This notice provides information about an upcoming solicitation for base operations support services at Prospect Harbor Space Force Station in Maine. The solicitation is expected to be released in January 2024 for a follow-on contract to begin in October 2024.

The solicitation will be for a non-personal services contract to manage, operate, maintain, and provide logistical and security services at the government-owned, contractor-operated facility. The contractor will be responsible for staffing and all support functions, including civil engineering, communications, logistics, environmental services, and safety compliance. The acquisition is planned as a 100% small business set-aside and will use a best value tradeoff source selection method. The government intends to release the solicitation through the Procurement Integrated Enterprise Environment module, requiring offerors to register and submit proposals electronically. Questions about the notice should be addressed to the points of contact listed.

View the file

Other files

File Type Posted
PHSFS_BOS_RFP_Questions_SET_5_20240301.pdf PDF
FA255024R0003_Amend_0002_240301.pdf PDF
FA255024R0003_SF1449_Amend_0002_240301.pdf PDF
Atch_5_FFP_NTE_Task_Pricing_Template_Amend_0002_240229.xlsx XLSX spreadsheet
PHSFS_BOS_RFP_Questions_SET_2_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 4_20240226.pdf PDF
PHSFS_BOS_RFP_Questions_SET 3_20240226.pdf PDF
20240221_PHSFS_BOS_RFP_Questions.pdf PDF
Atch_8_ITO_Amend_0001_20240221.pdf PDF
FA255024R0003_Amend_0001_20240221.pdf PDF
Atch_9_Evaluation_Amend_0001_20240207.pdf PDF
Atch_16_PPQ_20240104.docx DOCX document
PH B104 Heat PM 9-18.pdf PDF
Report 2305 PH B103 OVHD PM 6-14-22.pdf PDF
Report 1844 PH B101 FM200 Fire System PM 4-5-21.pdf PDF
PH-103-K-01 - 2021 Inspection.pdf PDF
Report 259 PH B103 BFP Annual PM 3-28-23.pdf PDF
Report 1847 PH B112 Fire Alarm PM 4-5-21.pdf PDF
Report 1175 PH B105 Heat PM 9-27-19.pdf PDF
Report 1456 PH B110 Fire Alarm PM 6-30-20.pdf PDF
Report 2324 PH B104 Annual Heating PM 9-15-21.pdf PDF
Report 1359 PH B101 HVAC Compressor Nr 2 PM 6-10-20.pdf PDF
Report 2443 PH B101 Annual Heating PM 9-29-22.pdf PDF
PH B101 Boiler PM 10-18.pdf PDF
Report 1855 PH B101 Condenser B HVAC PM 4-20-21.pdf PDF
Report 1845 PH B102 CO2Fire System PM 4-5-21.pdf PDF
Report 1356 PH B101 HVAC Air Handler Nr 2 PM 6-10-20.pdf PDF
Report 2174 PH B102 CO2Fire System Annual PM SC 3-9-22.pdf PDF
PH inside Generator SC 3-29-19.pdf PDF
Report 1828 PH B104 OVHD Nr 2 PM 5-24-2021.pdf PDF
PH B112 F7P9ZP-PH-BURNER 2-03-21.pdf PDF
Report 1831 PH B102 Outside Generator SC 5-25-2021.pdf PDF
Report 2252 PH B102 Roof Inspection 6-6-2022.pdf PDF
PH-110-K-02 - 2021 Inspection.pdf PDF
Report 645 PH B102 Outside Generator Annual PM 9-6-23.pdf PDF
Report 1680 PH B103 No heat ESC 12-12-20.pdf PDF
Report 1082 PH B102 inside Generator PM 8-22-18.pdf PDF
Report 1851 Anual Extinguisher PMs 4-5-21.pdf PDF
Report 2241 PH B102 Outside Generator PM 5-18-22.pdf PDF
PH B103 Replace Window Glass 20190820.pdf PDF
Report 402 PH B101 HVAC Nr 1 PM 9-17.pdf PDF
Report 2448 PH B104 Annual Heating PM 9-28-22.pdf PDF
Report 1296 PH B102 Inside Generator PM 2-20-20.pdf PDF
PH B110 Boiler Nr 1 PM 9-18.pdf PDF
Report 367 PH B112 FA Install.pdf PDF
Report 1357 PH B103 HVAC PM 6-10-20.pdf PDF
Report 2175 PH B103 Fire Alarm PM 3-9-22.pdf PDF
Report 2047 PH B101 HVAC Air Handler Side A 9-30-21.pdf PDF
Report 658 PH B104 OVHDR eplace Push Button 7-25-18.pdf PDF
Report 645 PH Outside Generator repair SC 6-20-18.pdf PDF
Show 40 more

Latest 50 of 292 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of Work Orders

Work OrderDescriptionStatusLocationWork CenterWork TypeSub-Work TypeApproved DateTarget StartTarget FinishReported DateService Request #
B7GB24Prospect Harbor, Building 101, Furnace Room - Plug The Floor DrainCLOSEPROHAR-101PRNROUTINEROUTINE5/3/12 9:30 AM5/3/12 9:29 AM5/13/12 9:30 AM5/3/12 9:28 AM6183715
B7G9YZProspect Harbor, Building 101, Furnace Room - Repair/Replace A Leaking Oil FilterCLOSEPROHAR-101PRNROUTINEROUTINE5/3/12 9:26 AM5/3/12 9:26 AM5/13/12 9:26 AM5/3/12 9:16 AM6183665
BBYNJCProspect Harbor, Building 101 - The Toilet Is LeakingCLOSEPROHAR-101PRNROUTINEROUTINE12/6/12 9:33 AM12/6/12 9:27 AM12/16/12 9:33 AM12/6/12 9:18 AM6901959
B7G549Prospect Harbor, Building 106 - Clean Out A Storage AreaCLOSEPROHAR-101PRNROUTINEROUTINE5/3/12 6:07 AM5/3/12 6:06 AM5/13/12 6:07 AM5/3/12 6:00 AM6182588
B7GB2GProspect Harbor, Building 105 - Repair Oil Leaking FurnaceCLOSEPROHAR-101PRNROUTINEROUTINE5/3/12 9:35 AM5/3/12 9:34 AM5/13/12 9:35 AM5/3/12 9:31 AM6183731
B5LTWPProspect Harbor - Rental Of A ManliftCLOSEPROHAR-101WANPR1ROUTINEFACILITIES1/11/12 7:02 AM1/11/12 6:59 AM1/21/12 7:02 AM1/11/12 6:57 AM5795085
CNFLWZReplace water fountainCLOSEPROHAR-101WANP52ROUTINEFACILITIES2/23/16 8:21 AM2/23/16 8:20 AM3/24/16 8:21 AM2/23/16 8:18 AM11117988
BSNDNVNaval Support Activity Prospect Harbor - various sites on stationCLOSEPROHAR-101PRNROUTINEROUTINE7/22/13 9:41 AM7/22/13 9:40 AM8/1/13 9:41 AM7/22/13 8:58 AM7624900
ZTM5TProspect Harbor, Building 101 - Install Sub Floor & Carpet TilesCLOSEPROHAR-101PRN11ROUTINEFACILITIES4/6/11 7:56 AM4/16/11 7:56 AM4/6/11 7:55 AM3826427
CFFH9Pinstall new water heaterCLOSEPROHAR-101WANP52ROUTINEFACILITIES7/28/15 7:43 AM7/28/15 7:43 AM8/27/15 7:43 AM7/28/15 7:41 AM10163198
DYLDWGBldg. 101 - Replace hallway carpet with tile throughout.CLOSEPROHAR-101WANP52ROUTINEFACILITIES11/14/19 2:46 AM11/14/19 2:46 AM3/26/18 9:16 AM14613153
CRLSYCPaint louvers on buildingCLOSEPROHAR-101WANP52ROUTINEFACILITIES6/7/16 7:48 AM6/7/16 7:46 AM7/7/16 7:48 AM6/7/16 7:40 AM11467555
BZK39KInspect and make repairs to roofCLOSEPROHAR-101WANP52ROUTINEFACILITIES6/17/14 7:34 AM6/17/14 7:33 AM7/17/14 7:34 AM6/17/14 7:30 AM8931686
C4ZMNBRepair Circulation PumpCLOSEPROHAR-101WANP52ROUTINEFACILITIES11/17/14 8:38 AM11/17/14 8:32 AM12/17/14 8:38 AM11/17/14 8:29 AM9396011
BDK3DHProspect Harbor, Building 101 - There Is Too Much Heat In The Building, Around 86 DegreesCLOSEPROHAR-101PRNROUTINEROUTINE4/1/13 5:34 AM4/1/13 5:34 AM4/11/13 5:34 AM3/28/13 11:05 AM7257489
CZTZCFInstall mopboard in conference roomCLOSEPROHAR-101WANP52ROUTINEFACILITIES5/5/17 4:56 AM5/4/17 10:57 AM6/4/17 4:56 AM5/4/17 10:54 AM12613088
CCRTPYReplace multiple Ballast in facilityCLOSEPROHAR-101WANP52ROUTINEFACILITIES5/6/15 8:53 AM5/6/15 8:52 AM6/5/15 8:53 AM5/6/15 8:49 AM9854481
