This document is a Surface Water Management Report prepared by Kimley-Horn and Associates, Inc. for Collier County Board of Commissioners regarding the Veterans Memorial Boulevard Phase 2B roadway extension project in Naples, Florida. The project consists of approximately 6,500 linear feet of four-lane divided roadway connecting the Phase 1 roadway west to U.S. 41, with an additional 1,550 linear feet connecting Old 41 to U.S. 41. The surface water management system includes three major drainage basins with on-site wet and dry detention ponds for water quality and attenuation. The design accounts for existing drainage patterns, culvert crossings at Turtle Creek conservation area and within the 100-foot Florida Power & Light easement, and manages runoff at control elevations of 8.28 to 8.50 feet NAVD. Stormwater from basins west of the railroad tracks discharges at 0.13 cubic feet per second per acre per the Collier County Stormwater Ordinance, ultimately outfalling to the Cocohatchee River through various ditches and drainage structures. The project site encompasses 44.36 acres and involves modifications to existing Environmental Resource Permit permits for the Mercedes Benz development, Triangle Parcel, and other adjacent properties.
The report provides comprehensive calculations and modeling for 25-year and 100-year storm events, water quality treatment volumes exceeding regulatory requirements by 50 percent for discharge to Outstanding Florida Waters, floodplain compensation analysis demonstrating the project as an exporter of runoff, and nutrient loading analysis showing total nitrogen and phosphorus reductions of 49 and 87 percent respectively through proposed wet detention with littoral shelves and treatment systems. All proposed detention ponds include bleeder orifices designed to discharge water quality volumes over 24-hour periods, with specific control structures (CS-TP3, CS-CC4, and CS-MB2) sized and detailed for implementation. The Integrated Comprehensive Routing and Pond (ICPR) modeling provides node and link maximum conditions for both the 25-year and 100-year storm events, with detailed stage-area tables and hydraulic specifications for all detention features. Design parameters include curve numbers ranging from 72.49 to 89.83 depending on basin land use composition, site grades varying from 9.50 to 13.40 feet NAVD, and permanent pool volumes of 65.8 acre-feet for Lake 2 and 28.3 acre-feet for Lake 3 to support water quality treatment objectives.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Veterans Memorial Boulevard
Phase 2B
Surface Water Management Calculations
Prepared for:
Collier County Board of Commissioners
3299 Tamiami Trail East, Suite 303
Naples, FL 34112-5746
Prepared By:
Kimley-Horn and Associates, Inc.
1514 Broadway, Suite301, Fort Myers, FL 33901 Phone (239) 271-2650 Fax (941) 379-4352 www.kimley-horn.com http://www.kimley-horn.com/
VETERANS MEMORIAL BOULEVARD PHASE 2 SURFACE WATER MANAGEMENT CALCULATIONS
TABLE OF CONTENTS
Section I – Summary of Design
Section II – Calculations
Staff Report Data On-Site Land Use Calculations Sub-Basin Calculations Water Quality Calculations Flood Plain Management Calculations Nutrient Loading Analysis
Section III – Input Data for ICPR Modeling
Section IV – ICPR Modeling Results
25 Year – 3 Day Storm Event Model Node Maximum Conditions Link Maximum Conditions Node Time Series to 15 days
100 Year – 3 Day Storm Event Model (With Discharge) Node Maximum Conditions Link Maximum Conditions
Section V - Off-Site Drainage Modification Summaries
Mercedes Benz Summary Triangle Parcel Summary Turtle Creek Summary Table of Comparisons between Existing Permits and Proposed Modification
VETERANS MEMORIAL BOULEVARD PHASE 2B SURFACE WATER MANAGEMENT CALCULATIONS
SECTION I
PROJECT PURPOSE
This application is a request for a modification of SFWMD ERP Permit No. 11-
102981-P, Application No. 241203-48073 authorizing the construction and operation of a surface water management system serving Veterans Memorial
Boulevard Phase 2B. Veterans Memorial Boulevard Phase 2 is an extension and modification of the constructed Phase 1 roadway approved under ERP No. 11-
102981-P, Application No. 210419-5949.
PROJECT SITE DESCRIPTION
The general project location begins to the west of the new high school entrance on the Veterans Memorial Boulevard Phase 1 roadway and ends at US 41 with undeveloped wetlands located west of Old 41 in Naples, Florida.
EXISTING DRAINAGE CONDITIONS
Stormwater from the Veterans Memorial Boulevard right of way west of the railroad tracks is controlled at 8.50 ft NAVD and drains south to Wiggins Bay. This is done via existing ditches along US 41, Old 41, and the western boundary of the
Conservation Collier parcel.
PROPOSED PROJECT
The project will consist of a four-lane divided roadway extension with turn lanes for the Old 41 and US 41 intersections. Approximately 4,950 linear feet of four-lane divided roadway will be extended to the west to connect the new high school to Old
41. Another ±1,550 linear feet of four-lane divided roadway will connect the Veterans
Memorial Blvd intersection at Old 41 with US 41 to the west. The result will be approximately 6,500 linear feet of four-lane divided roadway.
The Veterans Memorial Boulevard Water Management System consists of three (3) major basins. Each basin will include an on-site lake or dry detention pond to allow for water quality and attenuation. The sub-basins west of the railroad tracks (Basin’s
2 C 3) are controlled at an elevation of 8.50 ft NAVD.
The control elevation for Basin’s 2 C 3 west of the railroad tracks was determined from existing ERP’s for adjacent parcels and ultimately matches the control elevation utilized for the Mercedes Benz of Bonita Springs ERP (Permit No. 11-
03669-P). Run-off from each basin will be conveyed via sheet flow to curb inlets to wet and dry detention ponds within each basin.
Culvert crossings to match existing drainage patterns are proposed at locations along
Phase 2; south of the Turtle Creek conservation area and within the 100 ft FPL easement south of the North Collier Industrial Center. The total area and allowable discharge rate for the existing ERP permits were used to determine the total discharge rate and pipe size for the proposed culverts under the road. The estimated 24” RCP storm pipes were placed at invert elevations at or slightly below existing ground elevations. The proposed 24” RCP pipes will ensure that the existing drainage areas north of the proposed roadway continue to flow south into conservation wetlands which ultimately outfall to the Cocohatchee River.
LAND USE
See “Staff Report Data” in Section II of this report for the land use breakdown.
FLOODPLAIN COMPENSATION
The project is predominantly in FEMA Flood Zone “AE” and Zone “X” as shown on the National Flood Insurance Program Map 12021C0191J, effective date of
February 8, 2024. Basin’s 2 C 3 (West of the Railroad) have an average floodplain contour elevation of 10.5 ft NAVD. The map identifies the project in a special flood hazard area subject to inundation by the 1% annual chance flood. The 1% annual chance flood (100-year flood), also known as the base flood, is the flood that has a
1% chance of being equaled or exceed in any given year. Since the project is in the floodplain, floodplain calculations are included for the 2.7 acres of Zone “X” in
Basin’s 2 C 3. The calculations specified by SFWMD, indicate 0.64 ac-ft of runoff is produced by Basins 2 C 3. Therefore, Basins 2, C 3 are considered exporters and do not require floodplain compensation areas.
DISCHARGE
Allowable discharge for this project is limited to 0.13 cfs per acre for basins west of the railroad (Wiggins Bay Outlet Basin) as specified in the Collier County
Stormwater Ordinance 2017-19.
The existing control structure for the Triangle Parcel will be removed and replaced with a proposed control structure (CS-TP3) in the same location and convey discharge through an 18” RCP pipe to the wetlands east of the Triangle Parcel. A modification to the Triangle Parcel ERP (Permit No. 11-02353-P) will be required for the proposed improvements. The wetlands drain to the existing ditch along Old 41 which ultimately crosses US 41 at the intersection.
A proposed control structure (CS-CC4) will convey discharge from proposed Wet
Detention Pond #2 to the existing ditch within the 100 ft FPL easement known as the Imperial West Landmark FPL Ditch (Permit No. 11-01540-P) along the east boundary of the Landmark Estates (Permit No. 11-00178-S).
RECEIVING BODY
Stormwater from Basin 2 located west of the railroad and east of Old 41 will flow south via the Imperial West Landmark FPL Ditch and cross US 41 via the Imperial
Drainage Outfall stream and outfall to the Cocohatchee River. Stormwater from
Basin 3 located west of Old 41 will flow through roadside ditches along Old 41, Tarpon Cove Drive, and Gulf Harbor Drive before the outfall to the Cocohatchee River south of Wiggins Pass Road. The tailwater used for the hydraulic modeling was estimated on assumptions made for the ditch along the Old 41 roadway.
WATER QUALITY
The proposed wet and dry detention ponds will provide water quality for the project. An additional 50% above the required water quality volume of 1 inch over the basin area is provided to meet the anti-degradation requirements for discharge to an OFW.
