20231129_Prospect_Harbor_Asset_Download.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- FA255024R0003
About this file
This pre-solicitation notice provides details for the Prospect Harbor Space Force Station Base Operations Support contract opportunity. The solicitation is expected to be released in January 2024 for base operations support services at the Government Owned, Contractor Operated Prospect Harbor Space Force Station in Maine. The contractor will be responsible for operation of the facility, including staffing and managing physical security functions and programs, civil engineering services and maintenance, communications systems operation and administration, logistics management, and environmental and safety requirements. The acquisition will be conducted as a 100% small business set-aside and use a tradeoff best value source selection method. The government plans to release the solicitation through the Procurement Integrated Enterprise Environment Solicitation Module. No funds are presently available and no award will be made until funding is obtained, with the right to cancel reserved.
View the file
Other files
Show 40 more
Latest 50 of 292 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report
ASSETS INVENTORY INFORMATION
| Asset | Parent | Description | Location or Pool Location | Reference Location | Status | Manufacturer or Make | Serial # or VIN # | Model | Installation Date or In Service Date | Replacement Cost | Warranty | Warranty Expiration Date |
| K10522 | Generator Day Tank | PROHAR-102 | Inside room that houses generator | OPERATING | PRYCO | 07548200 | PY50UL | 10/15/16 | 5,173.00 | |||
| K10520 | Condenser | PROHAR-101 | Unit "A", concrete slab, SE corner of building | OPERATING | TRANE | 12231R02YA | TTA073D300AA | 8/15/12 | 18,476.00 | |||
| K10527 | CERAMIC TILE FLOORING | PROHAR-110 | OPERATING | 9/15/18 | 53,638.00 | |||||||
| K10523 | Air Handler | PROHAR-101 | Rooftop Unit, Labelled "AHU-1" | OPERATING | TRANE | C12G05010 | TCCB008ODC0A0CTMB | 8/15/12 | 135,248.00 | |||
| K10529 | ROOF COVERING | PROHAR-112 | OPERATING | 5/15/20 | 14,782.00 | |||||||
| K10525 | 300kw Generator | PROHAR-102 | Located inside building, "Generator 2" | OPERATING | KOHLER POWER | SGM32G3XG | 300REOZJ | 8/15/15 | 289,827.00 | |||
| K130107 | EMERGENCY EYE WASH | PROHAR-105 | PW SHOP | OPERATING | 1/23/19 | 2,122.00 | ||||||
| K130115 | WATER FILTER | PROHAR-103 | HALLWAY | OPERATING | 1/22/20 | 0.00 | ||||||
| K130116 | WATER FILTER | PROHAR-110 | UNDER KITCHEN SINK | OPERATING | 1/24/19 | 0.00 | ||||||
