About this file

FA2517-05-D-9001 Task Order 0018 Systems Engineering Planning and Program Support to HQ AFSPC/A8 Directorate of Strategic plans programs analysis Assessment and Lessons Learned

View the file

Other files for this federal contract opportunity

Other files attached to Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command, newest first.
File Type Posted
Amendment 8 CSMC RFP.doc DOC document
CSMC RFP Amendment 6.doc DOC document
Block 13 Continuation Sheet 2 Oct 09.docx DOCX document
Amendment 5 Attachment L-3 MWMD PWS FINAL 29 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 4.doc DOC document
CSMC RFP 23 Sep 09 Amendment 3.doc DOC document
Amendment 3 Attachment L-3 MWMD PWS FINAL 23 Sep 09.doc DOC document
Attachment 1 CSMC PWS FINAL 21 Sep 09.docx DOCX document
Attachment 5 Section L Attachments 21 Sep 09.doc DOC document
SF30 Summary of Changes - Amendment 2.doc DOC document
Q A 22 Sep 09.doc DOC document
MILSATCOM CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List ILSS 11.rtf RTF text file
MILSATCOM CDRLs 30 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 35 36.rtf RTF text file
Attachment 3 CSMC 254 24 Aug 09.pdf PDF
CDRLS Master List MGMT 29.rtf RTF text file
Attachment 2 Acronyms 22 Jul 09.doc DOC document
MWMD CDRLs 29 9 Sep 09.rtf RTF text file
CDRLS Master List SESS 37.rtf RTF text file
Rerevised Contract Mgmt Section.docx DOCX document
One-On-One Session Directions.pptx PPTX presentation
MILSATCOM 2 4 31 May 09.pdf PDF
Section L Past Performance Questionnaire.doc DOC document
9003-0043.doc DOC document
9003-0036.doc DOC document
9003-0035.doc DOC document
Market Research Questions.doc DOC document
SSA.docx DOCX document
A6-0176 CSMC PWS.docx DOCX document
A4 PWS 4 Sep 08.doc DOC document
9003-0019.doc DOC document
9003-0029.doc DOC document
9002-0014.doc DOC document
9002-0017.DOC DOC document
9002-0006.doc DOC document
9002-0009.doc DOC document
9002-0004.doc DOC document
9001-0004.doc DOC document
9001-0028.doc DOC document
9000-0018.doc DOC document
9000-0015.doc DOC document
9000-0027.doc DOC document
9000-0002.doc DOC document
9003-0034.doc DOC document
9000-0030.doc DOC document
9002-0026.doc DOC document
9001-0038.doc DOC document
CAASETAIPrimeandSubcontractorList.doc DOC document
2_MarketResearchQuestions.doc DOC document
Show all 50

Advisory & Assistance Services & Systems Engineering & Technical Assistance Services for Headquarters, Air Force Space Command has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HQ AFSPC

CONTRACT INFORMATION

Contract Number
FA2517-05-D-9001 Task Order 0018
Requiring Activity
HQ AFSPC/A8

Systems Engineering, Planning and Program Support to HQ AFSPC/A8 Directorate of Strategic plans, programs, analysis, Assessment and Lessons Learned

Contract Type
Cost Plus Fixed Fee (CPFF)
Incumbent Name & Address
Scitor Corporation

745 Space Center Dr

Colorado Springs, CO 80915

Period of Performance
11 Sep 06 – 10 Sep 10

(Base + 3 Opt Yrs )

Total Contract Dollar Amount
$3,417,370

STATEMENT OF WORK

FOR

SYSTEMS ENGINEERING, PLANNING AND PROGRAM SUPPORT

TO

HQ AFSPC/A8 Directorate of Strategic plans, programs, analysis, ASSESSMENT and lessons learned

Peterson AFB, CO 80914

31 Aug 06 9001-0018

1.0 DESCRIPTION OF SERVICES: This Statement of Work (SOW) defines the tasks to be performed by the contractor in providing Systems Engineering, Planning and Program Support to HQ AFSPC/A8 Directorate of Strategic Plans, Programs, Analysis, Assessment and Lessons Learned for the Base Realignment and Closure (BRAC) 2005 directed realignment/closure of Onizuka AFS (OAFS), bed-down of missions at Vandenberg AFB (VAFB), Buckley AFB (BAFB), FE Warren AFB (FEW AFB), Malmstrom AFB (MAFB), Peterson AFB (PAFB) and the closure of the Buckley AFB Annex.

1.1. ORGANIZATION BEING SUPPORTED:

HQ AFSPC/A8

150 Vandenberg Street, Suite 1105

Peterson AFB CO 80914

1.1.2. MISSION: Program and advocate resources, and organizational development. Manage competitive sourcing and privatization and develop and sustain international relations in direct support of unified commands and Air Force missions.