The proposed roadway will require the removal of the Mercedes Benz existing dry detention area within the 90 ft reservation area for the Veteran’s Memorial Boulevard right of way. The dry detention area along the eastern boundary of the Mercedes Benz development will provide the 0.5 inch dry pretreatment volume required prior to discharging through the proposed control structure (CS-MB2) to proposed Wet Detention
Pond #3. A modification to the Mercedes Benz ERP (Permit No. 11-03669-P) will be required for the proposed improvements.
Compensating water quality treatment for the right turn lane and dual left turn lanes on US-
41, which are considered off-site, have been provided in Phase 2 Basin 3.
IRRIGATION WATER SOURCE
Collier County will be using water from the proposed 12” water main to be installed as a part of this project for irrigation water. No water use permit will be required.
Collier County Stormwater Management Facilities
Collier county GMD, State of Florida, Maxar
6/18/2024 0 0.4 0.80.2 mi
0 0.65 1.30.33 km
1:27,046
SECTION II
Calculations
West of Railroad
Basin’s 2 & 3
PHASE-2B
Project: Veterans Memorial Blvd Improvements - Phase 2B
Proj. #: 190062.00.01 Task # 0016
Calculated By: NDG Date: 6-Aug-25
Checked By: LAS Date: 6-Aug-25
Veterans Memorial Blvd Improvements - Phase 2B - West of Railroad
Water Management Calculations
Contents:
- Staff Report Data
- On-Site Land Use Calculations
- Sub-Basin Calculations
- Water Quality Calculations
Project Veterans Memorial Blvd Improvements - Phase 2B
Proj. #: 190062.00.01 Task # 0016 Calculated By: NDG Date: 6-Aug-25
Checked By: LAS Date: 6-Aug-25
Water Management Calculations
Assumptions
1. The following water quality calculations will show storage elevation for the first inch of storm water runoff or 2.5 times the percent impervious, whichever is greater. The bleeder will be designed to allow 1/2" discharge over a 24 hour period.
2. The Control Elevation varies between 8.28 and 8.50 ft NAVD based on SFWMD ERP Application
#031219-10 (Permit #11-02353-P) and Application #141112-2 (Permit #11-03669-P)
3. The subject property consists of 44.36 acres.
4. The Drainage Area will consist of 44.36 acres.
5. There will be a berm constructed around the water management system (Drainage Area) , with a minimum crest elevation set at the 100-year 3-day peak. Onsite indigenous preserve and canal maintenance easement areas will be outside of the Drainage Area.
6. Based on SFWMD Environmental Resource Permit Applications Handbook, Volume II - Using
Method 1, SFWMD ERP Application #031219-10 (Permit #11-02353-P) and SFWMD ERP
Application #141112-2 (Permit #11-03669-P), the Rainfall Amounts chosen for the design are:
10-year 1-day = 6.70 inches, 25-year 3-day = 11.50 inches, and 100-year 3-day = 15.00 inches.
7. Average depth to water level is ± 3.77 ft. Refer to "Water Quality Calculations" and "Lake and Basin Storage Calculations."
8. Soil compaction factor = 25%.
9. The site is located within the Wiggins Bay Outlet Basin according to the "Allowable Discharge Rates for Projects in the South Florida Water Management District."
10. An additional 50% water quality volume will be provided according to the SFWMD policy for discharge to sensitive receiving waters.
Staff Report Data
Water Quantity Discharge Rate:
Discharge Storm Frequency 25 year - 3day Design Rainfall: 11.50 inches Allow Disch
(cfs) Method of Determination
(cfs/ac)
Peak Disch (cfs) Peak Stage Modeled
(ft, NAVD)
Wiggins Bay Basin (CS-TP3) 3.55 0.13 3.50 11.68
Wiggins Bay Basin (CS-CC4) 2.22 0.13 2.17 11.51
Road Design:
Discharge Storm Frequency 25 year - 3day Design Rainfall: 11.50 inches
Basin
Peak Stage (ft, NAVD)
Proposed Min. Road Crown (ft, NAVD)
Phase 2 Sub-Basin 1 VMB East 11.51 11.70
Phase 2 Sub-Basin 2A US41-VMB 11.68 11.70
Phase 2 Sub-Basin 2B VMB West 11.64 11.70
Phase 2 Sub-Basin 3A Mercedes 12.26 13.00*
Phase 2 Sub-Basin 3B Mercedes 12.29 13.00*
Phase 2 Sub-Basin 4 Cons. Collier Lake 11.51 11.70
Phase 2 Sub-Basin 5 Triangle Parcel 11.66 12.38**
Phase 2 Sub-Basin 5A Triangle Lake 11.65 11.70
Berm Design:
Discharge Storm Frequency 100 year - 3day (0 Discharge) Design Rainfall: 15.00 inches
Basin
Peak Stage (ft, NAVD)
Proposed Berm Elevation (ft, NAVD)*
Phase 2 Sub-Basin 1 VMB East 12.66 12.80
Phase 2 Sub-Basin 2A US41-VMB 12.67 12.80
Phase 2 Sub-Basin 2B VMB West 12.66 12.80
Phase 2 Sub-Basin 3A Mercedes 13.13 13.30
Phase 2 Sub-Basin 3B Mercedes 13.16 13.30
Phase 2 Sub-Basin 4 Cons. Collier Lake 12.66 12.80
Phase 2 Sub-Basin 5 Triangle Parcel 12.67 12.80**
Phase 2 Sub-Basin 5A Triangle Lake 12.67 12.80
Water Quality / Discharge Structures:
Str #
Type
Width (feet)
Height (feet) Invert Elev. (ft, NAVD)
Phase 2 Sub-Basin 3A & 3B
(Mercedes Dry Pretreatment)
CS-MB2
Orifice (Circular) 0.25 0.25 8.50
Horizontal Rectangular Grate Weir 2.34 3.51 11.00
Phase 2 Sub-Basin 2A, 2B, 3A, 3B, 5, & 5A
(VMB West Water Quality Volume)
CS-TP3
Orifice (Circular) 0.33 0.33 8.50
Rectangular Weir
1.80 0.25 9.83
Horizontal Rectangular Grate Weir** 2.34 3.51 12.80
Phase 2 Sub-Basin 5
(Triangle Parcel Dry Pretreatment)
CS-TP1
CS-TP2
Broad Rectangular Weir** 70.00 1.85 10.93
Orifice (Circular)** 0.27 0.27 8.28
Horizontal Rectangular Grate Weir** 2.00 3.00 10.90
Phase 2 Sub-Basin 1 & 4
(VMB East Water Quality Volume)
CS-CC4
Orifice (Circular) 0.42 0.42 8.50
Rectangular Weir 0.60 0.25 8.90
Horizontal Rectangular Grate Weir 2.34 3.51 12.80
Staff Report Data
Water Quality Treatment
Method Vol Req'd (ac-ft) Minimum Vol Prov'd (ac-ft)
Wet/Dry Detention (CS-TP3) 5.09 5.09
Wet/Dry Detention (CS-CC4) 2.13 2.13
Notes:
*Per SFWMD Application #141112-2, Permit #11-03669-P
**Per SFWMD Application #031219-10, Permit #11-02353-P
***Elevation Needed for Floodplain Comp
****Lake Interconnect
K:\2019\190062.00.01 Veteran's Memorial Extension - Phase 2\016 Master Drainage Infrastructure Plan\Calculations\ERP Calcs\2025-10-24 Water Management Calcs Phase 2 - West of RR (rev 2) jjs 5 of 19
DRAINAGE BASIN LAND USE
Phase 2 Sub-Basin 1 VMB East Phase 2 Sub-Basin 2A US41-VMB Phase 2 Sub-Basin 2B VMB West Phase 2 Sub-Basin 3A Mercedes1 Phase 2 Sub-Basin 3B Mercedes1
Site Area (Ac) 9.56 1.05 3.70 5.49 1.78
Commercial Development 9.56 1.05 3.70 5.49 1.78
Building 0.00 0% 0.00 0% 0.00 0% 1.98 36% 0.00 0% Pavement/Sidewalk 4.65 49% 0.74 70% 2.37 64% 2.70 49% 0.98 55% Lake @ Control 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% Lake Slope Area 0.00 0.00 0.00 0.00 0.00 Dry Detention Bottom 0.38 0.00 0.08 0.05 0.04
13% 0% 9% 6% 20%
Dry Detention Slope Area 0.89 0.00 0.27 0.26 0.32
Open Space 3.64 0.31 0.98 0.50 0.44 Total Area Less Building 9.56 1.05 3.70 3.51 1.78
Lake Area 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0%
Total Building 0.00 0% 0.00 0% 0.00 0% 1.98 36% 0.00 0%
Total Pavement/Sidewalk 4.65 49% 0.74 70% 2.37 64% 2.70 49% 0.98 55% Total Pervious Area3 4.91 51% 0.31 30% 1.33 36% 0.81 15% 0.80 45%
Total Sub-Basin Area (Ac) 9.56 100% 1.05 100% 3.70 100% 5.49 100% 1.78 100%
Phase 2 Sub-Basin 4 Cons. Collier Phase 2 Sub-Basin 5 Triangle Phase 2 Sub-Basin 5A Triangle Lake Drainage Basin Total
Site Area (Ac) 7.50 10.99 4.29 44.36
Commercial Development 7.50 10.99 4.29 44.36
Building 0.00 m 3.36 31% 0.00 0% 5.34 12%
Pavement/Sidewalk 0.00 0% 5.63 51% 0.00 0% 17.07 38%
Lake @ Control 4.89 65% 0.00 0% 2.79 65% 7.68 17%
Lake Slope Area 1.01 0.00 0.78 1.79
Dry Detention Bottom 0.00 0% 0.23 5% 0.00 0% 0.78 7% Dry Detention Slope Area 0.00 0.37 0.00 2.11
Open Space 1.60 1.40 0.72 9.59
Total Area Less Building 7.50 7.63 4.29 39.02
Lake Area 4.89 65% 0.00 0% 2.79 65% 7.68 17%
Total Building 0.00 0% 3.36 31% 0.00 0% 5.34 12%
Total Pavement/Sidewalk 0.00 0% 5.63 51% 0.00 0% 17.07 38% Total Pervious Area3 2.61 35% 2.00 18% 1.50 35% 14.27 32%
Total Sub-Basin Area (Ac) 7.50 100% 10.99 100% 4.29 100% 44.36 100%
Notes
1. Mercedes Benz areas based on approved ERP Permit No. 11-03669-P, App. No. 141112-2
2. Triangle Parcel areas based on approved ERP Permit No. 11-02353-P, App. No. 031219-10
3. Total Pervious Area is inclusive of Lake Slope Area, Dry Detention Bottom, and Dry Detention Slope Area
PHASE 2 SUB-BASIN 1 (VMB EAST) CALCULATIONS
Average Site Grade Elevation Range Avg Elev. Area Area x Avg Elev.