| K130106 | EMERGENCY EYE WASH | PROHAR-104 | STATION GARAGE | OPERATING | 12/15/20 | 1,678.00 | ||||||
| K10524 | Air Handler | PROHAR-101 | Rooftop unti, designated "AHU-2" | OPERATING | TRANE | C12G05011 | TCCB008ODC0A0CTMB | 8/15/12 | 135,248.00 | |||
| K10521 | Condenser | PROHAR-101 | Unit "B", concrete slab, SW corner of building | OPERATING | TRANE | 121910UWYA | TTA073D300AA | 8/15/12 | 18,476.00 | |||
| K130113 | DISINFECTION SYSTEM | PROHAR-112 | ADMINISTRATION MECHNAICAL ROOM | OPERATING | 1/21/20 | 0.00 | ||||||
| K130114 | WATER FILTER | PROHAR-101 | HALLWAY | OPERATING | 2/5/20 | 0.00 | ||||||
| K04179 | QUARTERLY, EXTERIOR SECURITY LIGHTS | PROHAR-110 | THRU-OUT BASE | OPERATING | UNKNOWN | SECURITY LIGHTS | OUTSDIE LIGHTING | 1/1/75 | 18,303.00 | |||
| BA0200001 | STRUCTURAL SLAB ON GRADE | PROHAR-101 | STRUCTURAL SLAB ON GRADE | OPERATING | 6/1/64 | 191,606.00 | ||||||
| BA0200002 | STEEL STRUCTURAL FRAME | PROHAR-101 | STEEL TRUSS ROOF STRUCTURE | OPERATING | 6/1/64 | 35,385.00 | ||||||
| BA0200003 | BRICK EXTERIOR WALLS | PROHAR-101 | EAST ELEVATION EXTERIOR BRICK WALL | OPERATING | 6/1/64 | 77,791.00 | ||||||
| BA0200004 | EXTERIOR WINDOWS | PROHAR-101 | WEST ELEVATION EXTERIOR WINDOW | OPERATING | 6/1/84 | 3,283.00 | ||||||
| BA0200005 | DOORS, EXTERIOR METAL DOORS | PROHAR-101 | SOUTH ELEVATION EXTERIOR METAL DOOR | OPERATING | 6/1/90 | 9,992.00 | ||||||
| BA0200006 | SINGLE PLY ROOF COVERING | PROHAR-101 | ROOF ELEVATION SINGLE PLY COVER | OPERATING | 6/1/16 | 31,085.00 | ||||||
| BA0200007 | ROOFING, ROOF HATCHES | PROHAR-101 | ROOF ELEVATION ROOF HATCH | OPERATING | 6/1/64 | 6,502.00 | ||||||
| BA0200008 | FIXED PARTITIONS - CMU WALLS | PROHAR-101 | CMU WALL PARTITIONS | OPERATING | 6/1/64 | 58,958.00 | ||||||
| BA0200009 | DOORS, INTERIOR WOOD | PROHAR-101 | INTERIOR WOOD DOORS | OPERATING | 6/1/95 | 27,371.00 | ||||||
| BA0200010 | EXTERIOR STAIRS | PROHAR-101 | EAST ELEVATION EXTERIOR STAIR | OPERATING | 6/1/64 | 28,987.00 | ||||||
| BA0200011 | CARPET | PROHAR-101 | CARPET | OPERATING | 6/1/64 | 38,822.00 | ||||||
| BA0200012 | CEILING, TILE | PROHAR-101 | CEILING TILE FINISHES | OPERATING | 6/1/85 | 19,883.00 | ||||||
| BA0200045 | DOORS, EXTERIOR METAL DOORS | PROHAR-110 | OPERATING | 6/1/00 | 12,490.00 | |||||||
| BA0200047 | METAL ROOF COVERING | PROHAR-110 | OPERATING | 6/1/94 | 14,160.00 | |||||||
| BA0200048 | DOORS, INTERIOR METAL | PROHAR-110 | OPERATING | 6/1/94 | 15,194.00 | |||||||
| BA0200032 | OVERHEAD LIGHTING | PROHAR-102 | OPERATING | 6/1/00 | 8,789.00 | |||||||
