This document is a comprehensive set of design drawings and specifications for the MAGIS-100 Infrastructure Modifications project (Project No. 6-7-111) at Fermilab, issued for bid on January 28, 2026.
The project encompasses mechanical, plumbing, and electrical infrastructure modifications including: installation of a new 26-inch diameter supply duct with associated supports running through a vertical riser shaft; demolition and replacement of existing 6-inch sump discharge piping; relocation of an air compressor and associated compressed air distribution system; relocation of existing stainless steel scintillator oil fill/drain piping; and installation of new compressed air tubing distribution throughout multiple elevation levels (733'-0", 580'-0", 440'-0", and other elevations). The mechanical work involves ductwork fabrication per SMACNA standards, hydronic piping installation per ASME B31.9, and hangers/supports per MSS SP-58. Plumbing work includes general-duty valve installation per relevant standards, piping identification and labeling, and field quality control testing including hydrostatic pressure tests and visual inspections. Electrical modifications involve panelboard connections and equipment relocation, with a relocated air compressor requiring new power distribution to a 480/277V panelboard (PHP-MNA1-4). Coordination with the Fermilab Construction Coordinator is required throughout, particularly for scheduled downtime of mechanical and sump systems. The drawings specify existing conditions to remain, demolition sequences, new installations, and detailed riser shaft sections across multiple elevation levels showing spatial relationships between all systems.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAGIS-100 INFRASTRUCTURE MODIFICATIONS
PROJECT NO.: 6-7-111
LIST OF DRAWINGS
G-1 LOCATION PLAN
M-0 MECHANICAL SYMBOLS
M-0.1 MECHANICAL SPECIFICATIONS
MD-1 MECHANICAL DEMO PLANS
MD-2 MECHANICAL DEMO SECTIONS
MD-3 MECHANICAL DEMO SECTIONS
M-1 MECHANICAL FLOOR PLANS
M-2 MECHANICAL SECTIONS
M-3 MECHANICAL SECTIONS
P-0 PLUMBING SYMBOLS
P-0.1 PLUMBING SPECIFICATIONS
PD-1 PLUMBING DEMO PLANS
PD-2 PLUMBING DEMO SECTIONS
PD-3 PLUMBING DEMO SECTIONS
P-1 PLUMBING FLOOR PLANS
P-2 PLUMBING SECTIONS
P-3 PLUMBING SECTIONS
E-1 ELECTRICAL FLOOR PLANS
PROJECT
AREA
RAILYARD
STORAGE
AREA
ROAD
C
HWY. 56 BUTTERFIELD RD.
INDUSTRIAL
MAIN
TO
IN
TE
R
ST
AT
E I-8
FA
R N
SW
O
R
TH
KAUTZ RD.
CONSTRUCTION
ENTRANCE
INJECTOR
MAIN
SUBSTATION
KA
U
TZ
R
D
KAUTZ RD.
RING RD.
WILSON ST.
ENTRANCE
PINE ST.
ENTRANCE
(NO TRUCKS)
R O
AD
B
PINE ST. (OUT)
PINE ST. (IN)
KI
R
K R
D
ROAD
A
-2
ROAD
A -1
HOLTER RD
AREA
LABORATORY
CENTRAL
CDF
FE
LD
O
TT
R D
BATAVIA RD.
WILSON ST.
RECEIVING
SITE
BURLINGTON NORTHERN R.R.
TO ENTER THIS GATE
FA
RM
R D
LEGEND
SITE BOUNDARY LINES
ON SITE CONST. ROUTES
SW
ENSON
HOURS
(NO ACCESS)
EOLA RD.
ENTRANCE
TO RT. 59
HWY 38 ROOSEVELT RD.
BATAVIA RD.
EO
LA
R
D
FIXED
TARGET
AREA
ROAD D
FERMILAB
VILLAGE
LOCKED
GATE
WILSON ST.
NOTE: APPROPRIATE I.D. IS REQUIRED
(LOAD LIMIT-6 TONS)
C O
M M
O N
W
EA
LT
H
E D
IS
O
N P
O W
ER
L
IN
ES
BATAVIA RD.
ENTRANCE
TO HWY 59
EL
G
IN
J
O
LI
ET
E
AS
TE
R
N R
.R
WILSON ST 6 AM TO 6 PM
PINE ST 6 AM TO 8 PM
BATAVIA RD 6 AM TO 8 PM
KAUTZ RD CLOSED
NOTE: APPROPRIATE I.D.
IS REQUIRED TO ENTER
THIS GATE (REAL ID)
VICINITY PLAN
NOT TO SCALE
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
G en er al .d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
G-1
Ja n.
8, IS
SU
ED
F O
R B
ID
LOCATION PLAN
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
ABBREVIATIONS
NEW DUCTWORK DIMENSIONS10x10
EXISTING DUCTWORK DIMENSIONS10/10
ATMOSPHERIC VENT
APPARATUS DEW POINT
ABOVE FINISHED FLOOR
AVERAGE
AFF
ADP
ATV
AVG
BOILER BLOW DOWNBBD
BACKDRAFT DAMPERBDD
BELOW FINISHED CEILINGBFC
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BTU PER HOURBTUH
COOLING COILCC
CUBIC FEET PER MINUTECFM
CHILLED WATER RETURNCHWR
CHILLED WATER SUPPLYCHWS
CONDENSER WATER RETURNCWR
CONDENSER WATER SUPPLYCWS
EXHAUST AIREA
ENTERING AIR TEMPERATUREEAT
EXTERNAL STATIC PRESSUREESP
ENTERING WATER TEMPERATUREEWT
FIRE DAMPERFD
FUEL OILFO
FEET PER MINUTEFPM
FEETFT
FOOT POUNDFT LB
GAUGEGA
GALLONGAL
GALLONS PER MINUTEGPM
GRAINSGR
HEATING COILHC
HEADHD
HORSEPOWERHP
HOT WATER RETURNHWR
HOT WATER SUPPLYHWS
INNER DIAMETERID
INCHESIN
KILOWATTKW
LEAVING AIR TEMPERATURELAT
POUNDSLBS
LINEAR FEETLF
LEAVING WATER TEMPERATURELWT
MIXED AIRMA
THOUSAND BTUS PER HOURMBH
MAKEUP AIRMUA
MAKEUP WATERMUW
MANUAL VOLUME DAMPERMVD
NEWN
NOT APPLICABLEN/A
NOISE CRITERIANC
NORMALLY CLOSEDNC
NATURAL GAS, HIGH PRESSURENGHP
NOT IN CONTRACTNIC
NORMALLY OPENNO
OUTSIDE AIROA
OUTSIDE DIAMETEROD
PUMPED CONDENSATEPCND
PRESSURE DIFFERENCEPD
ELECTRICAL PHASEPH
PARTS PER MILLIONPPM
POUNDS PER SQUARE FOOTPSF
POUNDS PER SQUARE INCHPSI
RETURN AIRRA
RELATIVE HUMIDITYRH
REVOLUTIONS PER MINUTERPM
SUPPLY AIRSA
SMOKE DAMPERSD
SAFETY FACTORSF
SPECIFIC GRAVITYSG
STATIC PRESSURESP
SQUARESQ
TEMPERATURE DIFFERENCETD
TOTAL STATIC PRESSURETSP
UNDERCUT DOORUC
UP THROUGH ROOFUTR
VOLTAGEV
VARIABLE AIR VOLUMEVAV
VELOCITY PRESSUREVP
VARIABLE REFRIGERANT VOLUME/FLOWVRV/F
VARIABLE VOLUME AND TEMPERATUREVVT
INCHES WATER COLUMNWC
EXISTING TO REMAINX
EXISTING TO BE DEMOLISHEDXD
EXISTING TO BE RELOCATEDXR
EXISTING REMOVED AND RELOCATEDXRR
AIR SYSTEM SYMBOLS
NEW SUPPLY DIFFUSER
NEW RETURN GRILLE
NEW SUPPLY DIFFUSER WITH BLANK OFF PANEL
NEW ROUND SUPPLY DIFFUSER
SURFACE MOUNTED SUPPLY GRILLE
DIRECTION OF AIRFLOW
MANUAL VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
NEW DUCTWORK
EXISTING DUCTWORK TO REMAIN
EXISTING DUCTWORK TO BE DEMOLISHED
EXISTING SUPPLY DIFFUSER
EXISTING RETURN GRILLE
EXISTING EXHAUST GRILLE
NEW EXHAUST GRILLE
POINT OF CONNECTION
POINT OF DISCONNECTION
CONTROL DIAGRAM SYMBOLS
THERMOSTAT
TEMPERATURE SENSOR
HUMIDISTAT
EQUIPMENT SYMBOLS
ELECTRIC UNIT HEATER
ELECTRIC WALL HEATER
ELECTRICAL/CONTROL PANEL
PUMP
ELECTRIC CABINET HEATER
VARIABLE AIR VOLUME BOX
ANNOTATION SYMBOLS
NEW AIR DEVICE TAG
EQUIPMENT TAG
REVISION DELTA
KEY NOTE