Open Space* 11.70 13.40 12.55 3.64 45.68
Pavement 11.70 13.40 12.55 4.65 58.36
Dry Detention Slope 10.00 12.80 11.40 0.89 10.15
Lake Slope 8.50 12.80 10.65 0.00 0.00
9.18 114.19
Avg Site Grade = 12.44
Soil Storage
From SFWMD; Basis for Review, Volume IV
(Developed Storage Available) x (Pervious Area)/(12 inches/ft
(Available Soil Storage/Site Area) x (12 inches/ft)
CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 8.50 10.00 11.70 12.80 13.40 14.40
Open Space* 11.70 13.40 3.64 0.00 0.00 0.00 2.36 3.64 3.64
Pavement 11.70 13.40 4.65 0.00 0.00 0.00 3.01 4.65 4.65
Dry Detention Slope 10.00 12.80 0.89 0.00 0.00 0.54 0.89 0.89 0.89
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 10.00 12.80 0.38 0.00 0.38 0.38 0.38 0.38 0.38
Lake 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.56 0.00 0.38 0.92 6.63 9.56 9.56
Stage-Volume (AF)
Elevation Range Area 8.50 10.00 11.70 12.80 13.40 14.40
Open Space* 11.70 13.40 3.64 0.00 0.00 0.00 1.30 3.09 6.73
Pavement 11.70 13.40 4.65 0.00 0.00 0.00 1.65 3.95 8.60
Dry Detention Slope 10.00 12.80 0.89 0.00 0.00 0.46 1.25 1.78 2.67
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 10.00 12.80 0.38 0.00 0.00 0.65 1.06 1.29 1.67
Lake 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9.56 0.00 0.00 1.11 5.26 10.12 19.68
CN for Sub-Basin 72.49
9.56
4.53
12.44
8.5
3.94
25%
8.01
3.02
3.80
Sub-Basin Area
Pervious Area
Average Site Grade (ft)
Control Elevation (ft)
Average Depth to Water Table (ft)
Soil Compaction Factor (i.e. 25%)
Developed Storage Available (in)
Available Soil Storage
Site-Wide Soil Storage (S)
PHASE 2B SUB-BASIN 2A (US41-VMB) CALCULATIONS
Open Space* 11.70 12.90 12.30 0.31 3.81
Pavement 11.70 12.90 12.30 0.74 9.10
Dry Detention Slope 9.50 12.80 11.15 0.00 0.00
Lake Slope 8.50 12.80 0.00 0.00 0.00
1.05 12.92
Avg Site Grade = 12.30
Soil Storage
Sub-Basin Area 1.05
Pervious Area 0.31
Average Site Grade (ft) 12.30 ̀
Control Elevation (ft) 8.5
Average Depth to Water Table (ft) 3.80
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 7.63 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 0.20 (Developed Storage Available) x (Pervious Area)/(12 inches/ft Site-Wide Soil Storage (S) 2.25 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 81.62 CN = 1,000 /(S + 10)
Elevation Range Area 8.50 9.50 11.70 12.80 12.90 13.90
Open Space* 11.70 12.90 0.31 0.00 0.00 0.00 0.28 0.31 0.31
Pavement 11.70 12.90 0.74 0.00 0.00 0.00 0.68 0.74 0.74
Dry Detention Slope 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.05 0.00 0.00 0.00 0.96 1.05 1.05
Elevation Range Area 8.50 9.50 11.70 12.80 12.90 13.90
Open Space* 11.70 12.90 0.31 0.00 0.00 0.00 0.16 0.19 0.50
Pavement 11.70 12.90 0.74 0.00 0.00 0.00 0.37 0.44 1.18
Dry Detention Slope 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.05 0.00 0.00 0.00 0.53 0.63 1.68
PHASE 2B SUB-BASIN 2B (VMB WEST) CALCULATIONS
Open Space* 11.70 12.90 12.30 0.98 12.05
Pavement 11.70 12.90 12.30 2.37 29.15
Dry Detention Slope 9.50 12.80 11.15 0.27 3.01
Lake Slope 8.50 12.80 0.00 0.00 0.00
3.62 44.22
Avg Site Grade = 12.21
Soil Storage
Sub-Basin Area 3.70
Pervious Area 1.25
Average Site Grade (ft) 12.21 ̀
CN for Sub-Basin 80.02 CN = 1,000 /(S + 10)
Elevation Range Area 8.50 9.50 11.70 12.80 12.90 13.90
Open Space* 11.70 12.90 0.98 0.00 0.00 0.00 0.90 0.98 0.98
Pavement 11.70 12.90 2.37 0.00 0.00 0.00 2.17 2.37 2.37
Dry Detention Slope 9.50 12.80 0.27 0.00 0.00 0.18 0.27 0.27 0.27
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 12.80 0.08 0.00 0.08 0.08 0.08 0.08 0.08
3.70 0.00 0.08 0.26 3.42 3.70 3.70
Open Space* 11.70 12.90 0.98 0.00 0.00 0.00 0.49 0.59 1.57
Pavement 11.70 12.90 2.37 0.00 0.00 0.00 1.19 1.42 3.79
Dry Detention Slope 9.50 12.80 0.27 0.00 0.00 0.20 0.45 0.47 0.74
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 12.80 0.08 0.00 0.00 0.18 0.26 0.27 0.35
Lake 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.70 0.00 0.00 0.37 2.40 2.75 6.45
Control Elevation (ft) 8.5
Average Depth to Water Table (ft) 3.71
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 7.39 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 0.77 (Developed Storage Available) x (Pervious Area)/(12 inches/ft Site-Wide Soil Storage (S) 2.50 (Available Soil Storage/Site Area) x (12 inches/ft)
PHASE 2B SUB-BASIN 3A (MERCEDES) CALCULATIONS
Open Space* 13.00 13.90 13.45 0.50 6.73
Pavement 13.00 13.90 13.45 2.70 36.32
Dry Detention Slope 9.50 13.00 11.25 0.26 2.93
Lake Slope 8.50 13.00 10.75 0.00 0.00
3.46 45.97
Avg Site Grade = 13.28
Soil Storage
Sub-Basin Area 5.49
Pervious Area 0.76
Average Site Grade (ft) 13.28
Control Elevation (ft) 8.5
Average Depth to Water Table (ft) 4.78
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 8.18
Available Soil Storage 0.52
Site-Wide Soil Storage (S) 1.13
CN for Sub-Basin 89.83
Elevation Range Area 8.50 9.50 12.99 13.00 13.90 14.90
Open Space* 13.00 13.90 0.50 0.00 0.00 0.00 0.00 0.50 0.50
Pavement 13.00 13.90 2.70 0.00 0.00 0.00 0.00 2.70 2.70
Dry Detention Slope 9.50 13.00 0.26 0.00 0.00 0.26 0.26 0.26 0.26
Lake Slope 8.50 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 13.00 0.05 0.00 0.05 0.05 0.05 0.05 0.05
Lake 8.50 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.51 0.00 0.05 0.31 0.31 3.51 3.51
