About this file

This document is a Request for Additional Information (RAI) issued by the South Florida Water Management District (SFWMD) to Collier County Board of County Commissioners regarding an Environmental Resource Permit (ERP) application for Veterans Memorial Boulevard Phase 2A (Application No. 260529-64674), dated June 26, 2026. The project involves a roadway extension and associated improvements that have been split into two phases for separate permit review. The District requires submission of a $4,500 application fee, updated function assessments removing impacts to other surface waters, written confirmation from a mitigation bank reserving 2.85 freshwater forested credits, revised stormwater management documentation specific to Phase 2A including separate exhibits for drainage basin limits and nutrient analysis, and clarification regarding potential impacts to the Imperial Lakes residential development and Imperial Drainage Basin Stormwater Improvements project. The applicant must provide documentation and computations demonstrating no adverse impacts will occur to these related projects due to the inseparable nature of the ERP applications. Additionally, the District requests information on whether temporary dewatering will be required during construction and, if so, confirmation of coordination with the Water Use Permit process. The applicant has 90 days from June 26, 2026 to submit a complete substantive response via the SFWMD's RegPermitting website or by hard copy to the Fort Myers Service Center; failure to respond within this period will result in application denial.

The RAI includes an advisory notice regarding potential canal, road, and oil, gas, or mineral reservations that may encumber the property, with responsibility for verification falling to the property owner. District staff contacts for clarification include Elizabeth Blessing (Senior Environmental Analyst), Carmen Quan (Engineer Senior), and Rich Walker (Property Analyst). No pricing information or contract award details are included in this RAI document, as it represents an administrative request for permit application completeness rather than a procurement solicitation or contract award notice.

View the file

Other files

File Type Posted
Exhibit_F12_-_Triangle_Section_A_Revised.pdf PDF
Exhibit_F11_-_251205-59840_RAIExtension_20260630.pdf PDF
Exhibit_F10_-_Mercedes_Section_A_Revised.pdf PDF
Exhibit_F9_-_S5_-_250814-56017_-_06_Surface_Water_Mgmt_Report_-_DSS.pdf PDF
Exhibit_F8_-_S5_-_250814-56017_-_05_ERP_Plans_-_DSS.pdf PDF
Exhibit_F7_-_S5_-_250814-56017_-_Response_to_Comments_Letter.pdf PDF
Exhibit_F6_-_250814-56017_RAI_20260626.pdf PDF
Exhibit_F5_-_S2_-_260529-64674_Mitigation_Plan_Veterans_Memorial_Blvd_Ext_Ph2_Basin_1.pdf PDF
Exhibit_F4_-_S2_-260529-64674_06_Surface_Water_Management_Report_-_DSS_(1).pdf PDF
Exhibit_F3_-_S2_-_260529-64674_05_ERP_Plans_-_DSS.pdf PDF
Exhibit_F2_-_S2_-_260529-64674_SFWMD_Response_to_Comments.pdf PDF
Pre-Proposal_Design_Meeting_VMB_II-REV4.pptx PPTX presentation
PO_Terms_and_Conditions_Rev.3.pdf PDF
PSA_CCNA_Single_Project_Agreement_[2026_ver.1].pdf PDF
26-8668_Insurance_Requirements_FE.pdf PDF
Form_4_Reference_Questionnaire.pdf PDF
Form_3_Immigration_Certification.pdf PDF
Form_2_Conflict_of_Interest_Certification.pdf PDF
Form_1_Vendor_Declaration_Statement.pdf PDF
Checklist_-_Vendor_Checklist_.pdf PDF
26-8668_Authorization_to_Advertise_FE.pdf PDF
Exhibit_E13_-_Environmental_Supplement_Report_-_May_2024.pdf PDF
Exhibit_E12_-_Construction_Pollution_Prevention_Plan_Rev_01.pdf PDF
Exhibit_E11_-_ROW_Map_SS.pdf PDF
Exhibit_E10_-_Surface_Water_Management_Analysis_for_Phase_I_Updates_-_Pending_SS.pdf PDF
Exhibit_E9_-_Surface_Water_Management_Report_for_Phase_II-_Pending_Review_and_SS.pdf PDF
Exhibit_E8_-_Environmental_Resource_Permit_Plans_-_Pending_SS.pdf PDF
Exhibit_E7_-_Project_Location_Map.pdf PDF
Exhibit_E6_-_04_Signature_Authorization_REV02.pdf PDF
Exhibit_E5_-_03_Section_E_Rev_01.pdf PDF
Exhibit_E4_-_02_Section_C.pdf PDF
Exhibit_E3_-_01a_Section_A_-_signature_page_(2024-07-08).pdf PDF
Exhibit_E2_-_01_Section_A_(2024-07-08).pdf PDF
Exhibit_E1_-_Preliminary_Drainage_&_Pond_Siting_Analysis_SS.pdf PDF
Exhibit_D_-_Topographical_Survey-PH-II.pdf PDF
Exhibit_C_-_Veterans_Memorial_Boulevard_Roadway_Final_GM_Signed.pdf PDF
Exhibit_B_-_VMB_Final_Traffic_Noise_Technical_Memorandum_1.17.20_updated_7.1.2021.pdf PDF
Exhibit_A_-_Old_US_41_VISSIM_Build_Conditions_Memo_07312023.pdf PDF
Request_for_Professional_Services_Instructions_Version_2.pdf PDF
26-8668_Solicitation.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

