This is a Surface Water Management Report prepared by Kimley-Horn and Associates, Inc. for Collier County Board of Commissioners in support of a modification to SFWMD Environmental Resource Permit (ERP) No. 11-102981-P for Veterans Memorial Boulevard Phase 2A. The project extends the Veterans Memorial Boulevard roadway from the existing high school westward to the railroad tracks in Naples, Florida, encompassing approximately 49.49 acres of drainage area. The proposed system includes expansion of existing stormwater management facilities to provide water quality treatment and attenuation through wet and dry detention ponds, with culvert crossings at two locations to maintain existing drainage patterns. The project is located predominantly in FEMA Flood Zones "AE" and "X" with an average floodplain contour elevation of 11.0 ft NAVD88. Design calculations indicate a required water quality volume of 6.18 acre-feet (with an additional 50% for anti-degradation requirements to sensitive receiving waters), with 6.22 acre-feet to be provided. The allowable discharge rate is limited to 0.12 cfs per acre as specified in Collier County Stormwater Ordinance 2017-19, with a total allowable discharge of 5.94 cfs from the East Basin. The 25-year 3-day storm design rainfall is 11.55 inches, and the 100-year 3-day storm design rainfall is 15.00 inches.
The report includes comprehensive hydraulic modeling results using ICPR (Integrated Catchment Modeling Program) software, demonstrating peak discharge conditions and storage elevations for both 25-year and 100-year storm events. Floodplain compensation calculations classify the site as an exporter of stormwater, with 5.15 acre-feet of pre-development runoff and 21.03 acre-feet of post-development storage provided, resulting in a net reduction in flood exports. Pre- and post-development nutrient loading analysis indicates nitrogen loading reduction of 13.74 kg/yr and phosphorus loading reduction of 3.62 kg/yr through wet detention with littoral shelf treatment. The proposed permanent pool volume for the expanded lake is 43.1 acre-feet with a mean depth of 10.2 feet. Control structure CS-1 in the expanded wet detention pond features an orifice weir, rectangular weir, and horizontal grate weir to manage discharge at the 10.50 ft NAVD control elevation. The system is designed to discharge through a 24-inch RCP pipe to a swale ultimately leading to a canal on the east side of Imperial Golf Estates residential community, which outfalls to the Cocohatchee River.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Veterans Memorial Boulevard Phase 2A
Surface Water Management Calculations
Prepared for:
Collier County Board of Commissioners 3299 Tamiami Trail East, Suite 303
Naples, FL 34112-5746
Kimley-Horn and Associates, Inc.
1514 Broadway, Suite301, Fort Myers, FL 33901 Phone (239) 271-2650 Fax (941) 379-4352 www.kimley-horn.com http://www.kimley-horn.com/
VETERANS MEMORIAL BOULEVARD PHASE 2A SURFACE WATER MANAGEMENT CALCULATIONS
TABLE OF CONTENTS
Section I – Summary of Design
Section II – Calculations
Staff Report Data On-Site Land Use Calculations Sub-Basin Calculations Water Quality Calculations Flood Plain Management Calculations Nutrient Loading Analysis
Section III – Input Data for ICPR Modeling
Section IV – ICPR Modeling Results
25 Year – 3 Day Storm Event Model Node Maximum Conditions Link Maximum Conditions Node Time Series to 15 days
100 Year – 3 Day Storm Event Model (With Discharge) Node Maximum Conditions Link Maximum Conditions
Section V - Off-Site Drainage Modification Summaries
Table of Comparisons between Existing Permits and Proposed Modification
SECTION I
PROJECT PURPOSE
This application is a request for a modification of SFWMD ERP Permit No. 11-102981-P, Application No. 241203-48073 authorizing the construction and operation of a surface water management system serving Veterans Memorial Boulevard Phase 2A. Veterans Memorial Boulevard Phase 2A is an extension and modification of the constructed Phase 1 roadway approved under ERP No. 11- 102981-P, Application No. 210419-5949, for the Veterans Memorial Blvd surface water management system.
PROJECT SITE DESCRIPTION
Veterans Memorial Blvd currently extends from the high school west to Livingston Road. This is Veterans Memorial Blvd Phase 1. Phase 2A of Veterans Memorial Blvd is the portion of the roadway from the existing high school to the west to the railroad tracks. This project is for the Phase 2A portion of VMB but will also refer to Phase 1 as these two phases have a shared stormwater management facility.
EXISTING DRAINAGE CONDITIONS
The existing drainage for the project site is shown on the Existing Drainage Map within the plans.
Currently the existing four-lane roadway discussed above is included in one (1) major basin separated into three (3) sub-basins and is permitted under ERP No. 11-102981-P. The runoff from the roadway is stored in either an on-site lake or dry detention pond to allow for water quality and attenuation. Each drainage basin within Phase 1 is controlled at an elevation of 10.50 ft NAVD. An undeveloped portion of the Phase 2A Veterans Memorial Boulevard right of way of phase 1 and east of the railroad tasks currently flows to the south.
The Mediterra development, to the north of the right of way, was originally permitted under ERP No.
11-01761-P, Application No. 990126-4. As part of Veterans Phase 1 a 48” pipe from Mediterra control structure #2 in lake #24 connects to a junction box S-129 located in the 20 ft drainage easement along the north side of the west Detention Pond 1. and is routed through a 48” pipe to the east where it connects to the junction box S-133 and the control structure CS-1 from the Phase 1 Wet Detention Pond 1 and it continues to junction box S-134 south around the wet detention lake in Phase 1. This 48” pipe discharges to the same drainage easement within the Imperial Golf Estates site that the existing flow went to and splits flows to the east and south. This was not combined with the Phase 1 SWM system and will not be combined with the Phase 2A SWM system as the flows have already been treated on the Mediterra parcel.
The undeveloped portion of the Veterans Memorial Boulevard Phase 2A right-of-way between the railroad tracks and the Phase 1 western limits currently flows to the south in a ditch constructed to carry the Mediterra discharges from DA #2 and then discharges directly via surface flow into the ditch along the north side of the Imperial Golf Estates development.
PROPOSED PROJECT
The proposed project is the extension of Veterans Memorial Blvd Phase 2A between the existing high school to the existing railroad tracks. This is Veterans Memorial Blvd Phase 2A. This project includes expanding the Phase 1 stormwater management facility to provide water quality for Phase 2A also.
The Veterans Memorial Boulevard Phase 2A Water Management System consists of two major basins. Phase 2A will expand the existing stormwater management facilities to provide water quality and attenuation. The control elevation for Phase 2A east of the railroad tracks was determined from the existing ERP (Permit No. 11-102981-P) for Veterans Memorial Boulevard Phase 1.
A modification to the Phase 1 Permit No. 11-102981-P under Application No. 241203-48073 was necessary as result of the construction of the Mediterra berm which increased the drainage area to the roadway SWM system thereby impacting the required storage for Phase 1. In the review and discussion with the Engineer of Record for the modification, it was determined that additional storage was needed in Phase 1 that could occur in the existing median. The proposed Phase 2 modification will include the additional storage necessary in the Phase 1 median.
Culvert crossings to match existing drainage patterns are proposed at two locations along Phase 2A. These are near the Seminole Railroad ROW and just west of the expansion of Wet Detention Pond 1 which serves Phase 1 and Phase 2A. The total area and allowable discharge rate for the existing ERP permits were used to determine the total discharge rate and pipe size for the proposed culverts under the road. The proposed 24” pipes were placed at invert elevations at or slightly below existing ground elevations. The proposed 24” RCP pipes will ensure that the existing drainage areas north of the proposed roadway continue to flow south into conservation wetlands which ultimately outfall to the Cocohatchee River.