Elevation Range Area 8.50 9.50 12.99 13.00 13.90 14.90
Open Space* 13.00 13.90 0.50 0.00 0.00 0.00 0.00 0.23 0.73
Pavement 13.00 13.90 2.70 0.00 0.00 0.00 0.00 1.22 3.92
Dry Detention Slope 9.50 13.00 0.26 0.00 0.00 0.45 0.46 0.69 0.95
Lake Slope 8.50 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 13.00 0.05 0.00 0.00 0.17 0.18 0.22 0.27
3.51 0.00 0.00 0.63 0.63 2.35 5.86
PHASE 2B SUB-BASIN 3B (MERCEDES) CALCULATIONS
Open Space* 13.00 13.90 13.45 0.44 5.92
Pavement 13.00 13.90 13.45 0.98 13.18
Dry Detention Slope 9.50 13.00 11.25 0.32 3.60
Lake Slope 8.50 13.00 10.75 0.00 0.00
1.74 22.70
Avg Site Grade = 13.05
Soil Storage
Sub-Basin Area 1.78
Pervious Area 0.76
Average Site Grade (ft) 13.05
Control Elevation (ft) 8.5
Average Depth to Water Table (ft) 4.55
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 8.18
Available Soil Storage 0.52
Site-Wide Soil Storage (S) 3.49
CN for Sub-Basin 74.11
Elevation Range Area 8.50 9.50 12.99 13.00 13.90 14.90
Open Space* 13.00 13.90 0.44 0.00 0.00 0.00 0.00 0.44 0.44
Pavement 13.00 13.90 0.98 0.00 0.00 0.00 0.00 0.98 0.98
Dry Detention Slope 9.50 13.00 0.32 0.00 0.00 0.32 0.32 0.32 0.32
Lake Slope 8.50 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 13.00 0.04 0.00 0.04 0.04 0.04 0.04 0.04
1.78 0.00 0.04 0.36 0.36 1.78 1.78
Elevation Range Area 8.50 9.50 12.99 13.00 13.90 14.90
Open Space* 13.00 13.90 0.44 0.00 0.00 0.00 0.00 0.20 0.64
Pavement 13.00 13.90 0.98 0.00 0.00 0.00 0.00 0.44 1.42
Dry Detention Slope 9.50 13.00 0.32 0.00 0.00 0.56 0.56 0.85 1.17
Lake Slope 8.50 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.50 13.00 0.04 0.00 0.00 0.14 0.14 0.18 0.22
1.78 0.00 0.00 0.70 0.70 1.66 3.44
PHASE 2B SUB-BASIN 4 (CONS. COLLIER LAKE) CALCULATIONS
Open Space* 11.70 12.90 12.30 1.60 19.68
Pavement 11.70 12.90 12.30 0.00 0.00
Dry Detention Slope 9.50 12.80 11.15 0.00 0.00
Lake Slope 8.50 12.80 10.65 1.01 10.76
2.61 30.44
Avg Site Grade = 11.66
Elevation Range Area 8.50 9.50 11.70 12.80 12.90 13.90
Open Space* 11.70 12.90 1.60 0.00 0.00 0.00 1.47 1.60 1.60
Pavement 11.70 12.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Slope 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Slope 8.50 12.80 1.01 0.00 0.23 0.75 1.01 1.01 1.01
Dry Detention Bottom 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake 8.50 8.50 4.89 4.89 4.89 4.89 4.89 4.89 4.89
7.50 4.89 5.12 5.64 7.37 7.50 7.50
Open Space* 11.70 12.90 1.60 0.00 0.00 0.00 0.81 0.96 2.56
Pavement 11.70 12.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Slope 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Slope 8.50 12.80 1.01 0.00 0.12 1.20 2.17 2.27 3.28
Dry Detention Bottom 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake 8.50 8.50 4.89 0.00 4.89 15.65 21.03 21.52 26.41
7.50 0.00 5.01 16.85 24.01 24.75 32.25
CN for Sub-Basin 83.82
7.50
2.61
11.66
8.5
3.16
25%
5.55
1.21
1.93
Sub-Basin Area
Pervious Area
Average Site Grade (ft)
Control Elevation (ft)
Average Depth to Water Table (ft)
Soil Compaction Factor (i.e. 25%)
Developed Storage Available (in)
PHASE 2B SUB-BASIN 5 (TRIANGLE PARCEL) CALCULATIONS
Open Space* 11.70 12.80 12.25 1.40 17.15
Pavement 12.29 14.00 13.15 5.63 74.01
Dry Detention Slope 9.30 12.80 11.05 0.37 4.09
Lake Slope 8.50 12.80 10.65 0.00 0.00
7.40 95.24
Avg Site Grade = 12.87
(Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Elevation Range Area 8.50 9.30 11.70 12.29 12.80 14.00 15.00
Open Space* 11.70 12.80 1.40 0.00 0.00 0.00 0.75 1.40 1.40 1.40
Pavement 12.29 14.00 5.63 0.00 0.00 0.00 0.00 1.68 5.63 5.63
Dry Detention Slope 9.30 12.80 0.37 0.00 0.00 0.25 0.32 0.37 0.37 0.37
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.30 12.80 0.23 0.00 0.23 0.23 0.23 0.23 0.23 0.23
Lake 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.63 0.00 0.23 0.48 1.30 3.68 7.63 7.63
Elevation Range Area 8.50 9.30 11.70 12.29 12.80 14.00 15.00
Open Space* 11.70 12.80 1.40 0.00 0.00 0.00 0.22 0.77 2.45 3.85
Pavement 12.29 14.00 5.63 0.00 0.00 0.00 0.00 0.43 4.81 10.44
Dry Detention Slope 9.30 12.80 0.37 0.00 0.00 0.30 0.47 0.65 1.09 1.46
Lake Slope 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Bottom 9.30 12.80 0.23 0.00 0.00 0.55 0.69 0.81 1.08 1.31
Lake 8.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.63 0.00 0.00 0.86 1.38 2.65 9.44 17.07
CN for Sub-Basin 88.36
10.99
1.77
12.87
8.5
4.37
25%
8.18
1.21
1.32
Sub-Basin Area
Pervious Area
Average Site Grade (ft)
Control Elevation (ft)
Average Depth to Water Table (ft)
Soil Compaction Factor (i.e. 25%)
Developed Storage Available (in)
PHASE 2B SUB-BASIN 5A (TRIANGLE LAKE) CALCULATIONS
Open Space* 11.70 12.80 12.25 0.72 8.82
Pavement 11.70 12.90 12.30 0.00 0.00
Dry Detention Slope 9.50 12.80 11.15 0.00 0.00
Lake Slope 8.50 12.80 10.65 0.78 8.31
1.50 17.13
Avg Site Grade = 11.42
Soil Storage
Sub-Basin Area 4.29
Pervious Area 1.50
Average Site Grade (ft) 11.42
Control Elevation (ft) 8.5
Average Depth to Water Table (ft) 2.92
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 4.70 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 0.59 (Developed Storage Available) x (Pervious Area)/(12 inches/ft
Site-Wide Soil Storage (S) 1.64 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 85.90 CN = 1,000 /(S + 10)
Stage Storage Stage - Area (Ac.)