D9969DSeal SE Door in OPS RoomCLOSEPROHAR-101WANP52ROUTINEFACILITIES10/26/17 7:14 AM10/26/17 7:14 AM11/25/17 7:14 AM10/26/17 7:10 AM13836447
DDV3WPBldg. 101 - Replace bathroom exhaust fanCLOSEPROHAR-101WANP52ROUTINEFACILITIES3/20/18 8:46 AM3/20/18 8:46 AM4/19/18 8:46 AM3/20/18 8:44 AM14566190
DT37SRRepair broken drawer in kitchenCLOSEPROHAR-101WANP52ROUTINEFACILITIES6/4/19 10:12 AM6/4/19 10:11 AM7/4/19 10:11 AM6/4/19 10:10 AM17457719
DYKZZKReplace e-light batteriesCLOSEPROHAR-101WANP52ROUTINEFACILITIES11/13/19 6:02 AM11/13/19 6:02 AM12/13/19 6:02 AM11/8/19 10:46 AM18560600
F9KTCNBoiler will not fireCLOSEPROHAR-101WANP52EMERGENCYFACILITIES5/8/20 5:05 PM5/8/20 6:05 PM5/9/20 5:05 PM5/8/20 9:30 AM19160897
F9KTCHService required on boiler in operations building (BLDG 101). Boiler will not fire.CLOSEPROHAR-101KTR-PNSYURGENTFACILITIES5/8/20 4:36 PM5/8/20 4:36 PM5/15/20 4:36 PM5/8/20 4:31 PM19160848
FDK3FZP) FIRE PANEL IS ALARMING IN MECHANICAL ROOMCLOSEPROHAR-101KTR-PNSYEMERGENCYFACILITIES9/3/20 5:54 AM9/3/20 6:54 AM9/4/20 5:54 AM9/3/20 5:44 AM19632835
FDJWPLE) FIRE PANEL IN TROUBLECLOSEPROHAR-101KTR-PNSYEMERGENCYFACILITIES9/3/20 5:03 AM9/3/20 6:03 AM9/4/20 5:03 AM9/3/20 4:59 AM19632696
WTNK4service call for hvac in pro har BLDG101CLOSEPROHAR-101PRN11ROUTINEFACILITIES11/9/10 10:53 AM11/19/10 10:53 AM11/9/10 10:45 AM4083802
BYXVNVWaterproof and insulate wire chase to radomeCLOSEPROHAR-101WANP51ROUTINEROUTINE5/9/14 9:58 AM5/9/14 9:57 AM6/8/14 9:58 AM5/9/14 9:46 AM8807426
BBNMYTProspect Harbor, Building 101 - Open & Inspect Roof LeaksCLOSEPROHAR-101WANPR1ROUTINEFACILITIES11/19/12 6:14 AM11/19/12 6:13 AM11/29/12 6:14 AM11/19/12 5:09 AM6843028
XYXSJProspect Harbor, Building 101 - Fire Protection InspectionsCLOSEPROHAR-101PRN11ROUTINEFACILITIES1/6/11 6:44 AM1/16/11 6:44 AM1/6/11 6:41 AM3812413
CYZJYGRepair/Replace signageCLOSEPROHAR-101WANP52ROUTINEFACILITIES3/28/17 5:50 PM3/28/17 7:15 AM4/27/17 5:50 PM3/28/17 8:18 AM12487646
CZ4HTHReplace failed circulatorCLOSEPROHAR-101WANP52URGENTFACILITIES4/3/17 6:26 AM4/3/17 5:35 AM4/10/17 6:26 AM4/1/17 2:15 AM12505338
DSZBNME) Building 101 fire alarm annunciator panel indicating intermittent alarm "mechanical door sensor". This is not an emergency it is something that weCLOSEPROHAR-101KTR-PNSYROUTINEFACILITIES6/3/19 4:56 AM6/3/19 4:56 AM7/3/19 4:56 AM5/30/19 1:22 PM17419929
F6X6ZNE) Operations HVAC unit A Air Handler louvers working intermittently, request inspection of louver control to return to operational status.CLOSEPROHAR-101KTR-PNSYROUTINEFACILITIES3/12/20 7:57 AM3/12/20 7:57 AM4/11/20 7:57 AM3/12/20 7:06 AM19004785
FCMPZPE) Add weatherstripping to air handler doorsCLOSEPROHAR-101WANP52ROUTINEFACILITIES7/27/20 1:52 AM7/27/20 1:52 AM8/26/20 1:52 AM7/24/20 9:49 AM19514853
CDZJXXCoil has water leak, need repair ASAPCLOSEPROHAR-101WANP52ROUTINEFACILITIES7/10/15 8:27 AM7/10/15 8:26 AM8/9/15 8:27 AM7/10/15 8:22 AM10093689
CVXWX7Rewire circulation pumpCLOSEPROHAR-101WANP52ROUTINEFACILITIES11/2/16 10:46 AM11/2/16 10:25 AM12/2/16 10:46 AM11/2/16 9:40 AM12062866
CJVGTGRepair ToiletCLOSEPROHAR-101WANP52ROUTINEFACILITIES11/16/15 6:56 AM11/16/15 6:56 AM12/16/15 6:56 AM11/16/15 6:53 AM10652361
D4BFHKShower valve needs replacingCLOSEPROHAR-101WANP52ROUTINEFACILITIES7/11/17 1:56 PM7/11/17 1:55 PM8/10/17 1:56 PM7/11/17 1:51 PM12917189
DYPWZPReplace batteries in E lighting Bld. 101CLOSEPROHAR-101WANP52ROUTINEFACILITIES11/18/19 5:13 AM11/18/19 5:13 AM12/18/19 5:13 AM11/15/19 8:11 AM18583889
DZKLZ3E) Primary heating (boiler) for building 101 had to be reset this weekend and is making an unusually loud noise. Additionally, the boiler room has aCLOSEPROHAR-101KTR-PNSYURGENTFACILITIES12/2/19 8:24 AM12/2/19 8:24 AM12/9/19 8:24 AM12/2/19 6:50 AM18639060
FDNHLZE) Place rodent traps in 2 offices and kitchen area.CLOSEPROHAR-101KTR-PNSYROUTINEFACILITIES9/10/20 1:24 AM9/10/20 1:24 AM10/10/20 1:24 AM9/9/20 8:10 AM19644218
CW47VFreplace Circulation PumpCLOSEPROHAR-101WANP52ROUTINEFACILITIES11/14/16 10:18 AM11/14/16 10:17 AM12/14/16 10:18 AM11/14/16 10:15 AM12095705
CPCDVSE-light in boiler room is not workingCLOSEPROHAR-101WANP52ROUTINEFACILITIES4/7/16 6:39 AM4/7/16 6:39 AM5/7/16 6:39 AM4/7/16 6:32 AM11253545
C4YV7XBldg 101 - Repair of leaking circulator pump in the heating system per quote from Bangor Pipe & Supply..CLOSEPROHAR-101WANP52ROUTINEFACILITIES11/12/14 10:29 AM11/12/14 10:29 AM12/12/14 10:29 AM11/12/14 10:18 AM9382760
CVFJWZAHU-1 drive belt brokeCLOSEPROHAR-101WANP52ROUTINEFACILITIES10/18/16 7:12 AM10/17/16 7:11 AM11/17/16 7:12 AM10/18/16 7:06 AM12016282
CLNK3JPipe froze and burst.CLOSEPROHAR-101WANP52ROUTINEFACILITIES1/7/16 8:44 AM1/7/16 8:43 AM2/6/16 8:44 AM1/7/16 8:41 AM10816289
DTZKWLE) Water cooler leak in main passage way,CLOSEPROHAR-101WANP52ROUTINEFACILITIES7/9/19 10:44 AM7/9/19 3:28 AM8/8/19 3:28 AM7/8/19 7:16 AM17715477
FC6WXNRepair/Replace building numbersCLOSEPROHAR-101WANP52ROUTINEFACILITIES7/7/20 3:06 PM7/7/20 3:06 PM8/6/20 3:06 PM7/7/20 3:00 PM19455683
FFSLB4Adjust conference room door to close properlyCLOSEPROHAR-101WANP52ROUTINEFACILITIES10/21/20 7:46 AM10/21/20 7:46 AM11/20/20 7:46 AM10/21/20 7:42 AM19749702
F7WZNHE) Operations HVAC unit B can not maintain temp and Unit A is down.CLOSEPROHAR-101KTR-PNSYURGENTFACILITIES4/14/20 1:17 PM4/14/20 1:17 PM4/21/20 1:17 PM4/14/20 7:12 AM19091051
F7WZNME) OPERATIONS HVAC UNIT A AIT HANDLER WILLNOT POWER ONCLOSEPROHAR-101KTR-PNSYROUTINEFACILITIES4/14/20 1:18 PM4/14/20 1:18 PM5/14/20 1:18 PM4/13/20 7:51 AM19087794
FGB7XNE) Repair snow cover for A/C off line unitCLOSEPROHAR-101WANP52ROUTINEFACILITIES11/18/20 9:50 AM11/18/20 9:50 AM12/18/20 9:50 AM11/17/20 11:02 AM19816011
FGVJ3ZRepair light fixuteCLOSEPROHAR-101WANP52ROUTINEFACILITIES12/16/20 11:46 AM12/16/20 11:46 AM1/15/21 11:46 AM12/16/20 11:40 AM19883966
FLHXZCRepair split system condenser and/or AHUCLOSEPROHAR-101WANP52URGENTFACILITIES5/19/21 10:06 AM5/19/21 10:06 AM5/26/21 10:06 AM5/19/21 9:59 AM20338778
FLRX6KPOWR LOSS AT PROSPECT HARBOR INCIDENT NOTIFICATION #51469CLOSEPROHAR-101WANP63EMERGENCYUTILITIES5/24/21 2:15 AM5/24/21 3:15 AM5/25/21 2:15 AM5/24/21 1:53 AM20349914
FMVWPLReplace batteries in outside generatorCLOSEPROHAR-101KTR-PNSYURGENTFACILITIES7/15/21 5:06 AM7/15/21 5:06 AM7/22/21 5:06 AM7/15/21 4:46 AM20565686