FLOODPLAIN COMPENSATION
The project is predominantly in FEMA Flood Zone “AE” and Zone “X” as shown on the National Flood Insurance Program Map 12021C0191J, effective date of February 8, 2024. Phase 2A has an average floodplain contour elevation of 11.0 ft NAVD88. The map identifies the project in a special flood hazard area subject to inundation by the 1% annual chance flood. The 1% annual chance flood (100‐ year flood), also known as the base flood, is the flood that has a 1% chance of being equaled or exceed in any given year. Since the project is in the floodplain, floodplain calculations are included for the project less 4.0 acres of Zone “X” in Basin 1 and 2.7 acres of Zone “X” in Basin 2. The calculations specified by SFWMD, indicate 5.15 ac‐ft of runoff is produced by Basin 1 and 0.64 ac-ft of runoff is produced by Basin 2. Therefore, Basins 1 and 2 are considered exporters and do not require floodplain compensation areas.
DISCHARGE
Allowable discharge for this project is limited to 0.12 cfs per acre (Imperial Drainage Outlet Basin) as specified in the Collier County Stormwater Ordinance 2017-19.
The existing control structure from the Veterans Memorial Boulevard Phase 1 SWM system will be removed and replaced with the proposed control structure (CS-1) in the expanded wet detention pond. The existing 24” RCP pipe will convey discharge to a swale that ultimately leads to the canal on the east side of Imperial Golf Estates residential community. While no impacts are expected for the Mediterra SWM system, the proposed improvements to the Veterans Memorial Boulevard SWM system will require a modification to the Phase 1 ERP (Permit No. 11-102981-P).
RECEIVING BODY
The Phase 2A project (east of the roadway to the existing high school) flows through the Imperial Golf Estates SWM system and ultimately outfalls to the Cocohatchee River via a canal on the south side of Imperial Golf Estates. The tailwater used for hydraulic modeling was estimated based on hydraulic conditions within the Imperial Golf Estates system.
WATER ǪUALITY
The proposed wet and dry detention ponds will provide water quality for the project. An additional 50% above the required water quality volume of 1 inch over the basin area is provided to meet the anti-degradation requirements for discharge to an OFW.
IRRIGATION WATER SOURCE
Collier County will be using water from the proposed 12” water main to be installed as a part of this project for irrigation water. No water use permit will be required.
Collier County Stormwater Management Facilities
Collier county GMD, State of Florida, Maxar
6/18/2024 0 0.4 0.80.2 mi
0 0.65 1.30.33 km
1:27,046
SECTION II
Calculations
East of Railroad –
Basin 1
East of Railroad Phase - 2A Basin 1
Project Veterans Memorial Blvd Improvements Phase 2A
Proj. #: 190062.00.01 Task # 016
Calculated By: NDG Date: 6-Aug-25
Checked By: LAS Date: 6-Aug-25
Veterans Memorial Blvd Improvements Phase 2A - East of Railroad
Water Management Calculations
Contents:
- Staff Report Data
- On-Site Land Use Calculations
- Sub-Basin Calculations
- Water Quality Calculations
Project Veterans Memorial Blvd Improvements
Phase 2A
Proj. #: 190062.00.01 Task # 016
Calculated By: NDG Date: 6-Aug-25
Checked By: LAS Date: 6-Aug-25
Water Management Calculations
Assumptions
1. The following water quality calculations will show storage elevation for the first inch of storm water runoff or 2.5 times the percent impervious, whichever is greater. The bleeder will be designed to allow 1/2" discharge over a 24 hour period.
2. The Control Elevation is set at 10.50 ft NAVD based on wet season water nails
3. The subject property consists of 49.49 acres.
4. The Drainage Area will consist of 49.49 acres.
5. There will be a berm constructed around the water management system (Drainage Area) , with a minimum crest elevation set at the 25-year 3-day peak. Onsite indigenous preserve and canal maintenance easement areas will be outside of the
Drainage Area.
6. Based on SFWMD Environmental Resource Permit Applications Handbook, Volume II - Using Method 1, the Rainfall
Amounts chosen for the design are:
From Figure C-9 25-year 1-day = 11.50 inches.
7. Average depth to water level is ± 3.80 ft. Refer to "Water Quality Calculations" and "Lake and Basin Storage
Calculations."
8. Soil compaction factor = 25%.
9. The site is located within the Cocohatchee River Basin according to the "Allowable Discharge Rates for Projects in the
South Florida Water Management District."
10. An additional 50% water quality volume will be provided according to the SFWMD policy for discharge to sensitive receiving waters.
11. East Basin is inclusive of Phase 2 Sub-Basin 1-DE, Phase 2 Sub-Basin 1-LE, Phase 1 Sub-Basin 2, Phase 1 Sub-Basin
3, and Phase 1 Sub-Basin 4.
Staff Report Data
Water Quantity Discharge Rate:
Discharge Storm Frequency 25 year - 3day Design Rainfall: 11.55 in.
Allow Disch (cfs)
Method of Determination (cfs/ac)
Peak Disch (cfs)
Peak Stage Modeled (ft, NAVD)
East Basin 5.94 0.12 5.23 13.27
Road Design:
Discharge Storm Frequency 25 year - 3day Design Rainfall: 11.55 in.
Basin
Peak Stage (ft, NAVD)
Proposed Min. Road Crown (ft, NAVD)
Phase 2 Sub-Basin 1-DE 13.19 13.40
Phase 2 Sub-Basin 1-LE 13.18 13.40
Phase 1 Sub-Basin 2 13.19 13.40
Phase 1 Sub-Basin 3 13.20 13.40
Phase 1 Sub-Basin 4 13.20 13.40
Berm Design:
Discharge Storm Frequency 100 year - 3day (w/ Discharge) Design Rainfall: 15.00 in.
*Elevation Needed for Floodplain Comp
Water Quality / Discharge Structures:
Str #
Type
Width (feet)
Height (feet)
Invert Elev. (ft, NAVD)
Phase 1 Sub-Basin 2 CS-1
Orifice (Circular) 0.50 0.50 10.50
Rectangular Weir 1.20 0.75 11.77
Rectangular Weir (Horizontal Grate) 3.00 4.50 13.40
Water Quality Treatment
Method
Vol Req'd (ac-ft) Minimum Vol Prov'd (ac-ft)
Wet/Dry Detention 6.18 6.22
Basin
Peak Stage (ft, NAVD)
Proposed Berm Elevation (ft, NAVD)*
Phase 2 Sub-Basin 1-DE 13.67 14.20
Phase 2 Sub-Basin 1-LE 13.67 14.20
Phase 1 Sub-Basin 2 13.67 14.20
Phase 1 Sub-Basin 3 13.73 14.20
Phase 1 Sub-Basin 4 13.74 14.20
DRAINAGE BASIN LAND USE
Phase 1
Sub-Basin 41
Phase 1
Sub-Basin 31
Phase 1
Sub-Basin 21
Phase 2
Sub-Basin 1-DE
Phase 2
Sub-Basin 1-LE
Drainage Basin Total
Total Sub-Basin Area (Ac) 9.05 23.29 1.41 9.71 6.03 49.49
Total Pavement/Sidewalk 4.64 51% 9.52 41% 0.67 48% 4.53 47% 0.00 0% 19.36 39%
Lake @ Control3 0.00 0% 0.00 0% 0.00 0% 0.00 0% 4.23 70% 4.23 9%
Total Pervious Area2 4.41 49% 13.77 59% 0.74 52% 5.18 53% 1.80 30% 25.90 52%
Lake Slope Area 3 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.74 41% 0.74 3%
Ex. Dry Detention Bottom 1.43 32% 3.80 28% 0.00 0% 0.00 0% 0.00 0% 5.23 20%
Ex. Dry Detention Bank 1.23 28% 2.30 17% 0.00 0% 0.00 0% 0.00 0% 3.53 14%
Prop. Dry Detention Bottom 0.00 0% 0.43 3% 0.00 0% 0.69 13% 0.00 0% 1.12 4%
Prop. Dry Detention Bank 0.00 0% 1.38 10% 0.00 0% 0.58 11% 0.00 0% 1.96 8%
Berm Construction 0.25 6% 3.67 27% 0.24 32% 0.45 9% 0.48 27% 5.09 20%
Open Space 1.50 34% 2.19 16% 0.50 68% 3.46 67% 0.58 32% 8.23 32%
Total Sub-Basin Area (Ac) 9.05 100% 23.29 100% 1.41 100% 9.71 100% 6.03 100% 49.49 100%
Notes
1. Areas for Phase 1 Sub-Basin's 2 through 4 based on approved ERP Permit No. 11-102981-P, App. No. 241203-48073
2. Total Pervious Area is inclusive of Lake Slope Area, Dry Detention Bottom, and Dry Detention Slope Area
3. Sub-Basin 1-LE Lake and Lake Slope areas include the previously proposed Lake (1.23 ac) and Lake Bank (0.53) areas for Sub-Basin 2 per ERP Permit No. 11-102981-P, App. No. 241203-48073
PHASE 1 SUB-BASIN 4 CALCULATIONS
Average Site Grade Elevation Range Avg Elev. Area Area x Avg Elev.