| BA0200033 | STANDARD SLAB ON GRADE | PROHAR-104 | OPERATING | 6/1/69 | 6,124.00 | |||||||
| BA0200034 | STEEL STRUCTURAL FRAME | PROHAR-104 | OPERATING | 6/1/69 | 5,213.00 | |||||||
| BA0200035 | BRICK EXTERIOR WALLS | PROHAR-104 | OPERATING | 6/1/69 | 38,496.00 | |||||||
| BA0200036 | OVERHEAD DOORS | PROHAR-104 | OPERATING | 6/1/69 | 14,958.00 | |||||||
| BA0200037 | OVERHEAD LIGHTING | PROHAR-104 | OPERATING | 6/1/00 | 6,590.00 | |||||||
| BA0200038 | PANELBOARDS | PROHAR-109 | OPERATING | 6/1/03 | 7,036.00 | |||||||
| BA0200039 | STANDARD SLAB ON GRADE | PROHAR-110 | OPERATING | 6/1/94 | 18,081.00 | |||||||
| BA0200021 | PANELBOARDS | PROHAR-101 | MECHANICAL ROOM/PANEL BOARD | OPERATING | 6/1/98 | 7,036.00 | ||||||
| BA0200022 | PANELBOARDS | PROHAR-101 | OPS ROOM/PANEL BOARD | OPERATING | 6/1/03 | 7,036.00 | ||||||
| BA0200040 | TRUSSES AND STRUCTURAL "I" JOISTS | PROHAR-110 | OPERATING | 6/1/94 | 16,029.00 | |||||||
| BA0200041 | STEEL STRUCTURAL FRAME | PROHAR-110 | OPERATING | 6/1/94 | 11,521.00 | |||||||
| BA0200043 | SIDING STEEL | PROHAR-110 | OPERATING | 6/1/94 | 23,604.00 | |||||||
| BA0200044 | EXTERIOR WINDOWS | PROHAR-110 | OPERATING | 6/1/94 | 4,377.00 | |||||||
| BA0200023 | OVERHEAD LIGHTING | PROHAR-101 | OVERHEAD LIGHTING THROUGHOUT BUILDING | OPERATING | 6/1/00 | 13,731.00 | ||||||
| BA0200024 | EXIT AND EMERGENCY LIGHTING | PROHAR-101 | THROUGHOUT BUILDING /EXIT EMERGENCY LIGHT | OPERATING | 6/1/00 | 1,346.00 | ||||||
| BA0200025 | STRUCTURAL SLAB ON GRADE | PROHAR-102 | OPERATING | 6/1/64 | 6,124.00 | |||||||
| BA0200026 | ROOF DECKS AND SLABS | PROHAR-102 | OPERATING | 6/1/64 | 5,716.00 | |||||||
| BA0200027 | BRICK EXTERIOR WALLS | PROHAR-102 | OPERATING | 6/1/64 | 39,296.00 | |||||||
| BA0200028 | FIXED PARTITIONS - CMU WALLS | PROHAR-102 | OPERATING | 6/1/64 | 6,216.00 | |||||||
| BA0200029 | PANELBOARDS | PROHAR-102 | OPERATING | 6/1/03 | 7,036.00 | |||||||
| BA0200030 | SWITCHBOARD - FEEDER | PROHAR-102 | OPERATING | 6/1/00 | 55,524.00 | |||||||
| BA0200081 | EXTERIOR WINDOWS | PROHAR-49 | OPERATING | 6/1/90 | 10,940.00 | |||||||
| BA0200049 | EXTERIOR STAIRS | PROHAR-110 | OPERATING | 6/1/94 | 4,348.00 | |||||||
| BA0200050 | DRYWALL / GYPSUM WALLBOARD FINIHSES | PROHAR-110 | OPERATING | 6/1/94 | 4,124.00 | |||||||
| BA0200052 | DRYWALL / GYPSUM BOARD | PROHAR-110 | OPERATING | 6/1/94 | 8,487.00 | |||||||
| BA0200053 | CEILING, TILE | PROHAR-110 | OPERATING | 6/1/94 | 15,263.00 | |||||||
| BA0200054 | WATER CLOSET, W/ TANK | PROHAR-110 | OPERATING | 6/1/94 | 4,402.00 | |||||||
