About this file

FA2517-05-D-9002 Task Order 0012 Synthetic Theater Operations Research Model (STORM) and THUNDER campaign models

View the file

Other files for this federal contract opportunity

Other files attached to Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command, newest first.
File Type Posted
Amendment 8 CSMC RFP.doc DOC document
CSMC RFP Amendment 6.doc DOC document
Block 13 Continuation Sheet 2 Oct 09.docx DOCX document
Amendment 5 Attachment L-3 MWMD PWS FINAL 29 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 4.doc DOC document
CSMC RFP 23 Sep 09 Amendment 3.doc DOC document
Amendment 3 Attachment L-3 MWMD PWS FINAL 23 Sep 09.doc DOC document
Attachment 1 CSMC PWS FINAL 21 Sep 09.docx DOCX document
Attachment 5 Section L Attachments 21 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 2.doc DOC document
Q A 22 Sep 09.doc DOC document
MILSATCOM CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List ILSS 11.rtf RTF text file
MILSATCOM CDRLs 30 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 35 36.rtf RTF text file
Attachment 3 CSMC 254 24 Aug 09.pdf PDF
CDRLS Master List MGMT 29.rtf RTF text file
Attachment 2 Acronyms 22 Jul 09.doc DOC document
MWMD CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 37.rtf RTF text file
Rerevised Contract Mgmt Section.docx DOCX document
One-On-One Session Directions.pptx PPTX presentation
MILSATCOM 2 4 31 May 09.pdf PDF
Section L Past Performance Questionnaire.doc DOC document
9003-0043.doc DOC document
9003-0036.doc DOC document
9003-0035.doc DOC document
Market Research Questions.doc DOC document
SSA.docx DOCX document
A6-0176 CSMC PWS.docx DOCX document
A4 PWS 4 Sep 08.doc DOC document
9003-0019.doc DOC document
9003-0029.doc DOC document
9002-0014.doc DOC document
9002-0017.DOC DOC document
9002-0006.doc DOC document
9002-0009.doc DOC document
9002-0004.doc DOC document
9001-0004.doc DOC document
9001-0028.doc DOC document
9000-0018.doc DOC document
9000-0015.doc DOC document
9000-0027.doc DOC document
9000-0002.doc DOC document
9003-0034.doc DOC document
9000-0030.doc DOC document
9002-0026.doc DOC document
9001-0038.doc DOC document
CAASETAIPrimeandSubcontractorList.doc DOC document
2_MarketResearchQuestions.doc DOC document
Show all 50

Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ AFSPC

CONTRACT INFORMATION

Contract Number
FA2517-05-D-9002 Task Order 0012
Requiring Activity
HQ AFSPC/XPY

Synthetic Theater Operations Research Model (STORM) and THUNDER campaign models

Contract Type
Cost Plus Fixed Fee (CPFF)
Incumbent Name & Address
bd Systems

360 Command View Colorado Springs, CO 80915

Period of Performance
26 Apr 06 – 25 Apr 07

(Base Year plus 1 opt yr)

Total Contract Dollar Amount
$150,861

STATEMENT OF WORK

FOR

THUNDER/STORM MODEL SUPPORT

FOR

HQ AFSPC/A9I (XPYM)

XP-0106

9002-0012

27 March (Revised)

1.0 DESCRIPTION OF SERVICES:

1.1. ORGANIZATION BEING SUPPORTED:

HQ AFSPC/DA9 (XPY)

150 Vandenberg St, 1105

Peterson AFB, CO 80914-4240

1.1.1. MISSION:

The Space Analysis Division is the Air Force designated Center of Excellence for providing objective and responsive space studies, analysis and science & technology expertise to decision makers, warfighters, and the national space community.

1.2. OVERVIEW OF SERVICES REQUIRED

AFSPC/DA9 (XPY) requires data run implementation for the Synthetic Theater Operations Research Model (STORM) and THUNDER campaign models within DA9 (XPY) to be developed and the software maintained. DA9 (XPY) needs to validate AFSPC STORM output against the Air Force Studies and Analysis Agency (AFSAA) STORM output for the same database runs. DA9 (XPY) also requires the implementation of Major Combat Operations (MCO) scenarios into STORM and/or THUNDER. The availability of MCO scenario data will drive the schedule.

1.3. SPECIFIC REQUIREMENTS

1.3.1. REQUIREMENT 1:

The contractor shall maintain the STORM and/or THUNDER software for the Period of Performance on the AFSPC/DA9 clustered equipment as described in paragraph 3.2. This will include, but is not limited to the following:

a) Maintain the current version of STORM and/or THUNDER software and ensure compatibility with the blades, nodes, servers, clients and operating system.

b) Author, test and implement scripts and/or software modifications that enable the successful accomplishment of data runs using the STORM and/or THUNDER models.

c) Install, update, activate and ensure operability of all THUNDER/STORM upgrades.

d) Identify and document configuration control changes to the THUNDER/STORM software.

e) Attend weekly status meeting with HQ AFSPC/A9I (XPYM).

This requirement estimated to be 35% of the total task effort.