Open Space* 14.95 16.00 15.48 1.50 23.21
Roadway 14.95 16.00 15.48 4.64 71.80
Lake Bank 10.50 13.40 11.95 0.00 0.00
Ex. Dry Detention Bank 11.50 14.20 12.85 1.23 15.81
Berm Construction 14.20 18.00 16.10 0.25 4.03
7.62 114.85
Avg Site Grade = 15.07
Soil Storage
Sub-Basin Area 9.05
Pervious Area 4.41
Average Site Grade (ft) 15.07
Control Elevation (ft) 10.5
Average Depth to Water Table (ft) 4.57
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 8.18 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 3.01 (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Site-Wide Soil Storage (S) 3.99 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 75.22 CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 10.50 11.50 12.50 13.40 14.40 15.40 16.40 17.40 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bottom 11.5 14.2 1.43 0.00 1.43 1.43 1.43 1.43 1.43 1.43 1.43 1.43
Open Space* 15.0 16.0 1.50 0.00 0.00 0.00 0.00 0.01 0.61 1.39 1.46 1.50
Roadway 15.0 16.0 4.64 0.00 0.00 0.00 0.00 0.00 1.99 4.64 4.64 4.64
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bank 11.5 14.2 1.23 0.00 0.00 0.46 0.87 1.23 1.23 1.23 1.23 1.23
Berm Construction 14.2 18.0 0.25 0.00 0.00 0.00 0.00 0.01 0.08 0.14 0.21 0.25
9.05 0.00 1.43 1.89 2.30 2.68 5.34 8.83 8.97 9.05
Stage-Volume AF
Elevation Range Area 10.50 11.50 12.50 13.40 14.40 15.40 16.40 17.40 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bottom 11.5 14.2 1.43 0.00 0.00 1.43 2.72 4.15 5.58 7.01 8.44 9.30
Open Space* 15.0 16.0 1.50 0.00 0.00 0.00 0.00 0.00 0.14 1.39 2.89 3.79
Roadway 15.0 16.0 4.64 0.00 0.00 0.00 0.00 0.00 0.45 4.29 8.93 11.72
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bank 11.5 14.2 1.23 0.00 0.00 0.23 0.82 1.91 3.14 4.37 5.60 6.33
Berm Construction 14.2 18.0 0.25 0.00 0.00 0.00 0.00 0.00 0.05 0.16 0.34 0.48
9.05 0.00
0.00 1.66 3.54 6.05 9.35 17.21 26.19 31.61
PHASE 1 SUB-BASIN 3 CALCULATIONS
Open Space* 13.41 14.98 14.20 2.19 31.09
Roadway 13.41 14.98 14.20 9.52 135.14
Lake Bank 10.50 13.40 11.95 0.00 0.00
Ex. Dry Detention Bank 11.50 13.50 12.50 2.30 28.75
Prop. Dry Detention Bank 11.80 13.80 12.80 1.38 17.66
Berm Construction 14.20 18.00 16.10 3.67 59.09
19.06 271.72
Avg Site Grade = 14.26
Soil Storage
Sub-Basin Area 23.29
Pervious Area 13.77
Average Site Grade (ft) 14.26
Control Elevation (ft) 10.5
Average Depth to Water Table (ft) 3.76
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 7.51 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 8.61 (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Site-Wide Soil Storage (S) 4.44 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 69.26 CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 10.50 11.50 11.80 12.50 13.40 13.80 14.40 15.40 16.40 17.40 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bottom 11.5 13.5 3.80 0.00 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80 3.80
Prop. Dry Detention Bottom 11.8 13.8 0.43 0.00 0.00 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43 0.43
Open Space* 13.4 15.0 2.19 0.00 0.00 0.00 0.00 0.00 0.54 1.38 2.19 2.19 2.19 2.19
Roadway 13.4 15.0 9.52 0.00 0.00 0.00 0.00 0.00 2.36 6.00 9.52 9.52 9.52 9.52
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bank 11.5 13.5 2.30 0.00 0.00 0.35 1.15 2.19 2.30 2.30 2.30 2.30 2.30 2.30
Prop. Dry Detention Bank 11.8 13.8 1.38 0.00 0.00 0.00 0.48 1.10 1.38 1.38 1.38 1.38 1.38 1.38
Berm Construction 14.2 18.0 3.67 0.00 0.00 0.00 0.00 0.00 0.00 0.19 1.16 2.12 3.09 3.67
23.29 0.00 3.80 4.58 5.86 7.52 10.82 15.49 20.78 21.74 22.71 23.29
Elevation Range Area 10.50 11.50 11.80 12.50 13.40 13.80 14.40 15.40 16.40 17.40 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bottom 11.5 13.5 3.80 0.00 0.00 1.14 3.80 7.22 8.74 11.02 14.82 18.62 22.42 24.70
Open Space* 13.4 15.0 2.19 0.00 0.00 0.00 0.00 0.00 0.11 0.68 2.64 4.83 7.02 8.33
Roadway 13.4 15.0 9.52 0.00 0.00 0.00 0.00 0.00 0.46 2.97 11.47 20.99 30.51 36.22
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bank 11.5 13.5 2.30 0.00 0.00 0.05 0.58 2.08 2.99 4.37 6.67 8.97 11.27 12.65
Berm Construction 14.2 18.0 3.67 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.70 2.34 4.94 6.97
21.48 0.00 0.00 1.19 4.38 9.30 12.30 19.06 36.30 55.75 76.17 88.88
Veterans Memorial Blvd Improvements Phase 2A
East of Railroad
PHASE 1 SUB-BASIN 2 CALCULATIONS
Open Space* 13.63 14.32 13.98 0.50 6.99
Roadway 13.63 14.32 13.98 0.67 9.36
Lake Bank 10.50 13.40 11.95 0.00 0.00
Ex. Dry Detention Bank 11.50 13.40 12.45 0.00 0.00
Berm Construction 14.20 18.00 16.10 0.24 3.86
1.41 20.21
Avg Site Grade = 14.34
Soil Storage
Sub-Basin Area 1.41
Pervious Area 0.74
Average Site Grade (ft) 14.34
Control Elevation (ft) 10.5
Average Depth to Water Table (ft) 3.84
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 7.73 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 0.48 (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Site-Wide Soil Storage (S) 4.06 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 71.14 CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 10.50 11.50 12.50 13.40 14.40 14.80 15.60 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Botto 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Open Space* 13.6 14.3 0.50 0.00 0.00 0.00 0.00 0.50 0.50 0.50 0.50
Roadway 13.6 14.3 0.67 0.00 0.00 0.00 0.00 0.67 0.67 0.67 0.67
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bank 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Berm Construction 14.2 18.0 0.24 0.00 0.00 0.00 0.00 0.01 0.04 0.09 0.24