EXISTING AIR DEVICE TAG
S = SUPPLY AIR
R = RETURN AIR
E = EXHAUST AIR
M = MAKE-UP AIR
T = TRANSFER AIR
X-###
PIPING SYMBOLS
VENTLESS PRESSURE REGULATOR
PIPE UP
PIPE DOWN
PIPE TEE DOWN
PIPE CONTINUATION
VALVE (REFER TO LABEL FOR TYPE)
CHECK VALVE
PRESSURE REDUCING VALVE
CONTROL VALVE
CONTROL VALVE (3-WAY)
CONTROL VALVE (4-WAY)
STRAINER
STRAINER WITH BLOW DOWN VALVE
PIPE UNION
SURFACE MOUNTED RETURN/EXHAUST GRILLE
NEW SUPPLY PIPING
NEW RETURN PIPING
X XXXX
X"
XXX-X
X
X
M
M
F
S
T S H
X
X DETAIL/SECTION MARKDETAIL #
SHEET #
XXX
XXX
XXX ROOM TAG
M
GAS FIRED UNIT HEATER
CHILLED/HOT WATER COIL
ELECTRIC HEATING COIL
OPPOSED BLADE DAMPER
M PARALLEL BLADE DAMPER
T AVERAGING TEMPERATURE SENSOR
T BULB TEMPERATURE SENSOR
H HUMIDITY SENSOR
PIPING PITCH (POINTING DOWN)X%
A AIRFLOW MEASURING STATION
FAN
FILTER
DIRECTION OF FLOW
NEW LINEAR SLOT DIFFUSER
ACCESS DOOR/PANEL
DUCTWORK CONTINUATION
COMPRESSED AIRAIR
CONDENSATECND
DUAL TEMPERATURE WATER RETURNDTWR
DUAL TEMPERATURE WATER SUPPLYDTWS
INDUSTRIAL COOLING WATER RETURNICWR
INDUSTRIAL COOLING WATER SUPPLYICWS
LOW CONDUCTIVITY WATER RETURNLCWR
LOW CONDUCTIVITY WATER SUPPLY
NATURAL GAS, LOW PRESSURE
LCWS
NGLP
NATURAL GAS, MEDIUM PRESSURENGMP
NITROGEN GASNIT
REFRIGERANTREFR
VACUUM AIRVAC
PROJECT NORTHPN
TRUE NORTHTN
TRITIATED CONDENSATETCND
CHILLED WATER PIPING
HYDRONIC HOT WATER PIPING
CONDENSER WATER PIPING
INDUSTRIAL COOLING WATER PIPING
LOW CONDUCTIVITY WATER PIPING
CONDENSATE DRAIN PIPING
DUAL TEMP WATER PIPING
LOW PRESSURE NATURAL GAS PIPING
MEDIUM PRESSURE NATURAL GAS PIPING
HIGH PRESSURE NATURAL GAS PIPING
DEMO SUPPLY PIPING
DEMO RETURN PIPING
EXISTING SUPPLY PIPING
VARIABLE FREQUENCY DRIVE
EXISTING RETURN PIPING
VFD
VARIABLE SPEED DRIVEVSD
POND WATER RETURNPWR
POND WATER SUPPLYPWS
MOTORIZED DAMPERM
BALANCING VALVE
PIPE END CAP
NOT TO SCALE
UNISTRUT WALL SUPPORT DETAIL
(2) 3/8” DIA HILTI KH-EZ WITH 2-1/2” MINIMUM
EMBEDMENT, OR APPROVED EQUAL.
PROVIDE PLASTIC END CAPS.
VERTICAL PIPE
CLAMP/DUCT CLAMP
LOCATE SUPPORTED LOAD AS CLOSE
TO SHAFT WALL AS POSSIBLE. TRIM
SUPPORT LENGTH TO LIMIT LENGTH OF
SUPPORT NOT TO EXCEED THE DEPTH
OF SUPPORTED LOAD.
UNISTRUT P2542 OR
APPROVED EQUAL
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
M-0
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL SYMBOLS
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
1. REFER TO PROJECT MANUAL FOR COMPLETE PROJECT
SPECIFICATIONS. IF A CONFLICT EXISTS BETWEEN THIS SECTION
AND THE PROJECT MANUAL, THE PROJECT MANUAL SHALL TAKE
PRECEDENCE.
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND
EQUIPMENT
1. APPLICATION
1.1. WHERE NOT INDICATED, SELECT SIZES OF COMPONENTS
SO STRENGTH WILL BE ADEQUATE TO CARRY STATIC LOADS
WITHIN SPECIFIED LOADING LIMITS. REFER TO
SPECIFICATIONS FOR MINIMUM STATIC DESIGN LOADS.
2. INSTALLATION OF HANGERS AND SUPPORTS
2.1. INSTALL HANGERS AND SUPPORTS TO ALLOW CONTROLLED
THERMAL AND SEISMIC MOVEMENT OF PIPING SYSTEMS, TO
PERMIT FREEDOM OF MOVEMENT BETWEEN PIPE ANCHORS,
AND TO FACILITATE ACTION OF EXPANSION JOINTS,
EXPANSION LOOPS, EXPANSION BENDS, AND SIMILAR UNITS.
2.2. INSTALL LATERAL BRACING WITH PIPE HANGERS AND
SUPPORTS TO PREVENT SWAYING.
2.3. INSTALL HANGERS AND SUPPORTS TO PROVIDE INDICATED
PIPE SLOPES AND TO NOT EXCEED MAXIMUM PIPE
DEFLECTIONS ALLOWED BY ASME B31.9 FOR BUILDING
SERVICES PIPING.
2.4. INSULATED PIPING
2.4.1. INSTALL PROTECTION SADDLES IF INSULATION
WITHOUT VAPOR BARRIER IS INDICATED. FILL INTERIOR
VOIDS WITH INSULATION THAT MATCHES ADJOINING
INSULATION.
2.4.2. INSTALL PROTECTIVE SHIELDS ON COLD PIPING WITH
VAPOR BARRIER. SHIELDS ARE TO SPAN AN ARC OF 180
DEGREES.
2.4.3. REFER TO SPECIFICATIONS FOR MINIMUM SHIELD
DIMENSIONS.
2.5. INSTALL HANGERS, SUPPORTS, CLAMPS, AND
ATTACHMENTS AS REQUIRED TO PROPERLY SUPPORT
PIPING FROM THE BUILDING STRUCTURE.
2.6. ARRANGE FOR GROUPING OF PARALLEL RUNS OF PIPING,
AND SUPPORT TOGETHER ON FIELD-ASSEMBLED STRUT
SYSTEMS.
3. ADJUSTING
3.1. ADJUST HANGERS TO DISTRIBUTE LOADS EQUALLY ON
ATTACHMENTS AND TO ACHIEVE INDICATED SLOPE OF PIPE.
3.2. TRIM EXCESS LENGTH OF CONTINUOUS-THREAD HANGER
AND SUPPORT RODS TO 3/4 INCHES
4. PAINTING
4.1. CLEAN WELDS, BOLTED CONNECTIONS, AND ABRADED
AREAS AND APPLY GALVANIZING-REPAIR PAINT TO COMPLY
WITH ASTM A780/A780M.
5. HANGER AND SUPPORT SCHEDULE
5.1. REFER TO SPECIFICATION FOR HANGER AND SUPPORT
SCHEDULE.
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND
EQUIPMENT
1. PREPARATION
1.1. CLEAN PIPING AND EQUIPMENT SURFACES OF
INCOMPATIBLE PRIMERS, PAINTS, AND ENCAPSULANTS, AS
WELL AS DIRT, OIL, GREASE, RELEASE AGENTS, AND OTHER
SUBSTANCES THAT COULD IMPAIR BOND OF IDENTIFICATION
DEVICES
2. INSTALLATION, GENERAL REQUIREMENTS
2.1. COORDINATE INSTALLATION OF IDENTIFYING DEVICES WITH
COMPLETION OF COVERING AND PAINTING OF SURFACES
WHERE DEVICES ARE TO BE APPLIED.
2.2. COORDINATE INSTALLATION OF IDENTIFYING DEVICES WITH
LOCATIONS OF ACCESS PANELS AND DOORS.
2.3. INSTALL IDENTIFYING DEVICES BEFORE INSTALLING
ACOUSTICAL CEILINGS AND SIMILAR CONCEALMENT.
2.4. LOCATE IDENTIFYING DEVICES SO THAT THEY ARE READILY
VISIBLE FROM THE POINT OF NORMAL APPROACH.
3. INSTALLATION OF EQUIPMENT LABELS, WARNING SIGNS, AND
LABELS
3.1. REFER TO SPECIFICATIONS FOR SIGN AND LABEL COLORS.
3.2. LOCATE EQUIPMENT LABELS WHERE ACCESSIBLE AND
VISIBLE.
4. INSTALLATION OF PIPE LABELS
4.1. INSTALL PIPE LABELS SHOWING SERVICE AND FLOW
DIRECTION WITH PERMANENT ADHESIVE ON PIPES.
4.2. PIPE-LABEL LOCATIONS: LOCATE PIPE LABELS WHERE
PIPING IS EXPOSED OR ABOVE ACCESSIBLE CEILINGS IN
FINISHED SPACES; MACHINE ROOMS; ACCESSIBLE
MAINTENANCE SPACES SUCH AS SHAFTS, TUNNELS, AND
PLENUMS; AND EXTERIOR EXPOSED LOCATIONS AS
FOLLOWS:
4.2.1. WITHIN 3 FT. OF EACH VALVE AND CONTROL DEVICE.
4.2.2. AT ACCESS DOORS, MANHOLES, AND SIMILAR ACCESS
POINTS THAT PERMIT VIEW OF CONCEALED PIPING.
4.2.3. WITHIN 3 FT. OF EQUIPMENT ITEMS AND OTHER POINTS
OF ORIGINATION AND TERMINATION.
4.2.4. SPACED AT MAXIMUM INTERVALS OF 25 FT. ALONG
EACH RUN. REDUCE INTERVALS TO 10 FT. IN AREAS OF
CONGESTED PIPING, DUCTWORK, AND EQUIPMENT.
