About this file

FA2517-05-D-9002 Task Order 0008 Analyses of Alternatives (AoAs) Land-Based Strategic Deterrent (LBSD) Prompt Global Strike (PGS) and the Common Vertical Lift Support Platform (CVLSP)

View the file

Other files for this federal contract opportunity

Other files attached to Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command, newest first.
File Type Posted
Amendment 8 CSMC RFP.doc DOC document
CSMC RFP Amendment 6.doc DOC document
Block 13 Continuation Sheet 2 Oct 09.docx DOCX document
Amendment 5 Attachment L-3 MWMD PWS FINAL 29 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 4.doc DOC document
CSMC RFP 23 Sep 09 Amendment 3.doc DOC document
Amendment 3 Attachment L-3 MWMD PWS FINAL 23 Sep 09.doc DOC document
Attachment 1 CSMC PWS FINAL 21 Sep 09.docx DOCX document
Attachment 5 Section L Attachments 21 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 2.doc DOC document
Q A 22 Sep 09.doc DOC document
MILSATCOM CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List ILSS 11.rtf RTF text file
MILSATCOM CDRLs 30 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 35 36.rtf RTF text file
Attachment 3 CSMC 254 24 Aug 09.pdf PDF
CDRLS Master List MGMT 29.rtf RTF text file
Attachment 2 Acronyms 22 Jul 09.doc DOC document
MWMD CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 37.rtf RTF text file
Rerevised Contract Mgmt Section.docx DOCX document
One-On-One Session Directions.pptx PPTX presentation
MILSATCOM 2 4 31 May 09.pdf PDF
Section L Past Performance Questionnaire.doc DOC document
9003-0043.doc DOC document
9003-0036.doc DOC document
9003-0035.doc DOC document
Market Research Questions.doc DOC document
SSA.docx DOCX document
A6-0176 CSMC PWS.docx DOCX document
A4 PWS 4 Sep 08.doc DOC document
9003-0019.doc DOC document
9003-0029.doc DOC document
9002-0014.doc DOC document
9002-0017.DOC DOC document
9002-0006.doc DOC document
9002-0009.doc DOC document
9002-0004.doc DOC document
9001-0004.doc DOC document
9001-0028.doc DOC document
9000-0018.doc DOC document
9000-0015.doc DOC document
9000-0027.doc DOC document
9000-0002.doc DOC document
9003-0034.doc DOC document
9000-0030.doc DOC document
9002-0026.doc DOC document
9001-0038.doc DOC document
CAASETAIPrimeandSubcontractorList.doc DOC document
2_MarketResearchQuestions.doc DOC document
Show all 50

Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ AFSPC

CONTRACT INFORMATION

Contract Number
FA2517-05-D-9002 Task Order 0008
Requiring Activity
USAF HQ AFSPC/DRM

Analyses of Alternatives (AoAs): Land-Based Strategic Deterrent (LBSD), Prompt Global Strike (PGS) and the Common Vertical Lift Support Platform (CVLSP)

Contract Type
Cost Plus Fixed Fee (CPFF)
Incumbent Name & Address
bd Systems

360 Command View Colorado Springs, CO 80915

Period of Performance
26 Sep 05 – 24 Aug 06

(11 Months)

Total Contract Dollar Amount
$855,508

STATEMENT OF WORK (SOW)

FOR

ANALYSIS AND TECHNICAL SUPPORT

TO HEADQUARTERS AIR FORCE SPACE COMMAND (HQ/AFSPC)

DIRECTORATE OF REQUIREMENTS (DR)

FORCE APPLICATIONS BRANCH (DRM)

COMMON VERTICAL LIFT SUPPORT PLATFORM (CVLSP) ANALYSIS OF ALTERNATIVES (AoA)

9002-0008

18 August 2005

1.0

DESCRIPTION OF SERVICES

Requires analytical, technical and subject matter expertise supporting the AFSPC-led Common Vertical Lift Support Platform (CVLSP) Analyses of Alternative (AoA) and associated analysis to support same.