1.41 0.00 0.00 0.00 0.00 1.18 1.21 1.26 1.41
Elevation Range Area 10.50 11.50 12.50 13.40 14.40 14.80 15.60 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Botto 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Open Space* 13.6 14.3 0.50 0.00 0.00 0.00 0.00 0.21 0.41 0.81 2.01
Roadway 13.6 14.3 0.67 0.00 0.00 0.00 0.00 0.28 0.55 1.09 2.70
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ex. Dry Detention Bank 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Berm Construction 14.2 18.0 0.24 0.00 0.00 0.00 0.00 0.00 0.01 0.06 0.46
1.41 0.00 0.00 0.00 0.00 0.50 0.98 1.96 5.17
PHASE 2 SUB-BASIN 1-DE CALCULATIONS
Open Space* 13.63 13.40 13.52 3.46 46.76
Roadway 13.63 14.63 14.13 4.53 64.01
Lake Bank 10.50 13.40 11.95 0.00 0.00
Prop. Dry Detention Bank 11.50 13.40 12.45 0.58 7.22
Berm Construction 14.20 18.00 16.10 0.45 7.25
9.02 125.24
Avg Site Grade = 13.88
Soil Storage
Sub-Basin Area 9.71
Pervious Area 5.18
Average Site Grade (ft) 13.88
Control Elevation (ft) 10.5
Average Depth to Water Table (ft) 3.38
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 6.37 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 2.75 (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Site-Wide Soil Storage (S) 3.40 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 74.63 CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 10.50 11.49 11.50 12.50 13.40 14.40 14.80 15.60 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Prop. Dry Detention Bottom 11.5 13.4 0.69 0.00 0.00 0.69 0.69 0.69 0.69 0.69 0.69 0.69
Open Space* 13.6 13.4 3.46 0.00 0.00 0.00 0.00 0.00 3.46 3.46 3.46 3.46
Roadway 13.6 14.6 4.53 0.00 0.00 0.00 0.00 0.00 3.49 4.53 4.53 4.53
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Prop. Dry Detention Bank 11.5 13.4 0.58 0.00 0.00 0.00 0.31 0.58 0.58 0.58 0.58 0.58
Berm Construction 14.2 18.0 0.45 0.00 0.00 0.00 0.00 0.00 0.02 0.07 0.17 0.45
9.71 0.00 0.00 0.69 1.00 1.27 8.24 9.33 9.43 9.71
Elevation Range Area 10.50 11.49 11.50 12.50 13.40 14.40 14.80 15.60 18.00
Lake 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Prop. Dry Detention Bottom 11.5 13.4 0.69 0.00 0.00 0.00 0.69 1.31 2.00 2.28 2.83 4.49
Open Space* 13.6 13.4 3.46 0.00 0.00 0.00 0.00 0.00 3.06 4.45 7.21 15.52
Roadway 13.6 14.6 4.53 0.00 0.00 0.00 0.00 0.00 1.34 3.04 6.66 17.53
Lake Bank 10.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Prop. Dry Detention Bank 11.5 13.4 0.58 0.00 0.00 0.00 0.15 0.55 1.13 1.36 1.83 3.22
Berm Construction 14.2 18.0 0.45 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.12 0.86
9.71 0.00 0.00 0.00 0.84 1.86 7.54 11.14 18.65 41.61
K:\2019\190062.00.01 Veteran's Memorial Extension - Phase 2\016 Master Drainage Infrastructure Plan\Calculations\ERP Calcs\ 2025-05-05 Water Management Calcs Phase 2 - East of RR (rev 8) jjs 8 of 11
PHASE 2 SUB-BASIN 1-LE CALCULATIONS
Open Space* 13.63 13.40 13.52 0.58 7.84
Roadway 13.63 14.63 14.13 0.00 0.00
Lake Bank 10.50 13.40 11.95 0.74 8.84
Prop. Dry Detention Bank 11.50 13.40 12.45 0.00 0.00
Berm Construction 14.20 18.00 16.10 0.48 7.73
1.80 24.41
Avg Site Grade = 13.56
Soil Storage
Sub-Basin Area 6.03
Pervious Area 1.80
Average Site Grade (ft) 13.56
Control Elevation (ft) 10.5
Average Depth to Water Table (ft) 3.06
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 5.18 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 0.78 (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Site-Wide Soil Storage (S) 1.54 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 86.62 CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 10.50 11.49 11.50 12.50 13.40 14.40 14.80 15.60 18.00
Lake 10.5 13.4 4.23 4.23 4.23 4.23 4.23 4.23 4.23 4.23 4.23 4.23
Prop. Dry Detention Bottom 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Open Space* 13.6 13.4 0.58 0.00 0.00 0.00 0.00 0.00 0.58 0.58 0.58 0.58
Roadway 13.6 14.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Bank 10.5 13.4 0.74 0.00 0.25 0.26 0.51 0.74 0.74 0.74 0.74 0.74
Prop. Dry Detention Bank 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Berm Construction 14.2 18.0 0.48 0.00 0.00 0.00 0.00 0.00 0.03 0.08 0.18 0.48
6.03 4.23 4.48 4.49 4.74 4.97 5.58 5.63 5.73 6.03
Elevation Range Area 10.50 11.49 11.50 12.50 13.40 14.40 14.80 15.60 18.00
Lake 10.5 13.4 4.23 0.00 4.19 4.23 8.46 12.27 16.50 18.19 21.57 31.73
Prop. Dry Detention Bottom 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Open Space* 13.6 13.4 0.58 0.00 0.00 0.00 0.00 0.00 0.51 0.75 1.21 2.60
Roadway 13.6 14.6 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Lake Bank 10.5 13.4 0.74 0.00 0.13 0.13 0.51 1.07 1.81 2.11 2.70 4.48
Prop. Dry Detention Bank 11.5 13.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Berm Construction 14.2 18.0 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.12 0.91
6.03 0.00 4.31 4.36 8.97 13.34 18.83 21.07 25.61 39.72
COMBINED BASIN CALCULATIONS
*Does Not Include Building Area Avg Site Grade =
Soil Storage
705.23
14.25
Sub-Basin Area 49.49
Pervious Area 25.90
Average Site Grade (ft) 14.25
Control Elevation (ft) 10.5
Average Depth to Water Table (ft) 3.75
Soil Compaction Factor (i.e. 25%) 25%
Developed Storage Available (in) 7.49 From SFWMD; Basis for Review, Volume IV
Available Soil Storage 16.17 (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
Site-Wide Soil Storage (S) 3.92 (Available Soil Storage/Site Area) x (12 inches/ft)
CN for Sub-Basin 71.84 CN = 1,000 /(S + 10)
Stage Storage
Stage - Area (Ac.)