FZ3K6WE) Moss growing on building 103 and walkway. Request pressure wash to remove.CLOSEPROHAR-101WANP52ROUTINEFACILITIES6/24/22 2:09 AM6/24/22 2:09 AM7/24/22 2:09 AM6/23/22 10:10 AM21632978
FLGBN6E) Request personnel evaluate the B101 secondary/Bravo compressor for proper operation to restore cooling redundancy to operational spaces.CLOSEPROHAR-101WANP52ROUTINEFACILITIES5/14/21 2:18 AM5/14/21 2:18 AM6/13/21 2:18 AM5/13/21 10:22 AM20321823
FLH9GZRepair/Replace split system condensing unitCLOSEPROHAR-101KTR-PNSYURGENTFACILITIES5/18/21 7:45 AM5/18/21 7:45 AM5/25/21 7:45 AM5/18/21 7:37 AM20334004
FLRYBRFOLLOW UP TO POWER LOSS AT PROSPECT HARBOR INCIDENT NOTIFICATION #51469CLOSEPROHAR-101WANP63ROUTINEUTILITIES5/24/21 8:20 AM5/24/21 8:20 AM6/23/21 8:20 AM5/24/21 8:16 AM20351044
D996JCremodel kitcheneteCOMPPROHAR-101WANP52ROUTINEFACILITIES10/26/17 7:39 AM10/26/17 7:39 AM11/25/17 7:39 AM10/26/17 7:31 AM13836543
DDV3YFBldg. 101 - Replace exterior door kickplate/threshold and replace door frame gasket to prevent water from seeping into control room.COMPPROHAR-101WANP52ROUTINEFACILITIES3/20/18 8:50 AM3/20/18 8:50 AM4/19/18 8:50 AM3/20/18 8:49 AM14566218
CFSK3NProspect Harbor, Relocate Heating CircuitCOMPPROHAR-101WANP52ROUTINEFACILITIES8/27/15 8:54 AM8/28/15 5:00 AM9/26/15 8:54 AM8/27/15 8:43 AM10260250
FJLVY3Upgrade security measures in conference roomCOMPPROHAR-101WANP52ROUTINEFACILITIES3/5/21 7:53 AM3/5/21 7:53 AM4/4/21 7:53 AM3/5/21 7:45 AM20153424
G7T6HJE)Purchase and install door stops on required doors to ensure air flow in the event of cold weatherCOMPPROHAR-101WANP52ROUTINEFACILITIES2/9/23 7:41 AM2/9/23 7:41 AM3/11/23 7:41 AM2/8/23 6:28 AM22488856
G9CJPPE)purchase and replace broken toilet seat in building 101COMPPROHAR-101WANP52ROUTINEFACILITIES3/1/23 2:02 AM3/1/23 2:02 AM3/31/23 2:02 AM2/28/23 8:38 AM22548294
GBSMCME)investigate and repair leak from the toilet in building 101COMPPROHAR-101WANP52ROUTINEFACILITIES5/10/23 3:51 AM5/10/23 3:51 AM6/9/23 3:51 AM5/4/23 11:25 AM22747509
GCFZ7JE) air handler has a loose belt. it is slipping and smoking. requesting the contractor, Gatcomb, to replace belt.COMPPROHAR-101WANP52URGENTFACILITIES6/7/23 2:09 AM6/7/23 2:09 AM6/14/23 2:09 AM6/6/23 10:52 AM22841878
GDWMTDE)the fire panel in building 101 has an alarm of 'Mech Room Agent Low Pressure'. Requesting Dean & Allen the contractor, to respond to clear the alarmCOMPPROHAR-101KTR-PNSYEMERGENCYFACILITIES8/21/23 10:35 AM8/21/23 11:35 AM8/22/23 10:35 AM8/21/23 10:27 AM23242674
GF79LXE)The A side AC unit in Ops is throwing the 80 AMP breaker. Any attempt to restart the system the breaker is tripped again.COMPPROHAR-101WANP52ROUTINEFACILITIES9/5/23 10:43 AM9/5/23 10:43 AM10/5/23 10:43 AM9/5/23 10:32 AM23286085
G7TKF9E) Install foam insulation on heating pipes.COMPPROHAR-101WANP52ROUTINEFACILITIES2/10/23 4:16 AM2/10/23 4:16 AM3/12/23 4:16 AM2/9/23 8:52 AM22493195
GCFJNME) the fire suppression panel is not operational, was hot to the touch. power was cut to the panel. requesting contractor to address the situation.COMPPROHAR-101KTR-PNSYEMERGENCYFACILITIES6/6/23 12:57 PM6/7/23 11:57 AM6/6/23 11:46 AM22842215
CZ9GMDRepair automatic louver linkageCLOSEPROHAR-102WANP52ROUTINEFACILITIES4/10/17 12:44 PM4/10/17 11:40 AM5/10/17 12:44 PM4/10/17 11:39 AM12530112
CFT49LBLD-102, No Audible Alarm, Diesel TankCLOSEPROHAR-102WANP52ROUTINEFACILITIES8/28/15 10:56 AM8/28/15 11:00 AM9/27/15 10:56 AM8/28/15 10:45 AM10264950
DXNNWZE) Primary (outdoor) station generator won't start, we believe it is due to the fuel sensor reading very low.CLOSEPROHAR-102KTR-PNSYURGENTFACILITIES10/23/19 10:17 AM10/23/19 10:17 AM10/28/19 10:17 AM10/18/19 5:30 AM18474680
CH7NPMInstall new 3 phase power panelCLOSEPROHAR-102WANPR1ROUTINEFACILITIES10/15/15 5:56 AM10/15/15 5:56 AM11/14/15 5:56 AM10/15/15 5:48 AM10552081
CSLG4Minstall exit light in generator buildingCLOSEPROHAR-102WANP52ROUTINEFACILITIES7/21/16 6:25 AM7/21/16 6:24 AM8/20/16 6:25 AM7/21/16 6:21 AM11742903
CJD4XNReplace Exterior OutletCLOSEPROHAR-102WANP52ROUTINEFACILITIES10/29/15 7:27 AM10/29/15 7:27 AM11/28/15 7:27 AM10/29/15 7:22 AM10599600
XYX6RProspect Harbor, Building 102 - Fire Protection InspectionsCLOSEPROHAR-102PRN11ROUTINEFACILITIES1/6/11 6:07 AM1/16/11 6:07 AM1/6/11 5:51 AM3812569
BZJC9FReplace the batteries (two 8D's) in the gensetCLOSEPROHAR-102WANP52ROUTINEFACILITIES6/13/14 9:13 AM6/13/14 9:12 AM7/13/14 9:13 AM6/13/14 9:09 AM8922436
DHDMC412V battery exploded on the outside generator at Prospect Harbor building 102. The FSC contractor has been notified and is in route per Dave N.CLOSEPROHAR-102WANP52ROUTINEFACILITIES6/20/18 6:28 AM6/20/18 6:28 AM7/20/18 6:28 AM6/20/18 6:20 AM15549246
DRFZWCE) The primary generator tripped its main breaker during routine run test this morning. Breaker reset and completed run test, however noticed excessivCLOSEPROHAR-102KTR-PNSYURGENTFACILITIES3/28/19 9:17 AM3/28/19 9:16 AM4/4/19 9:16 AM3/27/19 6:08 AM17028526
CFHX4Srepair or replace louvered vent in generator roomCLOSEPROHAR-102WANP52ROUTINEFACILITIES8/5/15 5:52 AM8/5/15 5:52 AM9/4/15 5:52 AM8/5/15 5:48 AM10196100
DRDVRKE)Metal steps leading to the fuel tank fill-pipe need to be anchored to the concrete slab they rest on.CLOSEPROHAR-102WANP52ROUTINEFACILITIES3/27/19 9:27 AM3/27/19 9:23 AM4/26/19 9:23 AM3/19/19 11:57 AM16868828
C4MM9KRain caused leakCLOSEPROHAR-102WANP52ROUTINEFACILITIES10/20/14 7:15 AM10/20/14 7:14 AM11/19/14 7:15 AM10/20/14 6:57 AM9310491
DR9YWJInstall staris bldg 102CLOSEPROHAR-102WANP52ROUTINEFACILITIES3/26/19 11:56 AM3/26/19 11:56 AM4/25/19 11:56 AM3/26/19 11:54 AM17024439
DS7G4G(E) Primary (outdoor) generator tripped main breaker after reporting under speed fault during weekly run test. This is the second trouble ticket on thCLOSEPROHAR-102WANP52ROUTINEFACILITIES5/1/19 11:22 AM5/1/19 11:22 AM5/31/19 11:22 AM5/1/19 6:18 AM17216966
FPGHCBPaint Generator MufflerCLOSEPROHAR-102WANP52ROUTINEFACILITIES8/31/21 10:43 AM8/31/21 10:43 AM9/30/21 10:43 AM8/31/21 10:40 AM20695673
FWGNHDFire Panel AlarmCLOSEPROHAR-102KTR-PNSYURGENTFACILITIES3/21/22 10:35 AM3/21/22 10:35 AM3/28/22 10:35 AM3/21/22 10:31 AM21344812
FLRYRBInvestingate common fault in outside generatorCLOSEPROHAR-102KTR-PNSYURGENTFACILITIES5/24/21 9:42 AM5/24/21 9:42 AM5/31/21 9:42 AM5/24/21 9:38 AM20351454