4.3. DO NOT APPLY PLASTIC PIPE LABELS OR PLASTIC TAPES
DIRECTLY TO BARE PIPES CONVEYING FLUIDS AT
TEMPERATURES OF 125 DEG F OR HIGHER. WHERE THESE
PIPES ARE TO REMAIN UNINSULATED, USE A SHORT
SECTION OF INSULATION OR USE STENCILED LABELS.
4.4. FLOW-DIRECTION ARROWS: USE ARROWS TO INDICATE
DIRECTION OF FLOW IN PIPES, INCLUDING PIPES WHERE
FLOW IS ALLOWED IN BOTH DIRECTIONS.
4.5. REFER TO SPECIFICATIONS FOR PIPE LABEL COLOR
SCHEDULE.
5. INSTALLATION OF DUCT LABELS
5.1. INSTALL SELF-ADHESIVE DUCT LABELS SHOWING SERVICE
AND FLOW DIRECTION WITH PERMANENT ADHESIVE ON AIR
DUCTS.
5.2. PROVIDE LABELS IN THE FOLLOWING COLOR CODES:
5.2.1. FOR AIR SUPPLY DUCTS: WHITE LETTERS ON BLUE
BACKGROUND.
5.2.2. FOR AIR RETURN DUCTS: WHITE LETTERS ON BLUE
BACKGROUND.
5.2.3. FOR EXHAUST-, OUTSIDE-, RELIEF-, RETURN-, AND
MIXED-AIR DUCTS: WHITE LETTERS ON BLUE
BACKGROUND.
5.3. LOCATE LABEL NEAR EACH POINT WHERE DUCTS ENTER
INTO AND EXIT FROM CONCEALED SPACES AND AT
MAXIMUM INTERVALS OF 20 FT. WHERE EXPOSED OR ARE
CONCEALED BY REMOVABLE CEILING SYSTEM.
SECTION 230719 - HVAC PIPING INSULATION
1. EXAMINATION
1.1. EXAMINE SUBSTRATES AND CONDITIONS FOR COMPLIANCE
WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND
OTHER CONDITIONS AFFECTING PERFORMANCE OF
INSULATION APPLICATION.
1.2. PROCEED WITH INSTALLATION ONLY AFTER
UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
2. PREPARATION
2.1. CLEAN AND DRY SURFACES TO RECEIVE INSULATION.
REMOVE MATERIALS THAT WILL ADVERSELY AFFECT
INSULATION APPLICATION.
3. GENERAL INSTALLATION REQUIREMENTS
3.1. INSTALL INSULATION MATERIALS, ACCESSORIES, AND
FINISHES WITH SMOOTH, STRAIGHT, AND EVEN SURFACES;
FREE OF VOIDS THROUGHOUT THE LENGTH OF PIPING,
INCLUDING FITTINGS, VALVES, AND SPECIALTIES.
3.2. INSTALL INSULATION MATERIALS, FORMS, VAPOR BARRIERS
OR RETARDERS, JACKETS, AND OF THICKNESSES
REQUIRED FOR EACH ITEM OF PIPE SYSTEM, AS SPECIFIED
IN INSULATION SYSTEM SCHEDULES.
3.3. INSTALL ACCESSORIES COMPATIBLE WITH INSULATION
MATERIALS AND SUITABLE FOR THE SERVICE. INSTALL
ACCESSORIES THAT DO NOT CORRODE, COMPRESS, OR
OTHERWISE DAMAGE INSULATION OR JACKET.
3.4. INSTALL INSULATION WITH LONGITUDINAL SEAMS AT TOP
AND BOTTOM (12 O'CLOCK AND 6 O'CLOCK POSITIONS) OF
HORIZONTAL RUNS.
3.5. INSTALL MULTIPLE LAYERS OF INSULATION WITH
LONGITUDINAL AND END SEAMS STAGGERED.
3.6. DO NOT WELD BRACKETS, CLIPS, OR OTHER ATTACHMENT
DEVICES TO PIPING, FITTINGS, AND SPECIALTIES.
3.7. KEEP INSULATION MATERIALS DRY DURING STORAGE,
APPLICATION, AND FINISHING. REPLACE INSULATION
MATERIALS THAT GET WET DURING STORAGE OR IN THE
INSTALLATION PROCESS BEFORE BEING PROPERLY
COVERED AND SEALED IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
3.8. INSTALL INSULATION WITH TIGHT LONGITUDINAL SEAMS
AND END JOINTS. BOND SEAMS AND JOINTS WITH ADHESIVE
RECOMMENDED BY INSULATION MATERIAL MANUFACTURER.
3.9. INSTALL INSULATION WITH LEAST NUMBER OF JOINTS
PRACTICAL.
3.10. WHERE VAPOR BARRIER IS INDICATED, SEAL JOINTS,
SEAMS, AND PENETRATIONS IN INSULATION AT HANGERS,
SUPPORTS, ANCHORS, AND OTHER PROJECTIONS WITH
VAPOR-BARRIER MASTIC.
3.10.1. INSTALL INSULATION CONTINUOUSLY THROUGH
HANGERS AND AROUND ANCHOR ATTACHMENTS.
3.10.2. FOR INSULATION APPLICATION WHERE VAPOR
BARRIERS ARE INDICATED, EXTEND INSULATION ON
ANCHOR LEGS FROM POINT OF ATTACHMENT TO
SUPPORTED ITEM TO POINT OF ATTACHMENT TO
STRUCTURE. TAPER AND SEAL ENDS ATTACHED TO
STRUCTURE WITH VAPOR-BARRIER MASTIC.
3.10.3. INSTALL INSERT MATERIALS AND INSULATION TO
TIGHTLY JOIN THE INSERT. SEAL INSULATION TO
INSULATION INSERTS WITH ADHESIVE OR SEALING
COMPOUND RECOMMENDED BY INSULATION MATERIAL
MANUFACTURER.
3.10.4. COVER INSERTS WITH JACKET MATERIAL MATCHING
ADJACENT PIPE INSULATION. INSTALL SHIELDS OVER
JACKET, ARRANGED TO PROTECT JACKET FROM TEAR
OR PUNCTURE BY HANGER, SUPPORT, AND SHIELD.
3.11. APPLY ADHESIVES, MASTICS, AND SEALANTS AT
MANUFACTURER'S RECOMMENDED COVERAGE RATE AND
WET AND DRY FILM THICKNESSES.
3.12. INSTALL INSULATION WITH FACTORY-APPLIED JACKETS AS
FOLLOWS:
3.12.1. DRAW JACKET TIGHT AND SMOOTH, BUT NOT TO THE
EXTENT OF CREATING WRINKLES OR AREAS OF
COMPRESSION IN THE INSULATION.
3.12.2. COVER CIRCUMFERENTIAL JOINTS WITH 3-INCH WIDE
STRIPS, OF SAME MATERIAL AS INSULATION JACKET.
SECURE STRIPS WITH ADHESIVE AND
OUTWARD-CLINCHING STAPLES ALONG BOTH EDGES
OF STRIP, SPACED 4 INCHES O.C.
3.12.3. OVERLAP JACKET LONGITUDINAL SEAMS AT LEAST 1-1/2
INCHES. INSTALL INSULATION WITH LONGITUDINAL
SEAMS AT BOTTOM OF PIPE. CLEAN AND DRY SURFACE
TO RECEIVE SELF-SEALING LAP. STAPLE LAPS WITH
OUTWARD-CLINCHING STAPLES ALONG EDGE AT 4
INCHES O.C.
3.12.4. FOR BELOW-AMBIENT SERVICES, APPLY
VAPOR-BARRIER MASTIC OVER STAPLES.
3.12.5. COVER JOINTS AND SEAMS WITH TAPE, IN
ACCORDANCE WITH INSULATION MATERIAL
MANUFACTURER'S WRITTEN INSTRUCTIONS, TO
MAINTAIN VAPOR SEAL.
3.12.6. WHERE VAPOR BARRIERS ARE INDICATED, APPLY
VAPOR-BARRIER MASTIC ON SEAMS AND JOINTS AND
AT ENDS ADJACENT TO PIPE FLANGES AND FITTINGS.
3.13. CUT INSULATION IN A MANNER TO AVOID COMPRESSING
INSULATION.
3.14. FINISH INSTALLATION WITH SYSTEMS AT OPERATING
CONDITIONS. REPAIR JOINT SEPARATIONS AND CRACKING
DUE TO THERMAL MOVEMENT.
3.15. REPAIR DAMAGED INSULATION FACINGS BY APPLYING SAME
FACING MATERIAL OVER DAMAGED AREAS. EXTEND
PATCHES AT LEAST 4 INCHES BEYOND DAMAGED AREAS.
ADHERE, STAPLE, AND SEAL PATCHES IN SIMILAR FASHION
TO BUTT JOINTS.
3.16. FOR ABOVE-AMBIENT SERVICES, DO NOT INSTALL
INSULATION TO THE FOLLOWING:
3.16.1. VIBRATION-CONTROL DEVICES.
3.16.2. TESTING AGENCY LABELS AND STAMPS.
3.16.3. NAMEPLATES AND DATA PLATES.
4. GENERAL PIPE INSULATION INSTALLATION
4.1. REQUIREMENTS IN THIS ARTICLE GENERALLY APPLY TO ALL
INSULATION MATERIALS, EXCEPT WHERE MORE SPECIFIC
REQUIREMENTS ARE SPECIFIED IN VARIOUS PIPE
INSULATION MATERIAL INSTALLATION ARTICLES.