| BA0200055 | PIPING, DOMESTIC WATER | PROHAR-110 | OPERATING | 6/1/94 | 25,404.00 | |||||||
| BA0200056 | WATER HEATER, RESIDENTIAL | PROHAR-110 | OPERATING | 6/1/94 | 28,724.00 | |||||||
| BA0200057 | PANELBOARDS | PROHAR-110 | OPERATING | 6/1/03 | 8,058.00 | |||||||
| BA0200058 | OVERHEAD LIGHTING | PROHAR-110 | OPERATING | 6/1/94 | 15,434.00 | |||||||
| BA0200059 | STANDARD SLAB ON GRADE | PROHAR-112 | STANDARD SLAB ON GRADE | OPERATING | 6/1/92 | 74,249.00 | ||||||
| BA0200060 | WOOD FLOOR CONSTRUCTION | PROHAR-112 | CONVENTIONAL FRAMED FLOOR SYSTEM | OPERATING | 6/1/92 | 39,633.00 | ||||||
| BA0200061 | WOOD STRUCTURAL FRAME | PROHAR-112 | STRONG BACKING, ENGINEER BRACING OF ROOF WOOD STRU | OPERATING | 6/1/92 | 29,602.00 | ||||||
| BA0200062 | SIDING WOOD BOARD | PROHAR-112 | WOOD BOARD SIDING | OPERATING | 6/1/92 | 35,814.00 | ||||||
| BA0200063 | EXTERIOR WINDOWS | PROHAR-112 | EAST ELEVATION EXTERIOR WINDOW | OPERATING | 6/1/92 | 8,753.00 | ||||||
| BA0200064 | DOORS, EXTERIOR METAL DOORS | PROHAR-112 | NORTH ELEVATION EXTERIOR METAL DOOR | OPERATING | 6/1/92 | 9,992.00 | ||||||
| BA0200066 | DOORS, INTERIOR WOOD | PROHAR-112 | INTERIOR WOOD DOORS | OPERATING | 6/1/92 | 30,415.00 | ||||||
| BA0200067 | DRYWALL / GYPSUM WALLBOARD FINIHSES | PROHAR-112 | DRYWALL/ WALL FINISHES | OPERATING | 6/1/92 | 1,865.00 | ||||||
| BA0200068 | CARPET | PROHAR-112 | OPERATING | 6/1/92 | 31,188.00 | |||||||
| BA0200069 | DRYWALL / GYPSUM BOARD | PROHAR-112 | DRYWALL CEILING | OPERATING | 6/1/92 | 11,035.00 | ||||||
| BA0200070 | WATER CLOSET, W/ TANK | PROHAR-112 | TOILETS | OPERATING | 6/1/92 | 4,402.00 | ||||||
| BA0200071 | PIPING, DOMESTIC WATER | PROHAR-112 | PIPING, DOMESTIC WATER | OPERATING | 6/1/92 | 28,433.00 | ||||||
| BA0200073 | PANELBOARDS | PROHAR-112 | MECHANICAL ROOM/ PANEL BOARD | OPERATING | 6/1/03 | 8,058.00 | ||||||
| BA0200074 | OVERHEAD LIGHTING | PROHAR-112 | OVERHEAD LIGHTING THROUGHOUT BUILDING | OPERATING | 6/1/00 | 17,576.00 | ||||||
| BA0200075 | STANDARD SLAB ON GRADE | PROHAR-49 | OPERATING | 6/1/91 | 54,511.00 | |||||||
| BA0200076 | BASEMENT WALL CONSTRUCTION | PROHAR-49 | OPERATING | 6/1/69 | 29,562.00 | |||||||
| BA0200077 | WOOD FLOOR CONSTRUCTION | PROHAR-49 | OPERATING | 6/1/69 | 6,340.00 | |||||||
| BA0200078 | TRUSSES AND STRUCTURAL "I" JOISTS | PROHAR-49 | OPERATING | 6/1/69 | 6,128.00 | |||||||
| BA0200079 | WOOD STRUCTURAL FRAME | PROHAR-49 | OPERATING | 6/1/69 | 45,023.00 | |||||||
| BA0200080 | SIDING VINYL | PROHAR-49 | OPERATING | 6/1/90 | 6,873.00 | |||||||