* Delivered Via Email June 26, 2026

Jay Ahmad * Collier County Board Of County Commissioners 2885 Horeshoe Drive South Naples, FL 34104

Subject: Veterans Memorial Boulevard Phase 2A Request for Additional Information Application No. 260529-64674 Collier County

Dear Mr. Ahmad:

As discussed with Ms. Marielle Nageon de Lestang on June 25, 2026, the District is requesting the following information, in accordance with Section 5.0 or 7.0, as applicable, Environmental Resource Permit (ERP) Applicant's Handbook (AH) Volume (Vol.) I, adopted by reference in Subsection 62.330.010(4)(a), Florida Administrative Code (F.A.C.), to complete the application and provide reasonable assurances for permit issuance:

Please provide the required application fee of $4,500.00 for an Individual Environmental Resource Permit (ERP). The application is not complete until the required application fee has been paid. Payment of application fees can be done by credit card on the District's RegPermitting website, or by check. If submitted by check, please make the check payable to the South Florida Water Management District and reference Application No. 260529-64674 in the memo section of the check to ensure adequate processing. [Rule 62-330.071(1), F.A.C.]

1.

As discussed with Marielle Nageon de Lestang of Turrell, Hall, and Associates, Inc., please update the function assessment to remove impacts to other surface waters. Please submit written correspondence from the mitigation bank, confirming the 2.85 freshwater forested credits needed for this project have been reserved for purchase. [F.A.C.; Section 10.3.1.3, Volume I]

2.

The overall proposed roadway extension and associated improvements was split in two phases and each phase will be reviewed separately under Application No. 260529-64674 for Phase 2A and Application No. 250814-56017 for Phase 2B. Address the following [Rule 62.330.060, F.A.C.]:

a. Provide an aerial exhibit that shows the limits of each sub-basin of the overall Drainage Basin 1 as shown in page 13 of the engineering report.

b. Indicate in the nutrient analysis, the portion specifically relating to Phase 2A.

c. Provide a separate exhibit that includes the following information: seasonal high water table, control elevation, minimum finished floor, FEMA flood elevation (if applicable), minimum roadcrown and parking lot elevations, minimum perimeter berm elevation, and rainfall and the

3.

1.

2.

peak stage elevations for the controlling design storms, and the allowable and peak discharge rates.

d. The engineering report does not include any references to Phase 2A and 2B. It appears the limits are east and west of the railroad, however it is not clear. Staff requests that the SWM report be revised to include only information regarding the Phase 2A project.

3.

As currently presented it it is unclear if the proposed project will impact proposed facilities for the Imperial Lakes residential development as shown in incomplete Application No.