4.2. INSULATION INSTALLATION ON FITTINGS, VALVES,
STRAINERS, FLANGES, MECHANICAL COUPLINGS, AND
UNIONS:
4.2.1. INSTALL INSULATION OVER FITTINGS, VALVES,
STRAINERS, FLANGES, MECHANICAL COUPLINGS,
UNIONS, AND OTHER SPECIALTIES WITH CONTINUOUS
THERMAL AND VAPOR-RETARDER INTEGRITY UNLESS
OTHERWISE INDICATED.
4.2.2. INSULATE PIPE ELBOWS USING PREFABRICATED
FITTING INSULATION MADE FROM SAME MATERIAL AND
DENSITY AS THAT OF ADJACENT PIPE INSULATION.
EACH PIECE IS BUTTED TIGHTLY AGAINST ADJOINING
PIECE AND BONDED WITH ADHESIVE. FILL JOINTS,
SEAMS, VOIDS, AND IRREGULAR SURFACES WITH
INSULATING CEMENT FINISHED TO A SMOOTH, HARD,
AND UNIFORM CONTOUR THAT IS UNIFORM WITH
ADJOINING PIPE INSULATION.
4.2.3. INSULATE TEE FITTINGS WITH PREFABRICATED FITTING
INSULATION OF SAME MATERIAL AND THICKNESS AS
THAT USED FOR ADJACENT PIPE. CUT SECTIONAL PIPE
INSULATION TO FIT. BUTT EACH SECTION CLOSELY TO
THE NEXT AND HOLD IN PLACE WITH TIE WIRE. BOND
PIECES WITH ADHESIVE.
4.2.4. INSULATE VALVES USING PREFABRICATED FITTING
INSULATION OF SAME MATERIAL, DENSITY, AND
THICKNESS AS THAT USED FOR ADJACENT PIPE.
OVERLAP ADJOINING PIPE INSULATION BY NOT LESS
THAN 2 TIMES THE THICKNESS OF PIPE INSULATION, OR
ONE PIPE DIAMETER, WHICHEVER IS THICKER. FOR
VALVES, INSULATE UP TO AND INCLUDING THE
BONNETS, VALVE STUFFING-BOX STUDS, BOLTS, AND
NUTS. FILL JOINTS, SEAMS, AND IRREGULAR SURFACES
WITH INSULATING CEMENT.
4.2.5. INSULATE STRAINERS USING PREFABRICATED FITTING
INSULATION OF SAME MATERIAL, DENSITY, AND
THICKNESS AS THAT USED FOR ADJACENT PIPE.
OVERLAP ADJOINING PIPE INSULATION BY NOT LESS
THAN 2 TIMES THE THICKNESS OF PIPE INSULATION, OR
ONE PIPE DIAMETER, WHICHEVER IS THICKER. FILL
JOINTS, SEAMS, AND IRREGULAR SURFACES WITH
INSULATING CEMENT. INSULATE STRAINERS, SO
STRAINER BASKET FLANGE OR PLUG CAN BE EASILY
REMOVED AND REPLACED WITHOUT DAMAGING THE
INSULATION AND JACKET. PROVIDE A REMOVABLE
REUSABLE INSULATION COVER. FOR BELOW-AMBIENT
SERVICES, PROVIDE A DESIGN THAT MAINTAINS VAPOR
BARRIER.
4.2.6. INSULATE FLANGES, MECHANICAL COUPLINGS, AND
UNIONS USING A SECTION OF OVERSIZED PREFORMED
PIPE INSULATION TO FIT. OVERLAP ADJOINING PIPE
INSULATION BY NOT LESS THAN 2 TIMES THE
THICKNESS OF PIPE INSULATION, OR ONE PIPE
DIAMETER, WHICHEVER IS THICKER. STENCIL OR LABEL
THE OUTSIDE INSULATION JACKET OF EACH UNION
WITH THE WORD "UNION" MATCHING SIZE AND COLOR
OF PIPE LABELS.
4.2.7. COVER SEGMENTED INSULATED SURFACES WITH A
LAYER OF FINISHING CEMENT AND COAT WITH A
MASTIC. INSTALL VAPOR-BARRIER MASTIC FOR
BELOW-AMBIENT SERVICES AND A BREATHER MASTIC
FOR ABOVE-AMBIENT SERVICES. REINFORCE THE
MASTIC WITH REINFORCING MESH. TROWEL THE
MASTIC TO A SMOOTH AND WELL-SHAPED CONTOUR.
4.2.8. FOR SERVICES NOT SPECIFIED TO RECEIVE A
FIELD-APPLIED JACKET, EXCEPT FOR FLEXIBLE
ELASTOMERIC AND POLYOLEFIN, INSTALL FITTED PVC
COVER OVER ELBOWS, TEES, STRAINERS, VALVES,
FLANGES, AND UNIONS. TERMINATE ENDS WITH PVC
END CAPS. TAPE PVC COVERS TO ADJOINING
INSULATION FACING, USING PVC TAPE.
4.3. INSULATE INSTRUMENT CONNECTIONS FOR
THERMOMETERS, PRESSURE GAGES, PRESSURE
TEMPERATURE TAPS, TEST CONNECTIONS, FLOW METERS,
SENSORS, SWITCHES, AND TRANSMITTERS ON INSULATED
PIPES. SHAPE INSULATION AT THESE CONNECTIONS BY
TAPERING IT TO AND AROUND THE CONNECTION WITH
INSULATING CEMENT AND FINISH WITH FINISHING CEMENT,
MASTIC, AND FLASHING SEALANT.
4.4. INSTALL REMOVABLE INSULATION COVERS AT LOCATIONS
INDICATED IN PROJECT MANUAL.
4.5. REFER TO PROJECT MANUAL FOR SPECIFIC INSULATION
MATERIAL INSTALLATION REQUIREMENTS.
4.6. REFER TO PROJECT MANUAL FOR INSULATION SCHEDULE.
SECTION 232113 - HYDRONIC PIPING
1. PIPING APPLICATIONS
1.1. REFER TO PROJECT MANUAL FOR PIPING SCHEDULE.
2. INSTALLATION OF PIPING
2.1. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE
GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS. INDICATED LOCATIONS AND ARRANGEMENTS
ARE USED TO SIZE PIPE AND CALCULATE FRICTION LOSS,
EXPANSION, AND OTHER DESIGN CONSIDERATIONS.
INSTALL PIPING AS INDICATED UNLESS DEVIATIONS TO
LAYOUT ARE APPROVED ON COORDINATION DRAWINGS.
2.2. INSTALL PIPING IN CONCEALED LOCATIONS UNLESS
OTHERWISE INDICATED AND EXCEPT IN EQUIPMENT ROOMS
AND SERVICE AREAS.
2.3. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN
EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES
OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
PROHIBITED UNLESS SPECIFICALLY INDICATED OTHERWISE.
2.4. INSTALL PIPING ABOVE ACCESSIBLE CEILINGS TO ALLOW
SUFFICIENT SPACE FOR CEILING PANEL REMOVAL.
2.5. INSTALL PIPING TO PERMIT VALVE SERVICING.
2.6. INSTALL PIPING AT INDICATED SLOPES.
2.7. INSTALL PIPING FREE OF SAGS AND BENDS.
2.8. INSTALL FITTINGS FOR CHANGES IN DIRECTION AND
BRANCH CONNECTIONS.
2.9. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
2.10. SELECT SYSTEM COMPONENTS WITH PRESSURE RATING
EQUAL TO OR GREATER THAN SYSTEM OPERATING
PRESSURE.
2.11. INSTALL GROUPS OF PIPES PARALLEL TO EACH OTHER,
SPACED TO PERMIT APPLYING INSULATION AND SERVICING
OF VALVES.
2.12. INSTALL DRAINS, CONSISTING OF A TEE FITTING, NPS 3/4
BALL VALVE, AND SHORT NPS 3/4 THREADED NIPPLE WITH
CAP, AT LOW POINTS IN PIPING SYSTEM MAINS AND
ELSEWHERE AS REQUIRED FOR SYSTEM DRAINAGE.
2.13. INSTALL PIPING AT A UNIFORM GRADE OF 0.2 PERCENT
UPWARD IN DIRECTION OF FLOW.
2.14. REDUCE PIPE SIZES USING ECCENTRIC REDUCER FITTING
INSTALLED WITH LEVEL SIDE UP.
2.15. INSTALL BRANCH CONNECTIONS TO MAINS USING TEE
FITTINGS IN MAIN PIPE, WITH THE BRANCH CONNECTED TO
THE BOTTOM OF THE MAIN PIPE. FOR UP-FEED RISERS,
CONNECT THE BRANCH TO THE TOP OF THE MAIN PIPE.
2.16. INSTALL VALVES ACCORDING TO SECTION 230523
"GENERAL-DUTY VALVES FOR HVAC PIPING."
2.17. INSTALL AIR VENTS AND PRESSURE-RELIEF VALVES IN
ACCORDANCE WITH SECTION 232116 "HYDRONIC PIPING
SPECIALTIES."
2.18. INSTALL UNIONS IN PIPING, NPS 2 AND SMALLER, ADJACENT
TO VALVES, AT FINAL CONNECTIONS OF EQUIPMENT, AND
ELSEWHERE AS INDICATED.
2.19. INSTALL FLANGES IN PIPING, NPS 2-1/2 AND LARGER, AT
FINAL CONNECTIONS OF EQUIPMENT AND ELSEWHERE AS
INDICATED.
2.20. INSTALL SHUTOFF VALVE IMMEDIATELY UPSTREAM OF EACH
DIELECTRIC FITTING.