FXLR9DInvestigate/repair power issueCOMPPROHAR-102WANP52ROUTINEFACILITIES4/25/22 10:38 AM4/25/22 10:38 AM5/25/22 10:38 AM4/25/22 10:35 AM21451353
GB4G4ZE) The Automatic transfer switch to the primary generator has a failure to communicate with the SCU. Requesting to have the contractor, Border ElectriCOMPPROHAR-102KTR-PNSYURGENTFACILITIES4/17/23 1:19 AM4/17/23 1:19 AM4/24/23 1:19 AM4/14/23 1:17 PM22690255
D996HDBuild snow and ice shield over heat pumpCLOSEPROHAR-103WANP52ROUTINEFACILITIES10/26/17 7:29 AM10/26/17 7:29 AM11/25/17 7:29 AM10/26/17 7:27 AM13836528
DPWGPYE) HVAC in control room keeps freeze stat alarming *urgent*CLOSEPROHAR-103KTR-PNSYURGENTFACILITIES3/15/19 9:48 AM3/15/19 9:48 AM3/22/19 9:48 AM3/15/19 7:56 AM16853462
DVVYBVE)back flow preventer in overhead water piping above RO machine leaking.CLOSEPROHAR-103WANP52ROUTINEFACILITIES8/12/19 10:05 AM8/12/19 10:04 AM9/11/19 10:04 AM8/12/19 9:06 AM18038483
DWLWYCE) BOILER WILL NOT START, ALL ZONES CALLING FOR HEAT, SWITCHES ARE ON AND RESET DOES NOT SOLVECLOSEPROHAR-103KTR-PNSYURGENTFACILITIES9/9/19 4:57 AM9/9/19 4:57 AM9/16/19 4:57 AM9/9/19 4:38 AM18255855
DPPFP4E) HVAC in control room not working properlyCLOSEPROHAR-103KTR-PNSYROUTINEFACILITIES3/4/19 7:46 AM3/4/19 7:45 AM4/3/19 7:45 AM3/1/19 5:51 AM16796149
DSZGMYRepair steps to buildingCLOSEPROHAR-103WANP52ROUTINEFACILITIES6/3/19 7:30 AM6/3/19 7:30 AM7/3/19 7:30 AM6/3/19 7:28 AM17446935
DVSYZ4E)Weed/grass control. At specific locations, remove/cut weeds grass. Place grass/weed control fabric down. Fill area with proper amount of mulch. InsCLOSEPROHAR-103WANP52ROUTINEFACILITIES8/7/19 6:34 AM8/7/19 6:33 AM9/6/19 6:33 AM8/7/19 5:50 AM17995555
DDYC93Remove old toilets (mens & ladies) and replace with newCLOSEPROHAR-103WANP52ROUTINEFACILITIES3/22/18 8:50 AM3/22/18 8:50 AM4/21/18 8:50 AM3/22/18 8:48 AM14584837
DDYC99BLDG. 103 - Remove ONE shower stall in men's head and install toiletCLOSEPROHAR-103WANP52ROUTINEFACILITIES3/22/18 8:54 AM3/22/18 8:54 AM4/21/18 8:54 AM3/22/18 8:52 AM14584881
DDYC9SBLDG. 103 - Replace hot water heater in bathroom lower level.CLOSEPROHAR-103WANP52ROUTINEFACILITIES3/22/18 8:57 AM3/22/18 8:55 AM4/21/18 8:57 AM3/22/18 8:55 AM14584910
DVDFSMTroubleshoot tank alarmCLOSEPROHAR-103WANP52ROUTINEFACILITIES7/23/19 10:16 AM7/23/19 10:15 AM8/22/19 10:15 AM7/23/19 10:13 AM17824325
DV94YNE) Water leak in boiler/storage room of building 103. Leak looks to be coming from a pressure relief value above boiler. Which would indicate it's doiCLOSEPROHAR-103WANP52ROUTINEFACILITIES7/17/19 6:22 AM7/17/19 6:22 AM8/16/19 6:22 AM7/17/19 5:34 AM17781391
DV94Z4E) A rock from a lawnmower has broken the window in building 103 room 105. Need to replace the window.CLOSEPROHAR-103WANP52ROUTINEFACILITIES7/17/19 6:23 AM7/17/19 6:23 AM8/16/19 6:23 AM7/17/19 5:40 AM17781443
F3YYHCE) Primary heating (boiler) for building 103 is continually running but can not raise temp to above 64 degrees. All zones on primary loop are callingCLOSEPROHAR-103KTR-PNSYURGENTFACILITIES1/13/20 10:43 AM1/13/20 10:43 AM1/20/20 10:43 AM1/13/20 6:35 AM18782958
FGB7YGE) Purchase and install snow cover over heat pump to prevent damage from falling ice and snow.CLOSEPROHAR-103WANP52ROUTINEFACILITIES11/18/20 9:57 AM11/18/20 9:57 AM12/18/20 9:57 AM11/17/20 10:59 AM19815991
FGVJD3Evaluate boiler going out on resetCLOSEPROHAR-103KTR-PNSYURGENTFACILITIES12/16/20 12:21 PM12/16/20 12:21 PM12/23/20 12:21 PM12/16/20 12:18 PM19884122
FHDBBME) Investigate issue with window in building 103 room 102. The bottom left frame appears to be pulling away from the building.CLOSEPROHAR-103WANP52ROUTINEFACILITIES1/6/21 4:25 AM1/6/21 4:25 AM2/5/21 4:25 AM1/5/21 5:57 PM19938561
FHDBSXE) Investigate issue with window in building 103 room 102. The bottom left frame appears to be pulling away from the building.CLOSEPROHAR-103WANP52ROUTINEFACILITIES1/6/21 5:38 AM1/6/21 5:38 AM2/5/21 5:38 AM1/5/21 3:37 PM19939532
FTDVPLInvestigate no heat in storage roomCLOSEPROHAR-103KTR-PNSYURGENTFACILITIES12/27/21 8:53 AM12/27/21 8:53 AM1/3/22 8:53 AM12/27/21 8:49 AM21010871
FZMMMLCreate and install ID sign for B103CLOSEPROHAR-103WANP52ROUTINEFACILITIES7/22/22 5:39 AM7/22/22 5:39 AM8/21/22 5:39 AM7/22/22 5:35 AM21717618
G7T6HFE)Purchase and install door stops on required doors to ensure air flow in the event of cold weatherCOMPPROHAR-103WANP52ROUTINEFACILITIES2/9/23 7:38 AM2/9/23 7:38 AM3/11/23 7:38 AM2/8/23 6:30 AM22488860
GCTCP6E) the water cooler in building 103 has a water line leak. investigate and repair.COMPPROHAR-103KTR-PNSYROUTINEFACILITIES6/23/23 2:38 AM6/23/23 2:38 AM7/23/23 2:38 AM6/20/23 10:13 AM22880565
GF6GDPE) Overhead door in building 103 is not functioning correctly. door is falling down once up fully.COMPPROHAR-103KTR-PNSYURGENTFACILITIES8/31/23 3:21 AM8/31/23 3:21 AM9/7/23 3:21 AM8/30/23 7:24 AM23272051
GCTLDRE) the water cooler in building 103 has a water line leak. investigate and repair.COMPPROHAR-103WANP52ROUTINEFACILITIES6/26/23 4:18 AM6/26/23 4:18 AM7/26/23 4:18 AM6/26/23 4:17 AM22897172
G6Y3CXP) BOILER IS DOWNCOMP-OSPROHAR-103KTR-PNSYEMERGENCYFACILITIES12/23/22 6:49 PM12/23/22 7:49 PM12/24/22 6:49 PM12/23/22 6:42 PM22183351
FZTGP3Create and install ID sign for B103HOLDPROHAR-103WANP52ROUTINEFACILITIES8/4/22 7:34 AM8/4/22 7:35 AM9/3/22 7:35 AM8/4/22 7:34 AM21810275
CYJCDYPaint Garage DoorsCLOSEPROHAR-104WANP52ROUTINEFACILITIES3/7/17 11:35 AM3/7/17 11:15 AM4/6/17 11:35 AM3/7/17 11:07 AM12426149
CMTDWVFurnace fan making noiseCLOSEPROHAR-104WANP52ROUTINEFACILITIES2/3/16 6:33 AM2/3/16 6:32 AM3/4/16 6:33 AM2/3/16 6:29 AM10903022
BVSYB4Replace overhead door opener motor in vehicle garageCLOSEPROHAR-104PRNROUTINEROUTINE11/19/13 6:51 AM11/12/13 7:39 AM12/19/13 6:51 AM11/12/13 7:35 AM8185920
CDHFVMInvestigate roof leak and make needed repairsCLOSEPROHAR-104WANP52ROUTINEFACILITIES6/3/15 5:28 AM6/3/15 5:28 AM7/3/15 5:28 AM6/3/15 5:24 AM9951627
B7RFYSProspect Harbor, Building 105 - Replace The Power Cord On The Wood Shaper.CLOSEPROHAR-105PRNROUTINEROUTINE5/22/12 5:51 AM5/22/12 5:50 AM6/1/12 5:51 AM5/22/12 5:47 AM6244081
DM4XNRRepair deficiencies in Prospect Harbor stemming from Fire inspection.CLOSEPROHAR-105WANP52ROUTINEFACILITIES10/30/18 5:39 AM10/30/18 5:39 AM11/29/18 5:39 AM10/30/18 5:34 AM16256479
CKR6PWNo Heat . fuel issueCLOSEPROHAR-105WANP52ROUTINEFACILITIES12/14/15 8:09 AM12/11/15 8:07 AM1/13/16 8:09 AM12/14/15 7:59 AM10740446
