Checklist_-_Vendor_Checklist_.pdf

PDF 122 KB Posted

Attached to
Design Services for Veterans Memorial Blvd. Phase II
Solicitation number
26-8668
Issued by
Collier County, Florida

About this file

This is a Vendor Checklist document issued by the Collier County Board of County Commissioners Procurement Services Division in Florida for the Design Services for Veterans Memorial Boulevard Phase II project. The checklist establishes mandatory submission requirements for all vendors responding to the Request for Professional Services. Vendors must acknowledge and accept General Instructions and Collier County Purchase Order Terms and Conditions, complete and submit Form 1 (Vendor Declaration Statement), Form 2 (Conflict of Interest Certification), and Form 3 (Immigration Affidavit Certification). Additionally, vendors must provide proof of business status from the Florida Department of State Division of Corporations, demonstrate current E-Verify enrollment, submit a completed W-9 Form, provide reference questionnaires as applicable, and include copies of all requested licenses and certifications required for project completion. All documents must be submitted electronically through OpenGov with wet signatures or verifiable electronic signatures.

The checklist further requires vendors to acknowledge insurance requirements and confirm their ability to produce required insurance certificates within five days of receiving a Notice of Recommended Award. Vendors must also sign and attach all addenda, acknowledge County IT Technical Architecture Requirements if applicable, and accept any supplemental requirements and terms. Grant Provisions and Assurances packages must be included in their entirety when applicable to the solicitation. Failure to provide any applicable documents may result in the vendor being deemed non-responsive or non-responsible and could result in proposal rejection.

View the file

Other files

File Type Posted
Exhibit_F1_-_260529-64674_RAI_20260626.pdf PDF
Exhibit_F4_-_S2_-260529-64674_06_Surface_Water_Management_Report_-_DSS_(1).pdf PDF
Exhibit_F7_-_S5_-_250814-56017_-_Response_to_Comments_Letter.pdf PDF
Exhibit_F8_-_S5_-_250814-56017_-_05_ERP_Plans_-_DSS.pdf PDF
Exhibit_F9_-_S5_-_250814-56017_-_06_Surface_Water_Mgmt_Report_-_DSS.pdf PDF
Exhibit_F10_-_Mercedes_Section_A_Revised.pdf PDF
Exhibit_F6_-_250814-56017_RAI_20260626.pdf PDF
Exhibit_F11_-_251205-59840_RAIExtension_20260630.pdf PDF
Exhibit_F12_-_Triangle_Section_A_Revised.pdf PDF
Exhibit_F2_-_S2_-_260529-64674_SFWMD_Response_to_Comments.pdf PDF
Exhibit_F3_-_S2_-_260529-64674_05_ERP_Plans_-_DSS.pdf PDF
Exhibit_F5_-_S2_-_260529-64674_Mitigation_Plan_Veterans_Memorial_Blvd_Ext_Ph2_Basin_1.pdf PDF
Pre-Proposal_Design_Meeting_VMB_II-REV4.pptx PPTX presentation
26-8668_Insurance_Requirements_FE.pdf PDF
Exhibit_E13_-_Environmental_Supplement_Report_-_May_2024.pdf PDF
Form_3_Immigration_Certification.pdf PDF
Form_4_Reference_Questionnaire.pdf PDF
Exhibit_E12_-_Construction_Pollution_Prevention_Plan_Rev_01.pdf PDF
Exhibit_E8_-_Environmental_Resource_Permit_Plans_-_Pending_SS.pdf PDF
Form_2_Conflict_of_Interest_Certification.pdf PDF
26-8668_Authorization_to_Advertise_FE.pdf PDF
Exhibit_E10_-_Surface_Water_Management_Analysis_for_Phase_I_Updates_-_Pending_SS.pdf PDF
Exhibit_E11_-_ROW_Map_SS.pdf PDF
Exhibit_E6_-_04_Signature_Authorization_REV02.pdf PDF
Exhibit_E7_-_Project_Location_Map.pdf PDF
Exhibit_E9_-_Surface_Water_Management_Report_for_Phase_II-_Pending_Review_and_SS.pdf PDF
Exhibit_E5_-_03_Section_E_Rev_01.pdf PDF
Form_1_Vendor_Declaration_Statement.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
PSA_CCNA_Single_Project_Agreement_[2026_ver.1].pdf PDF
Exhibit_D_-_Topographical_Survey-PH-II.pdf PDF
Exhibit_E1_-_Preliminary_Drainage_&_Pond_Siting_Analysis_SS.pdf PDF
Request_for_Professional_Services_Instructions_Version_2.pdf PDF
Exhibit_C_-_Veterans_Memorial_Boulevard_Roadway_Final_GM_Signed.pdf PDF
Exhibit_E3_-_01a_Section_A_-_signature_page_(2024-07-08).pdf PDF
26-8668_Solicitation.pdf PDF
Exhibit_A_-_Old_US_41_VISSIM_Build_Conditions_Memo_07312023.pdf PDF
Exhibit_B_-_VMB_Final_Traffic_Noise_Technical_Memorandum_1.17.20_updated_7.1.2021.pdf PDF
Exhibit_E2_-_01_Section_A_(2024-07-08).pdf PDF
Exhibit_E4_-_02_Section_C.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev. 1 2025