2.21. COMPLY WITH REQUIREMENTS IN SECTION 230500
"COMMON WORK RESULTS FOR HVAC" FOR INSTALLATION
OF EXPANSION LOOPS, EXPANSION JOINTS, ANCHORS, AND
PIPE ALIGNMENT GUIDES.
2.22. COMPLY WITH REQUIREMENTS IN SECTION 230553
"IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT" FOR
IDENTIFYING PIPING.
2.23. INSTALL SLEEVES FOR PIPING PENETRATIONS OF WALLS,
CEILINGS, AND FLOORS. COMPLY WITH REQUIREMENTS FOR
SLEEVES SPECIFIED IN SECTION 230500 "COMMON WORK
RESULTS FOR HVAC."
3. JOINT CONSTRUCTION
3.1. REAM ENDS OF PIPES AND TUBES AND REMOVE BURRS.
BEVEL PLAIN ENDS OF STEEL PIPE.
3.2. REMOVE SCALE, SLAG, DIRT, AND DEBRIS FROM INSIDE AND
OUTSIDE OF PIPE AND FITTINGS BEFORE ASSEMBLY.
3.3. REFER TO PROJECT MANUAL FOR SPECIFIC JOINING
METHOD REQUIREMENTS.
4. INSTALLATION OF HANGERS AND SUPPORTS
4.1. COMPLY WITH REQUIREMENTS IN SECTION 230529
"HANGERS AND SUPPORTS FOR HVAC PIPING AND
EQUIPMENT" FOR HANGERS, SUPPORTS, AND ANCHOR
DEVICES.
4.2. INSTALL HANGERS FOR STEEL PIPING, WITH MAXIMUM
HORIZONTAL SPACING AND MINIMUM ROD DIAMETERS, TO
COMPLY WITH MSS SP-58, LOCALLY ENFORCED CODES, AND
AUTHORITIES HAVING JURISDICTION REQUIREMENTS,
WHICHEVER ARE MOST STRINGENT.
4.3. INSTALL HANGERS FOR PLASTIC PIPING, WITH MAXIMUM
HORIZONTAL SPACING AND MINIMUM ROD DIAMETERS, TO
COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS,
LOCALLY ENFORCED CODES, AND AUTHORITIES HAVING
JURISDICTION REQUIREMENTS, WHICHEVER ARE MOST
STRINGENT.
4.4. INSTALL HANGERS FOR FIBERGLASS PIPING, WITH MAXIMUM
HORIZONTAL SPACING AND MINIMUM ROD DIAMETERS, TO
COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS,
LOCALLY ENFORCED CODES, AND AUTHORITIES HAVING
JURISDICTION REQUIREMENTS, WHICHEVER ARE MOST
STRINGENT.
4.5. SUPPORT HORIZONTAL PIPING WITHIN 12 INCHES OF EACH
FITTING AND COUPLING.
4.6. SUPPORT VERTICAL RUNS OF STEEL PIPING TO COMPLY
WITH MSS SP-58, LOCALLY ENFORCED CODES, AND
AUTHORITIES HAVING JURISDICTION REQUIREMENTS,
WHICHEVER ARE MOST STRINGENT.
5. IDENTIFICATION
5.1. IDENTIFY SYSTEM COMPONENTS. COMPLY WITH
REQUIREMENTS FOR IDENTIFICATION MATERIALS AND
INSTALLATION IN SECTION 230553 "IDENTIFICATION FOR
HVAC PIPING AND EQUIPMENT."
6. SYSTEM STARTUP
6.1. PERFORM THE FOLLOWING BEFORE OPERATING THE
SYSTEM:
6.1.1. OPEN MANUAL VALVES FULLY.
6.1.2. INSPECT PUMPS FOR PROPER ROTATION.
6.1.3. SET MAKEUP PRESSURE-REDUCING VALVES FOR
REQUIRED SYSTEM PRESSURE.
6.1.4. INSPECT AIR VENTS AT HIGH POINTS OF SYSTEM AND
DETERMINE IF ALL ARE INSTALLED AND OPERATING
FREELY (AUTOMATIC TYPE), OR BLEED AIR
COMPLETELY (MANUAL TYPE).
6.1.5. SET TEMPERATURE CONTROLS SO ALL COILS ARE
CALLING FOR FULL FLOW.
6.1.6. INSPECT AND SET OPERATING TEMPERATURES OF
HYDRONIC EQUIPMENT, SUCH AS BOILERS, CHILLERS,
COOLING TOWERS, TO SPECIFIED VALUES.
6.1.7. VERIFY LUBRICATION OF MOTORS AND BEARINGS.
7. FIELD QUALITY CONTROL
7.1. PREPARE HYDRONIC PIPING IN ACCORDANCE WITH ASME
B31.9 AND AS FOLLOWS:
7.1.1. LEAVE JOINTS, INCLUDING WELDS, UNINSULATED AND
EXPOSED FOR EXAMINATION DURING TEST.
7.1.2. PROVIDE TEMPORARY RESTRAINTS FOR EXPANSION
JOINTS THAT CANNOT SUSTAIN REACTIONS DUE TO
TEST PRESSURE. IF TEMPORARY RESTRAINTS ARE
IMPRACTICAL, ISOLATE EXPANSION JOINTS FROM
TESTING.
7.1.3. FLUSH HYDRONIC PIPING SYSTEMS WITH CLEAN
WATER; THEN REMOVE AND CLEAN OR REPLACE
STRAINER SCREENS.
7.1.4. ISOLATE EQUIPMENT FROM PIPING. IF A VALVE IS USED
TO ISOLATE EQUIPMENT, ITS CLOSURE IS TO BE
CAPABLE OF SEALING AGAINST TEST PRESSURE
WITHOUT DAMAGE TO VALVE. INSTALL BLINDS IN
FLANGED JOINTS TO ISOLATE EQUIPMENT.
7.1.5. INSTALL PRESSURE-RELIEF VALVE, SET AT A PRESSURE
NO MORE THAN ONE-THIRD HIGHER THAN TEST
PRESSURE, TO PROTECT AGAINST DAMAGE BY
EXPANDING LIQUID OR OTHER SOURCE OF
OVERPRESSURE DURING TEST.
7.2. PERFORM THE FOLLOWING TESTS ON HYDRONIC PIPING:
7.2.1. USE AMBIENT-TEMPERATURE WATER AS A TESTING
MEDIUM UNLESS THERE IS RISK OF DAMAGE DUE TO
FREEZING. ANOTHER LIQUID THAT IS SAFE FOR
WORKERS AND COMPATIBLE WITH PIPING MAY BE
USED.
7.2.2. WHILE FILLING SYSTEM, USE VENTS INSTALLED AT HIGH
POINTS OF SYSTEM TO RELEASE AIR. USE DRAINS
INSTALLED AT LOW POINTS FOR COMPLETE DRAINING
OF TEST LIQUID.
7.2.3. ISOLATE EXPANSION TANKS AND DETERMINE THAT
HYDRONIC SYSTEM IS FULL OF WATER.
7.2.4. SUBJECT PIPING SYSTEM TO HYDROSTATIC TEST
PRESSURE THAT IS NOT LESS THAN 1.5 TIMES THE
SYSTEM'S WORKING PRESSURE. TEST PRESSURE IS
NOT TO EXCEED MAXIMUM PRESSURE FOR ANY
VESSEL, PUMP, VALVE, OR OTHER COMPONENT IN
SYSTEM UNDER TEST. VERIFY THAT STRESS DUE TO
PRESSURE AT BOTTOM OF VERTICAL RUNS DOES NOT
EXCEED 90 PERCENT OF SPECIFIED MINIMUM YIELD
STRENGTH OR 1.7 TIMES THE "SE" VALUE IN APPENDIX
A IN ASME B31.9.
7.2.5. AFTER HYDROSTATIC TEST PRESSURE HAS BEEN
APPLIED FOR AT LEAST 10 MINUTES, EXAMINE PIPING,
JOINTS, AND CONNECTIONS FOR LEAKAGE. ELIMINATE
LEAKS BY TIGHTENING, REPAIRING, OR REPLACING
COMPONENTS, AND REPEAT HYDROSTATIC TEST UNTIL
THERE ARE NO LEAKS.
7.2.6. PREPARE WRITTEN REPORT OF TESTING.
SECTION 233113 - METAL DUCTS
1. DUCT INSTALLATION
1.1. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE
GENERAL LOCATION AND ARRANGEMENT OF DUCT SYSTEM.
INDICATED DUCT LOCATIONS, CONFIGURATIONS, AND
ARRANGEMENTS WERE USED TO SIZE DUCTS AND
CALCULATE FRICTION LOSS FOR AIR-HANDLING EQUIPMENT
SIZING AND FOR OTHER DESIGN CONSIDERATIONS. INSTALL
DUCT SYSTEMS AS INDICATED UNLESS DEVIATIONS TO
LAYOUT ARE APPROVED ON SHOP DRAWINGS AND
COORDINATION DRAWINGS.
1.2. INSTALL DUCTS IN ACCORDANCE WITH SMACNA'S "HVAC
DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE"
UNLESS OTHERWISE INDICATED.
1.3. INSTALL DUCTS IN MAXIMUM PRACTICAL LENGTHS WITH
FEWEST POSSIBLE JOINTS.
1.4. INSTALL FACTORY- OR SHOP-FABRICATED FITTINGS FOR
CHANGES IN DIRECTION, SIZE, AND SHAPE AND FOR
BRANCH CONNECTIONS.
1.5. UNLESS OTHERWISE INDICATED, INSTALL DUCTS
VERTICALLY AND HORIZONTALLY, AND PARALLEL AND
PERPENDICULAR TO BUILDING LINES.
