About this file

FA2517-05-D-9003 Task Order 0005 Provide non-personal technical analytic and administrative support to the HQ AFSPC Directorate of Air and Space Operations (XO) ICBM and Helicopter Operations Division (XON) ICBM Operations and Future Concepts Branch (XONO) in support of concept development activities for advanced space systems and capabilities.

View the file

Other files for this federal contract opportunity

Other files attached to Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command, newest first.
File Type Posted
Amendment 8 CSMC RFP.doc DOC document
CSMC RFP Amendment 6.doc DOC document
Block 13 Continuation Sheet 2 Oct 09.docx DOCX document
Amendment 5 Attachment L-3 MWMD PWS FINAL 29 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 4.doc DOC document
CSMC RFP 23 Sep 09 Amendment 3.doc DOC document
Amendment 3 Attachment L-3 MWMD PWS FINAL 23 Sep 09.doc DOC document
Attachment 1 CSMC PWS FINAL 21 Sep 09.docx DOCX document
Attachment 5 Section L Attachments 21 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 2.doc DOC document
Q A 22 Sep 09.doc DOC document
MILSATCOM CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List ILSS 11.rtf RTF text file
MILSATCOM CDRLs 30 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 35 36.rtf RTF text file
Attachment 3 CSMC 254 24 Aug 09.pdf PDF
CDRLS Master List MGMT 29.rtf RTF text file
Attachment 2 Acronyms 22 Jul 09.doc DOC document
MWMD CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 37.rtf RTF text file
Rerevised Contract Mgmt Section.docx DOCX document
One-On-One Session Directions.pptx PPTX presentation
MILSATCOM 2 4 31 May 09.pdf PDF
Section L Past Performance Questionnaire.doc DOC document
9003-0043.doc DOC document
9003-0036.doc DOC document
9003-0035.doc DOC document
Market Research Questions.doc DOC document
SSA.docx DOCX document
A6-0176 CSMC PWS.docx DOCX document
A4 PWS 4 Sep 08.doc DOC document
9003-0019.doc DOC document
9003-0029.doc DOC document
9002-0014.doc DOC document
9002-0017.DOC DOC document
9002-0006.doc DOC document
9002-0009.doc DOC document
9002-0004.doc DOC document
9001-0004.doc DOC document
9001-0028.doc DOC document
9000-0018.doc DOC document
9000-0015.doc DOC document
9000-0027.doc DOC document
9000-0002.doc DOC document
9003-0034.doc DOC document
9000-0030.doc DOC document
9002-0026.doc DOC document
9001-0038.doc DOC document
CAASETAIPrimeandSubcontractorList.doc DOC document
2_MarketResearchQuestions.doc DOC document
Show all 50

Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ AFSPC

CONTRACT INFORMATION

Contract Number
FA2517-05-D-9003 Task Order 0005
Requiring Activity
HQ AFSPC/XONO

Provide non-personal technical, analytic, and administrative support to the HQ AFSPC, Directorate of Air and Space Operations (XO), ICBM and Helicopter Operations Division (XON), ICBM Operations and Future Concepts Branch (XONO) in support of concept development activities for advanced space systems and capabilities.

Contract Type
Cost Plus Fixed Fee (CPFF)
Incumbent Name & Address
Booz, Allen, and Hamilton, Inc

8283 Greensboro Drive

McLean, VA 22102-3838

Period of Performance
17 Aug 05 – 16 Aug 06

(Base + 1 Opt Yrs)

Total Contract Dollar Amount
$ 488,221.00

STATEMENT OF WORK

FOR

HEADQUARTERS AIR FORCE SPACE COMMAND

ICBM & HELICOPTER OPERATIONS DIVISION

TECHNICAL AND SUPPORT REQUIREMENTS

FOR THE

ICBM OPERATIONS AND FUTURE CONCEPTS BRANCH

TASK ORDER: XO-0055

23 June 2005

9003-0005

1.0 DESCRIPTION OF SERVICES:

Provide non-personal technical, analytic, and administrative support to the Headquarters, Air Force Space Command (HQ AFSPC), Directorate of Air and Space Operations (XO), ICBM and Helicopter Operations Division (XON), ICBM Operations and Future Concepts Branch (XONO) in support of concept development activities for advanced space systems and capabilities. Concept development requires identification of the capabilities necessary to generate effects on the battlefield in support of warfighter needs. Supported activities serve as the basis for a variety of planning, acquisition and operational functions including, but not limited to, Analyses of Alternatives (AoAs), the AFSPC Integrated Planning Process (IPP) and the Air Force Capabilities Review and Risk Assessment (CRRA) process.