DY766WInvestigate undetermined power panel circuitsCLOSEPROHAR-105WANP52ROUTINEFACILITIES11/6/19 3:55 AM11/6/19 3:55 AM12/6/19 3:55 AM11/5/19 1:39 PM18547437
F9L9NFRemove materials from Shaw property prior to demolitionCLOSEPROHAR-105WANP52ROUTINEFACILITIES5/11/20 11:53 AM5/11/20 11:53 AM6/10/20 11:53 AM5/11/20 9:11 AM19166217
CYGVRPRepair or Replace metal Chimney PipesCLOSEPROHAR-105WANP52ROUTINEFACILITIES3/2/17 7:12 AM3/2/17 7:12 AM4/1/17 7:12 AM3/2/17 7:07 AM12411283
CPDCY9Multiple repairs due to Storm DamageCLOSEPROHAR-105WANP52ROUTINEFACILITIES4/11/16 7:42 AM4/11/16 7:41 AM5/11/16 7:42 AM4/11/16 7:37 AM11263273
CXBSHXNo heatCLOSEPROHAR-105WANP52ROUTINEFACILITIES1/10/17 10:18 AM1/9/17 4:15 AM2/9/17 10:18 AM1/10/17 9:39 AM12257924
C9WJWWReplace light switch and thermostatCLOSEPROHAR-105WANP52ROUTINEFACILITIES3/24/15 6:07 AM3/24/15 6:07 AM4/23/15 6:07 AM3/24/15 6:05 AM9726508
FCTVCJE) Refinish exterior door. Sand, prime, paint and seal.CLOSEPROHAR-105WANP52ROUTINEFACILITIES8/5/20 8:13 AM8/5/20 8:13 AM9/4/20 8:13 AM8/5/20 3:51 AM19549318
FCTVDLE) wrap copper pipes with foam insulationCLOSEPROHAR-105WANP52ROUTINEFACILITIES8/5/20 8:17 AM8/5/20 8:17 AM9/4/20 8:17 AM8/5/20 3:18 AM19549266
DSZFDVTroubleshoot FurnaceCLOSEPROHAR-105WANP52ROUTINEFACILITIES6/3/19 5:46 AM6/3/19 5:46 AM7/3/19 5:46 AM6/3/19 5:41 AM17446172
DXCDYME) Tree was uprooted and fell on the perimeter fence damaging concertina wire, outrigger and the top, TREE IS STILL ON FENCE.CLOSEPROHAR-105WANP52ROUTINEFACILITIES10/18/19 8:05 AM10/18/19 8:05 AM11/17/19 8:05 AM10/17/19 1:11 PM18471390
FCYDR4Miove shop equipment for ECP projectCLOSEPROHAR-105WANP52ROUTINEFACILITIES8/13/20 10:07 AM8/13/20 10:07 AM9/12/20 10:07 AM8/13/20 10:02 AM19577198
CG6L9CInstall New Facilities Sign at front gateCLOSEPROHAR-105WANPR1ROUTINEFACILITIES9/9/15 10:23 AM9/9/15 10:23 AM10/9/15 10:23 AM9/9/15 10:17 AM10297729
CSVTMGRoad grading 1" Gravel Light House Point rd.CLOSEPROHAR-105WANPR1ROUTINEFACILITIES8/11/16 9:46 AM8/11/16 9:46 AM9/10/16 9:46 AM8/11/16 9:42 AM11806506
FC6WXLReplace window screensCLOSEPROHAR-105WANP52ROUTINEFACILITIES7/7/20 2:46 PM7/7/20 2:46 PM8/6/20 2:46 PM7/7/20 2:41 PM19455629
FDSDZMRepalce exisiting breaker legend in power panelCLOSEPROHAR-105WANP52ROUTINEFACILITIES9/17/20 11:28 AM9/17/20 11:28 AM10/17/20 11:28 AM9/17/20 11:23 AM19664310
FDLWYGE) clean out and remove equipment from back half of the building so construction crew can drill and install new water lineCLOSEPROHAR-105WANP52ROUTINEFACILITIES9/8/20 1:20 AM9/8/20 1:20 AM10/8/20 1:20 AM8/12/20 4:31 AM19571644
FYP39ME)purchase bleach for chlorination systemCLOSEPROHAR-105WANP52ROUTINEFACILITIES6/13/22 1:38 AM6/13/22 1:38 AM7/13/22 1:38 AM6/9/22 5:59 AM21589188
FPP3CVInstall Dimmer in drop armCLOSEPROHAR-105WANP52ROUTINEFACILITIES9/13/21 8:04 AM9/13/21 8:04 AM10/13/21 8:04 AM9/13/21 7:57 AM20725946
FYYWWJservice eye washCLOSEPROHAR-105WANP52ROUTINEFACILITIES6/22/22 9:59 AM6/22/22 9:59 AM7/22/22 9:59 AM6/22/22 9:53 AM21627653
CJD4WWPump out 3 Facility Sewer TanksCOMPPROHAR-105WANP52ROUTINEFACILITIES10/29/15 7:21 AM10/29/15 7:20 AM11/28/15 7:21 AM10/29/15 7:15 AM10599558
G9SPFWCut/remove tree on fencelineCOMPPROHAR-105WANP52ROUTINEFACILITIES3/21/23 4:05 AM3/21/23 4:05 AM4/20/23 4:05 AM3/21/23 4:03 AM22612446
G9SPW7Install EXIT signCOMPPROHAR-105WANP52ROUTINEFACILITIES3/21/23 4:09 AM3/21/23 4:09 AM4/20/23 4:09 AM3/21/23 4:08 AM22612462
G46T3VPlace wiring to OH lighting in junction boxCOMPPROHAR-105WANP52ROUTINEFACILITIES10/11/22 1:22 PM10/11/22 1:22 PM11/10/22 1:22 PM10/11/22 12:34 PM21997478
B9NPVDProspect Harbor, Building 106 - Repair Building VentCLOSEPROHAR-106PRNROUTINEROUTINE9/14/12 7:26 AM9/14/12 7:25 AM9/24/12 7:26 AM9/14/12 7:22 AM6618579
CRLT6GReplace hasp on doorCLOSEPROHAR-107WANP52ROUTINEFACILITIES6/7/16 7:57 AM6/7/16 7:56 AM7/7/16 7:57 AM6/7/16 7:49 AM11467597
FJKXJ4Repair door from wind damageCLOSEPROHAR-107WANP52ROUTINEFACILITIES3/2/21 9:56 AM3/2/21 9:56 AM4/1/21 9:56 AM3/2/21 9:54 AM20143659
FCLNZYE) replace second floor kitchen sink faucetCOMPPROHAR-107WANP52ROUTINEFACILITIES7/21/20 10:45 AM7/21/20 10:45 AM8/20/20 10:45 AM7/21/20 7:57 AM19501174
CLSRVCRepair security fence at the Front GateCLOSEPROHAR-109WANP52ROUTINEFACILITIES1/13/16 9:18 AM1/13/16 9:18 AM2/12/16 9:18 AM1/13/16 9:14 AM10836938
D34CTPCreate secured partitions for supply/training storageCLOSEPROHAR-109WANP52ROUTINEFACILITIES5/19/17 8:46 AM5/19/17 7:36 AM6/18/17 8:46 AM5/19/17 7:26 AM12660230
FVS3GRLOSS OF COMMERCIAL POWER PROSPECT HARBOR INCIDENT NOTIFICATION #51982CLOSEPROHAR-109WANP63EMERGENCYUTILITIES2/23/22 11:18 AM2/23/22 12:18 PM2/24/22 11:18 AM2/23/22 11:10 AM21265951
BBHLDTProspect Harbor, Building 110 - Purchase & Install Awning Over Entry Door At The Entrance To The BuildingCLOSEPROHAR-110WANPR1ROUTINEFACILITIES11/13/12 7:49 AM11/23/12 7:49 AM11/1/12 4:35 AM6785240
BB7FN6Prospect Harbor, Building 110 - Repair Trim On Northeast Corner Of BuildingCLOSEPROHAR-110PRNROUTINEROUTINE10/18/12 4:54 AM10/18/12 4:51 AM10/28/12 4:54 AM10/11/12 8:15 AM6710736
B9NPD6Prospect Harbor, Building 110 - Install An Exhaust Fan In Male HeadCLOSEPROHAR-110PRNROUTINEROUTINE9/14/12 7:21 AM9/14/12 7:20 AM9/24/12 7:21 AM9/14/12 7:19 AM6618560
B95M3VProspect Harbor, Building 110 - Request To Have The Deck Washed & Treated With Thompson's Water SealCLOSEPROHAR-110PRNROUTINEROUTINE8/9/12 4:28 AM8/9/12 4:26 AM8/19/12 4:28 AM8/9/12 4:20 AM6499692
B7G54NProspect Harbor, Building 110 - Install A Bench In The Locker RoomCLOSEPROHAR-110PRNROUTINEROUTINE5/2/12 2:30 AM5/3/12 6:11 AM5/12/12 2:30 AM5/3/12 6:09 AM6182624
B3KD56Prospect Harbor - Request To Obtain & Spread Crushed Rock/Stone -CLOSEPROHAR-110WANP63ROUTINEROUTINE9/6/11 6:00 AM9/6/11 5:58 AM9/16/11 6:00 AM9/6/11 3:06 AM5363139
B5KR8CProspect Harbor, Building 110 - Request To Have Maintenance Mechanic Sand & Paint Baseboard Heat RadCLOSEPROHAR-110PRNROUTINEROUTINE1/9/12 7:21 AM1/9/12 7:19 AM1/19/12 7:21 AM1/9/12 7:13 AM5786771
B9NNW5Prospect Harbor, Building 110 - Purchase & Install Thermostat Anti-Temper EnclosuresCLOSEPROHAR-110PRNROUTINEROUTINE9/14/12 7:17 AM9/14/12 7:15 AM9/24/12 7:17 AM9/14/12 7:11 AM6618525
BZJ4N6Install flushmate toilet systemsCLOSEPROHAR-110WANP52ROUTINEFACILITIES6/12/14 10:57 AM6/12/14 10:57 AM7/12/14 10:57 AM6/12/14 10:44 AM8919059