1.2. OVERVIEW OF SERVICES REQUIRED

To ensure the successful transition of current DoD, AF and HQ AFSPC/A8 missions and operations, a significant number of tasks/activities must be accomplished. These activities fall into four analysis and system engineering areas: Planning, Coordination, and Technical Liaison Support. Provide support to Headquarters Air Force Space Command Bases and Units Division mission.

· Support Base Realignment and Closure in response to Office of the Secretary of Defense (OSD), Secretary of the Air Force (SAF) and Headquarters Air Force (HAF) taskings.

· Provide support to the government in recurring processes in producing the various products. The contractor shall support ad-hoc and weekly meetings. The product is the deliverable and the process is the understanding of the organizational structure, which allows for the gathering of information to be compiled to provide a deliverable.

a. Base Realignment and Closure Analyses (BRAC)

b. OSD Program Budget Decisions (PBD)

c. President’s Budget Adjustments

1.3. SPECIFIC REQUIREMENTS:

1.3.1 REQUIREMENT 1: Planning (30% of overall effort)

The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 50 SW and 21 Space Operations Squadron in their development and implementation of the closure of Onizuka AFS and the 21 SOPS missions relocation to Vandenberg AFB. Contractor support includes the following: monitor and provide updates to the Integrated Master Schedule, including both operational and development milestones, identify critical milestones/tasks, track the progress of the various efforts, and identify possible schedule slips/delays which may impact this effort (estimated 2 updates per week). The contractor shall provide HQ AFSPC/A8 with the technical and management analysis of budget and identify potential funding disconnects and the associated impact to this effort. Provide recommendations within 3 days of the government’s request.

1.3.1.1. The contractor shall also support HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the realignment of the Air Force Satellite Control Network (AFSCN) 2nd Operational Control Node (OCN) and backup Network Operations Center (NOC) missions and tenant Defense Information Systems Agency (DISA) Defense Satellite Communication System (DSCS) mission and equipment to Vandenberg AFB. The contractor will provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 21 SW in the development and implementation of bed-down plans for the Counterintelligence Field Activity Facility for Peterson AFB. This will include MILCON planning (not including A & E services), construction progress reviews (estimated once a month), milestone progress (estimated weekly update), relocation planning and execution. Provide weekly updates within 1 day of the government’s request.

1.3.1.1.1 The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 460 SW in the development and implementation of bed-down plans for the realignment of the ARPC to Buckley AFB. This will include MILCON planning (not including A & E services), construction progress reviews (estimated once a month), milestone progress (estimated weekly update), relocation planning and execution. This will also include the actions required to close the Buckley AFB Annex and transfer of the property to AFRPA. Contractor shall monitor and provide updates to the Integrated Master Schedule, including both operational and development milestones, identify critical milestones/tasks, track the progress of the various efforts, and identify possible schedule slips/delays which may impact this effort (estimated 2 updates per week). Provide HQ AFSPC/A8 with the technical and management analysis of budget and identify potential funding disconnects and the associated impact to this effort. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.1.1.2. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 460 SW in the realignment of the 926 ECS to Buckley AFB. This will include MILCON planning (not including A & E services), construction progress reviews (estimated once a month), milestone progress (estimated weekly update), relocation planning and execution. Contractor shall monitor and provide updates to the Integrated Master Schedule, including both operational and development milestones, identify critical milestones/tasks, track the progress of the various efforts, and identify possible schedule slips/delays which may impact this effort (estimated 2 updates per week). Provide HQ AFSPC/A8 with the technical and management analysis of budget and identify potential funding disconnects and the associated impact to this effort. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.1.1.3. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 90 SW in the realignment of US Army National Guard and National Guard Bureau Joint Forces Headquarters units to F. E. Warren. This will include Add/Alter (ADAL) planning and execution, MILCON planning (not including A & E services), construction progress reviews (estimated once a month), milestone progress (estimated weekly update), relocation planning and execution. Contractor shall monitor and provide updates to the Integrated Master Schedule, including both operational and development milestones, identify critical milestones/tasks, track the progress of the various efforts, and identify possible schedule slips/delays which may impact this effort (estimated 2 updates per week). Provide weekly updates within 1 day of the government request and recommendations within 3 days of the government’s request.

1.3.1.1.4. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 90 SW with the beddown of Air Mobility Command (AMC) units at Cheyenne MAP. This will include add/alter (ADAL) planning and execution, progress reviews (estimated once a month), milestone progress (estimated weekly update), relocation planning and execution. Contractor shall monitor and provide updates to the Integrated Master Schedule, including both operational and development milestones, identify critical milestones/tasks, track the progress of the various efforts, and identify possible schedule slips/delays which may impact this effort (estimated 2 updates per week). Provide weekly updates within 1 day of the government request and recommendations within 3 days of the government’s request.

