Attachment_L-01_Historical_Info.pdf

PDF 264 KB Posted

Attached to
Instrumentation Range Support Program Federal contract opportunity
Solicitation number
FA2521-18-R-0024
Issued by
Department of the Air Force Space Command

About this file

This document provides historical workload indicators and estimated requirements for an instrumentation radar support program solicitation. The proposed contract would provide logistics sustainment support to instrumentation tracking systems for 26 government test ranges worldwide. Services include inventory management, stock acquisition, component repair, fabrication, on-site overhauls, engineering field support, and technical investigations. Estimated requirements over the five-year period include over 600 annual routine requisitions, over 150 annual component remanufactures, over 150 annual engineering manweeks. Estimated additional high-cost actions and overhauls are also provided. Seventeen potential overhauls are identified for year one. The solicitation number is FA2521-18-R-0024 and involves the Department of the Air Force Space Command and NASA. The response deadline is June 29, 2018. The required security clearance is Secret and facility clearance is Top Secret.

Attachment L-01 Historical Info

View the file

Other files for this federal contract opportunity

Other files attached to Instrumentation Range Support Program, newest first.
File Type Posted
Attachment_L-11_TEP_Cost_Workbook_25_OCT_19.xlsx XLSX spreadsheet
Attachment_L-04_Overhaul_Work_Specification_Final.pdf PDF
Attachment_3_GFM_List.xlsx XLSX spreadsheet
Attachment_10e_-__1-Imp_Guide_Appendix_C.pdf PDF
Attachment_L-03_IRSP_Phase_Out_Plan_Final_Redacted.pdf PDF
Attachment_L-05_Sample_System_Mod_Final.pdf PDF
Attachment_10d_-_DPAS_Implementation_Schedule.pdf PDF
Attachment_10a1_1-CICP_Imp_Guide_v2_7-3_App_E.xlsx XLSX spreadsheet
Attachment_10b_-__1-PMO_Imp_Guide_v2_7_3_FINAL.docx DOCX document
Attachment_Section_M.pdf PDF
Attachment_L-11_TEP_Cost_Workbook.xlsx XLSX spreadsheet
Attachment_7_-_Supported_Range_System_List_.pdf PDF
Whats_New-Bidders_Library_V9.pdf PDF
Master_Question_List_Updated_Oct_8,_2019.pdf PDF
Master_Question_List_1_Oct_19_Updated.pdf PDF
Exhibit_A-P_CDRL_Portfolio.pdf PDF
Attachment_Section_M.pdf PDF
Whats_New-Bidders_Library_V5.pdf PDF
Attachment_6_-_RESERVED_Labor_Rates.pdf PDF
Attachment_Section_L.pdf PDF
Attachment_L-08_Performance_Eval_Questionnaire.pdf PDF
Attachment_L-02_Question_Template.pdf PDF
DRAFT_RFP_FA252119RA007.pdf PDF
Attachment_L-07_Logistics_Sample_6_Aug_19.pdf PDF
Attachment_8_-__Range_Resource_List.pdf PDF
Attachment_9_IRSP_SBPCD.pdf PDF
Attachment_L-11_TEP_Cost_Workbook_DRAFT.xlsx XLSX spreadsheet
Attachment_10a_-_1-CICP_IG_v2_6.pdf PDF
Attachment_10c_-_GFE_Data_Sheet.xlsx XLSX spreadsheet
Attachment_L-01_Historical_Info.pdf PDF
Attachment_L-09_PEQ_Cover_Letter.pdf PDF
Attachment_11_-_FY_19_CFO_Report_Template.xlsx XLSX spreadsheet
RFP_Attachment_3a_GFP_Listing.pdf PDF
Draft_Section_L_6_Aug_19.pdf PDF
RFI_5_FA2521-18-R-0024.pdf PDF
RFP_Attachment_3b_GFP_Listing.pdf PDF
Attachment_L-07_Logistics_Sample_6_Aug_19.pdf PDF
Whats_New-Bidders_Library_V3.pdf PDF
RFI_4_FA2521-18-R-0024.pdf PDF
RFI__4_Draft_Documents.zip ZIP file
RFI_3_Draft_Docs-Section_L-M.zip ZIP file
RFI_3_Draft_Docs-Section_L-M.pdf PDF
Whats_New-Bidders_Library.pdf PDF
Attachment_3_Industry_Day_Questions.pdf PDF
Attach_2-_Industry_Day_Registration_Form.pdf PDF
Industry_Day_FBO_Notice.pdf PDF
IRSP_Sources_Sought_Synopsis_15_Oct_18.docx DOCX document
IRSP_SOW_draft.pdf PDF
RFI_06132018.pdf PDF
CLIN_Structure.pdf PDF
Show all 50