1.1

ORGANIZATION BEING SUPPORTED

USAF HQ AFSPC/DRM

(Deterrence and Strike Division)

150 Vandenberg Street, Suite 1150

Peterson AFB CO 80914-4280

Study work led by

USAF HQ AFSPC/XPY (Space Analysis Division)

1150 Academy Park Loop, Suite 212

Colorado Springs, CO 80910

HQ AFSPC/DRM is responsible for this study and provides oversight and the study lead officer. HQ AFSPC/XPY as the Command’s Analysis Division leads the support of this effort

1.1.1

MISSION

Headquarters, Air Force Space Command (HQ AFSPC) Requirements Directorate (DR) Deterrence and Strike Division (DRM) Develops, documents, and staffs space and missile requirements supporting Dod,Civil, and National users. Specifies requirements for space and missile systems with specific emphasis on Deterrence and Strike offensive and defensive missile systems and the entire support structure for these systems. Provides deterence, strike, force enhancement, and force application warfighting capability to Unified commands. Directs integration of new capabilities.

Headquarters, Air Force Space Command (HQ AFSPC) Space Analysis Division (XPY) through Space Force Application Branch (XPYA) supports AFSPC’s Space Force Application (SFA) Mission Area with analysis to address the SFA sub-areas of Nuclear Deterrence, Conventional Strike and Missile Warning/Missile Defense. This includes analysis support for Command tasks involving the requirements definition, operational concepts development, planning and programming, and assessing the military utility of systems which are pertinent to these sub-areas.

1.2

OVERVIEW OF SERVICES REQUIRED

Conduct urgent OSD-directed analyses in support of Deterrence and Strike Division (AFSPC/DRM) for the Common Vertical Lift Support Platform (CVLSP) UH-1N helicopter replacement program. Specifically, the contractor will perform Air Force vertical lift analysis and provide functional expertise in support of the CVLSP analysis of alternatives (AoA) providing sufficient initial results to update the Joint Requirements Oversight Council (JROC) in Dec 05 and provide staffed results by Mar 06. The contractor will document analysis and provide advisory and assistance services to develop presentations and staff AoA results. The normal timeline for an AoA is approximately 18 months; however, the JROC has directed AFSPC to accelerate this analysis in order to provide decision for an AF HELO way ahead and keep open the option of joining with (leveraging) the AF Special Operations Command (AFSOC) Combat Search and Rescue program CSAR-X. Study results must be staffed back to the JROC and be presented in concert with the AFSPC and AMC annexes to the CSAR-X capabilities development document (CDD). Leadership decision support to include quick turn analysis to answer specific JROC and senior leader questions are anticipated. In order to meet timelines and provide necessary rigor within available resources, expertise with, and ability to capitalize upon, previous Air Force vertical lift analyses as it relates to the current Air Force HELO way ahead, CVLSP initiative, Air Force Common Helicopter effort, and related programs and missions is imperative. These related programs and missions are: AFSOC CSAR-X (HH-60G HELO Replacement), Air Mobility Command’s (AMC) National Capital Region (NCR) mission, AFSPC Intercontinental Ballistic Missile (ICBM) and Space Launch Security/Support mission, commercial off the shelf plus (COTS+) alternative vertical lift solutions, and the vertical lift missions of PACAF, AETC, and AFMC. Contractor shall provide specialized technical support to AFSPC/XPYA and DRM on the CVLSP AoA to include vertical lift modeling & simulation, analysis, costing, subject matter expertise, operational expertise, evaluation of COTS+ alternative solutions, and documentation staffing. Contractor will be expected to work closely with the team supporting XPYA's CAASETA task Force Applications AoA Analysis Spt (Contract # FA-2517-05-D-900x-xxxx) and XPY FFRDC personnel.

1.3 SPECIFIC REQUIREMENTS

1.3.1 REQUIREMENT 1. REQUIREMENT DEVELOPMENT AND VALIDATION SUPPORT, CONCEPT OF OPERATIONS REFINEMENT, CONCEPT DEFINITION AND DEVELOPMENT, AND ANALYSIS SUPPORT