CBCVTMConstruct two Awnings over entrance doors of buildingCLOSEPROHAR-110WANP52ROUTINEFACILITIES4/6/15 7:44 AM4/6/15 7:42 AM5/6/15 7:44 AM4/6/15 7:31 AM9758538
CBCVXGReplace thermostatsCLOSEPROHAR-110WANP52ROUTINEFACILITIES4/6/15 8:29 AM3/24/15 8:18 AM5/6/15 8:29 AM4/6/15 8:14 AM9758737
XYXR9Prospect Harbor, Building 110 - Fire Protection InspectionsCLOSEPROHAR-110PRN11ROUTINEFACILITIES1/6/11 6:39 AM1/16/11 6:39 AM1/6/11 6:38 AM3813048
CLSRWSPick-up Flooring SuppliesCLOSEPROHAR-110WANP52ROUTINEFACILITIES1/13/16 9:25 AM1/13/16 9:24 AM2/12/16 9:25 AM1/13/16 9:23 AM10836969
CFKD7FRepair toilet.CLOSEPROHAR-110WANP52ROUTINEFACILITIES8/10/15 6:23 AM8/10/15 6:22 AM9/9/15 6:23 AM8/10/15 6:20 AM10209907
CP9TGMfurnace not workingCLOSEPROHAR-110WANP52ROUTINEFACILITIES4/4/16 6:30 AM4/4/16 6:28 AM5/4/16 6:30 AM4/4/16 6:21 AM11241001
CTDWKTReplace ballast in light fixtureCLOSEPROHAR-110WANP52ROUTINEFACILITIES8/31/16 6:45 AM8/23/16 6:43 AM9/30/16 6:45 AM8/31/16 6:41 AM11864442
BF4GWGProspect Harbor, Building 110 - Investigate Heating System IssuesCLOSEPROHAR-110PRNROUTINEROUTINE5/13/13 3:00 AM5/15/13 7:26 AM5/23/13 3:00 AM5/13/13 10:05 AM7403225
CKR7RCRepair door handleCLOSEPROHAR-110WANP52ROUTINEFACILITIES12/16/15 8:10 AM12/14/15 10:19 AM1/15/16 8:10 AM12/14/15 10:17 AM10741125
DP3SRVReplace dog house over septic tank pump houseCLOSEPROHAR-110WANP52ROUTINEFACILITIES2/6/19 10:04 AM2/6/19 10:03 AM3/8/19 10:03 AM2/6/19 9:58 AM16704818
DXNNWXE) 2 liights are burned out in the female head and 1 in the male head in Bldg. 110.CLOSEPROHAR-110WANP52ROUTINEFACILITIES10/23/19 10:16 AM10/23/19 10:16 AM11/22/19 10:16 AM10/21/19 8:33 AM18482310
F49WMLRepair female head shower benchCLOSEPROHAR-110WANP52ROUTINEFACILITIES1/16/20 1:13 PM1/16/20 1:13 PM2/15/20 1:13 PM1/16/20 1:04 PM18800324
FBNTFBE) Remove old caulking from kitchen sink in building 110 and apply new caulkingCLOSEPROHAR-110WANP52ROUTINEFACILITIES6/19/20 6:45 AM6/19/20 6:45 AM7/19/20 6:45 AM6/17/20 6:03 AM19389752
FCBJ9GE) Loose toilet seat in mens bathroomCLOSEPROHAR-110WANP52ROUTINEFACILITIES7/13/20 11:21 AM7/13/20 11:21 AM8/12/20 11:21 AM7/13/20 7:15 AM19471213
BXWP3CReplace ballast in fluorescent lightsCLOSEPROHAR-110PRNROUTINEROUTINE3/13/14 9:13 AM3/13/14 9:11 AM4/12/14 9:13 AM3/13/14 7:48 AM8647272
DJRS94Building 110 kitchen sink RepairCLOSEPROHAR-110WANP52ROUTINEFACILITIES7/25/18 6:08 AM7/25/18 6:07 AM8/24/18 6:08 AM7/25/18 6:06 AM15682006
DJSKCBProspect Harbor Bldg 110- Secured RFI Room wooden partition needs to be created for weapons to rest againstCLOSEPROHAR-110WANP52ROUTINEFACILITIES7/27/18 2:48 AM7/27/18 2:48 AM8/26/18 2:48 AM7/27/18 2:41 AM15691349
CXBSNFNo heatCLOSEPROHAR-110WANP52ROUTINEFACILITIES1/10/17 10:49 AM1/9/17 7:00 AM2/9/17 10:49 AM1/9/17 4:15 AM12258159
BBNW4LProspect Harbor, Building 110 - Request To RemoveThe FireSuppression System & Provide A Type "K" Class Fire ExtinguisherCLOSEPROHAR-110WANPR1ROUTINEFACILITIES11/20/12 5:58 AM11/20/12 5:51 AM11/30/12 5:58 AM11/20/12 4:51 AM6847780
CBJ9VNrepair second deck floorCLOSEPROHAR-110WANP52ROUTINEFACILITIES4/13/15 10:56 AM4/13/15 3:00 AM5/13/15 10:56 AM4/13/15 10:43 AM9779285
C3T9GCRepair cement stepsCLOSEPROHAR-110WANP52ROUTINEFACILITIES8/29/14 11:40 AM8/29/14 11:40 AM9/28/14 11:40 AM8/29/14 11:38 AM9158506
C3T9GGRepaint railing for stairsCLOSEPROHAR-110WANP52ROUTINEFACILITIES8/29/14 11:45 AM8/29/14 11:45 AM9/28/14 11:45 AM8/29/14 11:44 AM9158520
FCVNRNPlace rodent traps in varous buildingsCLOSEPROHAR-110WANP52ROUTINEFACILITIES8/7/20 4:50 AM8/7/20 4:50 AM9/6/20 4:50 AM8/7/20 4:42 AM19557507
BXD4W3Leaking valve in heating systemCLOSEPROHAR-110PRNROUTINEROUTINE2/10/14 11:39 AM2/10/14 11:38 AM3/12/14 11:39 AM2/10/14 11:33 AM8537633
C94LH7Remove water Damaged FlooringCLOSEPROHAR-110WANP52ROUTINEFACILITIES2/23/15 7:23 AM2/23/15 7:23 AM3/25/15 7:23 AM2/23/15 7:20 AM9644906
C9WJWBReplace thermostatsCLOSEPROHAR-110WANP52ROUTINEFACILITIES3/24/15 6:02 AM3/24/15 6:01 AM4/23/15 6:02 AM3/24/15 5:58 AM9726481
CP66KSArmory alarm system not workingCLOSEPROHAR-110WANP52ROUTINEFACILITIES3/28/16 9:19 AM3/28/16 9:18 AM4/27/16 9:19 AM3/28/16 9:06 AM11219448
C7ZCHWNO HeatCLOSEPROHAR-110WANP52ROUTINEFACILITIES2/16/15 4:46 AM2/17/15 12:30 PM3/18/15 4:46 AM2/17/15 12:30 PM9633531
DBCSBMESAMS DEF 683278, EMERGENCY LIGHT NOT WORKING THRU OUT BUILDINGCLOSEPROHAR-110WANP52ROUTINEFACILITIES12/14/17 11:55 AM12/14/17 11:55 AM1/13/18 11:55 AM12/14/17 11:53 AM13990637
DCKPN7Replace Toilet seats in building 110 and 101CLOSEPROHAR-110WANP52ROUTINEFACILITIES1/24/18 9:35 AM1/24/18 9:35 AM2/23/18 9:35 AM1/24/18 9:31 AM14142400
DDXWVMCut and Clean up debris from tree/branches that have fallen during the past stormCLOSEPROHAR-110WANP52ROUTINEFACILITIES3/21/18 12:47 PM3/21/18 12:46 PM4/20/18 12:47 PM3/21/18 12:44 PM14577317
DJCFXMRepair well pressure switch PROHAR-110CLOSEPROHAR-110WANP52ROUTINEFACILITIES7/11/18 8:53 AM7/11/18 8:53 AM8/10/18 8:53 AM7/11/18 8:49 AM15622966
FC93K7E) clogged sink in mens locker room.CLOSEPROHAR-110WANP52URGENTFACILITIES7/10/20 1:24 AM7/10/20 1:24 AM7/17/20 1:24 AM7/9/20 2:27 PM19463619
FCTTNKE) Set mouse/rat trapsCLOSEPROHAR-110KTR-PNSYROUTINEFACILITIES8/5/20 5:46 AM8/5/20 5:46 AM9/4/20 5:46 AM8/5/20 5:01 AM19549340
CRXKS6Install flooringCLOSEPROHAR-110WANP52ROUTINEFACILITIES6/20/16 11:49 AM6/20/16 11:47 AM7/20/16 11:49 AM6/20/16 11:39 AM11510891
BZBZ39Replace ballast in woman's BathroomCLOSEPROHAR-110WANP51ROUTINEROUTINE5/27/14 9:40 AM5/27/14 9:03 AM6/26/14 9:40 AM5/27/14 8:47 AM8854348
DTB344Reapir holes in floorCLOSEPROHAR-110WANP52URGENTFACILITIES6/24/19 6:12 AM6/18/19 5:52 AM6/25/19 5:52 AM6/18/19 5:37 AM17568694
DTB364Repair/Replace shower stall in womens headCLOSEPROHAR-110WANP52ROUTINEFACILITIES6/24/19 6:15 AM6/18/19 5:56 AM7/18/19 5:56 AM6/18/19 5:53 AM17568834
DW3GNPRemove core from lock on RFI doorCLOSEPROHAR-110WANP52ROUTINEFACILITIES8/21/19 4:46 AM8/21/19 4:45 AM9/20/19 4:45 AM8/21/19 4:44 AM18115591
FBRJ7LE) 3 railing spindle replacement, 11 railing spindle loose – 1 loose 4x4 railing post – few deckingCLOSEPROHAR-110WAMP52ROUTINEFACILITIES6/23/20 4:58 AM6/23/20 4:58 AM7/23/20 4:58 AM6/22/20 6:47 AM19405590
FCYDNFreplace washer/dryerCLOSEPROHAR-110WANP52ROUTINEFACILITIES8/13/20 9:48 AM8/5/20 9:55 AM9/12/20 9:48 AM8/13/20 9:44 AM19577120
BXDN6ZInvestigate and repair heating systemCLOSEPROHAR-110PRNROUTINEROUTINE2/11/14 1:34 PM2/11/14 1:33 PM3/13/14 1:34 PM2/11/14 1:29 PM8543406