Instrumentation Range Support Program has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only Source Selection Information – See FAR 2.101 and 3.104

FA2521-19-R-A007

(REF FA2521-18-R-0024)

Attachment L-01

1 13 February 15

INSTRUMENTATION RADAR SUPPORT PROGRAM

HISTORICAL PROGRAM INFORMATION / WORKLOAD INDICATORS

GENERAL PROGRAM REQUIREMENTS AS COVERED IN SOW PARAGRAPHS 1.0, 2.0, AND 3.0:

1. Program Variables: The number of ranges and systems supported may fluctuate throughout the duration of this contract. The contract effort involves a degree of uncertainty in the final costs. This is attributable to several factors:

(a) The number of participating ranges has and may continue to either increase or decrease, driving an increase or decrease in the number of requirements being supported;

(b) The number and type of systems at any given range may go up or down as the individual range's mission requirements change; and

(c) The number of items failing and hence needing repair/replacement as well as the cost of those items will vary due to aging infrastructure, duty cycles of usage, availability of vendors, etc.

2. Contractor Interface Requirements: The contractor will be required to interface with other range contractors to provide support in a timely manner consistent with mission requirements.

3. Reference Documents: The following documents are provided for guidance only for work to be performed on this contract.

GUIDANCE TITLE

MIL-HDBK-454B General Guidelines for Electronic Equipment 15 Apr 07 ISO-10012 Measurement Management Systems Requirements for Rev 3 Measurement Processes and Measuring Equipment

15 Apr 03

4 . Inventory Management (SOW Paragraph 3.2): Government Furnished Material/Inventory currently there are approximately 34,753 total line items which consume approximately 300,000 cubic feet of warehouse space and approximately 40,000 SF of outside storage.

The largest single item is approximately 360 cubic feet and weighs approximately 6,000 pounds. The approximate value of all government-owned property is 43.7 million dollars.

The actual value will vary according to the inventory and is described more fully in the documentation requirements established by the Government-Furnished Property Clause.

5. Obsolescence Engineering (SOW Paragraph 3.3): Approximately 3,000 hours are estimated per contract year to perform obsolescence engineering.

6. Configuration Management and Drawings: There are no program configuration management requirements. Each range participant is responsible for their local

FA2521-19-R-A007

Section L, Attachment L-01 25 Sep 19

2 13 February 15 configuration management; therefore, there is no central repository of configuration drawings available.

RANGE REQUIREMENTS AS COVERED IN SOW PARAGRAPH 4.0:

1. Material Acquisition (SOW paragraph 4.1): This is handled as stock replenishment actions during requisitioning, SOW 4.1, remanufacture & fabrications, SOW 4.1.2, and overhaul actions, SOW 4.2, and will fall into under $35K and over $35K requirements.

a. Under $35K material acquisition requirements: Requisitions requirements under SOW para 4.1, previously requisitions under $35K have been between 300 to 400 each year depending on participating ranges’ requirements for that year. Previously 100 to 200 of the requisitions submitted have resulted in under $35K remanufacture/fabrication actions under SOW para 4.2.

b. Over $35K material acquisition requirements: Previously the program had between 200 and 300 high cost actions each contract ordering period, SOW paragraphs’ 4.1, 4.2, and

4.4. Requisitions over $35K SOW paragraph 4.1 are considered High Cost Requisitions (HCR)s, and will vary significantly each year based on actual range requirements.

Component Remanufacture /Fabrication HCRs covered under SOW para 4.2 generally fall between 0 to 15.