| BA0200083 | ASPHALT SHINGLE ROOF COVERING | PROHAR-49 | OPERATING | 6/1/00 | 11,678.00 | |||||||
| BA0200084 | EXTERIOR STAIRS | PROHAR-49 | OPERATING | 6/1/90 | 12,954.00 | |||||||
| BA0200085 | DRYWALL / GYPSUM WALLBOARD FINIHSES | PROHAR-49 | OPERATING | 6/1/95 | 2,279.00 | |||||||
| BA0200082 | EXTERIOR WINDOWS | PROHAR-49 | OPERATING | 6/1/69 | 1,095.00 | |||||||
| BA0200086 | CARPET | PROHAR-49 | OPERATING | 6/1/95 | 18,203.00 | |||||||
| BA0200087 | DRYWALL / GYPSUM BOARD | PROHAR-49 | OPERATING | 6/1/90 | 15,612.00 | |||||||
| BA0200088 | OVERHEAD LIGHTING | PROHAR-49 | OPERATING | 6/1/89 | 10,067.00 | |||||||
| BA0200089 | STONE VENEER | PROHAR-52 | OPERATING | 12/30/99 | 26,645.00 | |||||||
| BA0200013 | PIPING, DOMESTIC WATER | PROHAR-101 | PIPING, DOMESTIC WATER | OPERATING | 6/1/64 | 30,974.00 | ||||||
| BA0200014 | Circulating PUMP | PROHAR-101 | MECHANICAL ROOM/HEAT GENERATING PUMP | OPERATING | TACO | 6/1/00 | 5,546.00 | |||||
| A74468 | Roof Coverings,Shingle Tile | PROHAR-106 | ROOF ELEVATION ASPHALT SHINGLE COVER | OPERATING | 5/9/78 | 2,311.00 | ||||||
| A74488 | Exterior Walls,Wood Cladding w/Stud Backup | PROHAR-106 | WOOD BOARD SIDING | OPERATING | 5/9/87 | 11,170.00 | ||||||
| A74494 | Foundations,Slab on Grade,Plain/Reinforced | PROHAR-106 | STANDARD SLAB ON GRADE | OPERATING | 5/9/78 | 3,176.00 | ||||||
| K02779 | STORAGE TANK, GROUND LEVEL | PROHAR-49 | PROHAR-49, LOCATED ON BASEMENT ALONG EASTERN WALL, PH-49-K-01 | OPERATING | UNKNOWN | UNKNOWN | TANK | 7/30/13 | 5,662.00 | |||
| A74497 | Exterior Doors,Overhead Doors,Wood, Manual, 8ftx8ft | PROHAR-106 | OPERATING | 5/9/78 | 7,479.00 | |||||||
| K02786 | STORAGE TANK, GROUND LEVEL | PROHAR-112 | PROHAR-112, LOCATED NORTH OF BUILDING, FST-5 | OPERATING | HIGHLAND TANK AND MANUFACTURING | A60516102 | 500 | 8/30/18 | 25,790.00 | 9/4/19 | ||
| K05140 | ROOFING | PROHAR-121 | OPERATING | 1/1/10 | 12,942.00 | |||||||
| K05175 | FOUNDATIONS | PROHAR-52 | OPERATING | UNKNOWN | UNKNOWN | UNKNOWN | 1/1/04 | 16,177.00 | ||||
| K05136 | ROOFING | PROHAR-116 | OPERATING | 1/1/10 | 11,321.00 | |||||||
| K05137 | ROOFING | PROHAR-117 | OPERATING | 1/1/10 | 16,177.00 | |||||||
| K05134 | ROOFING | PROHAR-115 | OPERATING | 1/1/10 | 8,087.00 | |||||||
| K05138 | ROOFING | PROHAR-119 | OPERATING | 1/1/10 | 12,942.00 | |||||||
| K05139 | ROOFING | PROHAR-120 | OPERATING | 1/1/10 | 12,942.00 | |||||||
| K10566 | FENCES - CHAIN LINK | PROHAR-230708 | OPERATING | 1/1/60 | 223,166.00 | |||||||
| K09609 | SEPTIC TANK | PROHAR-49 | OPERATING | 1/1/60 | 35,300.00 | |||||||