Elevation Range Area 10.50 11.50 11.77 12.50 14.40 14.80 15.60
Sub-Basin 4 11.5 18.0 9.05 0.00 1.43 1.55 1.89 2.68 3.75 6.04
Sub-Basin 3 11.5 18.0 23.29 0.00 3.80 4.11 5.86 15.49 17.60 20.97
Sub-Basin 2 13.6 18.0 1.41 0.00 0.00 0.00 0.00 1.18 1.21 1.26
Sub-Basin 1-DE 11.5 18.0 9.71 0.00 0.69 0.77 1.00 8.24 9.33 9.43
Sub-Basin 1-LE 10.5 18.0 6.03 4.23 4.49 4.55 4.74 5.58 5.63 5.73
49.49 4.23 10.41 10.99 13.48 33.17 37.51 43.42
Elevation Range Area 10.50 11.50 11.77 12.50 14.40 14.80 15.60
Sub-Basin 4 11.5 18.0 9.05 0.00 0.00 0.40 1.66 6.05 7.37 10.92
Sub-Basin 3 11.5 18.0 23.29 0.00 0.00 1.07 4.38 19.06 25.96 40.19
Sub-Basin 2 13.6 18.0 1.41 0.00 0.00 0.00 0.00 0.50 0.98 1.96
Sub-Basin 1-DE 11.5 18.0 9.71 0.00 0.00 0.20 0.84 7.54 11.14 18.65
Sub-Basin 1-LE 10.5 18.0 6.03 4.23 4.49 4.55 4.74 5.58 5.63 5.73
49.49 4.23 4.49 6.22 11.62 38.73 51.08 77.45
Sub-Basin 4 11.5 18.0 15.1 9.05 136.40
Sub-Basin 3 11.5 18.0 14.3 23.29 332.03
Sub-Basin 2 13.6 18.0 14.3 1.41 20.21
Sub-Basin 1-DE 11.5 18.0 13.9 9.71 134.82
Sub-Basin 1-LE 10.5 18.0 13.6 6.03 81.77
49.49
Bleeder Orifice Sizing
Q = 4.8 A H^1/2
Circular A = π*(h/2)2
Assuming h = 6.0 inch
H (ft) 1.02 A (sq-ft) 0.20
Q (cfs) = 0.95
Water Quality Calculations
Total
Phase 1Sub-Basin 4 9.05 Control Elevation: 10.5 ft NAVD
Phase 1Sub-Basin 3 23.29
Phase 1Sub-Basin 2 3.17 Allowable Discharge Rate: 0.12 cfs/ac
Phase 2Sub-Basin 1-DE 9.71 Basin Total Area: 49.49 ac
Phase 2Sub-Basin 1-LE 4.27 Allowable Discharge: 5.94 cfs
TOTAL AREA = 49.49
ON-SITE
Project Area for Water Quality 49.49 Ac
Water Quality:
1. First Inch of Runoff Criteria
1.0in x 1ft/12in x Area (ac) = Volume (ac-ft)
1.0in x 1ft/12in x 49.49 = Volume (ac-ft) 4.12 ac-ft
2. Percent Impervious Criteria
a) Site Area = Project Area - (Lake + Roof)
Site Area =
Site Area =
49.49
45.26
- 4.23 ac
b) Imp. Area= Site Area - Pervious Area
Imp. Area=
Imp. Area=
45.26
19.36
- 25.90 ac
c) Vol. Stor. Req'd= 2.5 in. * (1ft/12in.)*(Imp. Area/Site Area)*(Project Area -Lake)
Vol. Stor. Req'd= 2.5 in. * (1ft/12in.) * 0.43 * 45.26
Vol. Stor. Req'd = 4.03 ac-ft
Therefore Calculation # 1 Controls and a water quality volume of 4.12 ac-ft
TOTAL WATER QUALITY VOLUME
On-Site Water Quality Volume Required = 4.12 ac-ft
Sub-total 4.12 ac-ft + 50% Additional Storage 2.06 ac-ft
Total Water Quaility Volume Required 6.18 ac-ft
Total Water Quaility Volume to be Provided 6.22 ac-ft
Water Quality Storage occurs at Elevation
See Combined Basin Calc's for WQ Storage elevation calculation ft NAVD
Bleeder Calculations:
1/2 in x 1ft/12in x [(Area - Lake) (ac)] = Volume (ac-ft)
Discharge Volume 1.89 ac-ft per 24 hr
1.87 ac-ft from hour 176 to hour 200
Volume (ac-ft) x 1 day/24hours x 1hr/60min x 1min/60sec = Discharge (cfs)
Discharge Rate (Q)
0.95 cfs
11.77
Elevation
Lake & Detention
Area (ac)
Volume
(ac-ft)
Top of Bank 13.4 13.73 28.04
Min. Dry Detention Bottom 11.5 9.72 4.36
Control Elevation 10.5 4.23 0.00
Flood Plain Management Calculations
FLOOD HAZARD INFORMATION
THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING
DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT
HTTPS://MSC.FEMA.GOV
Without Base Bood Elevation (BFE}
With BFE or Depth zone c, o, H, v6, 9
NOTES TO USERS
SCALE
N 1 iach - 500 feet 16,000 feet meters
NATIONAL FLOOD INSURANCE PROGRAM
FLOOD INSURANCE RATE MAP
COLLIER COUNTY,
FLORIDA
and incorporated Areas rA#zr 191 or 1225
SPECIAL FLOOD
OMERAREASOF
FLOODHAZARD
ONER
AREAS
0nER
FEATURES
. t@ 6@ Regulatory Floodway
0.2% Annual Chance Nood Hazard, Areas of 1°Z annual chance flood with average depth less than one foot or with drainage areas of less than one square mile zone x Future Conditions 1°é Annual Chance Nood Hazard zo»e x
Area with Reduced Flood Risk due to Levee See Notes. zone x
Area with Flood Risk due to Levee zone o
Area of Minimal Flood Hazard zone x
Area of Undetemined Flood Hazard zone a
- -------------- Channel, Calvert, or Storm Sewer
' ' ' Levee, Dike, or Floodwall
Cross Sections with JS Annual Chance
Water Surface Elevation
%— o’as!t! tt'se*t Baseline
—- Profile Baseline Hydrographic Feature
— els— Base Flood Elevation Line (BFE}
Limit of Study
Jurisdiction Boundary
+ Limit of Moderate Wave Action (Li IWA)
PANEL LOCATOR
C0MMU8ITY
VERSION NUMBER
2.5.3.5
12021C0191J
FEBRUARY 8, 2024
Basin 1
East of Railroad
Project Veterans Memorial Phase 2A
Proj. #: 190062.00.01
Calculated By: NDG Date: 10‐Jun‐24
Checked By: LAS Date: 10‐Jun‐24
State of Florida Business Certificate No. EB‐0007663
Veterans Memorial Phase 2A ‐ East of Railroad Floodplain Compensation Importer/Exporter Calculations
See SFWMD ERP Information Manual ‐ Design Aids V‐1 to 7
A. PRE DEVELOPMENT
1. Site Pre‐Development 100‐year 3‐day Storm Runoff Volume Calculation
Assumptions:
‐ CN number is based on soil storage in SFWMD Information Manual Design Aids Appendix F‐1 for Coastal Uncompressed as a function of depth to water table
‐ The Collier County FEMA flood insurance study last completed in 2012, was used to establish flood elevations for the 2012 FIRM Maps.
According to the study, LIDAR topographic data was utilized to establish existing ground elevations for modeling purposes.
The 100 year 3 day rainfall amount is equal to: 15 inches See SFWMD ERP Information Manual Development area (Only disturbed project area): 9.70 acres Vol II, Appendix A‐18
= (Sub‐Basin 1‐DE + Sub‐basin 1‐LE (Lake Expansion only)) ‐ Zone X
= (9.71 + 3.99) ‐ 4.00 acres
Curve Number (CN) = 80 Avg Existing Ground Elev (Topo) = 10.50 NAVD
Storage Capacity of soil (S)= 1000
CN
(S) = 2.50
‐ 10 Control Elevation = 10.50 NAVD
Calculate the total runoff (Q) in inches resulting from the rainfall (P)
(Q) = (P‐0.2S)2
(P+0.8S)
(Q) = 12.37 inches
Calculate the total runoff volume produced
Total Runoff Volume = Development Area x Q =
2. Site Pre‐Development Storage Available to the basin during the 100‐yr flood
The amount of runoff volume that can be stored on site was calculated:
From Avg Exist Ground Elev= 10.50 NAVD Based on Topographic Data
To Floodplain Elevation = 11.00 NAVD Average per FIRM Map Number: 12021C0191J February 8, 2024
Volume between existing ground elevation or control elevation, whichever is higher and the 100 year floodplain elevation
Avg Existing Ground Elevation
Volume = 7,824 c.y. =
3. Difference between items A1 & A2 above
(Site Predevelopment Total Runoff Volume) ‐ ( Site Predevelopment Storage Volume Provided)
Difference = 10.00 ‐ 4.85 =
B. Exporter or Importer The site is considered an EXPORTER (Positive A3)
RWA, Inc.
6610 Willow Park Drive, Ste 200
Naples, Florida 34109
Phone: (239) 597-0575
Fax: (239) 597-0578
5.15 ac‐ft
4.85 ac‐ft
10.00 ac‐ft
21.03 ac‐ft
Project Veterans Memorial Phase 2A
Proj. #: 190062.00.01
Calculated By: NDG Date: 10‐Jun‐24
Checked By: LAS Date: 10‐Jun‐24
Veterans Memorial Phase 2A ‐ East of Railroad
Floodplain Compensation Importer/Exporter Calculations
See SFWMD ERP Information Manual ‐ Design Aids V‐1 to 7
C. POST DEVELOPMENT
1. Site Post‐Development 100‐year 3‐day Storm Runoff Volume Calculation
Assumptions:
CN number is based on soil type D with cover type as Woods/Grass combination in poor condition of the site.