BTRFK7Replace Safe S&G 8500 series with X-09CLOSEPROHAR-110WANP53ROUTINEROUTINE9/18/13 8:23 AM9/18/13 8:23 AM9/28/13 8:23 AM9/18/13 8:17 AM7939562
BTRFPXRepair the plumbing at the kitchen sinkCLOSEPROHAR-110PRNROUTINEROUTINE9/18/13 8:29 AM9/18/13 8:28 AM9/28/13 8:29 AM9/18/13 8:27 AM7939617
CPTBNKInstall microwave over stove.CLOSEPROHAR-110WANP52ROUTINEFACILITIES4/28/16 6:03 AM4/28/16 6:02 AM5/28/16 6:03 AM4/28/16 5:58 AM11317294
CP66LRreplace toilet valveCLOSEPROHAR-110WANP52ROUTINEFACILITIES3/28/16 9:33 AM3/22/16 9:20 AM4/27/16 9:33 AM3/28/16 9:20 AM11219498
BVSWN9Repair Female bathroom toilet Bldg 110CLOSEPROHAR-110PRNROUTINEROUTINE11/12/13 4:23 AM11/12/13 4:23 AM12/12/13 4:23 AM11/12/13 4:15 AM8185034
FDSCFBE) To investagate and stop a water leak at the kitchen sink.CLOSEPROHAR-110WANP52EMERGENCYFACILITIES9/17/20 6:13 AM9/17/20 7:13 AM9/18/20 6:13 AM9/17/20 6:08 AM19662946
F67SMFBoiler #3 needs to be adjustedCLOSEPROHAR-110KTR-PNSYURGENTFACILITIES2/18/20 1:23 AM2/18/20 1:23 AM2/25/20 1:23 AM2/14/20 11:40 AM18909870
F7PCGNBlack smoke coming from boiler #2CLOSEPROHAR-110KTR-PNSYURGENTFACILITIES4/4/20 4:20 AM4/4/20 4:20 AM4/13/20 4:20 AM4/2/20 4:06 PM19063243
FGNSRKInvestingate low heat in buildingCLOSEPROHAR-110WANP52ROUTINEFACILITIES12/3/20 9:07 AM12/3/20 9:07 AM1/2/21 9:07 AM12/3/20 9:04 AM19852026
FGR9BSBoiler 2 and 3 not firingCLOSEPROHAR-110KTR-PNSYROUTINEFACILITIES12/8/20 10:04 AM12/8/20 10:04 AM1/7/21 10:04 AM12/8/20 9:57 AM19862895
FGR9WTE) Boiler/furnace requires technical visit from Contractor.CLOSEPROHAR-110KTR-PNSYROUTINEFACILITIES12/8/20 2:15 PM12/8/20 2:15 PM1/7/21 2:15 PM12/8/20 6:31 AM19862113
FGVJ4GRepair/Replace toilet seatCLOSEPROHAR-110WANP52ROUTINEFACILITIES12/16/20 11:52 AM12/16/20 11:52 AM1/15/21 11:52 AM12/16/20 11:50 AM19884009
FJGW6MFreeze protection measures, boiler checksCLOSEPROHAR-110WANP52ROUTINEFACILITIES3/1/21 7:13 AM3/1/21 7:13 AM3/31/21 7:13 AM3/1/21 6:50 AM20139240
FRL66Drepair three furnacesCLOSEPROHAR-110KTR-PNSYROUTINEFACILITIES10/15/21 10:44 AM10/15/21 10:44 AM11/14/21 10:44 AM10/15/21 10:41 AM20811955
FXZJKYE) second floor weight room has a hole in the floor approximately 12 inches in diameter that needs to be patched up.CLOSEPROHAR-110WANP52ROUTINEFACILITIES5/11/22 3:30 AM5/11/22 3:30 AM6/10/22 3:30 AM5/9/22 6:27 AM21492305
FXZLVNpurchase "change keys" for 2 different Mosler SafesCLOSEPROHAR-110WANP52ROUTINEFACILITIES5/11/22 7:58 AM5/11/22 7:58 AM6/10/22 7:58 AM5/11/22 7:53 AM21500768
FXZLWXreplace bathroom vent/fanCLOSEPROHAR-110WANP52ROUTINEFACILITIES5/11/22 8:11 AM5/11/22 8:11 AM6/10/22 8:11 AM5/11/22 8:09 AM21500851
FZ44DCPressure wash algae from buildingCLOSEPROHAR-110WANP52ROUTINEFACILITIES6/27/22 6:07 AM6/27/22 6:07 AM7/27/22 6:07 AM6/27/22 6:05 AM21640787
D4NVRTRun new fiber optic cable to support NAVSOC mission.COMPPROHAR-110WANP52ROUTINEFACILITIES7/24/17 8:11 AM7/24/17 8:11 AM8/23/17 8:11 AM7/24/17 8:05 AM13070838
G4V3WDProspect Harbor, B110 Furnace #2 is outCOMPPROHAR-110KTR-PNSYROUTINEFACILITIES11/15/22 12:55 PM11/15/22 12:55 PM12/15/22 12:55 PM11/15/22 12:52 PM22090921
G7R3K3#2 Boiler DownCOMPPROHAR-110KTR-PNSYEMERGENCYFACILITIES2/1/23 8:01 AM2/1/23 9:01 AM2/2/23 8:01 AM2/1/23 7:54 AM22277731
G7R3H9E) #2 Boiler in building 110 is down. Due to the severe temperature drop expected this weekend Gatcomb should be dispatched.COMPPROHAR-110KTR-PNSYURGENTFACILITIES2/1/23 7:43 AM2/1/23 7:43 AM2/8/23 7:43 AM2/1/23 7:39 AM22277661
G7S4YDBoiler #2 downCOMPPROHAR-110KTR-PNSYURGENTFACILITIES2/6/23 10:38 AM2/6/23 10:38 AM2/13/23 10:38 AM2/6/23 10:36 AM22481447
G7T4STE)Purchase and install door stops on required doors to ensure air flow in the event of cold weatherCOMPPROHAR-110WANP52ROUTINEFACILITIES2/9/23 5:24 AM2/9/23 5:24 AM3/11/23 5:24 AM2/8/23 6:31 AM22488866
G7T47Lrepair frozen domestic heating lineCOMPPROHAR-110KTR-PNSYURGENTFACILITIES2/9/23 12:51 AM2/9/23 12:51 AM2/16/23 12:51 AM2/8/23 9:38 AM22489725
GBL7FME) purchase and replace shower heads in male and female locker roomsCOMPPROHAR-110WANP52ROUTINEFACILITIES4/26/23 10:07 AM4/26/23 10:07 AM5/26/23 10:07 AM4/26/23 5:54 AM22721118
GCGZZPE) purchase eye wash solution for eye wash stationsCOMPPROHAR-110WANP52ROUTINEFACILITIES6/13/23 4:59 AM6/12/23 10:20 AM7/12/23 10:20 AM6/13/23 4:59 AM22862178
G6JRJVP)Furnance/boiler located in basement is down causing no heat for the entire bldg. Current temp is 68 degreesCOMPPROHAR-110KTR-PNSYURGENTFACILITIES12/12/22 1:13 AM12/12/22 1:13 AM12/19/22 1:13 AM12/8/22 9:46 AM22147796
G7SFBFE)Replace batteries in thermostatsCOMPPROHAR-110WANP52ROUTINEFACILITIES2/7/23 12:05 PM2/7/23 12:05 PM3/9/23 12:05 PM2/7/23 7:16 AM22484278
G7T339E) Leak reported at base board heat in MWR bldg gymCOMPPROHAR-110WANP52EMERGENCYFACILITIES2/8/23 8:04 AM2/8/23 9:04 AM2/9/23 8:04 AM2/8/23 7:58 AM22489251
GB3ZH6E) remove dead and falling trees on the south east corner of building 110WJOBPLANPROHAR-110WANP52ROUTINEFACILITIES4/14/23 1:24 AM4/14/23 1:24 AM5/14/23 1:24 AM4/13/23 7:52 AM22685941
B5YVLHProspect Harbor, Barrier At Main Gate - Request To Have Maintenance Mechanic Troubleshoot The Barrier.CLOSEPROHAR-112PRNROUTINEROUTINE1/31/12 3:11 AM1/31/12 3:10 AM2/10/12 3:11 AM1/31/12 3:05 AM5863225
B59D5LProspect Harbor - Emergency Electrical RepairsCLOSEPROHAR-112WANPR1ROUTINEFACILITIES12/20/11 5:50 AM12/20/11 5:50 AM12/30/11 5:50 AM12/20/11 5:44 AM5743648
B3KDTNProspect Harbor, Building 112 - Request To Have Remaining Mulch (Provided) Spread On Garden Beds.CLOSEPROHAR-112WANP63ROUTINEROUTINE9/6/11 6:31 AM9/6/11 6:24 AM9/16/11 6:31 AM9/6/11 4:22 AM5363298
CBCVXRpaint/repair the mini-deckCLOSEPROHAR-112WANP52ROUTINEFACILITIES4/6/15 8:36 AM4/6/15 8:35 AM5/6/15 8:36 AM4/6/15 8:34 AM9758809
C4P3GSReplace toilet tank fill valve and flush valveCLOSEPROHAR-112WANP52ROUTINEFACILITIES10/22/14 7:11 AM10/22/14 7:10 AM11/21/14 7:11 AM10/22/14 6:47 AM9318283
ZTHV3Prospect Harbor, Building 112 - The Expansion Tank Is Bad & Leaking Into The Burner.CLOSEPROHAR-112PRN11ROUTINEFACILITIES4/14/11 9:58 AM4/24/11 9:58 AM4/6/11 3:05 AM3826344
CKR7NFInstall Dry Erase BoardCLOSEPROHAR-112WANP52ROUTINEFACILITIES12/14/15 10:12 AM12/14/15 10:12 AM1/13/16 10:12 AM12/14/15 10:08 AM10741073
CKR7P3Move two phone jacks on 2nd floorCLOSEPROHAR-112WANP52ROUTINEFACILITIES12/14/15 10:16 AM12/14/15 10:15 AM1/13/16 10:16 AM12/14/15 10:13 AM10741105