| K09616 | SEPTIC TANK | PROHAR-112 | OPERATING | 1/1/60 | 35,300.00 | |||||||
| K09644 | FURNACE | PROHAR-104 | CEILIING | OPERATING | ROYAL INDUSTRIES INC THOMSEN D | AF733288 | 0-84B-4 | 1/1/08 | 8,440.00 | |||
| K09645 | FURNACE | PROHAR-105 | OPERATING | OLSON | 1712B011638 | HTL 120D | 1/1/19 | 8,440.00 | ||||
| K09646 | BOILER, CAST IRON HT WTR GAS/OIL | PROHAR-110 | MECHANICAL ROOM, B-1 | OPERATING | PEERLESS | 657510-201103 | PO 70A | 2/1/12 | 8,440.00 | |||
| K02781 | STORAGE TANK, GROUND LEVEL | PROHAR-101 | PROHAR-101, EXTERIOR SOUTH OF BUILDING, FST-1 | OPERATING | HIGHLAND TANK AND MANUFACTURING | A60516105 | 500 | 8/30/18 | 25,790.00 | 9/4/19 | ||
| K02782 | STORAGE TANK, GROUND LEVEL | PROHAR-102 | PROHAR-102, EXTERIOR EAST OF BUILDING, FST-2 | OPERATING | HIGHLAND TANK AND MANUFACTURING | A60516106 | 2000 | 8/30/18 | 45,667.00 | 9/4/19 | ||
| K10543 | D3050530 - BASEBOARD HEATING, 3' | PROHAR-125 | OPERATING | CADET | 3F-750A | 5/15/21 | 507.00 | |||||
| K10546 | D5090904 - UNINTERUPTIBLE POWER SUPPLY | PROHAR-125 | OPERATING | LTN-16050 | LTN-BLX-2.1KVA | 5/15/21 | 15,216.00 | |||||
| K09849 | BOILER, CAST IRON HT WTR GAS/OIL | PROHAR-112 | PROHAR-112, MECHANICAL ROOM, B-1 | OPERATING | SMITH | G92-37 | BB 14A | 2/1/12 | 8,440.00 | |||
| K10582 | ROOFING | PROHAR-125C | OPERATING | 6/15/19 | 38,341.00 | |||||||
| K010400 | CONCRETE BLOCK - FOUNDATION WALL | PROHAR-49 | OPERATING | 1/1/60 | 301,536.00 | |||||||
| K03362 | K03615 | EMERGENCY LIGHTING | PROHAR-110 | 1ST FLOOR, LOCKER ROOM, EL-110-2 | OPERATING | EATON | UNKNOWN | SEL25R10SD | 2/1/18 | 64.00 | ||
| K03458 | K03615 | EMERGENCY LIGHTING | PROHAR-110 | 1ST FLOOR, WT. ROOM, EL-110-3 | OPERATING | EATON | SEL25R10SD | 2/1/18 | 64.00 | |||
| K03615 | EMERGENCY LIGHTING | PROHAR-110 | THRU-OUT | OPERATING | EATON | UNKNOWN | SEL25R10SD | 2/1/18 | 187.00 | |||
| K03166 | K03258 | EMERGENCY LIGHTING | PROHAR-112 | 1ST FLOOR, STAIRWELL ROOM 105, EL-112-1 | OPERATING | LITHONIA | UNKNOWN | ELM2 LED | 2/1/18 | 64.00 | ||
| K03171 | K03258 | EMERGENCY LIGHTING | PROHAR-112 | 1ST FLOOR, EXTIOR STAIRWELL ROOM 110, EL-112-2 | OPERATING | LITHONIA | UNKNOWN | ELM2 LED | 2/1/18 | 64.00 | ||
| K03186 | K03258 | EMERGENCY LIGHTING | PROHAR-112 | 2ND FLOOR, HALLWAY ROOM 201, EL-112-3 | OPERATING | LITHONIA | UNKNOWN | ELM2 LED | 2/1/18 | 64.00 | ||
| K03258 | EMERGENCY LIGHTING | PROHAR-112 | THRU-OUT BUILDING | OPERATING | LITHONIA | UNKNOWN | ELM2 LED | 2/1/18 | 187.00 | |||