Elevation Range Area 8.50 9.50 11.70 12.80 12.90 13.90
Open Space* 11.70 12.80 0.72 0.00 0.00 0.00 0.72 0.72 0.72
Pavement 11.70 12.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Slope 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Slope 8.50 12.80 0.78 0.00 0.18 0.58 0.78 0.78 0.78
Dry Detention Bottom 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake 8.50 12.80 2.79 2.79 2.79 2.79 2.79 2.79 2.79
0.72 2.79 2.97 3.37 4.29 4.29 4.29
Open Space* 11.70 12.80 0.72 0.00 0.00 0.00 0.40 0.47 1.19
Pavement 11.70 12.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Dry Detention Slope 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Slope 8.50 12.80 0.78 0.00 0.09 0.93 1.68 1.76 2.54
Dry Detention Bottom 9.50 12.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake 8.50 12.80 2.79 0.00 2.79 8.93 12.00 12.28 15.07
4.29 0.00 2.88 9.86 14.07 14.50 18.79
Veterans Memorial Blvd Improvements - Phase 2 - West of Railroad Combined Calculations
Ph 2 Sub-Basin 1 (VMB East) 10.0 12.6 12.44 9.56 118.91
Ph 2 Sub-Basin 2A (US41-VMB) 11.7 12.9 12.30 1.05 12.92
Ph 2 Sub-Basin 2B (VMB West) 9.5 12.9 12.21 3.70 45.19
Ph 2 Sub-Basin 3A (Mercedes) 9.5 13.9 13.28 3.51 46.63
Ph 2 Sub-Basin 3B (Mercedes) 9.5 13.9 13.05 1.78 23.22
Ph 2 Sub-Basin 4 (Cons. Collier Lake) 8.5 12.9 11.66 7.50 87.46
Ph 2 Sub-Basin 5 (Triangle Parcel) 9.3 13.1 12.87 7.63 98.21
Ph 2 Sub-Basin 5A (Triangle Lake) 8.5 12.8 11.42 4.29 48.98
Avg Site Grade =
39.02 481.52 12.34
(Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Area 8.50 8.86 9.50 9.78 11.70 12.80 12.90 13.90
Ph 2 Sub-Basin 1 (VMB East) 9.56 0.00 0.00 0.00 0.00 0.92 6.63 7.12 9.56
Ph 2 Sub-Basin 2A (US41-VMB) 1.05 0.00 0.00 0.00 0.00 0.00 0.96 1.05 1.05
Ph 2 Sub-Basin 2B (VMB West) 3.70 0.00 0.00 0.08 0.10 0.26 3.42 3.70 3.70
Ph 2 Sub-Basin 3A (Mercedes) 3.51 0.00 0.00 0.05 0.07 0.21 0.30 0.30 3.51
Ph 2 Sub-Basin 3B (Mercedes) 1.78 0.00 0.00 0.04 0.07 0.24 0.34 0.35 1.78
Ph 2 Sub-Basin 4 (Cons. Collier Lake) 7.50 4.89 4.97 5.12 5.19 5.64 7.37 7.50 7.50
Ph 2 Sub-Basin 5 (Triangle Parcel) 7.63 0.00 0.00 0.25 0.28 0.48 3.68 4.01 7.30
Ph 2 Sub-Basin 5A (Triangle Lake) 4.29 2.79 2.86 2.97 3.02 3.37 4.29 4.29 4.29
39.02 7.68 7.83 8.52 8.73 11.13 26.99 28.32 38.69
Area 8.50 8.86 9.50 9.78 11.70 12.80 12.90 13.90
Ph 2 Sub-Basin 1 (VMB East) 9.56 0.00 0.00 0.00 0.00 1.11 5.26 6.07 14.90
Ph 2 Sub-Basin 2A (US41-VMB) 1.05 0.00 0.00 0.00 0.00 0.00 0.53 0.63 1.68
Ph 2 Sub-Basin 2B (VMB West) 3.70 0.00 0.00 0.00 0.05 0.37 2.40 2.75 6.45
Ph 2 Sub-Basin 3A (Mercedes) 3.51 0.00 0.00 0.00 0.05 0.40 0.59 0.61 2.35
Ph 2 Sub-Basin 3B (Mercedes) 1.78 0.00 0.00 0.00 0.06 0.44 0.66 0.68 1.66
Ph 2 Sub-Basin 4 (Cons. Collier Lake) 7.50 0.00 1.80 5.01 6.51 16.85 24.01 24.75 32.25
Ph 2 Sub-Basin 5 (Triangle Parcel) 7.63 0.00 0.00 0.07 0.17 0.86 2.65 3.22 8.87
Ph 2 Sub-Basin 5A (Triangle Lake) 4.29 0.00 1.04 2.88 3.77 9.86 14.07 14.50 18.79
39.02 0.00 2.84 7.96 10.61 29.88 50.17 53.21 86.95
44.36
14.27
12.34
2B
11.00
Dry Pretreatment Detention Volume: Phase 2 Sub-Basin 3 (Mercedes)
Total Control Elevation:
Phase 2 Sub-Basin 3A (Mercedes) 5.49 Phase 2 Sub-Basin 3B (Mercedes) 1.78
TOTAL AREA 7.27
ft NAVD
Basin Total Area: 7.27 ac
Project Area for Dry Pretreatment: 7.27 Ac
Required Dry Pretreatment Volume:
Half Inch of Runoff Dry Pretreatment Criteria 0.5in x 1ft/12in x Area (ac) = Volume (ac-ft) 0.5in x 1ft/12in x 7.27 = Volume (ac-ft) = 0.30 ac-ft
Provided Dry Pretreatment Volume:
Stage Elevation (ft NAVD)
Total Area (ac)
Total Volume (ac-ft)
Top of Detention Area (Top of Bank Elevation) 13.00 0.67 1.33
Grate Elevation (Outfall Structure Top) 11.00 0.34 0.32
Bottom of Detention Area (Control Elevation + 1 Foot)
9.50 0.09 0.00
TOTAL WATER QUALITY VOLUME
Water Quality Volume Required = 0.30 ac-ft
Water Quality Volume to be Provided = 0.32 ac-ft
Dry Pretreatment Storage occurs at Elevation ft NAVD
Bleeder Calculations:
Volume (ac-ft) = 1/2 in x 1ft/12in x [(Area - Lake) (ac)]
Discharge Volume = 0.30 ac-ft per 24 hr
Discharge (cfs) = Volume (ac-ft) x 1 day/24hours x 1hr/60min x 1min/60sec
Discharge Rate (Q) =
0.15 cfs
8.5
Veterans Memorial Blvd Improvements - Phase 2B-West of Railroad
Bleeder Orifice Sizing
Q = 4.8 A H^1/2
Circular A = π*(h/2)2 Assuming h = 3.0 inch
H (ft) 1.38 A (sq-ft) 0.05
Q (cfs) = 0.28
16 of 19 jjs
Water Quality Calculations Phase 2 Sub-Basin's 2,3,5, & 5A (West of Old 41)
Total Control Elevation: 8.5 ft NAVD
Ph 2 Sub-Basin 2A (US41-VMB) 1.05
Ph 2 Sub-Basin 2B (VMB West) 3.70
Ph 2 Sub-Basin 3A (Mercedes) 5.49
Ph 2 Sub-Basin 3B (Mercedes) 1.78
Ph 2 Sub-Basin 5 (Triangle Parcel) 10.99
Ph 2 Sub-Basin 5A (Triangle Lake) 4.29
TOTAL AREA 27.30 Allowable Discharge Rate: 0.13 cfs/ac Basin Total Area: 27.30 ac
1Allowable Discharge: 3.55 cfs
Project Area for Water Quality: 27.30 Ac
Water Quality:
1. First Inch of Runoff Criteria
1.0in x 1ft/12in x Area (ac) = Volume (ac-ft) 1.0in x 1ft/12in x 27.30 = Volume (ac-ft) = 2.28 ac-ft
2. Percent Impervious Criteria
a) Site Area = Project Area - (Lake + Roof) Site Area = 27.30 - 8.13 Site Area = 19.17 ac
b) Imp. Area = Site Area - Pervious Area Imp. Area= 19.17 - 6.44 Imp. Area= 12.73 ac
c) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * (Imp. Area/Site Area) * (Project Area -Lake) Vol. Stor. Req'd = 2.5 in. * (1ft/12in. )* 0.66 * 24.51 Vol. Stor. Req'd = 3.39 ac-ft
Therefore calculation #2 controls a water quality volume of 3.39 ac-ft
Water Quality Volume Required = 3.39 ac-ft + 50% Additional Storage 1.70 ac-ft
Water Quality Volume to be Provided = 5.09 ac-ft
Elevation
(ft NAVD)
Lake Area
(ac)
Lake Volume
(ac-ft)
Detention Area
(ac)
Detention Volume
(ac-ft)
Total Volume
(ac-ft)
Top of Bank 12.80 3.57 13.67 1.62 3.36 17.04 Control Elevation + 1 9.50 2.97 3.18 0.40 0.00 3.18
Control Elevation 8.50 2.79 0.00 0.00 0.00 0.00
On-Site Water Quality Storage occurs at Elevation 9.78 ft NAVD
*Total Water Quality Storage occurs at Elevation 9.83 ft NAVD
*Includes Compensating Water Quality Storage for US 41
Discharge Volume = 1.01 ac-ft per 24 hr
Notes:
1. Allowable discharge measured through Control Structure #CS-TP3
0.51 cfs
Bleeder Orifice Sizing
Q = 4.8 A H^1/2
Circular A = π*(h/2)2 Assuming h = 4.0 inch
H (ft) 1.11 A (sq-ft) 0.09
Q (cfs) = 0.44
Veterans Memorial Blvd Improvements - Phase 2B-West of Railroad
17 of 19 jjs
0.05
Water Quality Calculations Phase 2 US 41 Off-Site
Ph 2 Off-Site Turn Lanes (US41) 0.52
TOTAL AREA 0.52 Allowable Discharge Rate: 0.13 cfs/ac Basin Total Area: 0.52 ac
1Allowable Discharge: 0.07 cfs
Project Area for Water Quality: 0.52 Ac
Water Quality:
1. First Inch of Runoff Criteria
1.0in x 1ft/12in x 0.52 = Volume (ac-ft) = 0.04 ac-ft
Site Area = 0.52 - 0.00
Site Area = 0.52 ac
b) Imp. Area = Site Area - Pervious Area
Imp. Area= 0.52 - 0.00
Imp. Area= 0.52 ac
c) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * (Imp. Area/Site Area) * (Project Area -
Lake) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * 1.00 * 0.52 Vol. Stor. Req'd = 0.11 ac-ft
Therefore calculation #2 controls a water quality volume of 0.11 ac-ft
Water Quality Volume Required = 0.11 ac-ft + 50% Additional Storage 0.06 ac-ft
Compensating WQ Volume to be Provided = 0.17 ac-ft
Top of Bank
Control Elevation
Water Quality Storage occurs at Depth ft
Elevation
(ft NAVD)
Lake Area
(ac)
Lake
Volume
(ac-ft)
12.80 3.57 13.67
8.50 2.79 0.00
18 of 19 jjs
Water Quality Calculations Phase 2 Sub-Basin's 1 & 4 (East of Old 41)
Total Control Elevation:
Ph 2 Sub-Basin 1 (VMB East) 9.56 Ph 2 Sub-Basin 4 (Cons. Collier Lake) 7.50 ft NAVD
Water Quality:
1. First Inch of Runoff Criteria
1.0in x 1ft/12in x 17.06 = Volume (ac-ft) = 1.42 ac-ft
Site Area = 17.06 - 4.89 Site Area = 12.17 ac
b) Imp. Area = Site Area - Pervious Area Imp. Area= 12.17 - 7.52 Imp. Area= 4.65 ac
c) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * (Imp. Area/Site Area) * (Project Area - Lake) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * 0.38 * 12.17 Vol. Stor. Req'd = 0.97 ac-ft
Therefore calculation #1 controls a water quality volume of 1.42 ac-ft
Water Quality Volume Required = 1.42 ac-ft + 50% Additional Storage 0.71 ac-ft
Water Quality Volume to be Provided = 2.13 ac-ft
Lake Area
(ac)
Lake Volume
(ac-ft)
Detention Area
(ac)
Detention Volume
(ac-ft)
Total Volume
(ac-ft) Top of Bank 12.80 5.90 23.20 1.27 2.31 25.51
Control Elevation + 1 9.50 5.12 5.01 0.38 0.00 5.01 Control Elevation 8.50 4.89 0.00 0.00 0.00 0.00
On-Site Water Quality Storage occurs at Elevation 8.86 ft NAVD
*Total Water Quality Storage occurs at Elevation 8.90 ft NAVD
*Includes Compensating Water Quality Storage for Old 41
Discharge Volume = 0.51 ac-ft per 24 hr
Notes:
1. Allowable discharge measured through Control Structure #CS-CC4
0.26 cfs
8.5
Bleeder Orifice Sizing
Q = 4.8 A H^1/2
Circular A = π*(h/2)2 Assuming h = 5.0 inch
H (ft) 0.15 A (sq-ft) 0.14
Q (cfs) = 0.25
TOTAL AREA 17.06 Allowable Discharge Rate: 0.13 cfs/ac Basin Total Area: 17.06 ac
1Allowable Discharge: 2.22 cfs
Project Area for Water Quality: 17.06 Ac
19 of 19 jjs
0.04
Water Quality Calculations Phase 2 Old 41 Off-Site
Ph 2 Off-Site Turn Lanes and Pavement Transitions (Old41) 0.76
TOTAL AREA 0.76 Allowable Discharge Rate: 0.13 cfs/ac Basin Total Area: 0.76 ac
1Allowable Discharge: 0.10 cfs
Project Area for Water Quality: 0.76 Ac
Water Quality:
1. First Inch of Runoff Criteria
1.0in x 1ft/12in x 0.76 = Volume (ac-ft) = 0.06 ac-ft
Site Area = 0.76 - 0.00
Site Area = 0.76 ac
b) Imp. Area = Site Area - Pervious Area
Imp. Area= 0.76 - 0.00
Imp. Area= 0.76 ac
c) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * (Imp. Area/Site Area) * (Project Area -
Lake) Vol. Stor. Req'd = 2.5 in. * (1ft/12in.) * 1.00 * 0.76 Vol. Stor. Req'd = 0.16 ac-ft
Therefore calculation #2 controls a water quality volume of 0.16 ac-ft
Water Quality Volume Required = 0.16 ac-ft + 50% Additional Storage 0.08 ac-ft
Compensating Water Quality Volume to be P 0.24 ac-ft
Top of Bank
Water Quality Storage occurs at Depth ft
Lake Area
(ac)
Lake
Volume
(ac-ft)
12.80 5.90 23.20
8.50 4.89 0.00
Flood Plain Management Calculations
Project Veterans Memorial Phase 2B
Proj. #: 190062.00.01
Calculated By: NDG Date: 10-Jun-24
Checked By: LAS Date: 10-Jun-24
Veterans Memorial Phase 2 - West of Railroad
Floodplain Compensation Importer/Exporter Calculations
See SFWMD ERP Information Manual - Design Aids V-1 to 7
A. PRE DEVELOPMENT
1. Site Pre-Development 100-year 3-day Storm Runoff Volume Calculation
Assumptions:
- CN number is based on soil storage in SFWMD Information Manual Design Aids Appendix F-1 for Coastal Uncompressed as a function of depth to water table
- The Collier County FEMA flood insurance study last completed in 2012, was used to establish flood elevations for the 2012 FIRM
Maps. According to the study, LIDAR topographic data was utilized to establish existing ground elevations for modeling purposes.
The 100 year 3 day rainfall amount is equal to: 15 inches See SFWMD ERP Information Manual Development area (Only disturbed project area): 20.92 acres Vol II, Appendix A-18
= (Sub-Basin 1 + Sub-basin 2A + Sub-Basin 2B + Sub-Basin 4 + Sub-Basin 5A (Lake
Expansion only)) - Zone X
= (9.56 + 1.05 + 3.70 + 7.5 + 1.81) - 2.70 acres
Curve Number (CN) = 80 Avg Existing Ground Elev (Topo) = 9.50 NAVD
Storage Capacity of soil (S)= 1000
CN
(S) = 2.50
- 10 Control Elevation = 8.50 NAVD
Calculate the total runoff (Q) in inches resulting from the rainfall (P)
(Q) = (P-0.2S)2
(P+0.8S)
(Q) = 12.37 inches
Calculate the total runoff volume produced
Total Runoff Volume = Development Area x Q =
2. Site Pre-Development Storage Available to the basin during the 100-yr flood
The amount of runoff volume that can be stored on site was calculated:
From Avg Exist Ground Elev= 9.50 NAVD Based on Topographic Data
To Floodplain Elevation = 10.50 NAVD Average per FIRM Map Number: 12021C0191J February 8, 2024
Volume between existing ground elevation or control elevation, whichever is higher and the 100 year floodplain elevation
Avg Existing Ground Elevation
Volume = 33,745 c.y. =
3. Difference between items A1 & A2 above
(Site Predevelopment Total Runoff Volume) - ( Site Predevelopment Storage Volume Provided)
Difference = 21.56 - 20.92 =
B. Exporter or Importer The site is considered an EXPORTER (Positive A3)
RWA, Inc.
6610 Willow Park Drive, Ste 200
Naples, Florida 34109
Phone: (239) 597-0575
Fax: (239) 597-0578
6/18/2024
0.64 ac-ft
20.92 ac-ft
21.56 ac-ft
Veterans Memorial Phase 2B-West of Railroad
Project Veterans Memorial Phase 2B
Proj. #: 190062.00.01
50.17 ac-ft
Calculated By: NDG Date: 10-Jun-24
Checked By: LAS Date: 10-Jun-24
Veterans Memorial Phase 2 - West of Railroad
Floodplain Compensation Importer/Exporter Calculations
See SFWMD ERP Information Manual - Design Aids V-1 to 7
C. POST DEVELOPMENT
1. Site Post-Development 100-year 3-day Storm Runoff Volume Calculation
Assumptions:
CN number is based on soil type D with cover type as Woods/Grass combination in poor condition of the site.
The 100 year 3 day rainfall amount is equal to: 15 inches See SFWMD ERP Information Manual Development area (Only disturbed project area): 20.92 acres Vol II, Appendix A-18
Curve Number (CN) = 80.07 See "CN for Sub-Basin" under "Soil
Storage Capacity of soil (S)= 1000 - 10 Storage" on the "Basin Calculations"
CN worksheet
(S) = 2.49
Calculate the total runoff (Q) in inches resulting from the rainfall (P)
(Q) = (P-0.2S)2
(P+0.8S)
(Q) = 12.38 inches
Calculate the total runoff volume produced
Total Runoff Volume = Development Area x Q =
2. Site Post-Development Storage Available to the basin during the 100-yr flood
100yr 3day rainfall runoff volume retained (peak stage/berm elevation 12.8)
Volume = 80,941 c.y. =
From WM Calcs @ 12.8 ft
3. Difference between items A1 & A2 above
(Site Post-development Total Runoff Volume) - ( Site Post-development Storage Volume Provided)
Difference = 21.57 - 50.17 =
4. Difference between (PRE VS POST) exports pre post Post Additional Storage Difference = 0.64 - -28.60 = 29.24
Post 2 of 2
6/18/2024
1:14 PM
-28.60 ac-ft
21.57 ac-ft
Veterans Memorial Phase 2B-West of Railroad
Nutrient Loading Analysis
Project Veterans Memorial Blvd Phase 2 Proj. #: 190062.00.01 Task: 0016
Calculated By: NDG Date: 13-Jun-24 Checked By: LAS Date: 13-Jun-24
Veterans Memorial Blvd Phase 2
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
PRE- VS. POST-DEVELOPMENT NUTRIENT LOADING ANALYSIS
CONTENTS
1. DESIGN ASSUMPTIONS
2. ON-SITE IMPERVIOUS/PERVIOUS CALCULATIONS
3. PRE-DEVELOPMENT UNTREATED LOADING
4. POST-DEVELOPMENT UNTREATED LOADING
5. BMP TRAINS COMPLETE REPORT
Veterans Memorial Blvd Phase 2B
B
Project Veterans Memorial Blvd Phase 2
DESIGN ASSUMPTIONS
1. THIS NUTRIENT LOADING ANALYSIS IS BASED ON METHODS PRESENTED IN “ERP
STORMWATER QUALITY APPLICANTS HANDBOOK”, 2010, WITH BMP TRAINS 5.3.2
2. ALL PAVEMENT IS CALCULATED AS DIRECTLY CONNECTED IMPERVIOUS AREAS,
DCIA.