1.3.1.1.5. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 341 SW for the realignment of the Army Reserve unit moving to Malmstrom AFB. This will include MILCON planning and execution, progress reviews (estimated once a month), milestone progress (estimated weekly update), relocation planning and execution. Contractor shall monitor and provide updates to the Integrated Master Schedule, including both operational and development milestones, identify critical milestones/tasks, track the progress of the various efforts, and identify possible schedule slips/delays which may impact this effort (estimated 2 updates per week). Provide weekly updates within 1 day of the government request and recommendations within 3 days of the government’s request.

1.3.2. REQUIREMENT 2: Coordination (40% of overall effort)

1.3.2.1. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 50 SW in coordinating closure, realignment related issues/recommendations, future concepts of operations, and transition plans with affected organizations. Additionally, the contractor shall assist in identifying potential impacts these issues/concepts may have on current and future operations. The contractor shall facilitate these actions while working with other contractors on 21 SOPS mission realignment actions. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.2.2. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 460 SW in coordinating closure, realignment related issues/recommendations, future concepts of operations, and transition plans with affected organizations. Additionally, the contractor shall assist in identifying potential impacts these issues/concepts may have on current and future operations. The contractor shall facilitate these actions while working with other contractors on realignment actions. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.2.3. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of 21 SW in coordinating realignment related issues/recommendations, future concepts of operations, and transition plans with affected organizations. Additionally, the contractor shall assist in identifying potential impacts these issues/concepts may have on current and future operations. The Contractor shall facilitate these actions while working with other contractors on realignment actions. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.2.4. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of 90 SW in coordinating realignment related issues/recommendations, future concepts of operations, and transition plans with affected organizations. Additionally, the contractor shall assist in identifying potential impacts these issues/concepts may have on current and future operations. The contractor shall facilitate these actions while working with other contractors on realignment actions. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.2.5. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of 341 SW in coordinating realignment related issues/recommendations, future concepts of operations, and transition plans with affected organizations. Additionally, the contractor shall assist in identifying potential impacts these issues/concepts may have on current and future operations. The contractor shall facilitate these actions while working with other contractors on realignment actions. Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.3. REQUIREMENT 3: Technical Liaison (30% of overall effort)

1.3.3.1. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 50 SW and other participating organizations and shall provide assistance in evaluating/reviewing requirements, and identifying potential differences between these requirements and 21 SOPS realignment actions. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of 50 SW with Integrated Product Team (IPT) meetings, conferences, and technical reviews (meetings, conferences and technical reviews occur estimated 4 times per year). The contractor shall provide all aspect of support for the MILCON and facilities (not including A & E services). Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.3.2. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 21 SW and other participating organizations and shall provide assistance in evaluating/reviewing requirements, and identifying potential differences between these requirements and realignment actions. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 21 SW with Integrated Product Team (IPT) meetings, conferences, and technical reviews (meetings, conferences and technical reviews occur estimated 4 times per year). The contractor shall provide all aspect of support for the MILCON and facilities (not including A & E services). Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.3.3. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 460 SW and other participating organizations and will provide assistance in evaluating/reviewing requirements, and identifying potential differences between these requirements and 460 SW realignment actions. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 460 SW with Integrated Product Team (IPT) meetings, conferences, and technical reviews (meetings, conferences and technical reviews occur estimated 4 times per year). The contractor shall provide all aspect of support for the MILCON and facilities (not including A & E services). Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.3.4. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 90 SW and other participating organizations and will provide assistance in evaluating/reviewing requirements, and identifying potential differences between these requirements and 90 SW realignment actions. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 90 SW with Integrated Product Team (IPT) meetings, conferences, and technical reviews (meetings, conferences and technical reviews occur estimated 4 times per year). The contractor will provide all aspect of support for the MILCON and facilities (not including A & E services). Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.3.5. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 341 SW and other participating organizations and will provide assistance in evaluating/reviewing requirements, and identifying potential differences between these requirements and 341 SW realignment actions. The contractor shall provide support to HQ AFSPC/A8 in the HQ AFSPC/A8 oversight of the 341 SW with Integrated Product Team (IPT) meetings, conferences, and technical reviews (meetings, conferences and technical reviews occur estimated 4 times per year). The contractor shall provide all aspect of support for the MILCON and facilities (not including A & E services). Provide weekly updates within 1 day of the government’s request and recommendations within 3 days of the government’s request.