| K03342 | K03615 | EMERGENCY LIGHTING | PROHAR-110 | 1ST FLOOR, LOUNGE ROOM, EL-110-1 | OPERATING | EATON | UNKNOW | SEL25R10SD | 2/1/18 | 64.00 | ||
| K09648 | BOILER, CAST IRON HT WTR GAS/OIL | PROHAR-110 | MECHANICAL ROOM, B-3 | OPERATING | PEERLESS | 657508-201103 | PO 70A | 2/1/12 | 8,440.00 | |||
| K02784 | STORAGE TANK, GROUND LEVEL | PROHAR-105 | PROHAR-105,PROHAR-104 SHARED TANK | OPERATING | HIGHLAND TANK AND MANUFACTURING | A60516103 | 500 | 8/30/18 | 25,790.00 | 9/4/19 | ||
| K02785 | STORAGE TANK, GROUND LEVEL | PROHAR-110 | PROHAR-110, LOCATED WITHIN BUILDING, PH-110-K-01 | OPERATING | UNKNOWN | UNKNOWN | TANK | 7/30/13 | 5,662.00 | |||
| K04180 | Interior Doors,Other | PROHAR-110 | EXTERIOR OF BUILDING | OPERATING | UNKNOWN | WOOD | WOOD | 1/1/85 | 8,058.00 | |||
| K05148 | ROOFING | PROHAR-107 | OPERATING | 1/1/10 | 8,087.00 | |||||||
| K10538 | BOILER, CAST IRON, HT WTR, OIL | PROHAR-101 | OPERATING | WEIL MCLAIN | 4 | WTGO-4D | 10/20/21 | 10,788.00 | ||||
| K09617 | SEPTIC TANK | PROHAR-101 | OPERATING | 1/1/60 | 35,300.00 | |||||||
| K10068 | WATER HEATERS, RESIDENTIAL, ELEC | PROHAR-103 | ABOVE CEILING IN OFFICE 104, NW, WH-1 | OPERATING | 3626100-35-160110-002863 | ES4-IM WIR | 1/1/16 | 536.00 | ||||
| K10065 | LIQUID AND GAS STORAGE TANKS | PROHAR-103 | STORAGE ROOM 109, | OPERATING | ROTH | 851605387988 | 275 GALLON | 1/1/16 | 7,675.00 | |||
| K10066 | UNIT HEATERS, HYDRONIC | PROHAR-103 | STORAGE ROOM 109, SW, UH-1 | OPERATING | MODINE | 39011616-2140 | HSB33SB01SA | 1/1/16 | 928.00 | |||
| K10067 | UNIT HEATERS, HYDRONIC | PROHAR-103 | STORAGE ROOM 109, NW, UH-2 | OPERATING | MODINE | 39011616-2136 | HSB33SB01SA | 1/1/16 | 928.00 | |||
| K09647 | BOILER, CAST IRON HT WTR GAS/OIL | PROHAR-110 | MECHANICAL ROOM, B-2 | OPERATING | PEERLESS | 657513-201103 | PO 70A | 2/1/12 | 8,440.00 | |||
| K10070 | BACKFLOW PREVENTER | PROHAR-103 | STORAGE ROOM 109 NE CORNER, BF-1 | OPERATING | CALEFFI | 1/2" - 3/4" | SERIES 573 | 1/1/16 | 459.00 | |||
| K10567 | "mission" vehicle crash barrier | PROHAR-230708 | OPERATING | HY SECURITY | 6AC458-2027-731) | STRONGARM M30 | 6/15/20 | 117,381.00 | ||||
| K10072 | PANELBOARDS | PROHAR-103 | STORAGE ROOM 109, SOUTH WALL, PRL-1A | OPERATING | EATON | 100AMP | 1/1/16 | 1,535.00 | ||||
| K10069 | WATER HEATERS, RESIDENTIAL, ELEC | PROHAR-103 | ABOVE CEILING IN KITCHEN ABOVE SINK, WH-2 | OPERATING | 3626100-35-160110-002868 | ES4-IM WIR | 1/1/16 | 536.00 | ||||
| K10071 | EMERGENCY LIGHTING | PROHAR-103 | THRU-OUT INTERIOR & EXTERIOR OF BUILDING | OPERATING | HUBBELL | LED | EVR2 SERIES/ EVC SERIES | 1/1/16 | 346.00 | |||