3. THE PRE-DEVELOPMENT PHASE 2B BASIN 1U SITE IS BEST CHARACTERIZED AS
UNDEVELOPED IN GOOD HYDROLOGICAL CONDITION.
4. THE PRE-DEVELOPMENT PHASE 2B BASIN 2U SITE IS BEST CHARACTERIZED AS
UNDEVELOPED IN GOOD HYDROLOGICAL CONDITION.
5. THE PRE-DEVELOPMENT PHASE 2B BASIN 3U SITE IS BEST CHARACTERIZED AS
UNDEVELOPED IN GOOD HYDOLOGICAL CONDITION.
6. THE PRE-DEVELOPMENT PHASE 2B BASIN 3D SITE IS BEST CHARACTERIZED AS LOW
INTENSITY COMMERCIAL IN GOOD HYDROLOGICAL CONDITION.
7. THE POST-DEVELOPMENT PHASE 2B BASIN 1U SITE IS BEST CHARACTERIZED AS
HIGHWAY IN GOOD HYROLOGICAL CONDITION.
8. THE POST-DEVELOPMENT PHASE 2B BASIN 2U SITE IS BEST CHARACTERIZED AS
HIGWAY IN GOOD HYDROLOGICAL CONDITION.
9. THE POST-DEVELOPMENT PHASE 2B BASIN 3U SITE IS BEST CHARACTERIZED AS
HIGHWAY IN GOOD HYDROLOGICAL CONDITION.
10. THE POST-DEVELOPMENT PHASE 2B BASIN 3D SITE IS BEST CHARACTERIZED AS
LOW INTENSITY COMMERCIAL IN GOOD HYDROLOGICAL CONDITION.
11. THE SURFACE WATER MANAGEMENT SYSTEM INCLUDES INLETS AND STORM
SEWERS TO INTERCEPT RUN-OFF AND DIRECT IT TO THE LAKES.
B
Impervious/Pervious Calculations
Pre-Development (Existing Conditions)
PHASE 2 BASIN 2U PHASE 2 BASIN 3U PHASE 2 BASIN 3D
(Sub-Basin 1 & 4)
(Existing Undeveloped)
(Sub-Basin 2A & 2B)
(Existing Undeveloped)
(Sub-Basin 3A*, 3B*, 5**, & 5A)
(Existing Commercial) Existing Basin Total
Total Building Total Pavement Total Sidewalk & Impervious
Lake Area Total Open Space/Pervious
0.00 0%
0.00 0%
0.00 0%
0.00 0%
17.06 100%
0.00 0%
0.00 0%
0.00 0%
0.00 0%
4.75 100%
5.34 24%
8.65 38%
0.66 3%
1.66 7%
6.24 28%
5.34 6%
20.95 24%
3.04 3%
2.89 3%
56.51 64%
Total Sub-Basin Area (Ac) 17.06 4.75 22.55 88.73 100%
Post-Development (Proposed Conditions)
PHASE 2 BASIN 2U PHASE 2 BASIN 3U PHASE 2 BASIN 3D
(Sub-Basin 1 & 4)
(Proposed Highway)
(Sub-Basin 2A & 2B)
(Proposed Highway)
(Sub-Basin 3A*, 3B*, 5**, & 5A)
(Existing Commercial) Proposed Basin Total
Total Building Total Pavement Total Sidewalk & Impervious
Lake Area @ Control Total Open Space/Pervious
0.00 0%
3.74 22%
0.91 5%
4.89 29%
7.52 44%
0.00 0%
2.61 55%
0.50 11%
0.00 0%
1.64 35%
5.34 24%
8.65 38%
0.66 3%
2.79 12%
5.11 23%
5.34 6%
30.91 35%
5.38 6%
11.91 13%
35.19 40%
Total Sub-Basin Area (Ac) 17.06 4.75 22.55 88.73 100%
Notes:
* Phase 2 Sub-Basin 3A & 3B areas based on existing values for Mercedes Benz per SFWMD ERP Permit No. 11-03669-P, Application No. 141112-2.
** Phase 2 Sub-Basin 5 areas based on existing values for Triangle Parcel per SFWMD ERP Permit No. 11-02353-P, Application No. 031219-10.
Project Veterans Memorial Blvd Phase 2B
PRE-DEVELOPMENT UNTREATED LOADING
PRE-DEVELOPMENT SITE CHARACTERISTICS:
LAND USE
LAND USE CATEGORY AREA CONDITION HYDROLOGIC SOIL
GROUP
PHASE 2B BASIN 1U
UNDEVELOPED 15.74 GOOD B/D
PHASE 2B BASIN 2U
UNDEVELOPED 17.06 GOOD B/D
PHASE 2B BASIN 3U
UNDEVELOPED 4.75 GOOD A/D
PHASE 2B BASIN 3D
LOW INTENSITY
COMMERCIAL
22.55 GOOD A/D
TOTAL 88.73
IMPERVIOUS % & DIRECTLY CONNECTED IMPERVIOUS %
BASIN # LAND USE AREA PERVIOUS BUILDING
AREA
IMPERVIOUS UPLAND LAKE AREA UPLAND NON-
DCIA %
UPLAND DCIA %
PAVEMENT ONLY (PERVIOUS +
BUILDING +
IMPERVIOUS
(EXCLUDES LAKE
AREAS, ASSUME
100% BLDG)
(100% Pavement
DCIA)
PHASE 2B BASIN 1U
UNDEVELOPED 15.74 14.51 0.00 0.00 14.51 1.23 0% 0%
PHASE 2B BASIN 2U
UNDEVELOPED 17.06 17.06 0.00 0.00 17.06 0.00 0% 0%
PHASE 2B BASIN 3U
UNDEVELOPED 4.75 4.75 0.00 0.00 4.75 0.00 0% 0%
PHASE 2B BASIN 3D
LOW INTENSITY COMMERCIAL 22.55 6.24 5.34 8.65 20.23 1.66 26% 43%
CURVE NUMBER & RUNOFF COEFFICIENT, C
PHASE 2B
BASIN 1U
PHASE 2B
BASIN 2U
PHASE 2B
BASIN 3U
PHASE 2B
BASIN 3D
Sub-Basin Area (Excludes Lake) 14.51 17.06 4.75 20.89 Pervious Area 14.51 17.06 4.75 6.24 Average Site Grade (ft NAVD) 11.5 9.5 9.5 12.4 Control Elevation (ft NAVD) 10.5 8.5 8.5 8.5
Average Depth to Water Table (ft) 1.00 1.00 1.00 3.90
Soil Compaction Factor (i.e. 25%) 25% 25% 25% 25% Developed Storage Available (in) 0.45 0.45 0.45 7.90 Available Soil Storage 0.54 0.64 0.18 4.11 Site-Wide Soil Storage (S) 0.45 0.45 0.45 2.36 CN for Sub-Basin* 95.7 95.7 95.7 80.9
BASIN UPLANDS NON-DCIA
PERVIOUS
COMPOSITE
NON-DCIA
CURVE
DCIA %
NUMBER *From SFWMD; Basis for Review, Volume IV
(Developed Storage Available) x (Pervious Area)/(12 inches/ft)
26.25 0% 53% 81.6 47% CN = 1,000 /(S + 10)
14.51 0% 100% 95.7 0%
17.06 0% 100% 95.7 0%
4.75 0% 100% 95.7 0%
20.23 26% 31% 80.9 43%
PHASE 2B BASIN 1U
PHASE 2B BASIN 2U
PHASE 2B BASIN 3U
POST-DEVELOPMENT UNTREATED LOADING
POST-DEVELOPMENT SITE CHARACTERISTICS:
LAND USE
LAND USE CATEGORY
AREA CONDITION HYDROLOGIC
SOIL GROUP
IMPERVIOUS % & DIRECTLY CONNECTED IMPERVIOUS %
BASIN # LAND USE AREA PERVIOUS BUILDING AREA IMPERVIOUS UPLAND LAKE AREA UPLAND NON-
DCIA %
UPLAND DCIA %
PAVEMENT ONLY (PERVIOUS +
BUILDING +
IMPERVIOUS
(EXCLUDES LAKE
AREAS, ASSUME
100% BLDG)
(100%
Pavement DCIA)
PHASE 2B BASIN 1U
HIGHWAY 15.74 6.97 0.00 3.61 10.58 4.23 0% 34%
PHASE 2B BASIN 2U
HIGHWAY 17.06 7.52 0.00 3.74 11.26 4.89 0% 33%
PHASE 2B BASIN 3U
HIGHWAY 4.75 1.64 0.00 2.61 4.25 0.00 0% 61%
LOW INTENSITY COMMERCIAL 22.55 5.11 5.34 8.65 19.10 2.79 28% 45%
CURVE NUMBER & RUNOFF COEFFICIENT, C
PHASE 2B
BASIN 1U
PHASE 2B
BASIN 2U
PHASE 2B
BASIN 3U
PHASE 2B
BASIN 3D
Sub-Basin Area (Excludes Lake) 11.51 12.17 4.75 19.76