The 100 year 3 day rainfall amount is equal to: 15 inches See SFWMD ERP Information Manual Development area (Only disturbed project area): 9.70 acres Vol II, Appendix A‐18
Curve Number (CN) = 76.27 See "CN for Sub‐Basin" under "Soil
Storage Capacity of soil (S)= 1000 ‐ 10 Storage" on the "Combined Calculations"
CN worksheet
(S) = 3.11
Calculate the total runoff (Q) in inches resulting from the rainfall (P)
(Q) = (P‐0.2S)2
(P+0.8S)
(Q) = 11.82 inches
Calculate the total runoff volume produced
Total Runoff Volume = Development Area x Q =
2. Site Post‐Development Storage Available to the basin during the 100‐yr flood
100yr 3day rainfall runoff volume retained (peak stage/berm elevation 13.4)
Volume = 33,928 c.y. =
From WM Calcs @ 13.4 ft
3. Difference between items A1 & A2 above
(Site Post‐development Total Runoff Volume) ‐ ( Site Post‐development Storage Volume Provided)
Difference = 9.55 ‐ 21.03 =
4. Difference between (PRE VS POST) exports pre post Post Additional Storage Difference = 5.15 ‐ ‐11.48 = 16.62
‐11.48 ac‐ft
9.55 ac‐ft
Nutrient Loading Analysis
Project Veterans Memorial Blvd Phase 2A Proj. #: 190062.00.01 Task: 0016
Calculated By: NDG Date: 13-Jun-24 Checked By: LAS Date: 13-Jun-24
Veterans Memorial Blvd Phase 2A
SOUTH FLORIDA WATER MANAGEMENT DISTRICT
PRE- VS. POST-DEVELOPMENT NUTRIENT LOADING ANALYSIS
CONTENTS
1. DESIGN ASSUMPTIONS
2. ON-SITE IMPERVIOUS/PERVIOUS CALCULATIONS
3. PRE-DEVELOPMENT UNTREATED LOADING
4. POST-DEVELOPMENT UNTREATED LOADING
5. BMP TRAINS COMPLETE REPORT
PRE- VS. POST-DEVELOPMENT NUTRIENT LOADIN
ANALYSIS
DESIGN ASSUMPTIONS
1. THIS NUTRIENT LOADING ANALYSIS IS BASED ON METHODS PRESENTED IN "ERP STORMWATER QUALITY APPLICANTS
HANDBOOK", 2010, WITH BMP TRAINS 5.3.2.
2. ALL PAVEMENT IS CALCULATED AS DIRECTLY CONNECTED, IMPERVIOUS AREAS, DCIA.
3. THE PRE-DEVELOPMENT PHASE 1 BASIN 1D SITE IS BEST CHARACTERIZED AS HIGHWAY IN GOOD HYDROLOGICAL
CONDITION.
4. THIS PROJECT WILL PROVIDE WATER QUALITY TREATMENT IN THE FORM OF THREE (3) WET DETENTION LAKES.
5. SURFACE WATER MANAGEMENT SYSTEM INCLUDES INLETS AND STORM SEWERS TO INTERCEPT RUN-OFF AND
DIRECT IT TO THE LAKES.
Impervious/Pervious Calculations
PHASE 1 BASIN 1D PHASE 2 BASIN 1U
(Phase 1 Sub-Basin 2, 3, & 4)
(Existing Highway)
(Phase 2 Sub-Basin 1-LE & 1-DE)
(Existing Undeveloped) Existing Basin Total
Total Building Total Pavement Total Sidewalk & Impervious Lake Area Total Open Space/Pervious
0.00 0%
12.30 43%
2.38 8%
0.00 0%
13.95 49%
0.00 0%
0.00 0%
0.00 0%
1.23 8%
14.51 92%
5.34 6%
20.95 24%
3.04 3%
2.89 3%
56.51 64%
Total Sub-Basin Area (Ac) 28.63 15.74 88.73 100%
Post-Development (Proposed Conditions)
PHASE 1 BASIN 1D PHASE 2 BASIN 1U
(Phase 1 Sub-Basin 2, 3, & 4)
(Existing Highway)
(Phase 2 Sub-Basin 1-LE & 1-DE)
(Proposed Highway) Proposed Basin Total
Total Building Total Pavement Total Sidewalk & Impervious Lake Area @ Control Total Open Space/Pervious
0.00 0%
12.30 43%
2.38 8%
0.00 0%
13.95 49%
0.00 0%
3.61 23%
0.93 6%
4.23 27%
6.97 44%
5.34 6%
30.91 35%
5.38 6%
11.91 13%
35.19 40%
Total Sub-Basin Area (Ac) 28.63 15.74 88.73 100%
Notes:
* Phase 2 Sub-Basin 3A & 3B areas based on existing values for Mercedes Benz per SFWMD ERP Permit No. 11-03669-P, Application No. 141112-2.
** Phase 2 Sub-Basin 5 areas based on existing values for Triangle Parcel per SFWMD ERP Permit No. 11-02353-P, Application No. 031219-10.
Pre-Development (Existing Conditions)
ACRES
PHASE 1 BASIN 1D
PRE- VS. POST-DEVELOPMENT
PRE-DEVELOPMENT UNTREATED LOADING
PRE-DEVELOPMENT SITE CHARACTERISTICS:
LAND USE
LAND USE CATEGORY AREA CONDITION HYDROLOGIC SOIL
GROUP
PHASE 1 BASIN 1D
HIGHWAY 28.63 GOOD C/D
PHASE 2 BASIN 1U
UNDEVELOPED 15.74 GOOD B/D
PHASE 2 BASIN 2U
UNDEVELOPED 17.06 GOOD B/D
PHASE 2 BASIN 3U
UNDEVELOPED 4.75 GOOD A/D
PHASE 2 BASIN 3D
LOW INTENSITY COMMERCIAL 22.55 GOOD A/D
TOTAL 44.37
IMPERVIOUS % & DIRECTLY CONNECTED IMPERVIOUS %
BASIN # LAND USE AREA PERVIOUS BUILDING
AREA
IMPERVIOUS UPLAND LAKE AREA UPLAND NON-
DCIA %
UPLAND DCIA %
PAVEMENT ONLY (PERVIOUS +
BUILDING +
IMPERVIOUS
(EXCLUDES LAKE
AREAS, ASSUME
100% BLDG)
(100% Pavement
DCIA)
PHASE 1 BASIN 1D
HIGHWAY 28.63 13.95 0.00 12.30 26.25 0.00 0% 47%
PHASE 2 BASIN 1U
UNDEVELOPED 15.74 14.51 0.00 0.00 14.51 1.23 0% 0%
PHASE 2 BASIN 2U
UNDEVELOPED 17.06 17.06 0.00 0.00 17.06 0.00 0% 0%
PHASE 2 BASIN 3U
UNDEVELOPED 4.75 4.75 0.00 0.00 4.75 0.00 0% 0%
PHASE 2 BASIN 3D
LOW INTENSITY COMMERCIAL 22.55 6.24 5.34 8.65 20.23 1.66 26% 43%
CURVE NUMBER & RUNOFF COEFFICIENT, C
PHASE 1
BASIN 1D
PHASE 2
BASIN 1U
PHASE 2
BASIN 2U
PHASE 2
BASIN 3U
PHASE 2
BASIN 3D
Sub-Basin Area (Excludes Lake) 28.63 14.51 17.06 4.75 20.89
Pervious Area 13.95 14.51 17.06 4.75 6.24
Average Site Grade (ft NAVD) 13.4 11.5 9.5 9.5 12.4
Control Elevation (ft NAVD) 10.5 10.5 8.5 8.5 8.5
Average Depth to Water Table (ft) 2.90 1.00 1.00 1.00 3.90
Soil Compaction Factor (i.e. 25%) 25% 25% 25% 25% 25%
Developed Storage Available (in) 4.64 0.45 0.45 0.45 7.90
Available Soil Storage 5.39 0.54 0.64 0.18 4.11
Site-Wide Soil Storage (S) 2.26 0.45 0.45 0.45 2.36
CN for Sub-Basin* 81.6 95.7 95.7 95.7 80.9
BASIN UPLANDS NON-DCIA
PERVIOUS
COMPOSITE
NON-DCIA
CURVE
DCIA %
NUMBER *From SFWMD; Basis for Review, Volume IV
(Developed Storage Available) x (Pervious Area)/(12 inches/ft)
(Available Soil Storage/Site Area) x (12 inches/ft)
26.25 0% 53% 81.6 47% CN = 1,000 /(S + 10)
14.51 0% 100% 95.7 0%
17.06 0% 100% 95.7 0%
4.75 0% 100% 95.7 0%
20.23 26% 31% 80.9 43%
PHASE 2 BASIN 1U
PHASE 2 BASIN 2U
PHASE 2 BASIN 3U
POST-DEVELOPMENT UNTREATED LOADING
POST-DEVELOPMENT SITE CHARACTERISTICS:
LAND USE
LAND USE CATEGORY
AREA CONDITION HYDROLOGIC
SOIL GROUP
PHASE 1 BASIN 1D
HIGHWAY 28.63 GOOD C/D
PHASE 2 BASIN 1U
HIGHWAY 15.74 GOOD B/D
PHASE 2 BASIN 2U
HIGHWAY 17.06 GOOD B/D
PHASE 2 BASIN 3U