The Contractor shall provide support to the CVLSP AoA, material solution requirements refinement, AFSPC Rotary Wing Concept of Operations (CONOPS) refinement, and CDD annex system architecture refinement per findings as analysis unfolds. Contractor will assist in refinement and staffing of the study plan and briefing AoA results to the JROC. (CDRL 0008a JROC Briefing) The Contractor shall document their findings in order to validate requirements and refine the CONOPS based on the evolving threat environment since 9/11. (CDRL 0036a CONOPS) The Contractor shall document their attempts, identify, describe, and evaluate performance characteristics of available vertical lift platforms capable of conducting the entire AF utility vertical lift mission but emphasizing the AFSPC ICBM security and space launch security/support and the AMC NCR mission and demonstrate how possible COTS+ material solutions for these missions might relate to the AFSOC CSAR-X material solution in order to support leadership information with which to evaluate UH-1N replacement solutions in relationship to the AFSOC CSAR-X solution. The contractor shall be responsive to Senior leadership decision support to include involves quick look studies, exploring the COTS+ solutions, leveraging previous work, conducting “what if” analyses, staffing and advisory assistance. The Contractor shall perform Air Force vertical lift analysis and provide functional expertise in support of the CVLSP analysis of alternatives (AoA) providing sufficient initial results to update the Joint Requirements Oversight Council (JROC) in Dec 05. (CDRL 0037a) The contractor shall complete and staff this study to the JROC level prior to AFSOC CSAR-X contract award in Spring 06. (CDRL 0037b) The Contractor shall provide necessary data, analysis results and insight to assist DRM with updating the AFROCC-approved but JROC-held CDD annexes to include the basic document and annex appendixes. It is expected that the necessary updates will focus on updates to architecture and an information support plan. The Contractor shall provide approximately bi-weekly updates to the Command Study Lead (DRM) (CDRL 0030a) to continue development of and support the draft study plan and provide concept development, refinement and definition, modeling, simulation and analysis (MS&A), pre and post-event analysis, and documentation necessary for producing a final report. (CDRL 0037c) The contractor shall coordinate analysis resources and promote cooperation and technical information exchange between DRM/XPYA, other Air Force HELO-using MAJCOMs,Air Force analysis organizations, OSD, and aircraft manufacturers in order to obtain the required information on the alternatives and to evaluate and compare the various material solutions. The contractor shall interface with these organizations to assist DRM/XPYA in obtaining input data from operators, program offices, and manufacturers, assist in interpreting the data, and assist in the development of database dictionaries so that the data can be readily used for modeling, simulation, and validation. These Space Force Application-related tasks include all aspects of Effectiveness Analysis (EA) for the CVLSP effort. Tasks for this requirement constitute approximately 60% of total effort.

1.3.2 REQUIREMENT 2. MODELING AND SIMULATION AND ANALYSIS SUPPORT, TECHNICAL EXPERTISE, AND RESEARCH.

The Contractor shall perform data research to leverage previous vertical lift analysis efforts emphasizing previous Air Force efforts in order to aid in accomplishment of our leadership’s goal of accelerating this study effort. The Contractor shall provide data results to analysis and team leads approximately twice monthly (CDRL 0035a data accession list). The Contractor shall evaluate, operate, adapt and/or identify modeling and simulation tools to support DRM/XPYA in performing vertical lift mission-related studies. The Contractor shall provide study team leads with details, and technical expertise on the CVLSP (UH-1N replacement) effort and the programs and missions with which CVLSP relates to with respect to fulfilling the AF Helicopter Way-Ahead of maximum Air Force HELO commonality. This supports the study’s conclusions and study team recommendations to leadership and options for leadership decisions with regard to the AFSPC, AFMC, and AF HELO way ahead. These programs and missions with which CVLSP relates are: The UH-1N lead command role of AFSPC and how the primary Air Force UH-1N missions of AFSPC ICBM and Space Launch Security/Support and AMC’s NCR mission relate to the other UH-1N vertical lift programs of AETC, PACAF, AFMC, and AFSOC’s CSAR-X. This effort requires coordinated analysis across the above commands. The Contractor shall also leverage the previous detailed and long term AFSPC and AFSOC vertical lift replacement efforts including previous mission needs statement (MNS), operational requirements document (ORD), and the AFSPC/XONH helicopter CONOPS to further assist in accelerating this effort. The Contractor shall conduct data mining to fully explore the current state-of-art technology available. The contractor shall review and apply previous analysis efforts and databases for application to this current effort. The Contractor shall support post-analysis activities as AFSPC briefs results to other MAJCOMS, Air Staff, and DoD leadership for approval. This may include planning and execution of rapid-turn excursion analysis that senior decision makers request. Tasks for this requirement constitute approximately 18% of the total study effort but is a key piece of the effort in that it contributes to study speed and accurate HELO way ahead recommendations.