1.1. ORGANIZATION BEING SUPPORTED:

HQ AFSPC/XONO

150 Vandenberg Street Suite 1105

Peterson AFB CO 80914-4180

1.1.1. MISSION: Provide policy, guidance, and resources for AFSPC ICBM and helicopter operations.

1.2. OVERVIEW OF SERVICES REQUIRED

The contractor is required to provide technical services to include technical analysis of proposed space capabilities. These services include: feasibility assessment for various technological and engineering requirements; documentation of potential material solutions to fulfill capability needs; development of concept documents for future space capabilities; review of operational requirements in support of various Command-sponsored program activities including AoAs and special studies; and development of documentation and briefing materials necessary to support decisions regarding future space capability acquisition, planning and operations. Additionally, the contractor shall be required to evaluate and provide recommendations concerning concepts and positions.

1.3. SPECIFIC REQUIREMENTS

The contractor shall develop AFSPC functional and enabling concepts according to the specifications in AFSPC Instruction (AFSPCI) 10-102, Air Force Space Command Concept Development and Air Force Policy Directive (AFPC) 10-28, Air Force Concept Development (regulations apply in their entirety). Additionally, the contractor shall provide independent assessment and analysis of potential solutions and proposals to fill capability needs. The contractor shall provide technical advise, feasibility analysis and products necessary for decision support.

1.3.1 REQUIREMENT 1: Concept Development.

The contractor shall draft concept documents and identify mission performance characteristics and requirements to support concept definition, concept feasibility and technology needs for future space capabilities; one new document every three months and update/review the existing eight concepts documents and newly created documents semi-annually. This requirement mandates that the contractor fully understand both the concept development process as well as the hierarchy of Joint, service and AFSPC concept documentation. In addition, the contractor shall prepare reports, analyses, drawings, planning documents, spreadsheets, database files and presentation materials to support concept development activities. The contractor shall also attend those design reviews, technical symposia, conferences and technical interchange meetings related to concept development activities, then report outcome in meeting minutes and incorporate learned information into new or under-review concepts. Also, attendance at these forums is necessary to ensure the contractor is aware of the most current developments and activities that impact AFSPC concept development. The contractor will be required to attend approximately two (2) events per month on average of two (2) days each.

1.3.1.1. DELIVERABLES: CDRL 0009 Meeting Minutes. Technical Interchange Meeting Minutes.

1.3.1.2. New AFSPC Concept Documents.

1.3.1.2.1. The contractor shall deliver draft (one) new concept document IAW Air Force and HQ AFSPC directives specified in para 1.3 above every three months. Timelines for initial draft document delivery may range from five (5) working days for new concepts requested by Higher Headquarters to ninety (90) days for concepts considered routine or derived from the single AFSPC Strategic Master Plan. Draft documents will address the fundamental questions, contain applicable content and will be formatted in accordance with (IAW) the direction provided in AFSPCI 10-102 (regulation applies in its entirety). During the coordination process, the contractor shall collect and organize inputs from external agencies: HQ Air Force, AFSPC, USSTRATCOM, NAFs, Centers, and System Program Offices, USA, USN, and other DoD agencies consistent with each concept.

1.3.1.2.2. The contractor, in coordination with HQ AFSPC/XON, shall assist in the resolution of comments received during the coordination process. The contractor shall incorporate changes to documents and resubmit revised documents within five (5) working days for review.