HIGHWAY 4.75 GOOD A/D
PHASE 2 BASIN 3D
LOW INTENSITY COMMERCIAL 22.55 GOOD A/D
Total 44.37
IMPERVIOUS % & DIRECTLY CONNECTED IMPERVIOUS %
BASIN # LAND USE AREA PERVIOUS BUILDING AREA IMPERVIOUS UPLAND LAKE AREA UPLAND NON-
DCIA %
UPLAND DCIA %
PAVEMENT ONLY (PERVIOUS +
BUILDING +
IMPERVIOUS
(EXCLUDES LAKE
AREAS, ASSUME
100% BLDG)
(100%
Pavement DCIA)
PHASE 1 BASIN 1D
HIGHWAY 28.63 13.95 0.00 12.30 26.25 0.00 0% 47%
PHASE 2 BASIN 1U
HIGHWAY 15.74 6.97 0.00 3.61 10.58 4.23 0% 34%
PHASE 2 BASIN 2U
HIGHWAY 17.06 7.52 0.00 3.74 11.26 4.89 0% 33%
PHASE 2 BASIN 3U
HIGHWAY 4.75 1.64 0.00 2.61 4.25 0.00 0% 61%
LOW INTENSITY COMMERCIAL 22.55 5.11 5.34 8.65 19.10 2.79 28% 45%
CURVE NUMBER & RUNOFF COEFFICIENT, C
PHASE 1
BASIN 1D
PHASE 2
BASIN 1U
Sub-Basin Area (Excludes Lake) 28.63 11.51
Pervious Area 13.95 6.97
Average Site Grade (ft NAVD) 13.40 13.40
Control Elevation (ft NAVD) 10.5 10.5
Average Depth to Water Table (ft) 2.90 2.90
Soil Compaction Factor (i.e. 25%) 25% 25%
Developed Storage Available (in) 4.64 4.64
Available Soil Storage 5.39 2.70
Site-Wide Soil Storage (S) 2.26 2.81
CN for Sub-Basin* 81.6 78.1
BASIN UPLANDS NON-DCIA
PERVIOUS % COMPOSITE NON-
DCIA CURVE
DCIA %
NUMBER *From SFWMD; Basis for Review, Volume IV
ACRES (Developed Storage Available) x (Pervious Area)/(12 inches/ft)
PHASE 1 BASIN 1D (Available Soil Storage/Site Area) x (12 inches/ft)
26.25 0% 53% 81.6 47% CN = 1,000 /(S + 10)
PHASE 2 BASIN 1U
10.58 0% 66% 78.1 34%
PHASE 2 BASIN 2U
11.26 0% 67% 74.0 33%
PHASE 2 BASIN 3U
4.25 0% 39% 83.6 61%
19.10 28% 27% 83.0 45%
EXISTING LAKE 1 VOLUME CALCULATIONS
LAKE NUMBER Ex. 1 (PHASE 2 BASIN 1U)
Control Elevation Slope Break Toe of Slope
AREA AVERAGE DEPTH VOLUME
AREA AT CONTROL ELEVATION 1.23 ACRES
AREA AT SLOPE BREAK POINT (6:1) 0.40 ACRES
(CONTROL ELEVATION - 10 FT.)
AREA AT LAKE BOTTOM (2:1) 0.09 ACRES
(CONTROL ELEVATION - 20 FT.
PERMANENT POOL VOLUME, PPV =
0.82 ACRES x 10.0 FEET = 8.2 ACRE-FT
0.25 ACRES x 10.0 FEET = 2.5 ACRE-FT
LAKE MEAN DEPTH (FT) 8.6 FEET
ELEVATION (ft NAVD) AREA
10.50 0.50 -9.50
1.23 0.40 0.09
10.6 ACRE-FT
PROPOSED LAKE 1 VOLUME CALCULATIONS
LAKE NUMBER 1 (PHASE 2 BASIN 1U)
Control Elevation Slope Break Toe of Slope
AREA AVERAGE DEPTH VOLUME
AREA AT CONTROL ELEVATION 4.23 ACRES
AREA AT SLOPE BREAK POINT (6:1) 1.83 ACRES
(CONTROL ELEVATION - 10 FT.)
AREA AT LAKE BOTTOM (2:1) 0.72 ACRES
(CONTROL ELEVATION - 20 FT.
PERMANENT POOL VOLUME, PPV =
3.03 ACRES x 10.0 FEET = 30.3 ACRE-FT
1.28 ACRES x 10.0 FEET = 12.8 ACRE-FT
LAKE MEAN DEPTH (FT) 10.2 FEET
ELEVATION (ft NAVD) AREA
10.50 0.50 -9.50
4.23 1.83 0.72
43.1 ACRE-FT
Complete Report (not including cost) Ver 4.3.5 Project: Veterans Memorial Boulevard - Phase 2A Date: 7/16/2026 11:49:17 AM
Site and Catchment Information
Analysis: Specified Removal Efficiency
Catchment Name Phase 1 Basin 1D Phase 2 Basin 1U Rainfall Zone Florida Zone 4 Florida Zone 4 Annual Mean Rainfall 53.00 53.00
Pre-Condition Landuse Information Landuse User Defined Values Undeveloped - Wet Flatwoods: TN=1.213
TP=0.021
Area (acres) 28.63 15.74 Rational Coefficient (0-1) 0.46 0.47 Non DCIA Curve Number 81.60 95.70 DCIA Percent (0-100) 47.00 0.00 Nitrogen EMC (mg/l) 1.250 1.213 Phosphorus EMC (mg/l) 0.173 0.021 Runoff Volume (ac-ft/yr) 58.711 32.857 Groundwater N (kg/yr) 0.000 0.000 Groundwater P (kg/yr) 0.000 0.000 Nitrogen Loading (kg/yr) 90.488 49.141 Phosphorus Loading (kg/yr) 12.524 0.851
Post-Condition Landuse Information Landuse User Defined Values User Defined Values Area (acres) 28.63 15.74 Rational Coefficient (0-1) 0.46 0.36 Non DCIA Curve Number 81.60 78.10 DCIA Percent (0-100) 47.00 34.00 Wet Pond Area (ac) 0.00 4.23 Nitrogen EMC (mg/l) 1.250 1.250 Phosphorus EMC (mg/l) 0.173 0.173 Runoff Volume (ac-ft/yr) 58.711 18.133 Groundwater N (kg/yr) 0.000 0.000 Groundwater P (kg/yr) 0.000 0.000
7/16/2026about:blank
Catchment Number: 1 Name: Phase 1 Basin 1D Project: Veterans Memorial Boulevard - Phase 2A Date: 7/16/2026
None Design
Watershed Characteristics
Surface Water Discharge
Media Mix Information
Groundwater Discharge (Stand-Alone)
Load Diagram for None (stand-alone)
Nitrogen Loading (kg/yr) 90.488 27.947 Phosphorus Loading (kg/yr) 12.524 3.868
Catchment Area (acres) 28.63 Contributing Area (acres) 28.630 Non-DCIA Curve Number 81.60 DCIA Percent 47.00 Rainfall Zone Florida Zone 4 Rainfall (in) 53.00
Required TN Treatment Efficiency (%) Provided TN Treatment Efficiency (%) Required TP Treatment Efficiency (%) Provided TP Treatment Efficiency (%)
Type of Media Mix Not Specified Media N Reduction (%) 0.000 Media P Reduction (%) 0.000
Treatment Rate (MG/yr) 0.000 TN Mass Load (kg/yr) 0.000 TN Concentration (mg/L) 0.000 TP Mass Load (kg/yr) 0.000 TP Concentration (mg/L) 0.000
Load Diagram for None ( As Used In Routing)
Catchment Number: 2 Name: Phase 2 Basin 1U Project: Veterans Memorial Boulevard - Phase 2A Date: 7/16/2026
Wet Detention with Littoral Shelf Design
Watershed Characteristics
Surface Water Discharge
Load N: 90.49 kg/yr P: 12.52 kg/yr
Treatment N: % P: %
Surface Discharge N: 90.49 kg/yr P: 12.52 kg/yr
Mass Reduction N: 0.00 kg/yr P: 0.00 kg/yr
Upstream Nodes None
Load N: 90.49 kg/yr P: 12.52 kg/yr Q: 58.71 ac-ft
Treatment N: 0.0 % P: 0.0 %
Mass Discharged N: 90.49 kg/yr P: 12.52 kg/yr Q: 58.71 ac-ft
Mass Removed N: 0.00 kg/yr P: 0.00 kg/yr
Permanent Pool Volume (ac-ft) 43.100 Permanent Pool Volume (ac-ft) for 31 days residence 1.540 Annual Residence Time (days) 868 Littoral Zone Efficiency Credit 10 Wetland Efficiency Credit
Catchment Area (acres) 15.74 Contributing Area (acres) 11.510 Non-DCIA Curve Number 78.10 DCIA Percent 34.00 Rainfall Zone Florida Zone 4 Rainfall (in) 53.00
Media Mix Information
Groundwater Discharge (Stand-Alone)
Load Diagram for Wet Detention with Littoral Shelf (stand-alone)
