甚孟〃み

T雷§丁CONDuCTED: Befo「e Test After Test

CO2

S耽o来き

_葛臆臆臆「臆臆臆臆 臆ノ佐ゴー∴一夏.生

__∠ 」 臆臆「臆喜一∴∴ 0臆∴臆。一書。臆園丁臆

。r鵬t軸鴫叩___.上垣色___-」金堂∴ ∴ ∴臆臆臆臆__..

N。t筑諦T。mp____」麺∴÷臆.臆 臆喜一乏し….___

鯵reきch D憎京

0ver矩e Dm償

E 『即C丁烏NC Y

W宙ter T儲廿p

.0⊥

Do舶載c櫨ot W軸「 By

。肝独∴.盈_.上之∠養老∵ ____.

岳寄ilel● pipin

F剛u爪叫mb。」 ___:榊~__

Puel F唖er N叫mber

A正郎l鈍さi乙e

∠彰を二劣

メあ,雇′一葛をJ

貴揮ICほ討亡Y R雷POR丁

A〃 GENERALDIRE#忍法NGGUID雛鳥生食幼

(ク’∴-

Ratin芝 �SRMNeeds �Ratjn箪De鯖皿ition

Gree爪(十) �ustainmentcollSistingof �Entirecompo一一el一トSeCtiol-orCOmPOnent-SeCtionsamplefreeof

POSSiblepreventivemai】ltenanCe (Whereapplicable). �Observableorknowndistress.

G「een �Sし1Stainmentco】lSistingof �Nocomponent-SeCtionorsampleserviceabilityqorreliability.

POSSiblepreventivemaintenance (Whereappljcab!e)andminor �reduction.Some`butnofa用minor(non-Crjtical)subcomponentsmay

Su飾el‘fromslightdegradatjonQIfewmgivr(Critica」)sしIbcomponents repairs(COrreCtivemaintenance) topossiblyfeworsome �maysufferfroms!i如tdegradation.

Grcen(-) S鳴htorllOSerViceab航yorl.eliab=ityreductionovera旧othe

Subcomponents. �COmPOnentSmaySu舵rfromminordegradationormorethanone m年iorcriticalsubcompo`lel〕tmaySufferfromslightdegradation

Ambe「(十) �Sustainmentorrestorationtoany Ofthefollowing: Minor'.ePairstoseveral Subcomponents;Or Signifroantrepair,「ehabi=tation, O「「eplacementofoneormore Subcomponents,butnotenoしIgh toellCOmPaSSthecompone置lt- SeCtjonasawhole;O「 Conlbinationslhereo鼻 Su§tainmeIltO∫re§tOration l’equiredconsistingofm尋io「 repaIr,「ehabi皿南0重1,Or repIacementtothecomponent一 SeCtionasawhoIe. �Component-SeCtionorsamplese「viceabilityorreliabjlityisdegraded, butadequate.Averyfdym屯vr(Critical)subcomponel-tSmaySufl料 frommodel“ate。eteriorationwithperhapsafivminor(一1On-Criticai) Subcomponentssu節eringfromseve「edeterioration.

Ambe「 Co重nPOnent-SeCtiono「samplese「viceabilityo置・reliabilityisdefinjtely impaired‘Some,butnotamajo「ity,mg所(critical)subcomponents maysuiferfrommoderatedeteriorationwithperhapsmanyminol・

(non-C「itical)subcomponentssu節eringfromseveredeterioration.

Amber(-) Rd十 Componel一トSeCtiono「samplehassigllificantse「viccabilityor reliabiftyloss.Mostsubcomponentsmaysu鯖erfrommoderate degl●adationgrafewmむvr(C「jtical)subcomponentsmaysuifer舟om

SeVeredegradation.

e() ��Slgn掃eantse「viceabilityorreliability「edllCtionincomponent-SeCtioll

OrSamPle.Am屯vrityofsubcomponentsareseverelydegradedand Othersmayhaveva「yingdegreesofdegradation.

Red SevereservICeabilityor「eliab叫yred‘lCtiontothecomponent-SeCtiorl OrSamPIesuchthat吊sbare!yabletoperform.Mostsubcomponents aresevere!ydeg「aded.

Red(-) Ove「allcomponenトSeCtjondegradationistotal.Few,ifany, Subcomponentssalvageable.C`ompletelossofcomponent-SeCtionor SamPleserviceability.

Attachment J-J502000置08 Page l

File details come from the government source that posted it. Updated .