1.3.3.6. Special Studies: The contractor shall perform technical analyses in support of the closure and realignment efforts, including, but not limited to: conducting studies of issues and providing recommendations/alternatives; analyzing/assessing present and future operational requirements and their potential impact; and performing independent technical assessments of system functionality, personnel impacts, and facility space availability, as well as identifying risk, cost, and scheduling factors.

1.3.4. Monthly Status Report: The contractor shall provide a monthly status report (CDRL 0030)

2.0 .SERVICES SUMMARY

Performance Objective
SOW Para.
Performance Threshold
Deliverables are completed in an accurate and timely manner
1.3
No more than one (1) late document per month and no more than five (5) days late. Nor more than one (1) set of corrections or edits and all corrections must be accomplished within five (5) working days.
All requirements of the Task Order are met
1.3
Contractor receives no more than 2 formal, validated customer complaints/contract discrepancy reports per year. The contractor successfully resolves customer complaints within 10 calendar days of receipt, 100% of the time.

3.0. Government Furnished Property and services:

3.1. GOVERNMENT FURNISHED PROPERTY (GFP)

3.1.1. The government will furnish or make available to the contractor facility space, local area network (classified and unclassified) and class “A” phone, along with utilities within the space allocated.

3.1.1.1. The primary locations for this effort are government facilities at Onizuka AFS (OAFS), Vandenberg AFB (VAFB), Buckley AFB (BAFB), FE Warren AFB (FEW AFB), Malmstrom AFB (MAFB) and Peterson AFB (PAFB). Contractors are authorized to perform work at off-site locations. Off-site contractor facilities (conference/meeting areas; offices) will be made available to government personnel.

3.2. GOVERNMENT FURNISHED RESOURCES:

3.2.1 FACILITIES, SUPPLIES, AND SERVICES: HQ AFSPC/A8 will provide one work station per location: Onizuka AFS, Vandenberg AFB and Buckley AFB. Work stations include desk space, chairs, computers connected to appropriate LAN access. Contractor furnishes all sundry office supplies utilized for task efforts by their employees.

3.2.2. GOVERNMENT FURNISHED INFORMATION: The contractor will be required to perform in accordance with certain organization guidance/documentation. HQ AFSPC/A8 will provide OSD, SAF and Headquarters Air Force basing and BRAC 2005 guidance, direction, and any other actions that affect current and planned operational capabilities.

3.3. MATERIALS AND OTHER DIRECT COSTS (ODCs): The Quality Assurance Evaluator (QAE) shall approve all contractor purchases costing less than $500. Any item exceeding this dollar threshold will require approval of the Contracting Officer prior to purchase.

4.0 GENERAL INFORMATION

4.1 SECURITY.

· Contractor shall provide personnel with clearances commensurate with the BASIC AWARD DD Form 254, DoD Contract Security Classification Specification. Three SCI billets are available. Security clearance requirements are two (2) SI/TKs and one (1) TS/SI/TK.

· All tasks must be conducted in full compliance with DoD security regulations. Where necessary, the contractor shall conduct work within Sensitive Compartmented Information (SCI) Program Channels as directed.

· All contractors must review and comply with the Security Classification Guide (SCG) for the project area they are assigned.

· Restricted Area Badges. All personnel requiring frequent entry to their duty location and Peterson AFB shall be provided access in accordance with AFI 31-101, The Air Force Installation Security Program. Furthermore, access to other locations may be provided upon request for support of this contract and access to classified national security information may require Top Secret/SCI clearance.

· Access to classified national security information up to Top Secret/SCI is required.

4.2. ACCESS TO GOVERNMENT PROPERTY AND FACILITIES: The contractor will be allowed unescorted access to Government buildings located on Peterson AFB, Vandenberg AFB, Onizuka AFS, F.E. Warren AFB, Malmstrom AFB and Buckley AFB and other sites consistent with Task Order requirements. Access to government facilities, documents, and systems shall be in accordance with the attached DD254.

4.3. TRAVEL.

TRIP
#
NUM
TRIPS/
LOCATION
PEOPLE
OF DAYS
YEAR

Onizuka AFS

Peterson AFB
1
4
4
Vandenberg AFB
1
4
3

TOTAL

Vandenberg AFB

Onizuka AFS
1
4
4
Peterson AFB
1
4
3

TOTAL

Buckley AFB

FE Warren AFB
1
3
4
Peterson AFB
1
3
4
Malmstrom AFB
1
3
2

TOTAL

4.4. PRODUCT OWNERSHIP. All products produced by the Contractor in the performance of this SOW are the property of the government.

4.5. PROPRIETARY DATA. The Contractor shall request government approval prior to the use of any proprietary data or software tools to fulfill the requirements of this SOW.