2. Budgetary requests and Request for Proposals (Can cover SOW paragraphs 4.3 and 4.4): Typically there will be times during the year that ranges will need to submit changes to their existing requirements or new requirements such as system modifications in order to meet mission requirements. These requirements will typically fall into two categories:

a. SOW Requirements: The contractor shall provide “budgetary" estimates for SOW requests in the form of an abbreviated Cost Proposal (approximately 0-20 per year) when requested by the Government. Typically SOW requests will fall into Overhaul para 4.2. Of these approximately 0-10 abbreviated Cost Proposals, typically 0 to 5 will result in a request for proposal to the contractor.

b. System Modifications: System modification requests could come as budgetary requests or a formal request for proposal. If requested by the Government, the contractor shall provide budgetary estimates for system modification requests in the form of an abbreviated Cost Proposal (approximately 0-10 per year). Typically 0 to 5 of these budgetary requests will result in a formal request for proposal and could require both a technical and cost proposal. These will be negotiated separately and added subject to availability of funding.

3. Component Remanufacture/Fabrication (SOW Paragraph 4.1.2): Previously, 100 to

300 will be repairables under $35K covered under this SOW paragraph for each ordering period. Of these total number of reparable actions 5 to 15 have historically resulted in over $35K actions for each ordering period.

3 13 February 15

4. Engineering Support, Field Support, Technical Studies/Investigations (SOW Paragraph 4.2)

a. Engineering Support: This action will be handled according to SOW paragraph

4.2.1 Engineering and is calculated using manweeks. A manweek for US ranges is based on 56 direct labor hours - 40 work-performance hours and 16 hours for travel time to and from the requesting site. A manweek for FMS ranges is based on 72 direct labor hours - 40 work-performance hours and 32 hours for travel time. Historical Workload indicators for engineering and technical support vary significantly depending on system failures and mission requirements. Typically the program’s annual requirement’s call yields 0 to 165 manweeks requested by the ranges.

b. Field Support: These requirements generally include labor, materials, equipment and/or special projects. The support contractor will propose based on a SOW, and this may involve a proposal to a subcontractor. This action will be handled according to SOW paragraph 4.2.2. Some of the typical problems encountered are listed below;

however, this list is not all inclusive:

Alignments, Electronic or mechanical Slip Ring or Cable-wrap problems Alignments and or repairs of Transmitters Servo Alignments and/or repairs Computer Interface issues Checkout and resolve unique system problems Tape Drive and Magnetic Head problems Plotter Problems Training in Operations and Maintenance of Member Systems

Historical Manweek Scenarios For Information Only

c. Technical Investigations: Approximately 2-5 technical studies and/or investigations per contract year are anticipated. These are added as needed throughout the life of the contract to meet a range’s mission requirements. This action will be handled according to SOW paragraph 4.2.3.

Scenario Skill Mix # Hours Antenna Problems Electrical Engineer

Field Service Engineer Electrical Technician

Alignments and/or repairs of receivers (RF and IF) issues

Electrical Engineer Field Service Engineer

Calibration and Accuracy Evaluation

Field Service Engineer Electrical Technician

Gear Box Problems Field Service Engineer Mechanical Technician

Software/Firmware Issues Software Engineer Systems Integration Analyst

4 13 February 15

5. Pre-Overhauls/Overhauls (SOW Paragraph 4.3): The numbers of overhauls will vary each year according to ranges’ mission requirements. Historically there have been between 4 and 11 overhauls during the 1 year ordering period. Workload indicators for the projected number of overhauls per range for each year are listed beginning on page 12 of this document. The number of actual overhauls could vary significantly and will fluctuate between from 0 to 17 per fiscal year.

5 13 February 15

ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL

WORKLOAD INDICATORS for

1 Jan 21 – 30 SEP 21

Following are the estimated number of actions to be supported:

1. ROUTINE & EMERGENCY REQUISITIONS: 594

(Requisitions under $35K)

3. COMPONENT REMANUFACTURE and FABRICATION: 191 (Under $35K-includes those from requisitions)

4. ENGINEERING SUPPORT: 161*

NOTE: The quantities of the items to be supported above represent the government's estimate of actual work requirements. These requirements can and do change during the program’s annual requirement’s call and throughout the year based on range mission requirements, funding availability, and actual system failures experienced during the fiscal year.