BSKDFWProspect Harbor - Main Gate Pop up BarrierCLOSEPROHAR-112PRNROUTINEROUTINE7/10/13 5:43 AM7/10/13 5:42 AM7/20/13 5:43 AM7/9/13 8:06 AM7584451
DPZBKTE) Bathroom sink on first floor of B112 has intermittent water fluctuations where water stops running approx 4 seconds from turning on faucet and thenCLOSEPROHAR-112WANP52ROUTINEFACILITIES4/3/19 2:02 PM3/20/19 6:20 AM4/19/19 6:20 AM3/19/19 12:28 PM16869022
DTFY3CE) Repair or Replace the door damper/closer at the base of the main stairwell in bldg 112. Door next to PWD Maine offices.CLOSEPROHAR-112WANP52ROUTINEFACILITIES6/19/19 4:31 AM6/19/19 4:30 AM7/19/19 4:30 AM6/18/19 12:09 PM17572133
F7P9ZPInspect leaking burnerCLOSEPROHAR-112KTR-PNSYURGENTFACILITIES4/3/20 3:41 AM4/3/20 3:41 AM4/10/20 3:41 AM4/2/20 3:58 PM19063224
FF6TJ4Modify exisitng fuel tank stepsCLOSEPROHAR-112WANP52ROUTINEFACILITIES9/21/20 1:10 PM9/21/20 1:10 PM10/21/20 1:10 PM9/21/20 1:07 PM19672650
BXJZM3Toilet Handle broken in bathroomCLOSEPROHAR-112PRNROUTINEROUTINE2/20/14 9:35 AM2/20/14 9:32 AM3/22/14 9:35 AM2/20/14 9:22 AM8574817
CDY6M3Request the quarterdeck bell be mounted to the wall inside the entry way of BLDG 112.CLOSEPROHAR-112WANP52ROUTINEFACILITIES7/7/15 5:38 AM7/7/15 5:26 AM8/6/15 5:38 AM7/7/15 5:16 AM10078226
BXBFSSRequest that all interior office spaces of building #112 be re-cored and re-keyed.CLOSEPROHAR-112WANP51ROUTINEFACILITIES2/3/14 6:37 AM2/3/14 6:36 AM3/5/14 6:37 AM1/31/14 9:42 AM8499404
DDV43MBldg. 112 / FLR. 1 / Entryway - Sheetrock has water signs of damaged. Need to repair sheetrock as needed, mud, and paint.CLOSEPROHAR-112WANP52ROUTINEFACILITIES6/5/18 7:45 AM3/20/18 8:53 AM4/19/18 8:53 AM3/20/18 8:52 AM14566266
DDV4MJBldg. 112 / Stairwell - Repaint walls where sheetrock was just patched and mudded.CLOSEPROHAR-112WANP52ROUTINEFACILITIES3/20/18 9:00 AM3/20/18 8:58 AM4/19/18 9:00 AM3/20/18 8:57 AM14566311
DP7VYTRepair threshold that has been indentified as a tripping hazardCLOSEPROHAR-112WANP52ROUTINEFACILITIES2/14/19 8:31 AM2/14/19 8:30 AM3/16/19 8:30 AM2/14/19 8:28 AM16739541
DPXKCSE) Install a window lock on a relatively new window in building 112, CPLO view-space.CLOSEPROHAR-112WANP52ROUTINEFACILITIES3/17/19 9:00 PM3/17/19 9:00 PM4/18/19 10:33 AM3/18/19 10:17 AM16862188
DSTVSYReplace station transformerCLOSEPROHAR-112WANP52ROUTINEFACILITIES5/20/19 6:24 AM5/20/19 6:25 AM6/27/19 6:23 AM5/28/19 6:13 AM17397434
DTM963E) 1) Repair or Replace the door damper/closer at the base of the main stairwell in bldg 112.CLOSEPROHAR-112WANP52ROUTINEFACILITIES6/24/19 7:02 AM6/24/19 7:02 AM7/24/19 7:02 AM6/21/19 7:55 AM17597892
DYL3G4Exterior LightingCLOSEPROHAR-112WANP52ROUTINEFACILITIES10/1/19 3:00 AM11/13/19 6:04 AM12/13/19 6:04 AM11/8/19 10:49 AM18560610
FFLG4FE)Requesting the mounting of television on existing wall to facilitate Security training requirements, within bldg 112, floor 2.CLOSEPROHAR-112WANP52ROUTINEFACILITIES10/16/20 8:10 AM10/16/20 8:10 AM11/15/20 8:10 AM10/15/20 9:23 AM19734904
C6D7GZNo WaterCLOSEPROHAR-112WANP52ROUTINEFACILITIES12/1/14 7:36 AM12/1/14 7:35 AM12/31/14 7:36 AM12/1/14 7:29 AM9431971
XYX3GProspect Harbor, Building 112 - Fire Protection InspectionsCLOSEPROHAR-112PRN11ROUTINEFACILITIES1/6/11 5:47 AM1/16/11 5:47 AM1/6/11 5:41 AM3812568
DB6BX4Replace missing asphalt shingles on roof.CLOSEPROHAR-112WANP52ROUTINEFACILITIES12/4/17 7:22 AM12/4/17 7:22 AM1/3/18 7:22 AM12/4/17 7:10 AM13951434
FCMZLFRepalce/repair screensCLOSEPROHAR-112WANP52ROUTINEFACILITIES7/27/20 9:37 AM7/27/20 9:37 AM8/26/20 9:37 AM7/27/20 9:34 AM19520384
FCTVDSE) wrap copper pipes with foam insulationCLOSEPROHAR-112WANP52ROUTINEFACILITIES8/5/20 8:18 AM8/5/20 8:18 AM9/4/20 8:18 AM8/5/20 3:22 AM19549276
C4FT7MReplace faucet fuxtureCLOSEPROHAR-112WANP52ROUTINEFACILITIES10/7/14 6:29 AM10/7/14 6:28 AM11/6/14 6:29 AM10/6/14 8:07 AM9266211
C3YH9PWater testing after pump repair or replacementCLOSEPROHAR-112WANP52ROUTINEFACILITIES9/16/14 7:03 AM9/16/14 7:03 AM10/16/14 7:03 AM9/16/14 6:47 AM9204909
CZTZCSpatch and paint chiefs officeCLOSEPROHAR-112WANP52ROUTINEFACILITIES5/5/17 4:57 AM5/4/17 10:59 AM6/4/17 4:57 AM5/4/17 10:57 AM12613107
DJG4RLBuilding 112 sink RepairCLOSEPROHAR-112WANP52ROUTINEFACILITIES7/18/18 11:31 AM7/18/18 11:31 AM8/17/18 11:31 AM7/18/18 11:22 AM15654204
DRWZKXOrder hurricane supplies for CNIC buildingsCLOSEPROHAR-112WANP52ROUTINEFACILITIES4/19/19 9:40 AM4/22/19 9:57 AM5/22/19 9:57 AM4/22/19 9:47 AM17161605
DRXGJRRepair counter topCLOSEPROHAR-112WANP52ROUTINEFACILITIES4/25/19 11:10 AM4/25/19 11:10 AM5/25/19 11:10 AM4/25/19 11:07 AM17183189
DTB7FYFabricate handles for electrical man holes.CLOSEPROHAR-112WANP52ROUTINEFACILITIES6/18/19 10:40 AM6/18/19 10:39 AM7/18/19 10:39 AM6/18/19 10:36 AM17571212
DW3HHHTake samples of carpet squares, mail or deliver to PNSY for samples.CLOSEPROHAR-112WANP52ROUTINEFACILITIES8/21/19 5:33 AM8/21/19 5:32 AM9/20/19 5:32 AM8/21/19 5:25 AM18115907
DYPWTYReplace carpet in Bldg. 112. Prospect HarborCLOSEPROHAR-112WANP52ROUTINEFACILITIES11/19/19 4:47 AM11/18/19 4:17 AM12/18/19 4:17 AM11/18/19 3:57 AM18589757
DYPWZHRepair photocell on Bld. 112 and replace 2 ext. .ightsCLOSEPROHAR-112WANP52ROUTINEFACILITIES11/18/19 5:12 AM11/18/19 5:12 AM12/18/19 5:12 AM11/15/19 8:08 AM18583875
FBRGX7E) Outside deck railing is coming apart on the second deck building 112.CLOSEPROHAR-112WANP52ROUTINEFACILITIES6/23/20 4:46 AM6/23/20 4:46 AM7/23/20 4:46 AM6/22/20 2:21 PM19407895
CDJSMPFirst floor toilet repair.CLOSEPROHAR-112WANP52ROUTINEFACILITIES6/9/15 5:31 AM6/9/15 5:31 AM7/9/15 5:31 AM6/9/15 5:26 AM9972565
C4WBKSinstall a chlorination systemCLOSEPROHAR-112WANP52ROUTINEFACILITIES11/4/14 7:23 AM11/4/14 7:22 AM12/4/14 7:23 AM11/4/14 7:08 AM9360556
CGTDVZPROHAR-112, Roof Leak in VestibuleCLOSEPROHAR-112WANP52ROUTINEFACILITIES10/8/15 3:00 AM10/5/15 7:11 AM11/7/15 3:00 AM10/1/15 7:04 AM10518759
DWVMJLrepair door closureCLOSEPROHAR-112WANP52ROUTINEFACILITIES9/11/19 7:14 AM9/9/19 7:13 AM10/9/19 7:13 AM9/19/19 7:09 AM18341451
FFGK6Hrepair/replace bathroom lightCLOSEPROHAR-112WANP52ROUTINEFACILITIES10/6/20 8:29 AM10/6/20 8:29 AM11/5/20 8:29 AM10/6/20 8:25 AM19710826
FGLVDPE) Investigate flickering lights in office / change ballastsCLOSEPROHAR-112WANP52ROUTINEFACILITIES11/30/20 9:07 AM11/30/20 9:07 AM12/30/20 9:07 AM11/30/20 6:56 AM19841922