Load Diagram for Wet Detention ( As Used In Routing)
Required TN Treatment Efficiency (%) Provided TN Treatment Efficiency (%) 49 Required TP Treatment Efficiency (%) Provided TP Treatment Efficiency (%) 94
Type of Media Mix Not Specified Media N Reduction (%) Media P Reduction (%)
Treatment Rate (MG/yr) 0.000 TN Mass Load (kg/yr) 0.000 TN Concentration (mg/L) 0.000 TP Mass Load (kg/yr) 0.000 TP Concentration (mg/L) 0.000
Load N: 27.95 kg/yr P: 3.87 kg/yr
Treatment N: 49 % P: 94 %
Surface Discharge N: 14.20 kg/yr P: 0.24 kg/yr
Mass Reduction N: 13.74 kg/yr P: 3.62 kg/yr
Upstream Nodes None
Load N: 27.95 kg/yr P: 3.87 kg/yr Q: 18.13 ac-ft
Treatment N: 49.2 % P: 93.7 %
Mass Discharged N: 14.20 kg/yr P: 0.24 kg/yr Q: 18.13 ac-ft
Summary Treatment Report Version: 4.3.5
Total nitrogen target removal met? Yes Total phosphorus target removal met? Yes
Summary Report Nitrogen
Phosphorus
Mass Removed N: 13.74 kg/yr P: 3.62 kg/yr
Project: Veterans Memorial Boulevard - Phase 2A
Analysis Type: Specified Removal Efficiency BMP Types:
Catchment 1 - (Phase 1 Basin 1D) None Catchment 2 - (Phase 2 Basin 1U) Wet Detention with Littoral Shelf Based on % removal values to the nearest percent
Date:7/16/2026
Routing Summary Catchment 1 Routed to Outlet Catchment 2 Routed to Outlet
Surface Water Discharge Total N pre load 139.63 kg/yr Total N post load 118.43 kg/yr Target N load reduction % Target N discharge load 118.43 kg/yr Percent N load reduction 12 % Provided N discharge load 104.69 kg/yr 230.84 lb/yr Provided N load removed 13.74 kg/yr 30.3 lb/yr
Surface Water Discharge Total P pre load 13.374 kg/yr Total P post load 16.391 kg/yr Target P load reduction % Target P discharge load 16.391 kg/yr Percent P load reduction 22 %
Provided P discharge load 12.768 kg/yr 28.15 lb/yr Provided P load removed 3.624 kg/yr 7.991 lb/yr
SECTION III
Input Data for ICPR Modeling
PHASE-2A
Basin 1
East of Railroad
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 1
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Background Image: Nodal Layout
Veteran's Phase 2A - East of Railroad (Phase 1) - Detention in Median
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 2
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Simple Basin: Sub-Basin 1-DE Scenario: Scenario 1
Node: Sub-Basin 1-DE Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 9.7100 ac
Curve Number: 74.6 Ia/S: 0.00
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00 Rainfall Name: ~SFWMD-72
Comment:
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 3
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Simple Basin: Sub-Basin 1-LE Scenario: Scenario 1
Node: Sub-Basin 1-LE Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 6.0300 ac
Curve Number: 86.6 Ia/S: 0.00
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00 Rainfall Name: ~SFWMD-72
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 4
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Simple Basin: Sub-Basin 2 Scenario: Scenario 1
Node: Sub-Basin 2 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 1.4100 ac
Curve Number: 71.1 Ia/S: 0.00
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00 Rainfall Name: ~SFWMD-72
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 5
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Simple Basin: Sub-Basin 3 Scenario: Scenario 1
Node: Sub-Basin 3 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 23.2900 ac
Curve Number: 69.3 Ia/S: 0.00
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00 Rainfall Name: ~SFWMD-72
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 6
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Simple Basin: Sub-Basin 4 Scenario: Scenario 1
Node: Sub-Basin 4 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 9.0500 ac
Curve Number: 75.2 Ia/S: 0.00
% Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00 Rainfall Name: ~SFWMD-72
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 7
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Node: STR 133 Scenario: Scenario 1
Type: Stage/Area Base Flow: 22.10 cfs
Initial Stage: 1.26 ft Warning Stage: 13.40 ft
Alert Stage: 0.00 ft
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 8
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Node: STR 134 Scenario: Scenario 1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 0.96 ft Warning Stage: 13.40 ft
Alert Stage: 0.00 ft
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 9
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Node: STR 137 Scenario: Scenario 1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 0.76 ft Warning Stage: 13.40 ft
Alert Stage: 0.00 ft
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 10
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Node: STR 138 Scenario: Scenario 1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 0.28 ft Warning Stage: 13.40 ft
Alert Stage: 0.00 ft
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 11
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Node: Sub-Basin 1-DE Scenario: Scenario 1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 10.50 ft Warning Stage: 13.40 ft
Alert Stage: 0.00 ft
Stage [ft] Area [ac] Area [ft2]
10.50 0.0000 0
11.49 0.0000 0
11.50 0.6900 30056
12.50 1.0000 43560
13.40 1.2700 55321
14.40 8.2400 358934
14.80 9.3300 406415
15.60 9.4300 410771
18.00 9.7100 422968
Veteran's Phase 2 - East of Railroad (Phase 1) - Detention in Median 12
C:\Users\NGarcia\Desktop\190062.00.01 - Veterans Phase 2\2024-12-16 VMB ICPR Phase 1\ 5/21/2025 12:13
Node: Sub-Basin 1-LE Scenario: Scenario 1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 10.50 ft Warning Stage: 13.40 ft
Alert Stage: 0.00 ft
Stage [ft] Area [ac] Area [ft2]
10.50 4.2300 184259
11.49 4.4800 195149
11.50 4.4900…