*The 161 manweeks of Engineering Support are estimated as follows:

RANGE MANWEEKS RANGE MANWEEKS

96 TW 4 NASA/A 2

NAWC/WD-C 5 YPG 5

PMRF 2 NAWC/WD-P 8

CCM 1 DOE 5

AFLCMC 2 ATC 8

45 SW 12

WSMR 40* SWEDEN 2

WSMR-PRST 12* KOREA 2

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 8

SMC/CO 2 NORWAY 2

UTTR 3 SWITZERLAND 1

NASA/W 5 SMC/SY 12

* NOTE: WSMR on-site representative is split as follows WSMR - 22 manweeks, WSMR-PRST - 12 manweeks.

6 13 February 15

FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL

1 OCT 21 – 30 SEP 22

1. ROUTINE & EMERGENCY REQUISITIONS: 607

3. COMPONENT REMANUFACTURE and FABRICATION: 191

4. ENGINEERING SUPPORT: 163*

annual requirement’s call and throughout the year based on range mission requirements, *The 163 manweeks of Technical Support are estimated as follows:

96 TW 4 NAWC/WD-P 8

NAWC/WD-C 5 DOE 5

PMRF 2 ATC 8

CCM 1 NASA/W 6

AFLCMC 2 NASA/A 2

45 SW 12

WSMR 40* SWEDEN 0

WSMR-PRST 12* KOREA 2

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 8

SMC/CO 2 NORWAY 2

UTTR 3 SWITZERLAND 4

YPG 5 SMC/SY 12

7 13 February 15

1 OCT 22 – 30 SEP 23

1. ROUTINE & EMERGENCY REQUISITIONS: 615

3. COMPONENT REMANUFACTURE and FABRICATION: 188

4. ENGINEERING SUPPORT: 156*

annual requirement’s call and throughout the year based on range mission requirements, *The 156 manweeks of Technical Support are estimated as follows:

NAWC/WD-C 5 DOE 5

PMRF 2 ATC 8

CCM 1 NASA/W 5

AFLCMC 2 NASA/A 2

45 SW 12

WSMR 40* SWEDEN 0

WSMR-PRST 12* KOREA 3

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 8

SMC/CO 2 NORWAY 2

YPG 5 SMC/SY 8

8 13 February 15

FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD

INDICATORS for

1 OCT 23 – 30 SEP 24

1. ROUTINE & EMERGENCY REQUISITIONS: 600

3. COMPONENT REMANUFACTURE and FABRICATION: 190

4. ENGINEERING SUPPORT: 163*

annual requirement’s call and throughout the year based on range mission requirements, *The 163 manweeks of Technical Support are estimated as follows:

NAWC/WD-C 5 DOE 5

PMRF 2 ATC 8

CCM 1 NASA/W 5

AFLCMC 2 NASA/A 2

45 SW 12

WSMR 40* SWEDEN 2

WSMR-PRST 12* KOREA 3

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 10

SMC/CO 2 NORWAY 2

UTTR 3 SWITZERLAND 4

9 13 February 15

1 OCT 24 – 30 SEP 25

1. ROUTINE & EMERGENCY REQUISITIONS: 603

3. COMPONENT REMANUFACTURE and FABRICATION: 194

4. ENGINEERING SUPPORT: 165*

annual requirement’s call and throughout the year based on range mission requirements, *The 165 manweeks of Technical Support are estimated as follows:

NAWC/WD-C 5 DOE 5

PMRF 2 ATC 8

CCM 1 NASA/W 6

AFLCMC 2 NASA/A 2

45 SW 14

WSMR 40* SWEDEN 0

WSMR-PRST 12* KOREA 3

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 10

SMC/CO 2 NORWAY 2

10 13 February 15

1 OCT 25 – 30 SEP 26

1. ROUTINE & EMERGENCY REQUISITIONS: 635

3. COMPONENT REMANUFACTURE and FABRICATION: 198

4. ENGINEERING SUPPORT: 162*

annual requirement’s call and throughout the year based on range mission requirements, *The 162 manweeks of Technical Support are estimated as follows:

NAWC/WD-C 5 DOE 5

PMRF 2 ATC 8

CCM 1 NASA/W 5

AFLCMC 2 NASA/A 2

45 SW 14

WSMR 40* SWEDEN 0

WSMR-PRST 12* KOREA 3

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 8

SMC/CO 2 NORWAY 2

11 13 February 15

1 OCT 26 – 30 SEP 27

1. ROUTINE & EMERGENCY REQUISITIONS: 632

3. COMPONENT REMANUFACTURE and FABRICATION: 200

4. ENGINEERING SUPPORT: 162*

annual requirement’s call and throughout the year based on range mission requirements, *The 162 manweeks of Technical Support are estimated as follows:

NAWC/WD-C 5 DOE 5

PMRF 2 ATC 8

CCM 1 NASA/W 5

AFLCMC 2 NASA/A 2

45 SW 14

WSMR 40* SWEDEN 0

WSMR-PRST 12* KOREA 3

AUTEC 4 GERMANY 4

NAWC/AD 10 UK 8

SMC/CO 2 NORWAY 2

UTTR 4 SWITZERLAND 4

12 13 February 15

ESTIMATED WORKLOAD INDICATOR

OVERHAUL SCHEDULE

1 Jan 21 – 30 Sep 21

RANGE RADAR/T

M/

OPTICS

S/N RADAR SITE

1. WSMR FPS-16 4 Stallion, NM

2. NSMC/SY AN/FPQ-15

C-Band 2 Ascension Island

3. 96 TW FPS-16 #32

Ft Walton Beach, FL

4. 96 TW SA#4

(TAS3)

104 Port St. Joe, FL

5. PMRF Radar TBD TBD

6. PMRF Radar TBD TBD

7. PMRF Telemetry TBD TBD

8. PMRF Telemetry TBD TBD

9. PMRF Telemetry TBD TBD

10. PMRF Optics TBD TBD

11. NAWC/AD MIR

AN/FPQ-17

001 Patuxent NAS, MD

12. NASA/Armstrong Datron (pedestal only)

123 Edwards AFB, CA

13. Center for Countermeasures

KTM TBD TBD

14. WMSR-PRST ELTS-1 1300035 White Sands Missile Range, NM

15. WSMR-PRST ELTS-2 1300034 White Sands Missile Range, NM

16. WSMR-PRST TTS-5 TBD Mobile Sys, White Sands Missile

Range, NM

17. NASA-Wallops RIR-778C radar #2 82013 Wallops Island, VA

Note 1: The above table reflects the projected workload indicators for the FY indicated.

Ranges may add and delete overhauls based on mission needs and funding availability.

13 13 February 15

1 Oct 21 – 30 Sep 22

RANGE RADAR/TM/

OPTICS

S/N RADAR SITE

1. WSMR FPS-16 16 Phillips Hill, NM

2. SMC/SY AN/FPS-134 C-

Band N/A Exmouth, Western

Australia

3. 96 TW RIR 980 #2 BAE00265

Ft Walton Beach, FL

4. 96 TW Datron #3 (TAS 2)

103 Ft Walton Beach, FL

5. UTTR RIR980S 7 South Range, Dugway, UT

6. PMRF Radar TBD TBD

7. PMRF Radar TBD TBD

8. PMRF Telemetry TBD TBD

9. PMRF Telemetry TBD TBD

10. NASA/Armstrong RPM (pedestal only) 003 Edwards AFB, CA

11. DOE R-3 Tonopah, NV

12. NASA/Wallops RIR-778C radar

#8 94078 Wallops Island, VA

13. United Kingdom RIR-779 TBD So. Uist, Hebrides

14. Switzerland TBD TBD TBD

14 13 February 15

1 Oct 22 – 30 Sep 23

RANGE RADAR/T

M/

OPTICS

S/N RADAR SITE

1. WSMR FPS-16 33 WILDE Site

2. 96 TW SA#1

(TAS3)

101 Ft Walton Beach, FL

3. 96 TW Malibu 7.3m

(TAS2)

101 Ft Walton Beach, FL

4. PMRF Radar TBD TBD

5. PMRF Telemetry TBD TBD

6. PMRF Telemetry TBD TBD

7. PMRF Telemetry TBD TBD

8. PMRF Telemetry TBD TBD

9. PMRF Optics TBD TBD

10. NAWC/AD MTAV MTAV1 Patuxent NAS, MD

11. NASA/Armstrong LRO-1 BLP-

Edwards AFB, CA

12. DOE R-4 Tonopah, NV

13. NASA/Wallops RIR-716 radar #18 49 Wallops Island, VA

14. United Kingdom RIR-779 TBD So. Uist, Hebrides

15 13 February 15

1 Oct 23 – 30 Sep 24

S/N RADAR SITE

1. WSMR FPS-16 40 ADAMS site by Hollomon

AFB

2. 96 TW SA#6 (D-

1C)