1.6. INSTALL DUCTS CLOSE TO WALLS, OVERHEAD
CONSTRUCTION, COLUMNS, AND OTHER STRUCTURAL AND
PERMANENT ENCLOSURE ELEMENTS OF BUILDING.
1.7. INSTALL DUCTS WITH A CLEARANCE OF 1 INCH, PLUS
ALLOWANCE FOR INSULATION THICKNESS.
1.8. ROUTE DUCTS TO AVOID PASSING THROUGH
TRANSFORMER VAULTS AND ELECTRICAL EQUIPMENT
ROOMS AND ENCLOSURES.
1.9. WHERE DUCTS PASS THROUGH NON-FIRE-RATED INTERIOR
PARTITIONS AND EXTERIOR WALLS AND ARE EXPOSED TO
VIEW, COVER THE OPENING BETWEEN THE PARTITION AND
DUCT OR DUCT INSULATION WITH SHEET METAL FLANGES
OF SAME METAL THICKNESS AS THE DUCT. OVERLAP
OPENINGS ON FOUR SIDES BY AT LEAST 1-1/2 INCHES.
1.10. PROTECT DUCT INTERIORS FROM MOISTURE,
CONSTRUCTION DEBRIS AND DUST, AND OTHER FOREIGN
MATERIALS BOTH BEFORE AND AFTER INSTALLATION.
1.11. ELBOWS: USE LONG-RADIUS ELBOWS WHEREVER THEY FIT.
1.11.1. FABRICATE 90-DEGREE RECTANGULAR MITERED
ELBOWS TO INCLUDE TURNING VANES.
1.11.2. FABRICATE 90-DEGREE ROUND ELBOWS WITH A
MINIMUM OF THREE SEGMENTS FOR 12 INCHES AND
SMALLER AND A MINIMUM OF FIVE SEGMENTS FOR 14
INCHES AND LARGER.
1.12. BRANCH CONNECTIONS: USE LATERAL OR CONICAL
BRANCH CONNECTIONS.
2. INSTALLATION OF EXPOSED DUCTWORK
2.1. PROTECT DUCTS EXPOSED IN FINISHED SPACES FROM
BEING DENTED, SCRATCHED, OR DAMAGED.
2.2. TRIM DUCT SEALANTS FLUSH WITH METAL. CREATE A
SMOOTH AND UNIFORM EXPOSED BEAD. DO NOT USE
TWO-PART TAPE SEALING SYSTEM.
2.3. GRIND WELDS TO PROVIDE SMOOTH SURFACE FREE OF
BURRS, SHARP EDGES, AND WELD SPLATTER. WHEN
WELDING STAINLESS STEEL WITH A NO. 3 OR 4 FINISH,
GRIND THE WELDS FLUSH, POLISH THE EXPOSED WELDS,
AND TREAT THE WELDS TO REMOVE DISCOLORATION
CAUSED BY WELDING.
2.4. MAINTAIN CONSISTENCY, SYMMETRY, AND UNIFORMITY IN
ARRANGEMENT AND FABRICATION OF FITTINGS, HANGERS
AND SUPPORTS, DUCT ACCESSORIES, AND AIR OUTLETS.
2.5. REPAIR OR REPLACE DAMAGED SECTIONS AND FINISHED
WORK THAT DOES NOT COMPLY WITH THESE
REQUIREMENTS.
3. DUCT SEALING
3.1. SEAL DUCTS AT A MINIMUM TO THE FOLLOWING SEAL
CLASSES IN ACCORDANCE WITH SMACNA'S "HVAC DUCT
CONSTRUCTION STANDARDS - METAL AND FLEXIBLE":
3.1.1. COMPLY WITH SMACNA'S "HVAC DUCT CONSTRUCTION
STANDARDS - METAL AND FLEXIBLE."
3.1.2. CONDITIONED SPACE, SUPPLY-AIR DUCTS IN PRESSURE
CLASSES 2-INCH WG AND LOWER: SEAL CLASS C.
4. HANGER AND SUPPORT INSTALLATION
4.1. COMPLY WITH SMACNA'S "HVAC DUCT CONSTRUCTION
STANDARDS - METAL AND FLEXIBLE," CHAPTER 5, "HANGERS
AND SUPPORTS."
4.2. BUILDING ATTACHMENTS: CONCRETE INSERTS,
POWDER-ACTUATED FASTENERS, OR STRUCTURAL-STEEL
FASTENERS APPROPRIATE FOR CONSTRUCTION MATERIALS
TO WHICH HANGERS ARE BEING ATTACHED.
4.2.1. WHERE PRACTICAL, INSTALL CONCRETE INSERTS
BEFORE PLACING CONCRETE.
4.2.2. INSTALL POWDER-ACTUATED CONCRETE FASTENERS
AFTER CONCRETE IS PLACED AND COMPLETELY
CURED.
4.2.3. USE POWDER-ACTUATED CONCRETE FASTENERS FOR
STANDARD-WEIGHT AGGREGATE CONCRETES OR FOR
SLABS MORE THAN 4 INCHES THICK.
4.2.4. DO NOT USE POWDER-ACTUATED CONCRETE
FASTENERS FOR LIGHTWEIGHT-AGGREGATE
CONCRETES OR FOR SLABS LESS THAN 4 INCHES
THICK.
4.3. HANGER SPACING: COMPLY WITH SMACNA'S "HVAC DUCT
CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," TABLE
5-1, "RECTANGULAR DUCT HANGERS MINIMUM SIZE," AND
TABLE 5-2, "MINIMUM HANGER SIZES FOR ROUND DUCT,"
FOR MAXIMUM HANGER SPACING; INSTALL HANGERS AND
SUPPORTS WITHIN 24 INCHES OF EACH ELBOW AND WITHIN
48 INCHES OF EACH BRANCH INTERSECTION.
4.4. HANGERS EXPOSED TO VIEW: THREADED ROD AND ANGLE
OR CHANNEL SUPPORTS.
4.5. SUPPORT VERTICAL DUCTS WITH STEEL ANGLES OR
CHANNEL SECURED TO THE SIDES OF THE DUCT WITH
WELDS, BOLTS, SHEET METAL SCREWS, OR BLIND RIVETS;
SUPPORT AT EACH FLOOR AND AT A MAXIMUM INTERVALS
OF 16 FEET.
4.6. INSTALL UPPER ATTACHMENTS TO STRUCTURES. SELECT
AND SIZE UPPER ATTACHMENTS WITH PULL-OUT, TENSION,
AND SHEAR CAPACITIES APPROPRIATE FOR SUPPORTED
LOADS AND BUILDING MATERIALS WHERE USED.
5. DUCTWORK CONNECTIONS
5.1. COMPLY WITH SMACNA'S "HVAC DUCT CONSTRUCTION
STANDARDS - METAL AND FLEXIBLE" FOR BRANCH, OUTLET
AND INLET, AND TERMINAL UNIT CONNECTIONS.
6. DUCT SCHEDULE
6.1. REFER TO PROJECT MANUAL FOR DUCT SCHEDULE.
MECHANICAL INSTALLATION NOTES
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
M-0.1
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL
SPECIFICATIONS---- ----
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
A
B
MECH DEMO PLAN (750'-0" ELEV.)
1/8" = 1'-0"
MECH DEMO PLAN (430'-0" ELEV.)
1/8" = 1'-0"
1,2,3
MD-2
1,2,3
MD-3
1,2,3
MD-2
1,2,3
MD-3
DEMOLISH EXISTING 26"Ø SUPPLY DUCT.
DEMOLISH REMAINING UNUSED SUPPORT.
COORDINATE DEMOLITION WITH
RELOCATION OF EXISTING STAINLESS STEEL
OIL FILL PIPING. EXISTING DUCTWORK TO
REMAIN IN BUILDING TRENCH.
DEMOLISH EXISTING 26"Ø SUPPLY DUCT
AS SHOWN. EXISTING HORIZONTAL
DISTRIBUTION DUCT TO REMAIN FOR
FUTURE CONNECTION.
1. REFER TO SHEET M-0.1 AND PROJECT MANUAL FOR SPECIFIC
INSTALLATION REQUIREMENTS.
2. INSTALL ALL NEW DUCTWORK PRIOR TO DEMOLITION OF
EXISTING DUCTWORK. DEMOLISH EXISTING DUCTWORK AND
RECONNECT NEW DUCTWORK IN SUCH A WAY TO LIMIT
AMOUNT OF DOWNTIME ON AIR SYSTEM.
3. COORDINATE AHU-2 DOWNTIME WITH FERMI CONSTRUCTION
COORDINATOR.
4. COORDINATE SHAFT ACCESS WITH FERMI CONSTRUCTION
COORDINATOR. ONGOING ACCESS TO SHAFT MAY BE
REQUIRED BE FERMI STAFF AND A COORDINATED ACCESS
SCHEDULE IS A PROJECT REQUIREMENT.
MECHANICAL SHEET NOTES
26"Ø
26"Ø
26"Ø
EXISTING 4" CHILLED WATER
SUPPLY AND RETURN
RISERS TO REMAIN.
EXISTING 6" SUMP
FORCE MAIN. REFER TO
PLUMBING DRAWINGS.
EXISTING 1" STAINLESS STEEL
OIL FILL PIPING. REFER TO
PLUMBING DRAWINGS.
EXISTING 4" CHILLED WATER
SUPPLY AND RETURN
RISERS TO REMAIN.
EXISTING 6" SUMP
FORCE MAIN. REFER TO
PLUMBING DRAWINGS.
EXISTING 1" STAINLESS STEEL
OIL FILL PIPING. REFER TO
PLUMBING DRAWINGS.