1.3.1.2.3. New concept documents are generally produced once every 3 months; this will include follow-on generations of published concepts. The contractor shall coordinate inputs from approximately thirty (30) organizations at three-letter coordination, then approximately ten (10) organizations at two-letter coordination prior to AFSPC/XO signature. These organizations consist of offices within HQ Air Force, AFSPC, USSTRATCOM, NAFs, Centers, and System Program Offices.

1.3.1.3. Existing AFSPC Concept Documents.

1.3.1.3.1. The contractor shall develop and submit a schedule for conducting a semi-annual review for all AFSPC existing and newly created concept documents (eight current documents, average of 40 pages each) for which HQ AFSPC/XON is listed as the Office of Primary Responsibility (OPR). Schedule shall be delivered within thirty (30) calendar days of the contract start date. The contractor shall review concepts IAW this schedule.

1.3.1.3.2. The contractor shall evaluate the accuracy and currency of the information presented in each concept. In the event a concept document requires a revision, the contractor shall deliver revised concept documents within five (5) working days following completion of the semi-annual review.

1.3.1.3.3. In the event formal coordination is required for a revised concept, average of 1-2 annually, the contractor shall collect and organize inputs from external agencies. The contractor, in coordination with the supported Government agency, shall assist in the resolution of comments received during the coordination process. The contractor shall incorporate changes to documents and resubmit revised documents within five (5) working days for review, further coordination, or approval.

1.3.1.3.4. Updates to a published concept will likely be necessary approximately once every six months. The contractor shall be required to coordinate inputs from approximately thirty (30) organizations at three-letter coordination, then approximately ten (10) organizations at two-letter coordination prior to AFSPC/XO signature. These organizations consist of offices within HQ Air Force, AFSPC, USSTRATCOM, NAFs, Centers, and System Program Offices.

1.3.2. REQUIREMENT 2: Analyses of Alternatives and Special Studies Support

1.3.2.1. The contractor shall assist the HQ AFSPC/XON Future Concept Element to support eight annual AFSPC-sponsored AoAs, special studies and other initiatives. Below is a listing of those on-going activities AFSPC/XONO is currently supporting Land-Based Strategic Deterrent (LBSD) AoA. These special studies may evolve and change over time based on warfighter requirements.

· Prompt Global Strike (PGS) AoA

· Common Aero Vehicle (CAV) Study

· Conventional Ballistic Missile (CBM)

· Responsive Strike Command & Control (RSC2) Experiment (SMC-led effort)

· Affordable Responsive Spacelift (ARES) Demonstration

1.3.2.2. The contractor shall conduct the research necessary to support the development of Directorate positions on a variety of issues and subjects relating to military operations including, National Military Strategy, Joint and service doctrine, command and control processes, command relationships, architectures, and training methodologies.

1.3.2.3. The contractor shall attend those design reviews, technical symposia, conferences and technical interchange meetings, as determined by the QAE, required to support Command-sponsored study and analysis activities, then report outcome in meeting minutes and incorporate learned information into ongoing AoAs or special studies. The contractor shall attend approximately one (1) event per month on average of two (2) days each.

1.3.2.4. The contractor shall provide technical advice and assessment of the proposed material and non-material solutions for the capabilities and effects under consideration in the specified effort (e.g., AoA or special study). Additionally, the contractor shall develop materials necessary to support AFSPC/XONO involvement with these AoAs and/or special studies. Such materials include AoA Study Plan inputs, briefing materials, presentations, white papers, and point papers. The contractor shall normally create one (1) of these per event (attendance as required by paragraph 1.3.2.3) attended, normally one (1) event per month.

1.3.2.5. DELIVERABLES:

1.3.2.5.1. CDRL 0009 Meeting Minutes. Technical Interchange Meeting Minutes.

1.3.2.5.2. CDRL 0008 Presentation Material. Inputs, Briefing Materials, Presentations, Papers.

1.3.3. REQUIREMENT 3: Review Documents. The contractor shall review various documents, submitted to AFSPC/XON for review and/or coordination, to draft the division’s position. Such documents include AF-Level Concepts of Operations (CONOPS), AFSPC functional and enabling concepts where AFSPC/XON is not the OPR and other documentation related to special studies and activities. The contractor shall review said documents, an average of two (2) per month, and provide draft Division position within five (5) working days for XON Division Chief acceptance.