106 Panama City, FL

3. 96 TW FPS-16 27 Port St. Joe, FL

4. PMRF Radar TBD TBD

5. PMRF Telemetry TBD TBD

6. PMRF Telemetry TBD TBD

7. PMRF Telemetry TBD TBD

8. PMRF Telemetry TBD TBD

9. NASA/Armstrong RIR-716 34 Edwards AFB, CA

10. NASA/Wallops RIR-716 radar #3 8 Wallops Island, VA

11. United Kingdom MPS-39 5 Aberporth, Wales

12. United Kingdom CW Doppler DRX413

Eskmeals, Cumbria

16 13 February 15

1 Oct 24 – 30 Sep 25

S/N RADAR SITE

1. SMC/SY AN/FPQ-15 C-

Band

2 Ascension Island

2. 96 TW SA #5 (C-12) 105 Niceville, FL

3. 96 TW FPS-16 20 Ft Walton Beach, FL

4. UTTR RIR-980W 6 Wendover, UT

5. PMRF Radar TBD TBD

6. PMRF Telemetry TBD TBD

7. PMRF Telemetry TBD TBD

8. PMRF Telemetry TBD TBD

9. PMRF Telemetry TBD TBD

10. YPG NIDIR (TPQ-39) 2104 Yuma, AZ

11. NASA/Armstrong RIR-716 38 Edwards AFB, CA

12. WSMR-PRST TTS-1 TBD M.V. Pacific Collector, Portland, OR

13. NASA/Wallops 7m #1 (mobile) 150118-01 Wallops Island, VA

14. United Kingdom RIR TBD So. Uist, Hebrides

17 13 February 15

1 Oct 25 – 30 Sep 26

S/N RADAR SITE

1. SMC/SY AN/FPS-134

C-Band

N/A Exmouth, Western Australia

2. PMRF Radar TBD TBD

3. PMRF Telemetry TBD TBD

4. PMRF Optics TBD TBD

5. YPG FPS-16 Yuma, AZ

6. Center for

Countermeasures

KTM TBD TBD

7. WSMR-PRST TTS-3 24273TE Mobile System, Kwajalein Atoll

8. United Kingdom RIR TBD So. Uist, Hebrides

18 13 February 15

1 Oct 26 – 30 Sep 27

S/N RADAR SITE

1. UTTR RIR-980S 7 South Range, Dugway, UT

2. PMRF Radar TBD TBD

3. PMRF Radar TBD TBD

4. PMRF Telemetry TBD TBD

5. PMRF Telemetry TBD TBD

6. PMRF Telemetry TBD TBD

7. YPG MPS-25 XN-2 Yuma, AZ

8. Center for

Countermeasures

KTM TBD TBD

9. WSMR-PRST TTS-2 TBD S.S. Pacific Tracker, Portland, OR

10. WSMR-PRST TTS-4 24272TE Mobile System, Kwajalein Atoll

19 13 February 15

ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR

MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL

1 JAN 21-30 SEP 21

The following historical data are the estimated number of additional actions that may be supported after the program’s annual requirements call:

1. MATERIAL ACQUISITIONS:

HIGH COST ROUTINE & EMERGENCY REQUISITIONS (over $35K): 0 - 165

2. COMPONENT REMANUFACTURE and FABRICATION:

(Over $35K-includes those from requisitions) 0 - 49

3. ENGINEERING (Manweeks): 0 - 161 (Each engineering action historically involves one manweek. A manweek is (US Ranges: 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs; (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 - 668

(This equates to the estimated number of manweeks to be performed by the contractor which includes labor, materials, equipment, and/or special projects and requires a proposal.)

4. OVERHAULS: 0 - 17

NOTE: The information above represents high cost requisitions, component remanufacture and fabrication actions over $35,000; engineering, field support, and overhauls. The quantities of high cost and additional actions to be supported above represent the historical collection of actual work requirements along with member range projections, and will fluctuate based on system age, failures, mission needs, obsolescence issues, and funding availability.