| K10568 | "cottage" vehicle crash barrier | PROHAR-230708 | drop arm allowing access to Gull Cottage | OPERATING | HY SECURITY | 6AC458-2027-730 | STRONGARM M30 | 6/15/20 | 117,381.00 | |||
| K09615 | SEPTIC TANK | PROHAR-110 | OPERATING | 1/1/60 | 35,300.00 | |||||||
| K06809 | BOILER, CAST IRON HT WTR GAS/OIL | PROHAR-103 | STORAGE ROOM, B-1 | OPERATING | UNKNOWN | 2530-653-000663-7747019703 | G115WS/4 | 1/1/16 | 8,440.00 | |||
| K10500 | CO2 Fire Protection System | PROHAR-102 | OPERATING | 5/1/70 | 18,639.00 | |||||||
| K10530 | A1010110 - STRIP FOOTINGS | PROHAR-125 | OPERATING | 7/30/21 | 17,732.00 | |||||||
| K10531 | A1030 - SLAB ON GRADE | PROHAR-125 | OPERATING | 7/30/21 | 8,217.00 | |||||||
| K10542 | F101001 - PRE-ENGINEERED STRUCTURES | PROHAR-125 | OPERATING | 3/15/21 | 681,094.00 | |||||||
| K10544 | D3050530 - BASEBOARD HEATING, 6' | PROHAR-125 | OPERATING | CADET | 6F-1500A | 5/15/21 | 2,243.00 | |||||
| K10547 | D5020903 - EXTERIOR LIGHTING | PROHAR-125 | OPERATING | 5/15/21 | 89,847.00 | |||||||
| K10545 | D3050530 - BASEBOARD HEATING, 8' | PROHAR-125 | OPERATING | CADET | 8F-2500A | 5/15/21 | 926.00 | |||||
| K10577 | THRU-WALL HEAT PUMP | PROHAR-103 | OPERATING | DAIKIN | G003070 | RKN18NMVJU | 9/15/19 | 8,684.00 | ||||
| K10579 | ROOF COVERING | PROHAR-105 | OPERATING | 6/15/80 | 17,969.00 | |||||||
| K10580 | Windows | PROHAR-105 | OPERATING | 6/15/80 | 17,390.00 | |||||||
| K10581 | SLAB ON GRADE | PROHAR-105 | OPERATING | 6/15/80 | 36,229.00 | |||||||
| K10576 | Roofing Materials | PROHAR-104 | OPERATING | 7/15/08 | 12,607.00 | |||||||
| K10541 | D3050245 - HEAT PUMP, AIR/AIR, ROOF TOP | PROHAR-125 | OPERATING | FRIEDRICH | 2002F00830 | FPHMR36A3A | 5/15/21 | 14,491.00 | ||||
| K10584 | FOUNDATIONS | PROHAR-125C | OPERATING | 6/15/19 | 28,983.00 | |||||||
| K10540 | C3020 - FLOORING | PROHAR-125 | OPERATING | FORBO FLOORING SYSTEM | LINOLEUM (MARMOLEUM) | 5/15/21 | 13,147.00 | |||||
| K10578 | METAL SIDING PANEL | PROHAR-105 | OPERATING | 6/15/80 | 16,231.00 | |||||||
| K10583 | EXTERIOR LIGHTING | PROHAR-125C | OPERATING | 6/15/19 | 15,601.00 |
| Number of Records: | 163 | |||
| Dynamic Where Clause: | ( asset.assettype in (select value from maximo.synonymdomain where domainid = 'ASSETTYPE' and maxvalue = 'FACILITIES' ) or asset.assettype = 'FRCS' ) and ( ( upper( asset.status ) = 'OPERATING' and asset.siteid = '10201' and asset.location like '%PROHAR%' ) ) | |||
| 11/29/2023 9:08 AM | 1 | / | 5 |
File details come from the government source that posted it. Updated .