Report 1174 PH B104 Heat PM 9-27-19.pdf

PDF 2 MB Posted

Attached to
Prospect Harbor Space Force Station (SFS) Base Operations Support (BOS)
Solicitation number
FA255024R0003
Issued by

About this file

This document contains a pre-solicitation notice and related federal contract opportunity for base operations support services. The solicitation is expected to be released in January 2024 for base operations support at Prospect Harbor Space Force Station in Maine. The contractor will operate and maintain the government-owned facility, providing services such as physical security, civil engineering, communications systems administration, logistics management, and environmental compliance. The acquisition is a 100% small business set-aside and will use a subjective best value evaluation. The notice provides registration instructions for the Procurement Integrated Enterprise Environment solicitation module, which will host proposal submissions. No funds are presently available and the solicitation may be cancelled if funding is not obtained.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTENANCE&lNSPECTIONREPORT �DATE: /●堕吸音。械

(ONEFOREACHPIECEOFEQUiPMENT)

(ATTACHADDITIONAしSHE打SiFNECESSARY)

TYPEOFEQUIPMENT �MAKE �MODEL �TIMETOCOMPLETETASK

拠 」 ・・′ 二重“ �堕塑 � �」んや

CONTRACTOR: Gatcomb PIumbing and Heating 丁ECHNiCIAN’S NAME:

LOCATION BUILDING NAME OR NUMBER

MATERiALS USED lNSPECTIONしIST AT「ACHED? NO IF NO, DATE ITWILしBE RECEIVED: ASAP

SAFETYREQUIREMENTS

X �HAVEBEENMET

HAVENOTBEENME丁

HOUSEKEEPINGCOMPL打E

X �YES

NO

CONTRACTORSiGNATURE �CCISiGNATURE �SITEINSPECTORSiGNATURE / ・援慶 /““‾“′′‾ � �

E」IN♯

dmccaslin Rectangle dmccaslin Typewritten Text X dmccaslin Typewritten Text #1174 dmccaslin Typewritten Text

C004AA

dmccaslin Typewritten Text N40085-17-D-7201

Gatcomb PIumbing & Heating IれC.

P.0. Bo米539豊瞳st Maohias, ME O4630

2306US RしI晒証in呂, MEO4691

0鋪ce 207-2秒-2029

Cel1 207。263-7828

圏図星 J。冊鵬。・幽γ Bo陸「 Model:_____

島ST. 1983

しicensed Mas亡ers

Boile「 S証かNo:

T冨ST CONDuCTED: Before Test AfterTest

CO2

S帆oke

。r。SS S融T。-調。_____-___虹__ _…圭躯二_

N。t Sta。k T。mP ±雉ZL__」腫.___

臼r。。。h D融 ∴:0ユ ニ上望______ _._

Ovさr矩e D脚允

EFF冒CI ENCY

Water T勧請p_

Do肌e§t子c出ot W劃記「 By

.」酸__._._ _.___... 8∠

。il Tank_-血幽砿Q姦憂色___ Boiler piping _

F。。剛e冊n、b 。,._ _「屋Z2_二4L臆∴ ∵臆喜一

Air置l針Size

E声門C帖NCY鼠とPOR丁

〆〃 GENERALDIRECTCONDIT10NRATINGGUIDA現.荒み血鵜

ク

R兄備鵬容 �SRMNeeds �RatingDe鯖nition

Green(十) �Sustainmentco11Sistingof �EntirecompolleIlトSeCtio11OrCOmPOneIlt-SeCtionsamplefreeof

POSSiblepreve11tivemaintellanCe (whereapplicable). �Observableorknowndistress.

Green �Sし1Stainmentco】1Sistingof �Nocomponent-SeCtionorsamplese「viceabilityPorreliab=ity.

POSSiblepreventivemai」ltenanCe �reduction.Some,butnotall,minor(non-Critical)subcomponentsmay

(Whereapplicable)andminor �SufferfromsljghtdegradatjonQ±fewm亘か(Critical)sし厄COmPOnentS

「epairs(COr「eCtivemaintenance) topossiblyfeworsome �maysufferfroms」ightdegradation.

Grγ ��S=ghtor11OSerViceabilityorl.eliabilityreductionovera旧othe

Subcomponents. �COmPOnentSmaySufferfromminordeg「adationo「morethanOne m勾or(Critical)subcomponentmaysufferfromslightdegradation.

Ambe「(十) �Sustainmentorrestorationtoany �Component-SeCtionorsamplese「viceabilityorrehabilityisdegraded, Ofthefollowing: �butadequate.Averyfew,m勾Or(critical)subcomponelltSmaySufi料

Minorl‘ePairstoseverai �frommoderatedeterioratiollWithperhapsafewminol・(ilOn-Critical)

Subcomponents;Or Sign誼cantrepair,「ehab冊ation, �SしIbcomponentssu節eringfromseveredeterioration.

Amber ��Component-SeCtionorsampleseI.Viceabilityorreliabilityisdefinitely

OrrePlacementofoneormore �impaired・Some,butnotanngjority,mかr(critical)subcomponents

Subcomponents,butnotenoしIgh �maysu飾計frommoderatedeterioratjonwithperhapsmanyminol.

toellCOmPaSSthecomponent- Sectionasawhole;Or Combinationsthe「eof �(non-Critical)subcomponentssu節eringfromseveredeterioration.

Ambe「(-) ��Compo-1e一一t-SeCtiono「samplehassignifroantserviceabilityor reIiabi航yloss・Mostsubcomponentsmaysu鯖rfrommoderate degl’adationQIafewmむvr(Crjtical)sし1bcompoIlentSmaySuife「from

SeVeredegradation.

Red(十) �Sustainme11torrestOration �Sign描cantse「viceab硝yorreliability「edしICtionillCOmPOnenトSeCtjo11

1●equiredconsistingofmgivr �OrSamPle.Amむiorityofsubcomponentsareseve「eIydegradedand repalr,rehabilitation,Or 「eplacementtothecompoIlent- SeCtionasawhole. �OthersmayhavevaryirIgdegreesofdeg「adation.

Red ��Severeserviceabilityorrelia帥ty「edし1Ctiontothecomponent-SeCtion

OrS肌Plesuchthatitisbarelyab!etoperform.Mostsubcomponents areseve「elydeg「aded.

Red(-) 0verallcomponent-SeCtiondegradationistotal.Few言fany, Subcomponentssalvageable.C`ompletelossofcomponent-SeCtionor

SamPleservICeability.

Attachment J-]502000-08 Page l