20 13 February 15

1 OCT 21 – 30 SEP 22

1. MATERIAL ACQUISITIONS

HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 172

(Over $35K-includes those from requisitions) 0 - 52

3. ENGINEERING (Manweeks): 0 - 163 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 – 612

(This equates to the estimated number of manweeks to be performed

4. OVERHAULS: 0 - 14

fabrication actions over $35,000; engineering, field support and overhauls added after. The quantities of high cost and additional actions to be supported above represent the historical collection of actual work requirements along with member range projections, and will fluctuate based on system age, failures, mission needs, obsolescence issues, and funding availability.

21 13 February 15

1 OCT 22 – 30 SEP 23

supported after the program’s annual requirements call:

HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 163

(Over $35K-includes those from requisitions and overhauls) 0 - 43

3. ENGINEERING (Manweeks): 0 - 156 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 – 645

(This equates to the estimated number of manweeks to be performed

4. OVERHAULS: 0 – 14

high cost and additional actions to be supported above represent the historical collection of

22 13 February 15

1 OCT 23 – 30 SEP 24

HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 166

(Over $35K-includes those from requisitions) 0 - 44

3. ENGINEERING (Manweeks): 0 - 163 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 – 671

(This equates to the estimated number of manweeks to be performed

4. OVERHAULS: 0 - 12

high cost and additional actions to be supported above represent the historical collection of

23 13 February 15

1 OCT 24 – 30 SEP 25

HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 183

(Over $35K-includes those from requisitions) 0 - 50

3. ENGINEERING (Manweeks): 0 - 165 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 - 698

(This equates to the estimated number of manweeks to be performed

4. OVERHAULS: 0 - 14

high cost and additional actions to be supported above represent the historical collection of

24 13 February 15

1 OCT 25 – 30 SEP 26

HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 193

(Over $35K-includes those from requisitions) 0 - 53

3. ENGINEERING (Manweeks): 0 - 162 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 – 620

(This equates to the estimated number of manweeks to be performed

4. OVERHAULS: 0 - 8

high cost and additional actions to be supported above represent the historical collection of

25 13 February 15

1 OCT 26 – 30 SEP 27

HIGH COST (Over $35K) ROUTINE & EMERGENCY REQUISITIONS: 0 - 193

(Over $35K-includes those from requisitions) 0 - 50

3. ENGINEERING (Manweeks): 0 - 162 manweek is (US Ranges): 56 hours direct labor, 40 work-performance hours and 16 hours for travel time to and from the requesting site, plus travel costs. (Foreign Ranges): 72 hours direct labor, 40 work-performance hours and 32 hours for travel time to and from the requesting site, plus travel costs.)

FIELD SUPPORT: 0 – 616

(This equates to the estimated number of manweeks to be performed

4. OVERHAULS: 0 - 10

high cost and additional actions to be supported above represent the historical collection of

ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for
1 Jan 21 – 30 SEP 21
ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for
1 OCT 21 – 30 SEP 22
ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for
1 OCT 22 – 30 SEP 23
1 OCT 23 – 30 SEP 24
ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for
1 OCT 24 – 30 SEP 25
ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for
1 OCT 25 – 30 SEP 26
ESTIMATED MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION, ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL WORKLOAD INDICATORS for
1 OCT 26 – 30 SEP 27
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Jan 21 – 30 Sep 21
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Oct 21 – 30 Sep 22
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Oct 22 – 30 Sep 23
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Oct 23 – 30 Sep 24
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Oct 24 – 30 Sep 25
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Oct 25 – 30 Sep 26
ESTIMATED WORKLOAD INDICATOR
OVERHAUL SCHEDULE
1 Oct 26 – 30 Sep 27
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 JAN 21-30 SEP 21
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 21 – 30 SEP 22
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 22 – 30 SEP 23
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 23 – 30 SEP 24
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 24 – 30 SEP 25
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 25 – 30 SEP 26
ESTIMATED ADDITIONAL WORKLOAD INDICATORS ACTIONS FOR
MATERIAL ACQUISITION, COMPONENT REMANUFACTURE and FABRICATION,
ENGINEERING and TECHNICAL SUPPORT, AND OVERHAUL
1 OCT 26 – 30 SEP 27

File details come from the government source that posted it. Updated .