260127-6108. Please clarify and provide supporting documentation and relevant computations that demonstrates no adverse impacts will occur to the Imperial Lakes development as a result of the proposed project. Due to the inseparable nature of these ERP applications, District staff will review these applications concurrently and final agency action will be taken once all applications are deemed complete. [Rule 62.330.060, F.A.C.]

4.

As currently presented it it is unclear if the proposed project will impact proposed facilities for the Imperial Drainage Basin Stormwater Improvements project under Application No.

250930-57510. Please clarify and provide supporting documentation and relevant computations that demonstrates no adverse impacts will occur to the Imperial Drainage Basin Stormwater Improvements project as a result of the proposed project. Due to the inseparable nature of these ERP applications, District staff will review these applications concurrently and final agency action will be taken once all applications are deemed complete. [Rule 62.330.060, F.A.C.]

5.

Will temporary dewatering be required as part of the construction activities? Please contact Sean Roberts at 239-338-2929 ext #7719, email: sroberts@sfwmd.gov to determine if a Water Use Permit will be required for dewatering. Because of the inseparable nature of water use and surface water management, and in accordance with Subsection 2.3(b), Environmental Resource Permit Applicant's Handbook Volume II, District staff will review these applications concurrently and final agency action will be taken once both applications are deemed complete. [WU AH - 1, 1.4.1]

6.

Please note that new information submitted may result in additional requests for information to complete this permit application. [Rule 62.330.060, F.A.C.]

7.

The following comment is advisory in nature and does not require a response to the District.

Please be aware that properties within the South Florida Water Management District (District) may be subject to canal, road and/or oil, gas or mineral (OGM) reservations issued to the District or The Board of Trustees of the Internal Improvement Trust Fund of the State of Florida (TIITF).

These reservations encumber title to specific properties by granting certain rights to the District or TIITF to use the property to perform activities stated in the reservation documents, regardless of approvals/permits acquired or improvements constructed by the fee owner. It is the property owner’s responsibility to verify whether reservations exist on the property. The property owner may apply to the District or TIITF (or both, if applicable) to release reservations on the property at ReleaseApplications@sfwmd.gov. Issuance of an ERP for a proposed project on a specific property does not obligate the District or TIITF to release any reservations encumbering the property. Construction of approved/permitted works on property with unreleased reservations is at the risk of the fee owner.

If any of the items in this RAI need clarification or discussion, please contact: Elizabeth Blessing, Senior Environmental Analyst at (239) 338-2929 Ext. 7743 or via email at eblessin@sfwmd.gov;

Veterans Memorial Boulevard Phase 2A, Application No. 260529-64674

Carmen Quan, P.E., Engineer Senior at 239-338-2929 x7714 or via email at cquan@sfwmd.gov;

and Rich Walker, Property Analyst at (561) 682-6741 or via email at rdwalker@sfwmd.gov.

In accordance with Section 5.5.4, ERP AH Vol. I, adopted by reference in Subsection 62.330.010(4)(a), FAC review of the application will not resume until a substantive response to each comment has been received.

Please submit the complete response electronically on the District's RegPermitting website at www.sfwmd.gov/regpermitting using the 'Submit Additional Information' link. Information regarding RegPermitting is enclosed. Alternatively, please provide one original hard copy of the requested information, labeled with the application number, to the Fort Myers Service Center.

If a complete response is not provided within 90 days of this letter, this application will be processed for denial, in accordance with Section 5.5.3.5 ERP AH Vol. I. If additional time is necessary, please submit a request for an extension via the RegPermitting before the 90-day period ends, including a description of the circumstances requiring the extension of time.

For projects where more than 90 days will be needed to develop a complete application, it is recommended that the applicant withdraw the current application and resubmit a complete application at a later date. The processing fee, if paid, can be applied to a new application that is submitted within 365 days, pursuant to Rule 62-330.071(3), FAC. If the application is denied by the agency, fees will not be returned or credited.

Sincerely, Kimberly McNeely Environmental Supervisor c: Christopher Wright, Kimley-Horn And Associates, Inc * Tim Hall, Turrell and Associates Inc * Joe Parisi, N.A. Realty Trust, Inc *

Veterans Memorial Boulevard Phase 2A, Application No. 260529-64674 https://www.sfwmd.gov/regpermitting