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
MD-1
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL DEMO PLANS
1/8"=1'-0" 8 0 8 16
SCALE FEET
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
W
S
E
PNTN
RISER SHAFT SECTION - DEMO
1/8" = 1'-0"
1 RISER SHAFT SECTION - DEMO
1/8" = 1'-0"
2 RISER SHAFT SECTION - DEMO
1/8" = 1'-0"
T / FLOOR NUMI SERVICE BLDG.
748' - 6"
740' - 0"
730' - 0"
720' - 0"
710' - 0"
700' - 0"
690' - 0"
680' - 0"
670' - 0"
660' - 0"
650' - 0"
640' - 0"
630' - 0"
620' - 0"
610' - 0"
600' - 0"
590' - 0"
580' - 0"
570' - 0"
560' - 0"
550' - 0"
540' - 0"
530' - 0"
520' - 0"
510' - 0"
500' - 0"
490' - 0"
480' - 0"
470' - 0"
460' - 0"
450' - 0"
440' - 0"
430' - 0"
630' - 0" 510' - 0"
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINE
406' - 0"
DEMOLISH EXISTING 26"Ø SUPPLY
DUCT. COORDINATE DEMOLITION
WITH RELOCATION OF EXISTING
STAINLESS STEEL OIL FILL PIPING.
"Ø
26"Ø
26"Ø
"Ø
"Ø
EXISTING SHAFT
DRAINAGE GUTTER
SYSTEM. DO NOT
DISTURB.
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
MD-2
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL DEMO
SECTIONS---- ----
1/8"=1'-0" 8 0 8 16
SCALE FEET
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
T / FLOOR NUMI SERVICE BLDG.
748' - 6"
740' - 0"
730' - 0"
720' - 0"
710' - 0"
700' - 0"
690' - 0"
680' - 0"
670' - 0"
660' - 0"
650' - 0"
640' - 0"
630' - 0"
620' - 0"
610' - 0"
600' - 0"
590' - 0"
580' - 0"
570' - 0"
560' - 0"
550' - 0"
540' - 0"
530' - 0"
520' - 0"
510' - 0"
500' - 0"
490' - 0"
480' - 0"
470' - 0"
460' - 0"
450' - 0"
440' - 0"
430' - 0"
RISER SHAFT SECTION - DEMO
1/8" = 1'-0"
1 RISER SHAFT SECTION - DEMO
1/8" = 1'-0"
2 RISER SHAFT SECTION - DEMO
1/8" = 1'-0"
630' - 0"
510' - 0"
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINE
406' - 0"
DEMOLISH EXISTING 26"Ø SUPPLY
DUCT AND SUPPORTS.
COORDINATE DEMOLITION WITH
REMOVAL OF EXISTING STAINLESS
STEEL OIL FILL PIPING.
"Ø
"Ø
"Ø
EXISTING SHAFT
DRAINAGE GUTTER
SYSTEM. DO NOT
DISTURB.
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
MD-3
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL DEMO
SECTIONS---- ----
1/8"=1'-0" 8 0 8 16
SCALE FEET
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
B
M-4
M-4
MECHANICAL FLOOR PLAN (750'-0" ELEV.)
1/8" = 1'-0"
MECHANICAL FLOOR PLAN (430'-0" ELEV.)
1/8" = 1'-0"
INSTALL NEW 26"Ø
SUPPLY DUCT AND
SUPPORTS.
INSTALL NEW 26"Ø
SUPPLY DUCT AND
CONNECT TO EXISTING.
CONNECT NEW 26"Ø
SUPPLY DUCT TO
EXISTING
26"Ø SA
26"Ø
26"Ø
26"Ø SA
1. REFER TO SHEET M-0.1 AND PROJECT MANUAL FOR SPECIFIC
INSTALLATION REQUIREMENTS.
2. INSTALL ALL NEW DUCTWORK PRIOR TO DEMOLITION OF
EXISTING DUCTWORK. DEMOLISH EXISTING DUCTWORK AND
RECONNECT NEW DUCTWORK IN SUCH A WAY TO LIMIT
AMOUNT OF DOWNTIME ON AIR SYSTEM.
3. COORDINATE AHU-2 DOWNTIME WITH FERMI CONSTRUCTION
COORDINATOR.
4. COORDINATE SHAFT ACCESS WITH FERMI CONSTRUCTION
COORDINATOR. ONGOING ACCESS TO SHAFT MAY BE
REQUIRED BE FERMI STAFF AND A COORDINATED ACCESS
SCHEDULE IS A PROJECT REQUIREMENT.
5. HOT TAP CONNECT NEW CHILLED WATER PIPING TAKE-OFFS
TO PREVENT DROP IN CHILLED WATER SERVICE TO
UNDERGROUND ENCLOSURE.
MECHANICAL SHEET NOTES
MECHANICAL PLAN (733'-0" ELEV.)
1/8" = 1'-0"
MECHANICAL PLAN (580'-0" ELEV.)
1/8" = 1'-0"
MECHANICAL PLAN (440'-0" ELEV.)
1/8" = 1'-0"
PROVIDE SET OF VALVED AND
CAPPED CHILLED WATER SUPPLY
AND RETURN TAKE-OFFS AT THE
ELEVATION NOTED. REFER TO
ELEVATION VIEW FOR PIPE SIZE.
FUTURE CONNECTION BY FERMILAB.
PROVIDE SET OF VALVED AND
CAPPED CHILLED WATER SUPPLY
AND RETURN TAKE-OFFS AT THE
ELEVATION NOTED. REFER TO
ELEVATION VIEW FOR PIPE SIZE.
FUTURE CONNECTION BY FERMILAB.
PROVIDE SET OF VALVED AND
CAPPED CHILLED WATER SUPPLY
AND RETURN TAKE-OFFS AT THE
ELEVATION NOTED. REFER TO
ELEVATION VIEW FOR PIPE SIZE.
FUTURE CONNECTION BY FERMILAB.
26"Ø SA
26"Ø SA
26"Ø SA
1,2,3 M-2
1,2,3 M-3
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
M-1
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL FLOOR PLANS
1/8"=1'-0" 8 0 8 16
SCALE FEET
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
W
S
RISER SHAFT SECTION - NEW
1 RISER SHAFT SECTION - NEW
1/8" = 1'-0"
2 RISER SHAFT SECTION - NEW
1/8" = 1'-0"
T / FLOOR NUMI SERVICE BLDG.
748' - 6"
740' - 0"
730' - 0"
720' - 0"
710' - 0"
700' - 0"
690' - 0"
680' - 0"
670' - 0"
660' - 0"
650' - 0"
640' - 0"
630' - 0"
620' - 0"
610' - 0"
600' - 0"
590' - 0"
580' - 0"
570' - 0"
560' - 0"
550' - 0"
540' - 0"
530' - 0"
520' - 0"
510' - 0"
500' - 0"
490' - 0"
480' - 0"
470' - 0"
460' - 0"
450' - 0"
440' - 0"
430' - 0"
630' - 0" 510' - 0"
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINE
406' - 0"
INSTALL NEW 26"Ø
SUPPLY DUCT AND
SUPPORTS.
"Ø
PROVIDE THREE PAIRS OF 1"
PIPE TAKE-OFF AT ELEVATIONS
NOTED. TERMINATE WITH VALVE
FOR FUTURE CONNECTION
PROVIDE FLANGED COLLAR
CONNECTIONS AT POINTS
NOTED FOR FUTURE DUCT
REMOVAL BY OWNER
"Ø
PROVIDE DUCTWORK TO SMOOTHLY
TRANSITION FROM VERTICAL RISER
TO EXISTING HORIZONTAL
DISTRIBUTION DUCTWORK.
26"Ø
26"Ø
"Ø
EXISTING SHAFT
DRAINAGE GUTTER
SYSTEM. DO NOT
DISTURB.
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
M-2
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL SECTIONS
1/8"=1'-0" 8 0 8 16
SCALE FEET
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
740' - 0"
730' - 0"
720' - 0"
710' - 0"
700' - 0"
690' - 0"
680' - 0"
670' - 0"
660' - 0"
650' - 0"
640' - 0"
630' - 0"
620' - 0"
610' - 0"
600' - 0"
590' - 0"
580' - 0"
570' - 0"
560' - 0"
550' - 0"
540' - 0"
530' - 0"
520' - 0"
510' - 0"
500' - 0"
490' - 0"
480' - 0"
470' - 0"
460' - 0"
450' - 0"
440' - 0"
430' - 0"
RISER SHAFT SECTION - NEW
1/8" = 1'-0"
1 RISER SHAFT SECTION - NEW
1/8" = 1'-0"
2 RISER SHAFT SECTION - NEW
1/8" = 1'-0"
630' - 0"
510' - 0"
MATCHLINE
MATCHLINE
MATCHLINE
MATCHLINE
406' - 0"
INSTALL NEW 26"Ø
SUPPLY DUCT AND
SUPPORTS.
"Ø
"Ø
PROVIDE DUCTWORK TO SMOOTHLY
TRANSITION FROM VERTICAL RISER
TO EXISTING HORIZONTAL
DISTRIBUTION DUCTWORK.
"Ø
EXISTING SHAFT
DRAINAGE GUTTER
SYSTEM. DO NOT
DISTURB.
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
M ec ha ni ca l.d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
M-3
Ja n.