1.3.2. REQUIREMENT 2:

The contractor shall implement data runs in STORM and/or THUNDER to include writing scripts and database modifications to support analysis at AFSPC/DA9 (XPY). This may include support to the following studies: Integrated Planning Process (IPP), Prompt Global Strike (PGS) and other Analysis of Alternatives (AOA). This will include, but is not limited to the following:

e) Accomplish data runs using the STORM and/or THUNDER models and document model outputs.

f) Author, test and implement scripts and/or database modifications that enable the successful accomplishment of data runs using the STORM and/or THUNDER models.

g) Identify and document configuration control changes to the scripts and database.

d) Attend weekly status meeting with HQ AFSPC/A9I (XPYM).

This requirement estimated to be 40% of the total task effort.

1.3.3. REQUIREMENT 3:

The contractor shall validate AFSPC STORM output against the AFSAA STORM output for the same test scenario database runs. AFSAA STORM input and output will be provided. This will include, but is not limited to the following:

a) Perform a comparative analysis of the output from the AFSPC STORM output and the AFSAA STORM output.

b) Publish a comprehensive test report that identifies the test approach and documents the output differences between the two campaign models.

c) Attend AFSAA Interchange Meeting, as required.

d) Attend weekly status meeting with HQ AFSPC/A9I (XPYM).

This requirement estimated to be 10% of the total task effort.

1.3.4. REQUIREMENT 4:

The contractor shall produce MCO scenario documents and briefings. This will include, but is not limited to the following:

a) Perform a comparative analysis of the MCO scenario descriptions.

b) Publish a comprehensive report that identifies the test approach and documents the HQ AFSPC/DA9 (XPY) implementation of these MCO scenarios.

c) Attend weekly status meeting with HQ AFSPC/A9I (XPYM).

This requirement estimated to be 10% of the total task effort.

1.3.5

DELIVERABLES:

The Monthly Status Report shall be delivered by the 10th of the month following the report month and shall contain a narrative description of the work accomplished during the report month and a projection for work to be accomplished in the next month. The report shall identify any significant accomplishments and/or problems. The report shall contain a list of items purchased using government funds, travel fund expenditures and a projection for future purchases and travel. The report shall also include an approximate monthly spend plan.

This requirement estimated to be 5% of the total task effort.

1.3.5.1 DELIVERABLE (5):

CDRL 0030 Contractor’s Progress, Status and Management – Monthly Status Report CDRL 0036 Technical Report – Study/Services (Requirements: 1, 2, 3, and 4) CDRL 0006 Conference Report (Requirement 3)

2.0 SERVICE DELIVERY SUMMARY

Performance Objective
SOW Para.
Performance Threshold
Deliverables are completed in an accurate and timely manner
1.3
No more than one (1) late document per quarter and no more than five (5) days late. Not more than one (1) set of corrections or edits and all corrections must be accomplished within five (5) working days.
All requirements of the Task Order are met
1.3
Contractor receives no more than 2 formal, validated customer complaints/contract discrepancy reports per year. The contractor successfully resolves customer complaints within 10 calendar days of receipt, 100% of the time.

3.0. Government Furnished Property and RESOURCES:

3.1 GOVERNMENT FURNISHED PROPERTY (GFP)

None

3.2. GOVERNMENT FURNISHED RESOURCES

3.2.1 FACILITIES, SUPPLIES, AND SERVICES:

AFSPC/DA9 (XPY) will furnish workspace in the Atrium II facility, 1150 Academy Park Loop, Suite 212, Colorado Springs, CO. The workspace will be a shared resource consisting of desk space, chair, unclassified network computer, classified terminal connection for STORM and/or THUNDER access, use of telephones, copier and fax machines. The following hardware/software will be available:

3.2.1.1 Computer Equipment (Dell Servers and Clearcube/Dell Cluster)

3.2.1.2 STORM/THUNDER Current Software Versions (databases)

3.2.1.3 Linux Operating System and Vmware

3.2.2 INFORMATION SOURCES:

AFSPC/DA9 (XPY) personnel will be available to answer and facilitate questions on a daily basis and to provide the conduit between contractor and AFSAA. Information about STORM and THUNDER can be accessed through the following website:

http://www.group-w-inc.com/

3.2.3. GOVERNMENT FURNISHED INFORMATION:

3.2.3.1 MCO database input/output files

3.2.3.2 AFSAA STORM input/output files

3.2.4 DOCUMENTATION:

None

3.3. MATERIALS AND OTHER DIRECT COSTS (ODCs):

No ODC’s are anticipated, however, the Quality Assurance Evaluator (QAE) shall approve all contractor purchases costing less than $500 prior to purchase. Any item exceeding this dollar threshold will require approval of the Contracting Officer prior to purchase.

4.0 GENERAL INFORMATION

4.1 SECURITY.

Provisions outlined in the basic DD 254 apply to this task order. Contractor personnel must possess a minimum of a SECRET clearance.

4.2. ACCESS TO GOVERNMENT PROPERTY AND FACILITIES:

The contractor will be allowed unescorted access to Atrium II building, 1150 Academy Park Loop, Suite 212, Colorado Springs, CO. and Bldg 1, Peterson AFB, CO, consistent with Task Order requirements.

4.3. TRAVEL

The contractor shall be required to support the STORM and/or THUNDER technical interchange meetings.

Destination
Number of Trips
Duration
DC
3
4 Days

File details come from the government source that posted it. Updated .