Procurement Services Division

Vendor Check List

IMPORTANT: PLEASE REVIEW CAREFULLY AND SUBMIT WITH YOUR PROPOSAL. ALL APPLICABLE

DOCUMENTS SHALL BE SUBMITTED ELECTRONICALLY THROUGH OPENGOV. VENDOR SHOULD

CHECKOFF EACH OF THE FOLLOWING ITEMS. ALL DOCUMENTS REQUIRING EXECUTION SHOULD BE EITHER BY WET SIGNATURES OR VERIFIABLE ELECTRONIC SIGNATURES. FAILURE TO PROVIDE THE

APPLICABLE DOCUMENTS MAY DEEM YOU NON-RESPONSIVE/NON-RESPONSIBLE.

General Instructions has been acknowledged and accepted.

Collier County Purchase Order Terms and Conditions have been acknowledged and accepted.

Form 1: Vendor Declaration Statement

Form 2: Conflict of Interest Certification

Proof of status from Division of Corporations - Florida Department of State (If work performed in the State) -http://dos.myflorida.com/sunbiz/ should be attached with your submittal.

Vendor MUST be enrolled in the E-Verify - https://www.e-verify.gov/ at the time of submission of the proposal/bid.

Form 3: Immigration Affidavit Certification MUST be signed and attached with your submittal.

E-Verify Memorandum of Understanding or Company Profile page should be attached with your submittal.

Form 4: Reference Questionnaire form must be utilized for each requested reference and included with your submittal, if applicable to the solicitation.

Form 5: Grant Provisions and Assurances package in its entirety, if applicable, are executed and should be included with your submittal.

Vendor W-9 Form.

Vendor acknowledges Insurance Requirements and is prepared to produce the required insurance certificate(s) within five

(5) days of the County’s issuance of a Notice of Recommend Award.

Copies of all requested licenses and/or certifications to complete the requirements of the project.

All addenda have been signed and attached.

County’s IT Technical Architecture Requirements has been acknowledged and accepted, if applicable.

Any and all supplemental requirements and terms has been acknowledged and accepted, if applicable.

APPLICABLE DOCUMENTS MAY DEEM YOU NONRESPONSIVENONRESPONSIBLE:
undefined:
undefined_2:
undefined_3:
undefined_4:
undefined_5:
undefined_6:
undefined_7:
undefined_8:
undefined_9:
undefined_10:
undefined_11:
undefined_12:
undefined_13:
undefined_14:
undefined_15:

File details come from the government source that posted it. Updated .