1.3.4. REQUIREMENT 4: Quarterly Work Schedule. The contractor shall provide a quarterly work schedule describing the timeline and milestones for each assigned task and product.

1.3.4.1. DELIVERABLES: CDRL 0028 Task Assignment Plan. Quarterly Work Schedule.

1.3.5. REQUIREMENT 5: Attend XON Meetings. The contractor is required to attend weekly one-hour XON Staff Meetings.

1.3.6. ADDITIONAL DELIVERABLES:

1.3.6.1. CDRL 0031 Monthly Status Report. The Monthly Status Report shall contain a description of the work accomplished during the previous month. The report shall contain any significant accomplishments and/or problems. In addition, the Monthly Status Report shall list the cumulative labor hour/category and associated funding remaining on the Task Order as well as the funds expended during the respective period of performance by labor hour/category.

2.0 SERVICE DELIVERY SUMMARY

Performance Objective
SOW Para.
Performance Threshold
Deliverables are completed in an accurate and timely manner
1.3.1,

1.3.2, 1.3.3, 1.3.4, 1.3.5,

1.3.6 No more than one (1) late document per month and no more than five (5) days late. No more than one (1) set of corrections or edits and all corrections must be accomplished within five (5) working days.

All requirements of the Task Order are met
1.0 through 4.4
Contractor receives no more than 2 formal, validated customer complaints/contract discrepancy reports per year. The contractor successfully resolves customer complaints within 10 calendar days of receipt, 100% of the time.

3.0 Government Furnished Property and RESOURCES:

3.1. GOVERNMENT FURNISHED PROPERTY (GFP). None.

3.2. GOVERNMENT FURNISHED RESOURCES.

3.2.1.1. FACILITIES, SUPPLIES, AND SERVICES: AFSPC/XON shall furnish one (1) workspace in the Hartinger building on Peterson AFB, desk space, chairs, computers connected to 21 NET, Secret Internet Protocol Router network (SIPRNET) access, use of telephones, copier and fax machines.

3.2.2. INFORMATION SOURCES: Government personnel shall be available for technical exchanges with the contractor. Government personnel shall provide technical input, answer questions, review and accept completed work, and provide feedback regarding contractor efforts. The QAE is the primary source of technical guidance for this SOW.

3.2.3. GOVERNMENT FURNISHED INFORMATION: Copies of reference materials cited in SOW paragraph 1.3 are available to the contractor at http://www.e-publishing.af.mil/. The contractor shall have access to a web-based document library. All materials shall remain the property of the Government and shall be returned to the QAE upon request or at the end of the Task/Delivery Order period of performance.

3.3. MATERIALS AND OTHER DIRECT COSTS (ODCs): None.

4.0 GENERAL INFORMATION

4.1. SECURITY. Provisions outlined in the basic DD 254 apply to this task order.

4.2. ACCESS TO GOVERNMENT PROPERTY AND FACILITIES: The contractor shall be allowed non-escorted access to Government Building 1 (Hartinger Building) on Peterson AFB and other sites consistent with Task Order requirements.

4.3. TRAVEL. Approximately fifteen (15) trips (39 days of travel) outside the Colorado Springs Area are estimated to support this task. Task performance shall also require local travel (within 50 miles of Peterson AFB CO).

Location
Purpose
# Days
Trips/Year
Dayton, OH
Tech Interchange Mtg
3
3
Washington, DC
ICD/CCD Development
5
2
Washington, DC
Inter-service Discussions
3
2
Omaha, NE
USSTRATCOM Update
3
2
Cheyenne, WY
20 AF Update
1
2
Layton, UT
Tech Interchange Mtg
3
2
Ft Walton Beach, FL
Tech Interchange Mtg
3
2

4.4. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS. None.

File details come from the government source that posted it. Updated .