Pervious Area 6.97 7.52 1.64 5.11
Average Site Grade (ft NAVD) 13.40 11.70 11.70 12.40
Control Elevation (ft NAVD) 10.5 8.5 8.5 8.5 Average Depth to Water Table (ft) 2.90 3.20 3.20 3.90 Soil Compaction Factor (i.e. 25%) 25% 25% 25% 25%
Developed Storage Available (in) 4.64 5.69 5.69 7.90
Available Soil Storage 2.70 3.57 0.78 3.37 Site-Wide Soil Storage (S) 2.81 3.52 1.96 2.04 CN for Sub-Basin* 78.1 74.0 83.6 83.0
BASIN UPLANDS NON-DCIA
PERVIOUS % COMPOSITE NON-
DCIA CURVE
DCIA %
NUMBER *From SFWMD; Basis for Review, Volume IV
ACRES (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
PHASE 2B BASIN 1U (Available Soil Storage/Site Area) x (12 inches/ft)
10.58 0% 66% 78.1 34% CN = 1,000 /(S + 10)
PHASE 2B BASIN 2U
11.26 0% 67% 74.0 33%
PHASE 2B BASIN 3U
4.25 0% 39% 83.6 61%
19.10 28% 27% 83.0 45%
PHASE 2B BASIN 1U
HIGHWAY 15.74 GOOD B/D
PHASE 2B BASIN 2U
HIGHWAY 17.06 GOOD B/D
PHASE 2B BASIN 3U
HIGHWAY 4.75 GOOD A/D
PHASE 2B BASIN 3D
LOW INTENSITY COMMERCIAL 22.55 GOOD A/D
Total 88.73
7/8/2024
K:\2019\190062.00.01 Veteran's Memorial Extension - Phase 2\016 Master Drainage Infrastructure Plan\Calculations\ERP Calcs\Nutrient Loading Calcs\2024-07-03 Nutrient Calcs (rev 1)
Tab: Lake 2 Vol 20 ft
PROPOSED LAKE 2 VOLUME CALCULATIONS
LAKE NUMBER 2 (PHASE 2 BASIN 2U)
ELEVATION (ft NAVD) AREA
10.50
4.89
Slope Break 0.50 3.03
Toe of Slope -9.50 2.21
AREA AVERAGE
DEPTH
VOLUME
AREA AT CONTROL ELEVATION
AREA AT SLOPE BREAK POINT (6:1)
4.89 ACRES
3.96 ACRES
3.03 ACRES
x
10.0 FEET
39.6 ACRE-FT
(CONTROL ELEVATION - 10 FT.)
2.62 ACRES
26.2 ACRE-FT
AREA AT LAKE BOTTOM (2:1)
(CONTROL ELEVATION - 20 FT.
2.21 ACRES
PERMANENT POOL VOLUME, PPV = 65.8 ACRE-FT
LAKE MEAN DEPTH (FT)
13.5 FEET
K:\2019\190062.00.01 Veteran's Memorial Extension - Phase 2\016 Master Drainage Infrastructure Plan\Calculations\ERP Calcs\Nutrient Loading Calcs\2024-07-03 Nutrient Calcs (rev 1)
Tab: Ex. Lake 3 Vol 12 ft
EXISTING LAKE 3 VOLUME CALCULATIONS
LAKE NUMBER Ex. 3 (PHASE 2 BASIN 3D)
8.50
1.66
Slope Break -1.50 0.74
Toe of Slope -3.50 0.66
1.66 ACRES
1.20 ACRES
0.74 ACRES
12.0 ACRE-FT
0.70 ACRES
2.0 FEET
1.4 ACRE-FT
(CONTROL ELEVATION - 12 FT.
0.66 ACRES
PERMANENT POOL VOLUME, PPV = 13.4 ACRE-FT
8.1 FEET
K:\2019\190062.00.01 Veteran's Memorial Extension - Phase 2\016 Master Drainage Infrastructure Plan\Calculations\ERP Calcs\Nutrient Loading Calcs\2024-07-03 Nutrient Calcs (rev 1)
Tab: Lake 3 Vol 20 ft
PROPOSED LAKE 3 VOLUME CALCULATIONS
LAKE NUMBER 3 (PHASE 2 BASIN 3D)
8.50
2.79
Slope Break -1.50 1.17
Toe of Slope -11.50 0.52
2.79 ACRES
1.98 ACRES
1.17 ACRES
19.8 ACRE-FT
0.85 ACRES
8.5 ACRE-FT
(CONTROL ELEVATION - 20 FT.
0.52 ACRES
PERMANENT POOL VOLUME, PPV = 28.3 ACRE-FT
10.1 FEET
Complete Report (not including cost) Ver 4.3.5
Project: Veteran's Memorial Boulevard - Phase 2B Date: 7/17/2026 10:12:33 AM
Site and Catchment Information
Analysis: Specified Removal Efficiency
Catchment Name Phase 2 Sub-Basin 2A (3U) Phase 2 Sub-Basin 1 and 4 (2U)
Phase 2 Sub-Basin 3A, 3B, 5, and 5A (3D)
Rainfall Zone Florida Zone 4 Florida Zone 4 Florida Zone 4
Annual Mean Rainfall
53.00 53.00 53.00
Pre-Condition Landuse Information
Landuse Undeveloped - Wet Flatwoods: TN=1.213
TP=0.021
Undeveloped - Wet Flatwoods: TN=1.213
TP=0.021
User Defined Values
Area (acres) 4.75 17.06 22.55
Rational Coefficient (0-1)
0.47 0.47 0.43
Non DCIA Curve Number
95.70 95.70 80.90
DCIA Percent (0- 100)
0.00 0.00 43.00
Nitrogen EMC (mg/l)
1.213 1.213 0.930
Phosphorus EMC (mg/l)
0.021 0.021 0.190
Runoff Volume (ac-ft/yr)
9.915 35.612 43.150
Groundwater N (kg/yr)
1.213 1.213 1.130
Groundwater P (kg/yr)
0.021 0.021 0.188
Nitrogen Loading (kg/yr)
16.043 54.476 50.610
Phosphorus Loading (kg/yr)
0.278 0.943 10.297
Post-Condition Landuse
7/17/2026about:blank
Catchment Number: 1 Name: Phase 2 Sub-Basin 2A (3U)
Date: 7/17/2026
None Design
Watershed Characteristics
Surface Water Discharge
Information Landuse User Defined Values User Defined Values User Defined Values
Area (acres) 4.75 17.06 22.55
Rational Coefficient (0-1)
0.57 0.33 0.46
Non DCIA Curve Number
83.60 74.00 83.00
DCIA Percent (0- 100)
61.00 33.00 45.00
Wet Pond Area (ac)
0.00 4.89 2.79
Nitrogen EMC (mg/l)
1.250 1.250 0.930
Phosphorus EMC (mg/l)
0.173 0.173 0.190
Runoff Volume (ac-ft/yr)
11.896 17.869 40.041
Groundwater N (kg/yr)
1.520 1.520 1.130
Groundwater P (kg/yr)
0.200 0.200 0.188
Nitrogen Loading (kg/yr)
19.855 29.060 47.045
Phosphorus Loading (kg/yr)
2.738 4.012 9.568
Catchment Area (acres) 4.75
Contributing Area (acres) 4.750
Non-DCIA Curve Number 83.60
DCIA Percent 61.00
Rainfall Zone Florida Zone 4
Rainfall (in) 53.00
Required TN Treatment Efficiency (%)
Provided TN Treatment Efficiency (%)
Media Mix Information
Groundwater Discharge (Stand-Alone)
Load Diagram for None (stand-alone)
Load Diagram for None ( As Used In Routing)
Required TP Treatment Efficiency (%)
Provided TP Treatment Efficiency (%)
Type of Media Mix Not Specified
Media N Reduction (%) 0.000
Media P Reduction (%) 0.000
Treatment Rate (MG/yr) 0.000
TN Mass Load (kg/yr) 0.000
TN Concentration (mg/L) 0.000
TP Mass Load (kg/yr) 0.000
TP Concentration (mg/L) 0.000
Load N: 19.86 kg/yr P: 2.74 kg/yr
Treatment N: % P: %
Surface Discharge N: 19.86…