1.3.3 REQUIREMENT 3. Cost Analysis

The Contractor shall perform cost analysis in parallel with the effectiveness analysis, using the same operational concepts, and developing cost estimates for the life cycle of each alternative in order to get accurate life cycle costing of each alternative. The Contractor shall provide costing data results to analysis and team leads approximately twice monthly (CDRL 0035b data accession list) and providing team members with expertise in costing vertical lift alternatives such as or similar to the baseline UH-1N, H-60, Light Utility Helicopter (LUH), UH-1Y, S-92, NH-90 and the EH-101 will contribute to accelerating the study. The Contractor shall work with the helicopter SPO, operating command, industry, and civilian helicopter operators to gather necessary costing data. The contractor shall support the CVLSP AoA cost team to evaluate and adjust, where necessary, to ensure a fair comparison between material solution alternatives. The Contractor shall support concept refinement, technology development, system development and demonstration, production and deployment, O&S, and disposal (current UH-1 baseline) requirements to ensure life cycle cost estimates reflect total government cost.

The contractor shall have access to Automated Cost Estimating Integrated Tools (ACEIT), the AFSPC standard cost model. The contractor must have access to and experience with the Air Force standard costing tool, ACEIT and develop associated work breakdown structures (WBS) so as to be compatible with already ongoing XPY and other Air Force work. Tasks for this requirement constitute approximately 22% of total effort.

1.3.5

NON-DISCLOSURE AGREEMENTS

The contractor will be required to have (due to the shortened timeline these must be in place within two calendar weeks of award) non-disclosure agreements with any contractor requiring one in order to completely support the sensitive information being handled daily by XPYA. This includes (but is not limited to) the analysis in support of the requirement generation process in support of AoAs.

1.3.6 4 ADDITIONAL DELIVERABLES: Monthly Status Report [CDRL 0030b]

2.0 SERVICE DELIVERY SUMMARY

Performance Objective
SOW Para
Performance Threshold
Deliverables are completed in an accurate and timely manner
1.3

No more than one (1) late document per month and no more than five (5) days late. Nor more than one (1) set of corrections or edits and all corrections must be accomplished within five (5) working days.

All requirements of the Task Order are met
1.3

No more than two (2) formal customer complaints/contract discrepancy reports per year. The contractor shall successfully resolve customer complaints within 10 calendar days of receipt, 100% of the time.

3.0

GOVERNMENT FURNISHED PROPERTY AND RESOURCES

AFSPC/DRM in conjunction with AFSPC/XPY will furnish 2 workspaces in the XPY Facility (Atrium II building located at Fountain and Academy Blvd), desk space, chair, computer connected to 21 NET, Secret Internet Protocol Router network (SIPRNET) access, use of telephones, copier and fax machines. Access to the Hartinger building on Peterson AFB will be provided to included use of briefing and meeting facilities and use of telephones, copier and fax machines.

4.0

GENERAL INFORMATION

4.1

SECURITY

Provisions outlined in the basic DD 254 apply to this task order

4.2

ACCESS TO GOVERNMENT PROPERTY AND FACILITIES

The Contractor will be allowed unescorted access to the Hartinger Building (Building 1) at Peterson AFB and the Atrium II facility, 1150 Academy Park Loop, Suite 212 (XPY) in Colorado Springs, CO. Access to Government facilities, documents, and systems shall be in accordance with the basic award.

4.3 TRAVEL

Destination
Number of Trips
Duration (days)
Washington DC
6
3 ea
Scott AFB, IL
4
3 ea.
Wright Patterson AFB, OH
3
3 ea
Kirtland AFB, NM
2
2 ea.
Robins AFB, GA
2
2 ea
Hurlburt AFB, FL
1
2

One round robin to

FE Warren AFB WY, Vandenberg AFB CA, Malmstrom AFB MT, Minot AFB ND

1
6
Randolph AFB, TX
1
2
Peterson AFB if team is not co-located
10
3 ea
Material Solution Manufacturers: Fort Worth and Amarillo TX, Stratford, CT, the VX New York Facility
4
3 ea