8, IS
SU
ED
F O
R B
ID
MECHANICAL SECTIONS
1/8"=1'-0" 8 0 8 16
SCALE FEET
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
CO
HB
FPHB
FD FD
FS
HD
OFD
OSD
RD
ABBREVIATIONS
ATMOSPHERIC VENT
ABOVE FINISHED FLOOR
AVERAGE
AFF
ATV
AVG
BACKFLOW PREVENTERBFP
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BTU PER HOURBTUH
FEET PER MINUTEFPM
FEETFT
FOOT POUNDFT LB
GAUGEGA
GALLONGAL
GALLONS PER DAYGPD
HEADHD
HORSEPOWERHP
INNER DIAMETERID
INVERT ELEVATIONIE
KILOWATTKW
POUNDSLBS
LINEAR FEETLF
THOUSAND BTUS PER HOURMBH
MAKEUP WATERMUW
NEWN
NOT APPLICABLEN/A
NORMALLY CLOSEDNC
NOT IN CONTRACTNIC
NORMALLY OPENNO
OUTSIDE DIAMETEROD
PRESSURE DIFFERENCEPD
ELECTRICAL PHASEPH
PARTS PER MILLIONPPM
POUNDS PER SQUARE FOOTPSF
POUNDS PER SQUARE INCHPSI
REDUCED PRESSURE ZONE DEVICERPZ
SAFETY FACTORSF
SPECIFIC GRAVITYSG
STATIC PRESSURESP
SQUARESQ
UP THROUGH ROOFUTR
VENTV
VELOCITY PRESSUREVP
EXISTING TO REMAINX
EXISTING TO BE DEMOLISHEDXD
EXISTING TO BE RELOCATEDXR
EXISTING REMOVED AND RELOCATEDXRR
POINT OF CONNECTION
POINT OF DISCONNECTION
PUMP
ANNOTATION SYMBOLS
EQUIPMENT TAG
REVISION DELTA
KEY NOTE
PIPING SYMBOLS
PIPE UP
PIPE DOWN
PIPE TEE DOWN
PIPE CONTINUATION
PIPE CAP
CHECK VALVE
PRESSURE REDUCING VALVE
PIPE UNION
NEW PIPING
XXX-X
X
X
X
X DETAIL/SECTION MARKDETAIL #
SHEET #
XXX
XXX
XXX ROOM TAG
PIPING PITCH (POINTING DOWN)X%
DIRECTION OF FLOW
PROJECT NORTHPN
TRUE NORTHTN
CLEANOUTCO
SANITARY SEWERSAN
SERVICE SINKSS
ROOF DRAINRD
OVERFLOW DRAINOFD
FLOOR DRAINFD
REVOLUTIONS PER MINUTERPM
BELOW FINISHED CEILINGBFC
HOSE BIBBHB
PRESSURE REDUCING VALVEPRV
OPEN SIGHT DRAINOSD
FLOOR SINKFS
VOLTAGEV
VENT THROUGH ROOFVTR
WATER CLOSETWC
LAVATORYLAV
WATER HEATERWH
DOMESTIC COLD WATERDCW
DOMESTIC HOT WATERDHW
DIAMETERDIA
DRINKING FOUNTAINDF
DOWNDN
ELEVATIONEL./ELEV.
EXPANSION TANKET
ELECTRIC WATER COOLEREWC
FAUCETF
MOP SINKMS
STORM SEWERSTRM
THERMOSTATIC MIXING VALVETMV
URINALUR
DOWNSPOUTDS
REVERSE OSMOSISRO
DRAIN WASTE VENTDWV
SUPPLY FIXTURE UNITSSFU
DRAINAGE FIXTURE UNITSDFU
GALLONS PER MINUTEGPM
GALLONS PER HOURGPH
INCHESIN
MANUAL AIR VENTMAV
AREA DRAINAD
NET POSITIVE SUCTION HEADNPSH
AUTOMATIC AIR VENTAAV
EMERGENCY EYE WASHEEW
EMERGENCY SHOWERESH
ELEVATOR SUMP PUMPESP
ELECTRIC WATER HEATEREWH
FLOOR CLEANOUTFCO
FREEZE PROOF HOSE BIBBFPHB
STRAINER
STRAINER WITH BLOW DOWN VALVE
DEMO PIPING
EXISTING PIPING
DOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER PIPING
SANITARY SEWER PIPING
STORM SEWER PIPING
SANITARY VENT PIPING
ELECTRIC WATER COOLER
FIXTURE/EQUIPMENT SYMBOLS
AIR VENT
DRINKING FOUNTAIN
EMERGENCY EYE WASH
EMERGENCY SHOWER
BACKFLOW PREVENTER
FLOOR CLEANOUT
FLOOR DRAIN
FREEZE PROOF HOSE BIBB
FLOOR SINK
HOSE BIBB
LAVATORY
MOP SINK/RECEPTOR
OVERFLOW DRAIN
OPEN SIGHT DRAIN
ROOF DRAIN
REDUCED PRESSURE ZONE DEVICE
SERVICE SINK
URINAL, FLOOR MOUNT
WATER CLOSET, TANK TYPE
WATER HEATER (INSTANTANEOUS)
WATER HEATER (STORAGE TANK)
HUB DRAIN
WATER CLOSET, FLUSH VALVE FLOOR MOUNT
WATER CLOSET, FLUSH VALVE WALL MOUNT
URINAL, WALL MOUNT
WATER CLEANOUTWCO
J an
8,
- 1
0:
am H
:\A ct iv e
Pr oj ec ts
\6 \7
N uM
I\1
M
AG
IS
-1
S up po rt Fr am in g\
- F in al D es ig n\ D ra w in gs
\6 -7
-1
Pl um bi ng .d w g
12/9/2025A. TAYLOR
A. TAYLOR
A. BIELSKUS
J. WILLS
12/9/2025
12/9/2025
12/9/2025
6-7-111
MAGIS-100 INFRASTRUCTURE
MODIFICATIONS
P-0
Ja n.
8, IS
SU
ED
F O
R B
ID
PLUMBING SYMBOLS
785----
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
1. REFER TO PROJECT MANUAL FOR COMPLETE PROJECT
SPECIFICATIONS. IF A CONFLICT EXISTS BETWEEN THIS SECTION
AND THE PROJECT MANUAL, THE PROJECT MANUAL SHALL TAKE
PRECEDENCE.
SECTION 220523 - GENERAL-DUTY VALVES FOR PLUMBING PIPING
1. EXAMINATION
1.1. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.
1.2. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.
1.3. Examine threads on valve and mating pipe for form and cleanliness.
1.4. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.
1.5. Examine press fittings to verify they have been properly pressed.
1.6. Do not attempt to repair defective valves; replace with new valves.
Remove defective valves from site.
2. INSTALLATION OF VALVES
2.1. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
2.2. Provide support of piping adjacent to valves such that no force is imposed upon valves.
2.3. Locate valves for easy access and where not blocked by
equipment, other piping, or building components.
2.4. For valves in horizontal piping, install valves with stem at or above center of pipe.
2.4.1. For flanged valves, position valve with minimum one bolt hole above horizontal.
2.4.2. For screw valves, position valve stem at minimum 30° above horizontal.
2.5. Install valves in position that does not project into aisles or block access to other equipment.
2.6. Install valves in position to allow full stem and actuator or manual operator movement.
2.7. Install valves in position to allow full maintenance of valve.
2.8. Install valves as nearly as possible to the locations indicated on drawings.
2.8.1. Any change in valve location must be so indicated on the record drawings.
2.9. Verify that joints of each valve have been properly installed and sealed to assure there is no leakage or damage.
2.10. All valves must be true and straight at the time the system is tested and inspected for final acceptance.
2.11. Adhere to manufacturer's written installation instructions. When soldering or brazing valves, do not heat valves above maximum permitted temperature. Do not use solder with melting point temperature above valve manufacturer's written recommended maximum.
3. ADJUSTING
3.1. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing.
Replace valves if persistent leaking occurs.
4. GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
4.1. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
4.2. Refer to project manual for valve schedule.
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING
AND EQUIPMENT
1. APPLICATION
1.1. Strength of Support Assemblies: Where not indicated, select sizes of components, so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination is to include weight of supported components plus 200 lb.
2. INSTALLATION OF HANGERS AND SUPPORTS
2.1. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
2.2. Install lateral bracing with pipe hangers and supports to prevent swaying.
2.3. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping.
2.4. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
2.5. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
2.6. Insulated Piping:
2.6.1. Attach clamps and spacers to piping.
2.6.1.1. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
2.6.1.2. Piping Operating below Ambient Air Temperature: Use
thermal-hanger shield insert with clamp sized to match OD of insert.
2.6.1.3. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2.6.2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
2.6.2.1. Thermal-hanger shield inserts may be used as an option.
Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
2.6.3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields are to span an arc of 180 degrees.
2.6.3.1. Thermal-hanger shield inserts may be used as an option.
Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
2.6.4. Shield Dimensions for Pipe: Not less than the following:
2.6.4.1. NPS 1/4 to NPS 3-1/2 (DN 8 to DN 90): 12 inches long and 0.048 inch thick.
2.6.4.2. NPS 4 (DN 100): 12 inches long and 0.06 inch thick.
2.6.4.3. NPS 5 and NPS 6 (DN 125 and DN 150): 18 inches long
and 0.06 inch thick.
2.6.4.4. NPS 8 to NPS 14 (DN 200 to DN 350): 24 inches long and
0.075 inch thick.
2.6.4.5. NPS 16 to NPS 24 (DN 400 to DN 600): 24 inches long
and 0.105 inch thick.
2.6.5. Pipes NPS 8 (DN 200) and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.
2.7. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.
2.8. Strut System Installation: Metal; arrange for grouping of parallel runs of piping, and support together on field-assembled metal framing systems.
2.9.